1. Performance Work Statement - Metal Sunshades.pdf
PDF 1 MB Posted
- Solicitation number
- FA4800Q0112
About this file
This is a Performance Work Statement (PWS) for aircraft sunshade inspection, maintenance, and repairs services at Joint Base Langley-Eustis, Langley Air Force Base, Virginia, effective 02 July 2026.
The contractor must provide all equipment, tools, materials, parts, vehicles, personnel, labor, supervision, and management to inspect, maintain, and repair five metal roof aircraft sunshades totaling 44 aircraft parking spots. Work includes structural LED lights, bird nesting mitigation, lightning protection systems, obstruction lighting, safety reflective devices, and fall protection. The contractor shall perform semi-annual complete sunshade inspections in November and May, and quarterly electrical power system inspections in November, February, May, and August, submitting inspection reports in Microsoft Excel format within 21 calendar days of completion. All inspections, maintenance, and repairs must follow original equipment manufacturer (OEM) specifications, industry standards, or best practices, and comply with applicable Federal, State, local building codes, UFC, and UFGS standards. The contractor must develop and submit a non-proprietary Preventative Maintenance Plan (PMP) within 30 days of contract award and a Quality Control Plan within 10 business days of award.
Repairs require Contracting Officer approval via Letter of Direction (LOD) following a formal Request for Quote (RFQ) process; the contractor shall not bill for repairs without prior approval and must provide three competitive quotes for non-proprietary items exceeding $250 and reimburse parts at cost without markup. Emergency maintenance requires assessment within 2 hours and action within 24 hours; urgent maintenance requires assessment within 24 hours and completion within 5 workdays; routine maintenance follows a planned schedule. The contractor must maintain current personnel listings, comply with JBLE environmental and hazardous materials requirements, obtain necessary security clearances and base access, and coordinate all work with the Contracting Officer's Representative (COR) to minimize disruption to mission requirements. Standard operating hours are 0700 to 1600 EST Monday through Friday, excluding federal holidays, with coordination required for any work outside these hours. Performance evaluation uses a zero-defects threshold with 100% government surveillance for all performance objectives.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PERFORMANCE WORK STATEMENT
FOR
Aircraft Sunshade Inspection, Maintenance, and Repairs (Metal Roof Structures)
1st Aircraft Maintenance Squadron
Joint Base Langley-Eustis, Langley AFB VA
02 July 2026
PWS for Aircraft Sunshade Inspection, Maintenance
CUI
CUI
TABLE OF CONTENTS
1.0 SCOPE OF WORK
2.0 DESCRIPTION OF SERVICES
3.0 GENERAL INFORMATION
4.0 SERVICES SUMMARY
5.0 GOVERNMENT FURNISHED EQUIPMENT, SUPPLIES AND SERVICES
TECHNICAL EXHIBIT 1- Sunshade Configuration
TECHNICAL EXHIBIT 2- Maintenance Documentation
TECHNICAL EXHIBIT 3A- Semi-Annual / Annual Complete Sunshade Inspection Report
TECHNICAL EXHIBIT 3B- Semi-Annual / Annual Complete Inspection Report Checklist
TECHNICAL EXHIBIT 4A- Quarterly Electrical Inspection Report
TECHNICAL EXHIBIT 4B- Quarterly Electrical Inspection Report Checklist
APPENDIX A- Definitions
CUI
CUI
1.0 SCOPE OF WORK
1.1 SCOPE OF WORK. The contractor shall provide all equipment, tools, materials, parts, vehicles, personnel, labor, supervision, and management to perform inspections and maintenance including all repair services to five aircraft metal roof sunshades on Joint Base Langley- Eustis (JBLE), Langley Air Force Base (AFB), Virginia (VA), to include but not limited to: structure LED lights, bird nesting mitigation, lightning protection inspection, obstruction lighting, safety reflective devices, fall protection and any other attached features. The contractor shall perform inspections, maintenance and repairs in accordance with (IAW) original equipment manufacturers (OEM) specifications, procedures, industry standards, or best practices, (in that order), and in accordance with applicable Federal, State and local building codes and regulations or equivalent military standard Unified Facilities Criteria (UFC) and Unified Facility Guide Specifications (UFGS). Should any conflicts within the regulatory documents be noted, the contractor shall advise the Contracting Officer’s Representative (COR) prior to beginning any task or modifying the structure and any components. The contractor shall provide documentation to the government of inspections, maintenance, and repairs IAW Technical Exhibit (TE) 2, 3, and 4 of the PWS. Sunshade configuration is five (5) shelters with two (2) of the shelters having eight (8) aircraft parking spots each, two (2) shelters having seven (7) aircraft parking spots each, and one (1) shelter having twelve (12) parking spots as shown in TE 1.
2.0 DESCRIPTION OF SERVICES: INSPECTIONS, PREVENTIVE MAINTENANCE and
REPAIRS
2.1 Semi-Annual and Quarterly Inspections. The contractor shall perform Semi-Annual Inspections of the sunshades in the months of November and May of each year, and Quarterly Electrical Power inspections in November, February, May, and August. The contractor shall perform inspections, in accordance with all manufacturer’s recommended inspection procedures, industry standards and best practices, the PWS TE 3b, Sunshade Inspection Checklist, and TE 4b Electrical Power System Inspection Checklist for the following, but not limited to: lightning protection systems, aircraft sunshade structure, electrical lines, transformer inspection, corrosion of structural surfaces, and lighting. The contractor shall document all inspection results on the applicable inspection report.
2.1.1 Semi-Annual and Quarterly Inspection Results. The contractor shall submit the respective inspection reports to the COR and CO, TE 3a, for Semi-Annual Inspection Report and TE 4b for Quarterly Electrical Inspections, in Microsoft Excel spreadsheet format no later than 21 calendar days after the last sunshade is inspected.
2.1.2 Inspect, Correct, and Document. The contractor shall also inspect for, correct, and document the following if not required elsewhere in the PWS:
a) Inherent structural weakness
b) Corrosion
CUI
CUI
c) Design defect
d) Electrical defect
e) Weather (turbulence) related damage
f) Destruction of shelters manmade or natural.
g) Failure (signs of or evidence of electrical, structural, or mechanical failure)
h) Severed items
i) Evidence of stress/buckling/fatigue/etc.
j) Fabric tears/rips/rot/etc.
k) Missing hardware
l) Loose hardware
m) Wildlife intrusion
n) Other discrepancies
2.1.3 Inspection Schedule. The contractor shall schedule all work in advance with the COR to minimize disruption to mission requirements. They shall coordinate inspections no later than 30 calendar days before either the Semi-Annual Complete Sunshade or Quarterly Electrical Inspections. Semi-Annual Complete Sunshade inspections will be accomplished in November and May, and Quarterly Electrical Power System inspections will be accomplished in November, February, May, and August. This makes a total of two complete Sunshade inspections and four electrical inspections annually. Inspections due in November and May can be done in tandem; this will make for a minimum of four site visits for inspections annually.
2.2 Preventative Maintenance. The contractor shall accomplish routine maintenance as part of the following tasks to support aircraft sunshade maintenance requirements. Preventative maintenance shall include any maintenance action required by OEM specifications or standards which will prolong the sustainability of the aircraft sunshades. Preventative maintenance includes but is not limited to items listed in TE 3b and 4b of the PWS. All preventative maintenance will be performed in accordance with OEM specifications, industry standards, or best practices as applicable and shall be performed as part of the semi-annual inspection.
2.2.1 Preventative Maintenance Plan (PMP). The contractor shall develop and maintain a PMP that provides details of how the contractor shall address tasks to include how aircraft sunshade configurations shall be maintained, and a description of preventative maintenance to be performed on aircraft sunshades in accordance with the PWS. The contractor shall submit the PMP to the COR no later than 30 days after contract award, and the PMP shall be non-proprietary.
CUI
CUI
2.2.2 Estimated Time to Perform Maintenance. The contractor shall establish an estimated time to perform maintenance for aircraft sunshades and provide the written estimated time to the COR. The contractor shall notify the COR within 8 hours of knowledge of change from the planned schedule.
2.3 Repairs. The contractor shall identify, in writing, all necessary repairs discovered during PMs, inspections, or service calls that cannot be performed during the same visit. The contractor shall make all repairs once coordinated with the COR by following the repair procedures. The contractor shall accomplish all work order tasks during normal duty hours; however, occasions may arise that require work to be accomplished outside of these hours. The contractor shall coordinate all routine work outside of normal duty hours with the COR and the CO.
2.3.1 The Contracting Officer (CO) must approve any additional work with a Letter of Direction (LOD). The contractor is not authorized to perform unscheduled work without the below approvals.
2.3.1.1 All repair work is required to be approved by the CO to determine the price to be fair and reasonable. The process for CO approval is outlined below.
2.3.1.2 The contractor shall contact the COR first and provide the COR with the scope of work for repairs. The contractor shall not provide any pricing or estimates. The contactor shall only provide the scope of work to the COR.
2.3.1.2.1 The COR will submit a repair request to the 633 CONS contract specialist, who will then send a Request for Quote (RFQ) to the contractor.
2.3.1.2.2 The contractor shall provide their quote to the 633 CONS contract specialist, who will then coordinate with the COR to ensure technical acceptability. Once the COR provides their technical review to the 633 CONS contract specialist, a Letter of Direction (LOD) will be issued by 633 CONS for the contractor to begin the repairs. The contractor shall complete the repairs within the mutually agreed upon time stated in the LOD after the LOD notification. A minimum of three (3) quotes shall be submitted by the contractor for items that are not proprietary to the Original Equipment Manufacturer (OEM).
2.3.1.3 The contractor shall invoice for all repairs after the work is completed and submit all tickets for the work as one (1) attachment in Wide Area Workflow (WAWF).
2.3.2 The contractor will be reimbursed for parts at cost. The contractor shall ensure they obtain the best possible prices and discounts from suppliers. The contractor shall not add a mark up to their cost. The contractor shall provide a copy of the vendor invoice to the CO. For individual parts that exceed $250.00 the contractor shall provide three quotes to show the best value was obtained.
2.3.3 Repair Procedures. Upon completion of the semi-annual inspection or identification of an emergency repair, the contractor shall provide work orders to the COR and CO for approval for items deemed to be outside the scope of routine maintenance. All work must be approved by the CO before the contractor begins work. The contractor shall coordinate with COR for repair completion/timeframe. The contractor shall not include pricing estimates on service call/repair workorders. The contractor shall provide this directly to CONS during the RFQ process discussed above.
2.3.4 Repair Content. As a minimum, work orders shall contain the following information:
a) Date of preparation.
CUI
CUI
b) Contract number and work order number
c) Contract line item number(s)
d) Job description, sunshade spot number
e) Estimated time to complete inspection/maintenance/repairs
f) Work clearance and/or work permit required, Yes or No
g) Contractor’s signature and date
h) COR signature and date
i) Completion date and contractor's signature
j) In the event of significant modifications to a work order, as permitted by the terms within this PWS, the Contractor shall provide supporting documentation to the COR, in writing, prior to modifying the scheduled work.
2.3.5 Completed Repairs/Work Orders. When the contractor completes all work tasks, the contractor shall enter the completion date, sign the work order form as complete and submit the finalized work order form to the COR. The contractor shall maintain a copy of all finalized workorder forms.
2.3.6 Disruptions. In the event that maintenance, inspections or repairs will cause a disruption to the surroundings (e.g. Power-outage, blocked access, inspection process, maintenance process, repair process, cleaning, and/or spraying), the contractor shall provide written notification at a minimum of five (5) workdays prior to the disruption. Disruptions shall provide the least amount of customer inconvenience.
2.3.7 Terms and Conditions. All inspections, maintenance and repairs completed under the contract are subject to the terms and conditions of the contract. In the event of conflict with any repair, the contract will take precedence. The contractor shall refer any questions, concerns or disputes concerning work orders to the COR and the CO in writing within 24 hours (two hours for emergencies) of receipt of the work order. If questions, concerns, or disputes cannot be resolved, the COR will refer the matter to the Contracting Officer.
2.3.8 Maintenance and Repair.
2.3.8.1 Emergency Maintenance. Emergency maintenance is classified as an immediate response to repair hardware or structural failure that renders the sunshade unserviceable and/or unsafe, as determined and reported by the CO or COR. Scope shall be limited to work necessary to eliminate the emergency condition (i.e., investigation and temporary repair, except where permanent repair is more practical). The contractor shall have the capability to assess the emergency condition within 2 hours of notification, including outside of regular duty-hours. The contractor shall initiate actions necessary to render the sunshade safe within 24 hours of assessment, unless a waiver has been obtained from the CO. Once the emergency condition has been alleviated, the condition shall be re-categorized as urgent or routine (if applicable).
CUI
CUI
2.3.8.2 For events so catastrophic that 24-hour alleviation is not possible, a waiver may become automatic, as approved by the CO, with guidance from the WG/CC.
2.3.8.3 Urgent Maintenance. Urgent maintenance is classified as a condition that, if not acted upon immediately, is likely to create an emergency maintenance situation. The contractor shall have the capability to assess the urgent condition within 24 hours of notification. The contractor shall initiate urgent action repairs within 48 hours of assessment, and complete urgent work within five workdays of notification unless a waiver has been obtained from the CO.
2.3.8.4 Routine Maintenance. Routine maintenance is classified as all other maintenance actions. The contractor shall incorporate routine maintenance into a planned work schedule. If an asset(s) is found broken or inoperable during inspection, the contractor shall within 24 hours, provide a time when the asset(s) will be scheduled for repair.
2.3.8.5 Estimated Time to Repair. The contractor shall establish an estimated time to repair for aircraft sunshade service calls and provide the written estimated time to the COR. The contractor shall notify the COR within 8 hours of a known change from the planned schedule.
2.4. Documentation of Maintenance and Repair.
2.4.1 Documentation. The contractor shall maintain and submit maintenance documentation to the COR, in Microsoft Excel spreadsheet format, found in PWS TE 2, Maintenance Documentation.
Maintenance documentation shall include aircraft sunshade condition (serviceable/unserviceable-see definitions in PWS Appendix A., Definitions), scheduled and unscheduled maintenance activities (including preventative maintenance performed), discrepancies, corrosion control actions, repairs needed, corrective actions, identified trends in discrepancies and metrics. All documentation shall be considered an integral part of this contract and shall be non-proprietary in nature.
2.4.2 Reference Material. The contractor shall maintain copies of applicable aircraft sunshade manuals, drawings, specifications, etc. for use during inspection, preventive maintenance, repairs and have available for COR to view upon request.
2.4.3 Documentation of Paint and Coating Use. The contractor shall maintain a complete history of use of paint and any other protective coating. Documentation shall include the date of use, type and amount of product used to include any brand name, process used, specific location where product was applied, and the contractor that performed the work. The contractor shall provide the documentation to the COR, upon request.
2.4.4 Alternate Procedures. The contractor may propose alternate maintenance procedures as a cost saving initiative or enhancement to inspection and/or maintenance accomplishment. Alternate procedures include deviations from preventive maintenance requirements when supported by technical analysis, test results, and documented conclusions. The CO shall approve all contractor-proposed deviations from preventive maintenance requirements prior to implementation.
2.4.5 Warranties. The contractor shall assume and maintain any pre-existing warranties. Warranties for future work shall be provided to the COR and CO upon completion of the work.
CUI
CUI
2.4.6 Government Caused Delays. During inspection, maintenance and repair the contractor shall identify, document, and notify the COR and CO of any actual or potential delays caused by government action or mission interference. Site-specific problems affecting maintenance accomplishment and/or contractor performance will be reported to the COR and CO as soon as practicable.
2.5 Qualifications, Experience, Training.
2.5.1 Personnel Qualifications. Contractor personnel shall be fully trained and possess all professional certifications and licenses required to perform aircraft sunshade inspections, maintenance and repair services. The contractor shall provide proof of contractor employee qualifications to the CO and COR, upon request.
2.5.2 Employee Training. The contractor shall develop, implement, and maintain procedures for training, qualifying and certifying personnel prior to performance of assigned duties under this contract (i.e., welding, electrical, etc.). The contractor shall formulate and provide comprehensive training, qualification and certification procedures for contractor personnel for submission with the QCP (Quality Control Plan).
2.5.3 Training Records. The contractor shall develop and maintain individual training records to document training and test results and document all initial and supplemental training accomplished for each employee. The contractor shall maintain training records and make them available to the COR, upon request.
2.5.4 Employee Restrictions. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval in accordance with DoD Directive 5500.7, Standards of Conduct.
2.5.5 The contractor shall not employ persons identified by the Contracting Officer as a potential threat to the health, safety, security, general well-being, or operational mission of the installation or its populace.
The contractor shall remove personnel identified as potential threat. The Contracting Officer reserves the right of the Government to restrict the employment under the contract of any contractor employee or prospective contractor employee identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
2.5.6 Military Members. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment.
Military reservists and National Guard members are subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor's ability to perform services. The absence of these personnel at any time shall not constitute an excuse for nonperformance under this contract.
2.5.7 Appearance. Contractor personnel shall present a professional, conservative and neat appearance and be easily recognizable as a contractor employee while on the installation, through the use of distinctive clothing or overcoats, bearing the company name or logo. The coloring or design of the items
CUI
CUI
selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
2.5.8 Significant Incident Notification Procedure. The contractor shall inform the Contracting Officer within 24 hours of becoming aware of an incident that involves a Contractor’s employee that may subject the employee, the contractor, or the Government to either potential civil or criminal liability.
2.6 Environmental Management.
2.6.1 Joint Base Langley-Eustis (JBLE) is dedicated to the conservation, protection, and enhancement of the environment. The contractor shall comply with all federal laws and regulations; state and local laws, ordinances, and regulations; and Installation policies and procedures. JBLE Installation specific policies and procedures:
2.6.2 Joint Base Langley-Eustis – Langley Air Force Base. The contractor must comply with all provisions of the JBLE-Langley Environmental Special Conditions. You can review or download the document at https://www.jble.af.mil/Portals/46/Environmental%20Special%20Conditions%20- %202023.pdf. This is a living document that is updated periodically so ensure you have the latest version.
If you have any questions, please contact your project manager or the 633d Contracting Officer first and have them contact the 633d CES Environmental Element on your behalf.
2.6.3 Joint Base Langley-Eustis - Fort Eustis. Not applicable to this PWS.
2.6.4 Contractor Liability. The contractor is liable and responsible for non-compliance of environmental safety and health (ES&H) provisions and is responsible for payment of fines and fees resulting from improper contractor actions and/or process.
2.6.5 Hazardous Materials (HAZMAT). The contractor shall manage, handle, transport, store, and dispose of all HAZMAT, including hazardous waste, in accordance with the Resource Conservation and Recovery Act, 40 Code of Federal Regulations (CFR) 260-265, Protection of Environment, applicable State statutes and regulations, and the JBLE Hazardous Waste Management Plan. If requested, the contractor shall obtain a separate hazardous waste ID number identifying them as a generator of hazardous waste and coordinate all hazardous shipments with the 633 Civil Engineering Squadron (633 CES) Hazardous Waste Program Manager (633 CES/CEAN). The contractor shall not store HAZMAT on
JBLE.
2.6.6 Processing HAZMAT for Use on JBLE. The contractor shall not bring or use any type of HAZMAT on JBLE, until the HAZMAT has been approved by the Hazardous Materials Pharmacy (HAZMART). Upon contract award, the contractor shall submit Safety Data Sheets (SDS) to the COR for all HAZMAT the contractor intends to use on JBLE. The COR will contact the contractor if more data is required for HAZMAT use approval. The COR will also notify the contractor whether or not the HAZMAT has been approved for use on JBLE, including information for tracking HAZMAT by the contractor, if required.
2.6.7 HAZMAT Spills. The contractor shall take every reasonable precaution to prevent HAZMAT spills and immediately report any HAZMAT spills to the base fire department by calling 764-4222, in accordance with JBLE Spill Prevention and Response Plan procedures. The contractor shall clean and dispose of all hazardous materials spills in accordance with local, state, and federal laws and regulations.
CUI
CUI
The contractor shall bear full financial obligation incurred from cleaning and disposing of hazardous materials spills, or release of hazardous materials within the confines of JBLE by contractor personnel.
2.6.8 Notification of Environmental Spills. If the contractor spills or releases any hazardous materials into the environment, the contractor shall immediately report the incident to the CO and COR. The contractor is liable for all costs associated with the spill or release of hazardous materials.
2.6.9 Spill Containment Plan. The contractor shall submit a spill containment plan to the COR, no later than 15 calendar days after contract start date. As a minimum, the plan shall include how the contractor will handle and use hazardous materials on JBLE, and HAZMAT spill procedures. The contractor is responsible for informing contractor personnel of the content of the plan. The plan shall be maintained in a location where it is immediately available to contractor personnel.
2.6.10 Spill Containment Kits. The contractor shall ensure that all vehicles used for transport of hazardous materials on JBLE, carry an approved spill containment kit capable of containing a spill, until first responders arrive. The contractor shall make spill containment kits available for inspection by Government personnel, upon request.
2.6.11 Exposure. The contractor shall ensure that its operations do not expose Government personnel to any hazardous conditions; i.e., noise, chemicals, equipment, etc., as covered by OSHA/AFOSH Standards.
2.6.12 Work Clearance and Permits. The contractor shall coordinate with the COR, as required, to obtain digging, welding, and/or paint spraying permits in accordance with base procedures, prior to beginning tasks. The contractor shall not commence digging, welding, or paint spraying until required permits are obtained.
2.6.13 Bird Nesting. Contractor shall remove all bird nesting/nest building material as required. COR will coordinate with USDA as required to ensure removal is allowed and will not harm environment.
Contractor will include any removal action in the maintenance documentation.
3.0. GENERAL INFORMATION.
3.1 Hours of Operation. The hours of operation are 0700 to 1600 Eastern Standard Time (EST), Monday – Friday, excluding federal holidays. If the contractor wishes to perform any services outside of the normal hours of operation, the contractor shall coordinate with the Contracting Officer Representative (COR) and the Contracting Officer (CO) no later than one week prior to the scheduled event. In the event of emergency circumstances, accommodation may be made on a case-by-case basis.
3.1.1 Base Closure Days. If the Base Commander determines the base is closed due to snow, hurricane, or Acts of God, the contractor shall reschedule work planned for this time.
3.1.2 Federal Holidays. The Contractor shall not be required to work any of the following federal holidays:
New Year’s Day - 1 January
CUI
CUI
Martin Luther King Day - 3rd Monday in January
Washington’s Birthday - 3rd Monday in February
Memorial Day - last Monday in May
Juneteenth National Independence Day – 19 June
Independence Day - 4 July
Labor Day - 1st Monday in September
Columbus Day - 2nd Monday in October
Veteran’s Day - 11 November
Thanksgiving Day - 4th Thursday in November
Christmas Day - 25 December
3.1.2.1 If a holiday falls on Saturday, the preceding Friday shall be observed. If a holiday falls on Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day post the holiday observance.
3.2 Essential Contractor Service. The Government has identified services in paragraphs 2.3.8.1 thru
2.3.8.5 performed under this contract as essential contractor services in support of mission essential functions in accordance with Department of Defense Federal Acquisition Regulation Supplement (DFARS), Subpart 237.76, Continuation of Essential Contractor Services. The contractor shall activate its plan for maintaining essential contractor services only during periods of crisis, as directed by Government personnel. These services are not considered essential during exercises.
3.3 English Language Requirement. All contractor personnel shall read, understand, speak and write English fluently.
3.4 Contract Manager. The Contractor shall provide a contract manager and an alternate who shall be responsible for the performance of the work. These individuals shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract and shall be designated, in writing, to the Contracting Officer (CO). The alternate contract manager shall act for the contract manager when the manager is absent. The contract manager and alternate contract manager shall have experience in management and supervision.
3.4.1 The contract manager or alternate shall be available within 2 hours to meet on the installation or by telecom with the CO and/or with other government personnel designated by the CO during normal duty hours to discuss issues or concerns.
3.5 Communication. Contractor personnel shall maintain open and professional communication with government personnel at all times. Complaints validated by the COR shall be reported in writing to the CO and the contractor for action. Failure of the contractor to take corrective action on validated complaints raised by the COR and the CO will be considered a failure to perform.
CUI
CUI
3.6 Appearance. Contractor personnel shall present a professional, conservative, and neat appearance. Contractor personnel shall report for duty in a professional manner, in appropriate attire and having complied with socially acceptable standards of personal hygiene.
3.7 Contractor Identification. All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials. Contractors performing work at Government workplaces will provide their employees with an easily readable identification (ID) badge indicating the employee's name, the contractor's name, the functional area of assignment, and a recent color photograph of the employee. Contractors shall require their employees to wear the ID badges visibly when performing work at Government workplaces. Contractor personnel must also ensure that all e-mails, documents, or reports they produce are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All signature blocks on e-mails shall indicate the Contractor's name. All e-mail address lines shall include CTR in the address line.
3.8 Conflict of Interest. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest. The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such a person seeks and receives approval in accordance with the Department of Defense (DoD) Directive 5500.7 and Air Force policy. If prior military, personnel must have been discharged under honorable conditions with no administrative actions taken against them.
3.8.1 Security Requirements for Unclassified Contracts. The contractor shall ensure the necessary pass and identification items required for contract performance are obtained for all personnel.
3.8.2 Listing of Personnel. The contractor shall maintain a current listing of personnel NLT the 10 business days after contract award. The list shall include the employee’s name, social security number and level of security clearance. The list shall be validated and signed by the companies Facility Security Officer (FSO) and provided to the sponsoring agency’s security manager, the COR, and the CO. An updated listing shall be provided when an employee’s status or information changes within 5 business days of a change in personnel.
3.8.3 Langley Installation Access. The contractor shall ensure that each employee obtains the following pass and identification items: all necessary cards, passes, buttons, decals, or other items required for access to the areas and the installation. Upon contract award and the replacement of any employees, the contractor will be required to complete a base access request form which will be submitted to the COR. The COR will submit the pass request to the 633d Security Forces Squadron (633 SFS) to obtain the necessary identification items. Upon approval of the pass request by 633 SFS, the contractor employee will be required to obtain any individual and vehicle identifications media at the 633 SFS Pass and Identification Section, 20 Nealy Ave (Bldg 5) on Langley AFB, VA.
3.8.4 Ft. Eustis Installation Access. Reserved
3.8.5 Tier 1 (T1) Investigation. As a minimum, contractor personnel must be able to obtain and maintain a favorable suitability/fitness determination under 5 CFR 731 or equivalent. The Government will submit background investigations for positions that require a Common Access Card (CAC) and/or IT access only. Prior to CAC issuance, an FBI fingerprint check must be completed without adverse
CUI
CUI
comment, and the T1 Investigation or equivalent must be initiated. CACs will not be issued before the fingerprint check results have been completed and the investigation has been opened/scheduled at Office of Personnel Management (OPM). Fingerprints and the appropriate investigation will be submitted by the Government.
3.8.6 Physical Security (Security of Government Property). The contractor shall safeguard all government property, including controlled forms provided for contractor use. Contractors are prohibited from approaching aircraft. At the close of each work period, government equipment, facilities, and squadron assets and materials shall be secured.
3.8.6.1 Escorts. Contractor personnel shall comply with restricted area escorts only for means of security or critical equipment safeguarding. Escorts shall not have any authority over performance or execution of contract requirements.
3.8.6.2 Foreign Object Damage (FOD). All waste generated on the flight line will be contained and properly disposed of to prevent FOD (Foreign Object Damage) to aircraft.
3.8.6.3 Drone operation, photography, and video recording are strictly prohibited within the restricted area. No exceptions. Any violations will be reported to the Office of Special Investigations (OSI) and result in confiscation of the device used without guarantee of return.
3.8.7 Entry Procedures to Controlled/Restricted Areas. The contractor shall comply with local base procedures for entry to Air Force (AF) controlled/restricted areas where contractor personnel will work.
3.8.8 Reporting Requirements. The contractor shall comply with the requirements of Volume 1, AFI 71-101, Criminal Investigations, and paragraph 1.1 of Volume 2, Protective Service Matters. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware that may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. The contractor personnel’s immediate supervisor shall brief him/her upon initial on-base assignment and as required thereafter.
3.8.9 Retrieving Identification Media. The contractor shall return all identification media to the sponsoring agency’s security office, the COR or the CO upon completion/termination of the contract or upon departure of any personnel during the course of the contract. Failure to do so may delay payment to the contractor. Final payment may be withheld until identification media is returned.
3.9 Key Control. Reserved
3.9.1 Lost Keys. Reserved
3.10 Traffic Laws. The contractor and/or contractor personnel shall comply with the installation traffic code as specified in Virginia State Law and Air Force Instruction (AFI) 31-218,Motor Vehicle Traffic Supervision (current edition). The contractor and/or contractor personnel shall comply with current instruction on cell phone use while on a military installation.
3.11 Weapons, Firearms, and Ammunition. Contractor personnel are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on any Air Force base.
CUI
CUI
3.12 Smoking in Air Combat Command (ACC) Facilities. Contractors are advised that the ACC Commander has placed restrictions on the smoking of tobacco products in ACC facilities. AFI 40-102, Tobacco Use in the Air Force (current edition), outlines the procedures used by the commander to control smoking in our facilities. Contract personnel and visitors are subject to the same restrictions as Government personnel. Smoking is permitted only in designated smoking areas.
3.14 Operations Security (OPSEC). This contract has been determined to not have critical or sensitive information requiring an OPSEC Plan.
4.0 SERVICES SUMMARY
4.1 SERVICES SUMMARY (SS). The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government surveillance and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the Federal Acquisition Regulation (FAR) 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. The absence of any contract requirements from the SS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Government has the right to inspect all services required in the contract.
PERFORMANCE
OBJECTIVE
REFERENCE
PARAGRAPH
PERFORMANCE
THRESHOLD
SURVELLIANCE
METHOD
SS-1 Inspect, maintain, and repair aircraft sunshades
2.1, inclusive Zero Defects 100% surveillance
SS-2 Estimated time to repair 2.3.5, 2.3.8.4 Within +10% of contractor estimate
100% surveillance
SS-3 Completed repairs/work orders
2.3.5 Zero Defects 100% surveillance
SS-4 Assess Emergency Conditions
2.3.8.1 Zero Defects 100% surveillance
SS-5 Initiate Emergency repair actions
2.3.8.1 Zero Defects 100% surveillance
4.1.1 Performance Evaluation. The purpose of the Services Summary is to define performance evaluation and payment procedures. The Performance Objective (column 1) describes what the government will survey. Performance of a service will be evaluated to determine whether or not it meets the Performance Threshold (PT) of the contract. When the PT is exceeded, the COR will document the file with a Corrective Action Report (CAR) or a Performance Assessment Report (PAR) and provide the
CUI
CUI
Contracting Officer with a Department of Defense (DoD) Form 2772 (Contract Discrepancy Report (CDR)) for issuance to the contractor.
4.1.1.1 The Government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through inspections of reports and contractor services documentation. The Government may inspect each task as completed or increase the number of quality assurance inspections if deemed appropriate because of repeated failures or because of repeated customer complaints. Likewise, the Government may decrease the number of quality assurance inspections if performance dictates. The government COR will make final determination of the validity of customer complaint(s).
4.1.2 If any of the services do not conform to contract requirements, the Government may require the contractor to perform the services again in conformity with contract requirements at no increase in contract amount. When the defects in services cannot be corrected by re- performance, the Government may:
- Require the contractor to take necessary action to ensure that future performance conforms to contract requirements; and
- Reduce the contract price to reflect the reduced value of the services performed.
4.1.3 Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any quarter period may result in an immediate Progress Meeting with the Multi-functional Team. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non- consecutive quarters during a contract period shall constitute a warning or Letter of Concern from the Contracting Officer. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.
4.2 Quality Control. The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with this contract and PWS. The contractor shall develop and implement procedures to identify and prevent non-performance and continual repea tof defective service.
A written Quality Control Plan (QCP) shall be submitted to the CO and COR for review and feedback.
The plan shall be submitted no later than 10 working days after award. The plan shall specifically address the contractor’s strategy to provide quality workmanship, continual process improvement and for correcting deficiencies as required.
4.3 Quality Assurance. The Government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The COR shall inspect by watching actual task performance, physically checking an attribute of the completed task, checking management information reports, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR will record surveillance results. Results of the surveillance then become the official Air Force record of the contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate a Corrective Action Report (CAR) or Performance Assessment Report (PAR), and provide the Contracting Officer a
CUI
CUI
Contract Discrepancy Report (CDR) for issuance to the contractor. The contractor shall respond to the CDR in accordance with instructions provided and return it to the Contracting Officer no later than the suspense given by the CO.
4.4 Surveillance Methods.
4.4.1 100% Surveillance. This method requires the COR to inspect the service each time it occurs.
Results shall be annotated on the inspection checklist. Any deficiency shall be documented and the contractor shall re-perform service as directed by the COR. Any unsatisfactory inspection identified but re-performed acceptably, shall still be counted as an unsatisfactory inspection for trending purposes.
4.4.2 Customer Complaint. This method requires the customer to fill out a locally generated form provided by the COR or Contracting Officer. The COR will verify the complaint and notify the contractor of valid complaints. The contractor shall acknowledge the complaint within 2 hours and inform the COR of his recommendation. Any deficiency shall be documented and the contractor shall re-perform service immediately, if appropriate, or within 24 hours at no increase in contract amount. The contractor shall respond to the Customer Complaint in accordance with the instructions provided and return it to the Contracting Office within 5 calendar days of receipt. Any unsatisfactory inspection identified but re-performed acceptably, shall still be counted as an unsatisfactory inspection.
4.4.3 Periodic Progress Meetings. The Contracting Officer, Functional Commander, COR, or other government personnel as appropriate, and the contractor shall periodically meet to discuss the contractor’s performance. The following issues shall be discussed: observed positive performance and steps taken by the contractor to prevent unsatisfactory performance, any modifications required of the contract, opportunities to improve performance, unsatisfactory inspections and trends against each performance objective.
4.4.4 The minutes of these meetings will be reduced to writing, signed by the Contracting Officer and any other signatures as deemed appropriate, and distributed to the functional area and the contractor.
Should the contractor not concur with the minutes, the contractor will provide a written notification to the Contracting Officer identifying areas of non-concurrence for resolution within 10 days of receipt.
4.5 Deliverables. The contractor shall submit all deliverables in electronic form and shall produce reports using the Microsoft Office suite of applications. All deliverables must meet professional standards and the requirements set forth in contractual documentation. The contractor shall be responsible for delivering all end items specified.
Document/Item Due Coordinate Inspections NLT 30 calendar days before either the Semi-Annual
Complete Sunshade or Quarterly Electrical Inspections.
Semi-Annual Inspection Report NLT 21 calendar days after inspection completion Quarterly Inspection Report/Documents NLT 21 calendar days after inspection completion Preventative Maintenance Plan (PMP) NLT 30 calendar days after contract award Contractor's Quality Control Plan NLT 10 business days after contract award Listing of Personnel NLT 10 business days after contract award and w/in 5 business days of a change in personnel Spill Containment Plan NLT 15 calendar days after contract award
CUI
CUI
5.0 GOVERNMENT FURNISHED EQUIPMENT, SUPPLIES AND/OR SERVICES.
5.1 Contractor Furnished Items and Services. Except for those items or services specifically stated in this PWS to be government-furnished, the contractor shall furnish everything required to perform this contract in accordance with all of its terms and conditions. It is the contractor’s responsibility to ensure contractor personnel are familiar with and understand the contents of this PWS as well as the company’s handbooks/handouts, etc. prior to beginning work.
5.2 Utilities. The Government will provide the utilities necessary for the contractor to perform services in accordance with the terms and conditions of the contract.
5.3 Security, Fire and Medical Services. The Government will provide police and fire protection. In the event of a medical emergency, base ambulance services for transporting an injured employee to a local hospital is available on a cost reimbursement basis.
CUI
CUI
Technical Exhibit 1- Metal Sunshade Configuration Aircraft Sunshade Layout (Langley)
A2-8, B2-9&18-24, C2-9&18-29
Metal roof structures supported by steel post and beams. They are serviced by ground electrical to main stubs at the circuit breaker.
CUI
CUI
Technical Exhibit 2- Maintenance Documentation
ACC Aircraft Sunshade Maintenance Documentation Sheet
CUI
CUI
Technical Exhibit 3- Semi-Annual / Annual Inspection Report
ACC Aircraft Sunshade Annual Inspection Report
Technical Exhibit 3b- Semi-Annual / Annual Complete Inspection Report Checklist
1 Structure
1.1 Inspect all columns, beams, joists, girders and lateral cross bracing for proper connections, faulty/cracked welds, loose or missing bolts and corrosion. Tighten bolts to manufacturer specifications or replace if necessary. Treat corrosion and fatigue in accordance with manufacturer specifications.
1.2 Inspect turnbuckles and cables for severe corrosion, fraying or breaks, tightness, proper connection and security. Repair or replace in accordance with manufacturer specifications.
1.3 Inspect for loose/missing and damaged attaching hardware. Tighten or replace in accordance with manufacturer specifications and applicable Air Force Instructions concerning Foreign Object Damage guidelines.
1.4 Inspect anchor plate bolts for embedment, tightness, and severe corrosion. Tighten and treat corrosion as required in accordance with manufacturer specifications.
1.5 Inspect anchor plate for levelness (i.e. ensure it is flat on the ground).
1.6 Inspect concrete around all anchor plates for cracks/spalling.
1.7 Inspect sunshade frames for severe corrosion, treat corrosion as necessary.
2 Metal Roofing
2.1 Inspect roof panels and fasteners for security. Tighten or replace in accordance with manufacturer specifications.
2.2 Inspect for loose/missing and damaged attaching hardware. Tighten or replace in accordance with manufacturer specifications and applicable Air Force Instructions concerning Foreign Object Damage guidelines.
CUI
CUI
2.3 Inspect metal roof for severe corrosion, treat corrosion or replace in accordance with manufacturer specifications.
3 Miscellaneous
3.1 If installed, inspect gutters to ensure they are securely fastened. If loose or damaged, tighten/repair or replace in accordance with manufacturer specifications and applicable AirForce Instructions concerning Foreign Object Damage guidelines.
3.2 If equipped, inspect bird netting and fasteners for tightness. If loose or damaged, tighten, repair, or replace in accordance with manufacturer specifications and applicable Air Force Instructions concerning Foreign Object Damage guidelines.
3.3 The contractor shall inspect and repair/replace defective/damaged interior lights, lightning protection/grounding system, obstruction lighting, safety reflective devices, fall protection, and any other base-unique attached features, as applicable.
3.4 The contractor shall inspect/repair and document damage/defects to the solar lighting system, to include but not limited to the batteries, the inverter, the solar panels, any wiring and the housing for batteries and the inverter.
3.5 The contractor shall perform quarterly inspections/maintenance and document IAW the manufacturers recommended maintenance manual for the electrical power system.
3.6 The contractor shall perform biannual inspection of the lightning protection system (LPS). IAW
NFPA 780.
CUI
CUI
Technical Exhibit 4a- Quarterly Electrical Inspection Report
Aircraft Sunshade Quarterly Electrical Inspection Report
Shelter Spot #
Inspection Date
Discrepancy Corrective Action
Corrosion Control Actions
ECD Contractor Repair Needed (y/n)
Repair Cost
Technical Exhibit 4b- Quarterly Electrical Inspection Report Checklist
1 Electrical
1.1 The contractor shall inspect and repair/replace defective/damaged interior lights, lightning protection/grounding system, obstruction lighting, safety reflective devices, fall protection, and any other base-unique attached features, as applicable.
1.2 The contractor shall inspect/repair and document damage/defects to the solar lighting system (if installed), to include but not limited to the batteries, the inverter, the solar panels (if installed),any wiring and the housing for batteries and the inverter.
1.3 The contractor shall perform quarterly inspections/maintenance and document IAW the manufacturers recommended maintenance manual for the electrical power system.
1.4 The contractor shall perform biannual inspection of the lightning protection system (LPS).IAW
NFPA 780.
CUI
CUI
APPENDIX A – Definitions
Configuration Management - Physical attributes or characteristics. Installation of original hardware/equipment.
Corrosion - The electrochemical oxidation of metals in reaction with an oxidant such as oxygen. Can occur in any environment.
Fatigue - The progressive and localized structural damage that occurs when a material is subjected to cyclic loading.
Fracture - The (local) separation of an object or material into two, or more, pieces under the action of stress.
Fraying - To strain; chafe. To wear away (the edges of…