About this file
Based on the file name provided, this appears to be a State Fire Marshal (SFM) approved architectural/engineering drawing set for medical units at DSH-Atascadero (Department of State Hospitals - Atascadero). Without access to view the actual contents of the PDF file, I cannot provide specific details about the drawings, design specifications, floor plans, mechanical systems, or other technical elements that would typically be included in SFM-approved construction documents.
No additional information about pricing, timelines, bidding requirements, or project specifications can be determined from just the file name. A full review of the document contents would be needed to provide those details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
516 514
510A
508A
509A
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E Z S h a re d \P
R O
J E C
T S \2
\2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls
D
S H
A D S H
-M D S H
-N D S H
-P D
S H -C
C
A D
\D S H
-A ta s c a d e ro
\2 T .d w g
D A T E /T
IM
E J u l :5
P M
JCCA
DSH
LOCATION PLAN VICINITY MAP SCOPE OF WORK
10333 EL CAMINO REAL, ATASCADERO, CALIFORNIA 93422
DEPARTMENT OF STATE HOSPITALS - ATASCADERO
DEPARTMENT OF STATE HOSPITALS
T0.1
1. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 33 - FIRE SAFETY
DURING CONSTRUCTION OF THE 2022 CALIFORNIA FIRE CODE.
FIRE SAFETY DURING CONSTRUCTION
REPLACE EXISTING MEDICATION DISPENSING UNITS IN MED ROOMS:
1. VERIFY, DETERMINE, AND PREPARE EACH MOUNTING LOCATION FOR THE INSTALLATION OF
NEW ANCHOR PLATES (PROVIDED BY THE MANUFACTURER).
2. INSTALL ANCHOR PLATES PER MANUFACTURER'S CRITERIA, ANCHORAGE CRITERIA, AND
PLANNING CRITERIA PROVIDED IN THESE DRAWINGS.
3. VERIFY AND COORDINATE EQUIPMENT INSTALLATION WITH VENDOR. (EQUIPMENT INSTALLED
BY VENDOR AFTER CONTRACTOR CONFIRMS COORDINATION HAS BEEN PERFORMED).
4. REMOVE AND DISPOSE OF CASEWORK AND FIXTURES AS INDICATED TO PROVIDE SPACE FOR
EQUIPMENT INSTALLATION.
5. PATCH AND PAINT EXISTING, CEILING, WALL, FLOOR, AND CASEWORK FINISHES AS REQUIRED
TO MATCH EXISTING.
6. REMOVE AND REPLACE 2 EXISTING DOORS AND FRAMES TO ACCOMMODATE (N) EQUIPMENT
LAYOUT.
7. ROUTE (N) POWER AND DATA TO MED ROOMS AS INDICATED AND PROVIDE FIRESTOPPING AT
ALL RATED PENETRATIONS.
MEDICATION DISPENSING UNIT INSTALLATION
MULTI-BUILDING SUBMITTAL - PRIMARY OSFM PERMIT NUMBER: 24-S-0448-C
PROJECT INFORMATION
PREPARED BY:
J.C. CHANG & ASSOCIATES, INC.
ENGINEERS, ARCHITECTS AND PLANNERS
385 VAN NESS AVENUE, SUITE 208
TORRANCE, CALIFORNIA 90501
PHONE : (310) 212-7644
ARCHITECT OF RECORD /
PRIMARY PROFESSIONAL
MYOUNGJIN KANG
NO. C-37614
385 VAN NESS AVE. #208
TORRANCE, CALIFORNIA 90501
1. NO DEFERRED APPROVAL ON THIS PROJECT
DEFERRED APPROVALS
APPLICABLE CODES AND STANDARDS
TITLE SHEET
1. 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.
2. 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
(2021 INTERNATIONAL BUILDING CODE & 2021 CALIFORNIA AMENDMENTS)
3. 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
(2020 NATIONAL ELECTRICAL CODE AND 2021 CALIFORNIA AMENDMENTS)
4. 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
(2021 UNIFORM MECHANICAL CODE AND 2021 CALIFORNIA AMENDMENTS)
5. 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
(2021 UNIFORM PLUMBING CODE AND 2021 CALIFORNIA AMENDMENTS)
6. 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
7. 2022 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R.
(2021 INTERNATIONAL FIRE CODE AND 2021 CALIFORNIA AMENDMENTS)
8. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11,
TITLE 24 C.C.R.
9. 2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R.
10. TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.
PARTIAL LIST OF APPLICABLE STANDARDS
1. NFPA 13 AUTOMATIC SPRINKLER SYSTEMS (CA AMENDED) 2022 EDITION
2. NFPA 14 STANDPIPE SYSTEM (CA AMENDED) 2019 EDITION
3. NFPA 17a WET CHEMICAL SYSTEMS 2021 EDITION
4. NFPA 20 STATIONARY PUMPS 2019 EDITION
5. NFPA 24 PRIVATE FIRE MAINS (CA AMENDED) 2019 EDITION
6. NFPA 72 NATIONAL FIRE ALARM CODE (CA AMENDED) 2022 EDITION
7. NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS 2018 EDITION
W/ CA AMENDMENTS
8. NFPA 101 LIFE SAFETY CODE 2021 EDITION
9. REFERENCE CODE SECTION FOR NFPA STANDARDS 2022 CBC (SFM)
CHAPTER 35
REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35 OR 2022 CFC
CHAPTER 80. SEE CHAPTER 35 FOR STATE OF CALIFORNIA AMENDMENTS TO NFPA STANDARDS.
REFERENCE: 2022 CALIFORNIA FIRE CODE
1. SEE OVERALL SITE PLAN FOR SITE ACCESS FOR BOTH PUBLIC RIGHT OF WAY AND LOCAL
FIRE DEPARTMENT.
2. TURNAROUND CAN BE ACCOMPLISHED BY USING EXISTING SITE ROADS. SEE T0.2.
FIRE APPARATUS ACCESS
1. THE CONTRACTOR IS RESPONSIBLE FOR INVESTIGATING HAZARDOUS MATERIAL AT THE AREA
OF WORK INCLUDING BUT NOT LIMITED TO ASBESTOS AND LEAD, AND PROVIDING A REPORT
AND ABATEMENT PLAN ACCORDING TO THE CALIFORNIA STANDARD CODE AND CALOSHA
REQUIREMENTS.
HAZMAT NOTE
1. BIDDER'S ATTENTION IS DIRECTED TO THE FACT THAT THE LOCATIONS OF THE MEDICATION
DISPENSING UNITS SHOWN IN THE DRAWINGS IS DIAGRAMMATIC AND SCHEMATIC IN NATURE.
IT IS EXPECTED THAT THE CONTRACTOR WILL MAKE THE NECESSARY FIELD ADJUSTMENTS TO
COORDINATE THE EXACT LOCATION OF THE UNITS TO FIT WITHIN THE PHYSICAL CONSTRAINTS
OF THE SPACES SHOWN.
2. THE BASE BID MUST INCLUDE THE COST ASSOCIATED WITH MAKING FIELD ADJUSTMENTS AS
NEEDED BASED ON THE DIMENSIONS OF THE EQUIPMENT AND MOUNTING PLATE ANCHORAGE
CRITERIA. THE MOUNTING PLATE LOCATIONS WILL REQUIRE COORDINATION IN EACH
LOCATION TO AVOID CUTTING OR DAMAGE TO THE EXISTING REBAR. SEE THE STRUCTURAL
DRAWINGS FOR ADDITIONAL INFORMATION. IT IS EXPECTED THAT THE BIDDER WILL BE A
QUALIFIED CONTRACTOR WITH RECENT, RELEVANT EXPERIENCE WITH PROJECTS OF SIMILAR
SIZE AND SCALE, AND UTILIZE THEIR QUALIFICATIONS AND EXPERIENCE TO PROVIDE A
COMPLETE AND ACCURATE BASE BID.
BASE BID
PROJECT AREA
A MINIMUM OF 72 HOURS NOTICE WILL BE PROVIDED TO THE STATE FIRE MARSHAL WHEN
SCHEDULING ANY TESTS OR INSPECTIONS.
STATE FIRE MARSHAL SPECIAL INSPECTIONS
DRAWING INDEX
OSFM PERMIT NUMBERS FOR MULTIPLE BUILDINGS
BUILDING NAME
1. BUILDING 24
2. BUILDING 508A
3. BUILDING 509A
4. BUILDING 510A
5. BUILDING 511
6. BUILDING 512
7. BUILDING 513
8. BUILDING 514
9. BUILDING 515
10. BUILDING 516
11. BUILDING 517
12. BUILDING 518
13. BUILDING 519
14. BUILDING 520
15. BUILDING 521
16. BUILDING 522
17. BUILDING 523
18. BUILDING 972
NN
PREPARED FOR:
DEPARTMENT OF STATE HOSPITALS
ATASCADERO STATE HOSPITAL
10333 EL CAMINO REAL
ATASCADERO, CALIFORNIA 93422
DEPARTMENT OF STATE HOSPITALS (DSH)
1215 O STREET
SACRAMENTO, CALIFORNIA 95814
JOSHUA KAISER
CHIEF CONSTRUCTION MANAGER
OFFICE: (916) 248-0015
EMAIL: JOSHUA.KAISER@DSH.CA.GOV
JIM NETZ
ATASCADERO STATE HOSPITAL
10333 EL CAMINO REAL
ATASCADERO, CALIFORNIA 93422
RANDY DYE
CPO III
10333 EL CAMINO REAL
ATASCADERO, CALIFORNIA 93422
DESK: (805) 468-2249
CELL: (805) 712-6733
EMAIL: RANDY.DYE@DSH.CA.GOV
PROJECT LOCATION
E L C
A M
IN
O R
E A L
SAN RAFAEL RD
S A N R
A F A E L R
D
BANE ST
OSFM PERMIT NUMBER
24-S-0448-C (PRIMARY)
24-S-0449-C
24-S-0450-C
24-S-0451-C
24-S-0452-C
24-S-0453-C
24-S-0454-C
24-S-0455-C
24-S-0456-C
24-S-0457-C
24-S-0458-C
24-S-0459-C
24-S-0460-C
24-S-0461-C
24-S-0462-C
24-S-0463-C
24-S-0464-C
24-S-0465-C
DRAWING INDEX
GENERAL
T0.1 TITLE SHEET
T0.2 FIRE ACCESS SITE PLAN
T0.3 STATE FIRE MARSHAL TRIAGE LIST
T0.4 BUILDING INFORMATION
ARCHITECTURAL
00-A0.1 ARCHITECTURAL COVER SHEET
00-A0.2 OVERALL SITE PLAN
00-A3.1 DETAIL SHEET
00-A3.2 DETAIL SHEET
00-A3.3 DETAIL SHEET
01-A0.1 BUILDING 24 - UNIT 24 - FIRST AND SECOND FLOOR OVERALL PLAN
01-A1.1 BUILDING 24 - SECOND FLOOR DEMOLITION PLAN - MED - 3
01-A2.1 BUILDING 24 - SECOND FLOOR NEW WORK PLAN - MED 3
01-A4.1 BUILDING 24 - SECOND FLOOR ELEVATIONS - MED - 3
02-A0.1 BUILDING 508A - UNIT 1 - FIRST FLOOR OVERALL PLAN
02-A0.2 BUILDING 508A - UNIT 2 - SECOND FLOOR OVERALL PLAN
02-A0.3 BUILDING 508A - UNIT 3 - THIRD FLOOR OVERALL PLAN
02-A1.1 BUILDING 508A - UNITS 1, 2, 3 & PHARMACY - FIRST, SECOND, AND THIRD FLOOR DEMOLITION
PLANS - MEDS - 6 & OFFICE - 14
02-A2.1 BUILDING 508A - UNITS 1, 2, 3 & PHARMACY - FIRST, SECOND, AND THIRD FLOOR DEMOLITION
PLANS - MEDS - 6 & OFFICE - 14
02-A4.1 BUILDING 508A - UNITS 1, 2, 3 & PHARMACY - FIRST, SECOND AND THIRD FLOOR ELEVATIONS
- MEDS - 6 & OFFICE - 14
03-A0.1 BUILDING 509A - UNIT 4 - FIRST FLOOR OVERALL PLAN
03-A0.2 BUILDING 509A - UNIT 5 - SECOND FLOOR OVERALL PLAN
03-A1.1 BUILDING 509A - UNITS 4 & 5 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 9 & 13 03-A2.1 BUILDING 509A - UNITS 4 & 5 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 9 & 13
03-A4.1 BUILDING 509A - UNITS 4 & 5 - FIRST FLOOR ELEVATIONS - MEDS 9 & 13
04-A0.1 BUILDING 510A - UNIT 6 - FIRST FLOOR OVERALL PLAN
04-A0.2 BUILDING 510A - UNIT 7 - SECOND FLOOR OVERALL PLAN
04-A1.1 BUILDING 510A - UNITS 6 & 7 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 44 & 45 04-A2.1 BUILDING 510A - UNITS 6 & 7 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 44 & 45
04-A4.1 BUILDING 510A - UNITS 6 & 7 - FIRST FLOOR ELEVATIONS - MEDS 44 & 45
05-A0.1 BUILDING 511 - UNIT 8 - FIRST FLOOR OVERALL PLAN
05-A0.2 BUILDING 511 - UNIT 9 - SECOND FLOOR OVERALL PLAN
05-A1.1 BUILDING 511 - UNITS 8 & 9 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 44 05-A2.1 BUILDING 511 - UNITS 8 & 9 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 44
05-A4.1 BUILDING 511 - UNITS 8 & 9 - FIRST FLOOR ELEVATIONS - MEDS 44
06-A0.1 BUILDING 512 - UNIT 10 - FIRST FLOOR OVERALL PLAN
06-A0.2 BUILDING 512 - UNIT 11 - SECOND FLOOR OVERALL PLAN
06-A1.1 BUILDING 512 - UNITS 10 & 11 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 13 06-A2.1 BUILDING 512 - UNITS 10 & 11 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 13
06-A4.1 BUILDING 512 - UNITS 10 & 11 - FIRST FLOOR ELEVATIONS - MEDS 13
07-A0.1 BUILDING 513 - UNIT 12 - FIRST FLOOR OVERALL PLAN
07-A0.2 BUILDING 513 - UNIT 13 - SECOND FLOOR OVERALL PLAN
07-A1.1 BUILDING 513 - UNITS 12 & 13 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 13 07-A2.1 BUILDING 513 - UNITS 12 & 13 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 13
07-A4.1 BUILDING 513 - UNITS 12 & 13 - FIRST FLOOR ELEVATIONS - MEDS 13
08-A0.1 BUILDING 514 - UNIT 14 - FIRST FLOOR OVERALL PLAN
08-A0.2 BUILDING 514 - UNIT 15 - SECOND FLOOR OVERALL PLAN
08-A1.1 BUILDING 514 - UNITS 14 & 15 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 46 & 47 08-A2.1 BUILDING 514 - UNITS 14 & 15 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 46 & 47
08-A4.1 BUILDING 514 - FIRST FLOOR ELEVATIONS - MEDS 46 & 47
09-A0.1 BUILDING 515 - UNIT 16 - FIRST FLOOR OVERALL PLAN
09-A0.2 BUILDING 515 - UNIT 17 - SECOND FLOOR OVERALL PLAN
09-A1.1 BUILDING 515 - UNITS 16 & 17 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 30 09-A2.1 BUILDING 515 - UNITS 16 & 17 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 30
09-A4.1 BUILDING 515 - FIRST FLOOR ELEVATIONS - MEDS 30
10-A0.1 BUILDING 516 - UNIT 18 - FIRST FLOOR OVERALL PLAN
10-A0.2 BUILDING 516 - UNIT 19 - SECOND FLOOR OVERALL PLAN
10-A1.1 BUILDING 516 - UNITS 18 & 19 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 30 10-A2.1 BUILDING 516 - UNITS 18 & 19 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 30
10-A4.1 BUILDING 516 - UNITS 18 & 19 - FIRST FLOOR ELEVATIONS - MEDS 30
11-A0.1 BUILDING 517 - UNIT 20 - FIRST FLOOR OVERALL PLAN
11-A0.2 BUILDING 517 - UNIT 21 - SECOND FLOOR OVERALL PLAN
11-A1.1 BUILDING 517 - UNITS 20 & 21 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 58 11-A2.1 BUILDING 517 - UNITS 20 & 21 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 58
11-A4.1 BUILDING 517 - UNITS 20 & 21 - FIRST FLOOR ELEVATIONS - MEDS 58
12-A0.1 BUILDING 518 - UNIT 22 - FIRST FLOOR OVERALL PLAN
12-A0.2 BUILDING 518 - UNIT 23 - SECOND FLOOR OVERALL PLAN
12-A1.1 BUILDING 518 - UNITS 22 & 23 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 7 12-A2.1 BUILDING 518 - UNITS 22 & 23 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 7
12-A4.1 BUILDING 518 - UNITS 22 & 23 - FIRST FLOOR ELEVATIONS - MEDS 7
13-A0.1 BUILDING 519 - UNIT 25 - FIRST FLOOR OVERALL PLAN
13-A0.2 BUILDING 519 - UNIT 26 - SECOND FLOOR OVERALL PLAN
13-A1.1 BUILDING 519 - UNITS 25 & 26 - FIRST AND SECOND FLOOR DEMOLITION PLANS - 7
13-A2.1 BUILDING 519 - UNITS 25 & 26 - FIRST AND SECOND FLOOR NEW WORK PLANS - 7
13-A4.1 BUILDING 519 - UNITS 25 & 26 - FIRST FLOOR ELEVATIONS - MEDS 7
14-A0.1 BUILDING 520 - UNIT 27 - FIRST FLOOR OVERALL PLAN
14-A0.2 BUILDING 520 - UNIT 28 - SECOND FLOOR OVERALL PLAN
14-A1.1 BUILDING 520 - UNITS 27 & 28 - FIRST AND SECOND FLOOR DEMOLITION PLANS - 11 14-A2.1 BUILDING 520 - UNITS 27 & 28 - FIRST AND SECOND FLOOR NEW WORK PLANS - 11
14-A4.1 BUILDING 520 - UNITS 27 & 28 - FIRST FLOOR ELEVATIONS - MEDS - 11
15-A0.1 BUILDING 521 - UNIT 29 - FIRST FLOOR OVERALL PLAN
15-A0.2 BUILDING 521 - UNIT 30 - SECOND FLOOR OVERALL PLAN
15-A1.1 BUILDING 521 - UNITS 29 & 30 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS - 22 15-A2.1 BUILDING 521 - UNITS 29 & 30 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS - 22
15-A4.1 BUILDING 521 - UNITS 29 & 30 - FIRST FLOOR ELEVATIONS - MEDS - 22
16-A0.1 BUILDING 522 - UNIT 31 - FIRST FLOOR OVERALL PLAN
16-A0.2 BUILDING 522 - UNIT 32 - SECOND FLOOR OVERALL PLAN
16-A1.1 BUILDING 522 - UNITS 31 & 32 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS - 22 16-A2.1 BUILDING 522 - UNITS 31 & 32 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS - 22
16-A4.1 BUILDING 522 - UNITS 31 & 32 - FIRST FLOOR ELEVATIONS - MEDS - 22
17-A0.1 BUILDING 523 - UNIT 33 - FIRST FLOOR OVERALL PLAN
17-A0.2 BUILDING 523 - UNIT 34 - SECOND FLOOR OVERALL PLAN
17-A1.1 BUILDING 523 - UNITS 33 & 34 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS - 22 17-A2.1 BUILDING 523 - UNITS 33 & 34 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS - 22
17-A4.1 BUILDING 523 - UNITS 33 & 34 - FIRST FLOOR ELEVATIONS - MEDS 22
18-A0.1 BUILDING 972 - FIRST FLOOR OVERALL PLAN
18-A1.1 BUILDING 972 - FIRST FLOOR DEMOLITION PLAN - CONTROL OFFICE - 22
18-A2.1 BUILDING 972 - FIRST FLOOR NEW WORK PLAN - CONTROL OFFICE - 22
18-A4.1 BUILDING 972 - FIRST FLOOR ELEVATIONS - CONTROL OFFICE - 22
STRUCTURAL
S0.1 STRUCTURAL NOTES & RESEARCH REPORT EXCERPT
S3.1 STRUCTURAL DETAILS
TOTAL NUMBER OF SHEETS = 100
SAN R
AFA
EL R
D
DSA EXEMPTION NOTES
FULL COMPLIANCE WITH DISABLED ACCESS IMPROVEMENTS IS NOT REQUIRED PER THE
FOLLOWING:
11B-203 GENERAL EXCEPTIONS
11B-203.1 GENERAL
SITES, BUILDINGS, FACILITIES, AND ELEMENTS ARE EXEMPT FROM THESE REQUIRMENTS TO THE
EXTENT SPECIFIED BY 11B-203.
11B-203.9 EMPLOYEE WORKSTATIONS
SPACES AND ELEMENTS WITHIN EMPLOYEE WORKSTATIONS SHALL ONLY BE REQUIRED TO
COMPLY WITH SECTIONS 11B-207.1, 11B-215.3, 11B-302, 11B-303, 11B-308.1.1, 11B-308.1.2, AND
11B-404.2.3 UNLESS EXEMPTED BY OTHER PARTS OF THIS CODE. COMMON USE CIRCULATION
PATHS WITHIN EMPLOYEE WORKSTATIONS SHALL COMPLY WITH SECTION 11B-206.2.8.
EXCEPTION: RECEPTACLES, CONTROLS, AND SWITCHES THAT ARE AN INTEGRAL PART OF
WORKSTATION FURNISHING, FIXTURES AND EQUIPMENT SHALL NOT BE REQUIRED TO COMPLY
WITH SECTIONS 11B-308.1.1AND 11B-308.1.2
11B-206.2.8 EMPLOYEE WORK AREAS. COMMON USE CIRCULATION PATHS WITHIN EMPLOYEE
WORK AREAS SHALL COMPLY WITH SECTION 11B-402.
EXCEPTION: COMMON USE CIRCULATION PATHS LOCATED WITHIN EMPLOYEE WORK AREAS THAT
ARE AN INTEGRAL COMPONENT OF WORK AREA EQUIPMENT SHALL NOT BE REQUIRED TO
COMPLY WITH SECTION 11B-402.
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
24-0448
AutoCAD SHX Text: Ren.%%U AutoCAD SHX Text: C AutoCAD SHX Text: E AutoCAD SHX Text: F AutoCAD SHX Text: O AutoCAD SHX Text: S AutoCAD SHX Text: T AutoCAD SHX Text: A AutoCAD SHX Text: T AutoCAD SHX Text: O AutoCAD SHX Text: F AutoCAD SHX Text: A AutoCAD SHX Text: L AutoCAD SHX Text: I AutoCAD SHX Text: A AutoCAD SHX Text: I AutoCAD SHX Text: N AutoCAD SHX Text: R AutoCAD SHX Text: No. C-37614 AutoCAD SHX Text: 1/31/25 JNetz Line
JNetz Line
JNetz Text Box Being done under seperate contract
JNetz Line
519520
509A
510A
508A
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls D S H
A D
S H -M
D
S H -N
D
S H -P
D
S H
-C C A D
\D S H
-A ta s c a d e ro
\2 T .d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
LEGEND:
FIRE TRUCK ROUTE
FIRE HYDRANT
T0.2
FIRE ACCESS SITE PLAN
BUILDING NAME
02. 508A
03. 509A
04. 510A
05. 511
06. 512
07. 513
08. 514
09. 515
10. 516
FIRE ACCESS SITE PLAN
NO TO SCALE
11. 517
12. 518
13. 519
14. 520
15. 521
16. 522
01. 24
17. 523
N
18. 972
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
ADMISSIONS UNIT
SITE ACCESS FROM PUBLIC
RIGHT OF WAY AND USING
EXISTING PAVED ROADS
SALLY PORT
07/09/2024
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
24-0448
STATE FIRE MARSHAL TRIAGE
LIST, LOCAL FIRE AUTHORITY -
ACCESS APPROVAL
T0.3
LOCAL FIRE AUTHORITY - ACCESS APPROVAL
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls
D
S H
A D S H
-M D S H
-N D S H
-P D S H
-C C
A D
\D S H
-A ta s c a d e ro
\2 T .d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
ITEM SUBMITTAL REQUIREMENTS SUBMITTAL RESPONSE REFERENCE
GENERAL
SEE FOR SPECIFIC SECTION COMMENTS NOT APPLICABLE
PROVIDE A COMPLETE PLAN REVIEW APPLICATION
SUBMIT PLANS SUFFICIENT SIZE
PROVIDE SITE ADDRESS
PROVIDE NAME OF OWNER AND OCCUPANT
IDENTIFY IF NEW CONSTRUCTION OR T.I
IDENTIFY IF NEW OR EXISTING TENANT SPACE
IDENTIFY IF DEFERRED SUBMITTAL
ADD OSFM FILE NUMBER TO TITLE SHEET
PROJECT IS A PHASED SUBMITTAL
SLIP SHEETS SHALL BE BOUND TO SET
SHEET INDEX
WET STAMP AND SIGN SHEETS
SCOPE OF WORK
PROVIDED WITH SUBMITTAL
FLOOR PLANS ARE 1/8"=1' MINIMUM
10333 EL CAMINO REAL, ATASCADERO, CALIFORNIA 93422
OWNER: DEPARTMENT OF STATE HOSPITAL
T.I.
EXISTING
ALL RELEVANT
SHEETS
NOT APPLICABLE
T0.1
T0.1
OSFM NO #### IS NOTED ON THE TITLE SHEET T0.1
PROJECT IS NOT PHASED
NOT APPLICABLE
SHEET INDEX IS ON T0.1 T0.1
ELECTRONIC SIGNATURE PROVIDED ON DOCUMENT ALL SHEETS
SCOPE OF WORK IS INCLUDED ON TITLE SHEET T0.1
ITEM SUBMITTAL REQUIREMENTS SUBMITTAL RESPONSE REFERENCE
ACCESS AND WATER SUPPLY
PROVIDE LOCAL FIRE AUTHORITY APPROVAL LETTER
FIRE DEPARTMENT ACCESS
FIRE DEPARTMENT CONNECTION
FIRE HYDRANTS
FIRE ALARM ANNUNCIATOR
FIRE ALARM CONTROL PANEL
KNOX BOX/KEY SWITCH
ELEVATOR GURNEY ACCOMODATION
OCCUPANT: DEPARTMENT OF STATE HOSPITAL
PROVIDED ON FIRE ACCESS SITE PLAN
T0.2
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE - NO ELEVATOR ACCESS TO ROOF
T0.2
PROVIDED ON FIRE ACCESS SITE PLAN
NOT AVAILABLE - USE FIRE HYDRANTS
NOT AVAILABLE
T0.3SEE ATTACHED LETTER
PROVIDE A KEY PLAN COORDINATED TO EACH SHEET
PROVIDE A NORTH ORIENTED SITE MAP
ORIENTATE ALL SHEETS TO NORTH
PROVIDE ADOPTED CODE CYCLE LISTINGS AND STANDARDS
PROVIDE A LEGIBLE SCALE. TYPICALLY 1/8"
PROVIDE APPROVED REFERENCE PLANS/DOCUMENTATION
SITE KEY PLAN IS PROVIDED
NORTH ORIENTED SITE PLAN IS PROVIDED T0.3
SITE PLAN IS ORIENTED TO NORTH, INDIVIDUAL DRAWINGS HAVE KEYPLAN
ALL RELEVANT
SHEETS
ADOPTED CODE CYCLE LISTINGS ARE INCLUDED ON TITLE SHEET
ALL FLOOR PLANS ARE 1/8" SCALE MINIMUM. ALL SITE PLANS ARE 1"=30'
NOT APPLICABLE
T0.1
ALL RELEVANT
SHEETS
ALL RELEVANT
SHEETS
07/09/2024
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
BUILDING INFORMATION
T0.4
BUILDING INFORMATION
BUILDING NAME
CONSTRUCTION
TYPE
NUMBER
OF STORIES
BUILDING
AREA
IN SQ. FT.
SEPARATED /
NON SEPARATED
SPRINKLER
COVERAGE
FIRE ALARM
OTHER
PROTECTION
SYSTEM
SMOKE
CONTROL
SYSTEM
OCCUPANT
LOAD
YEAR BUILDING
CONSTRUCTED
HIGH FIRE
HAZARD
SEVERITY
ZONE
SEISMIC JOINT
EMERGENCY
RESPONDER RADIO
COVERAGE
OCCUPANCY
GROUP
I-2 / I-3
BUILDING
HEIGHT
AREA OF
PROJECT
ALLOWABLE
STORIES
(CBC TABLE
504.3)
USE
ALLOWABLE
AREA
(CBC TABLE
506.2)
YES NO 108 1954
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls D S H
A D
S H
-M D
S H
-N D
S H
-P D
S H
-C C A D
\D S H
-A ta s c a d e ro
\2 T .d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
YES NO NO YES YES
PARTIAL NO 1954NO NO
1952 UBC TYPE
I-F.R.
20'-0" 8,118
PATIENT
HOUSING
UNLIMITED UNLIMITED SEPARATED
33'-9" 32,255 26902. 508A
03. 509A
04. 510A
05. 511
06. 512
07. 513
08. 514
09. 515
10. 516
11. 517
12. 518
13. 519
14. 520
15. 521
16. 522
01. 24
17. 523
18. 972
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1958 UBC TYPE
I-F.R.
1958 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1958 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1994 UBC TYPE
I-F.R.
1994 UBC TYPE
I-F.R.
1994 UBC TYPE
I-F.R.
20'-0"
20'-0"
20'-4"
20'-4
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-4"
26'-11"
26'-11"
26'-11"
17,244
17,350
17,706
17,562
17,506
20,034
24,878
24,878
19,558
19,558
24,878
23,350
34,864
34,864
34,864
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES4,160 I-2 / I-3
1964 UBC
I-F.R.
2 15'-4"
PATIENT
ADMISSIONS/
HOUSING
UNLIMITED UNLIMITED SEPARATED YES YES NO NO 28 1967 NO
8,118
32,255
17,244
17,350
17,706
17,562
17,506
20,034
24,878
24,878
19,558
19,558
24,878
23,350
34,864
34,864
34,864
4,160
07/09/2024
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
00-A0.1
ARCHITECTURAL COVER
SHEET
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls
D
S H
A D S H
-M D S H
-N D S H
-P D S H
-C C
A D
\D S H -A ta s c a d e ro
\2 -A
.d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
LIGHT, THIN LINES INDICATE EXISTING.
HEAVY, THICK LINES INDICATE NEW
HEAVY, SHORT DASHED LINES INDICATE
DEMOLITION OR REMOVAL
TYPICAL PLAN LEGEND
THIS SYMBOLOGY TO BE USED BY ARCHITECTURAL AND LAYOUT FOR
ALL FLOOR PLANS, EQUIPMENT, DEVICES, UTILITIES, ETC., SHOWN ON
DRAWINGS.
GENERAL NOTES
(D) DEMOLISH
(E) EXISTING
(N) NEW
@ AT
& AND
ADJ ADJACENT
ALUM ALUMINUM
A.R.F. ANIMAL RESCUE FORCE
ASTM. AMERICAN SOCIETY FOR
TESTING MATERIALS
ARCH. ARCHITECTURAL OR
ARCHITECT
A.C. ASPHALT CONCRETE
AVE. AVENUE
BLDG. BUILDING
CA. CALIFORNIA
C.B. CATCH BASIN
C.H. CEILING HEIGHT
CLG. CEILING
CEM CEMENT
CEM. MORT. CEMENT MORTAR
CLR. CLEAR
CONC. CONCRETE
CONC. BLK CONCRETE BLOCK
CONST. CONSTRUCTION
C.J. CONSTRUCTION JOINT
CORR. CORRIDOR
DET. DETAIL
DIA.Ø DIAMETER
DIM. DIMENSION
D.O. DOOR OPENING
D.F. DOUGLAS FIR
DN. DOWN
D.S. DOWN SPOUT
DWG. DRAWING
EA. EACH
E EAST
ELECT. ELECTRICAL
EL. ELEVATION
ENGR. ENGINEER
EQ. EQUAL
EXIST. EXISTING
EXP. EXPANSION
EXP. JT. EXPANSION JOINT
EXT EXTERIOR
F.O.C. FACE OF CONCRETE
F.O.M. FACE OF MASONRY
FT. FEET
FIN. FINISH
F.F. FINISH FLOOR OR
FACTORY FINISH
F.S. FINISH SURFACE
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
F.H.C. FIRE HOSE CABINET
F.H. FIRE HYDRANT
FLR. FLOOR
F.D. FLOOR DRAIN
GA. GAGE (GAUGE)
GSM GALVANIZED SHEET METAL
GALV. GALVANIZED
GL. GLASS
HGT. / HT. HEIGHT
H.B HOSE BIBB
IN. INCHES
INFO INFORMATION
I.D. INSIDE DIAMETER
JT. JOINT
LT.WT. LIGHT WEIGHT
FF. LINEAL FOOT
MFR. MANUFACTURER
M.O. MASONRY OPENING
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MTL. METAL
MIN. MINIMUM
MISC. MISCELLANEOUS
N NORTH
N.I.C. NOT IN CONTRACT
N.T.S. NOT ON SALE
NO. / # NUMBER
O.C. or O/C ON CENTER
OCC OCCUPANT/OCCUPANCY
O.D. OUTSIDE DIAMETER
P.A. PLANTING AREA
PLAS. PLASTER
PLYWD. PLYWOOD
PREFAB. PREFABRICATED
PL PROPERTY LINE
POC POINT OF CONTACT
QTY. QUANTITY
REQD. REQUIRED
R.O. ROUGH OPENING
SF SQUARE FOOT
SHT. SHEET
SIM. SIMILAR
S SOUTH
SPEC(S) SPECIFICATION(S)
SQ.FT. SQUARE FOOT/FEET
S. STL. STAINLESS STEEL
STD. STANDARD
STL. STEEL
S.D. STORM DRAIN
ST. STREET
STRUCT. STRUCTURAL
THK. THICK
T&G TONGUE & GROOVE
TYP. TYPICAL
U.L. UNDERWRITERS
LABORATORIES
INCORPORATED
U.B.C. UNIFORM BUILDING
U.N.O. UNLESS NOTED
OTHERWISE
VENT VENTILATION
V.P. VENT PIPE
V.T.R. VENT THROUGH ROOF
VERT. VERTICAL
VOL. VOLUME
W.H. WATER HEATER
W.M. WATER METER
WT. WEIGHT
W WEST
W.D. WINDOW DIMENSION
W.O. WINDOW OPENING
W/ WITH
W/O WITHOUT
WD. WOOD
ABBREVIATIONS SYMBOL LIST
X
X-XX
CENTERLINE DIMENSION
FACE DIMENSION LINE
DETAIL NUMBER
SHEET NUMBER
DETAIL REFERENCE SYMBOL
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
SYMBOL DESCRIPTION
DETAIL NUMBER
SHEET NUMBER
A2.01
EL. DETAIL NUMBER
SHEET NUMBER
A3.01
A3.01
SECTION NUMBER
(BUILDING SECTION)
SHEET NUMBER
A3.01
SECTION NUMBER
(BUILDING SECTION)
SHEET NUMBER
A3.01
DETAIL NUMBER
SHEET NUMBER
INTERIOR EL. SHOWN
WORK POINT
DATUM LINE
MATCH LINE
REVISION CLOUD AND DELTA
C.H. 9'-0"
GRID IDENTIFICATION
ROOM NAME
ROOM NUMBER
ROOM HEIGHT
EQUIPMENT TAG
X X-###
LOBBY
B-23
125 SQ.FT.
SQUARE FOOT/FEET
X
GENERAL PROJECT CODE NOTES
XX-XX
1. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS WHICH INCLUDE THE
OWNER/CONTRACTOR AGREEMENT, THE DRAWINGS AND ALL ADDENDA AND MODIFICATIONS
ISSUED BY THE DESIGNER.
2. THE CONTRACTOR SHALL REVIEW ALL DOCUMENTS AND VERIFY ALL DIMENSIONS AND FIELD
CONDITIONS AND SHALL CONFIRM THAT WORK IS BUILDABLE AS SHOWN. ANY CONFLICTS OR
OMISSIONS, ETC., SHALL BE IMMEDIATELY REPORTED TO THE DESIGNER FOR CLARIFICATION
PRIOR TO THE PERFORMANCE OF ANY WORK IN QUESTION.
3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND INSPECTIONS AND COMPLY WITH ALL
CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL PUBLIC AUTHORITIES
(FEDERAL, STATE, OR LOCAL) GOVERNING THE WORK. THE MOST STRINGENT SHALL APPLY.
4. SUBSTITUTIONS, IF ALLOWED, MUST BE SUBMITTED TO THE DESIGNER FOR REVIEW (IN
CONFORMANCE WITH SPECIFIED PROCEDURES) PRIOR TO PURCHASE, FABRICATION, OR
INSTALLATION. PROPOSED SUBSTITUTIONS SHALL BE CLEARLY IDENTIFIED ON THE COVER
OF THE SUBMITTAL AND SHALL BE ACCOMPANIED WITH A COMPREHENSIVE COMPARATIVE
ANALYSIS OF THE 2 PRODUCTS FOR VERIFICATION OF EQUIVALENCY. IF SUCH A SUBMITTAL
REQUIRES ADDITIONAL REVIEW TIME BEYOND WHAT IS NORMALLY EXPECTED, THE
DESIGNER WILL BE COMPENSATED FOR THE ADDITIONAL TIME SPENT.
5. PROTECT THE BUILDING, ITS SYSTEMS, FINISHES, AND RELATED AND APPURTENANT ITEMS, SO AS NOT TO CAUSE DAMAGE DERIVED FROM THE WORK, COMPLY WITH BUILDING RULES
AND REGULATIONS.
6. "TYPICAL" OR "TYP." SHALL MEAN THAT THE CONDITION IS REPRESENTATIVE FOR SIMILAR
CONDITIONS THROUGHOUT, UNLESS OTHERWISE NOTED. DETAILS ARE USUALLY KEYED AND
NOTED "TYP." ONLY ONCE, WHEN THEY FIRST OCCUR.
7. "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED, VERIFY
DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS.
8. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT WRITTEN APPROVAL FROM THE DESIGNER.
9. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR DEVIATIONS FROM
REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE DESIGNER'S REVIEW OF SHOP
DRAWINGS, PRODUCT DATA SAMPLES OR SIMILAR SUBMITTALS UNLESS THE CONTRACTOR
HAS SPECIFICALLY INFORMED THE DESIGNER IN WRITING OF SUCH DEVIATION AT THE TIME
OF SUBMITTAL AND THE DESIGNER HAS REVIEWED THE SPECIFIC DEVIATION FOR
COMPLIANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN SHOP DRAWINGS,
PRODUCT DATA, SAMPLES OR SIMILAR SUBMITTALS BY THE DESIGNER'S REVIEW THEREOF.
10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE, REQUEST & FORWARD TO
THE DESIGNER FOR REVIEW AND APPROVAL SHOP DRAWINGS, PRODUCT DATA, SAMPLES &
SIMILAR SUBMITTALS REQUIRED BY THE CONTRACT DOCUMENTS IN A TIMELY MANNER IN
ORDER TO ALLOW PROPER REVIEW, APPROVAL, AND LEAD TIME ON ORDERING MATERIALS
AND EQUIPMENT SUCH THAT THERE ARE NO DELAYS TO THE PROJECT SCHEDULE.
INCOMPLETE SUBMITTALS WILL BE RETURNED UN-REVIEWABLE. THE DESIGNER SHALL BE
COMPENSATED FOR ADDITIONAL SERVICES FOR SUBMITTALS REQUIRING MORE THAN 2
REVIEWS DUE TO LACK OF INFORMATION, INCORRECT OR INCOMPLETE INFORMATION.
11. OPEN JOINTS, PENETRATIONS AND OTHER OPENINGS IN INTERIOR WALLS, FLOORS AND THE
BUILDING ENVELOPE RESULTING FROM THE INSTALLATION OF CONDUITS AND UTILITIES
SHALL BE CAULKED, SEALED, GASKETED, FIRESTOPPED OR WEATHER STRIPPED AS
REQUIRED TO LIMIT AIR LEAKAGE AND MAINTAIN FIRE RATINGS. ALL SUCH PENETRATIONS
SHALL BE FIRESTOPPED FOR 2 HOUR PROTECTION UNLESS OTHERWISE NOTED.
PENETRATIONS IN NON-RATED CONSTRUCTION SHALL BE CAULKED WITH PICK-PROOF
SECURITY SEALANT..
12. ALL MANUFACTURED ARTICLES, MATERIAL AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED, CLEANED, AND CONDITIONED AS DIRECTED BY THE
MANUFACTURER UNLESS HEREIN SPECIFIED TO THE CONTRARY. IN CASE OF DIFFERENCE
BETWEEN THE MANUFACTURER'S INSTRUCTION AND THE CONTRACT DOCUMENTS, THE
CONTRACTOR SHALL NOTIFY THE DESIGNER BEFORE PROCEEDING.
13. ALL CONTRACT DOCUMENTS, INCLUDING WITHOUT LIMITATION THESE GENERAL NOTES AND
THE SPECIFICATIONS SHALL APPLY NOT ONLY TO THE GENERAL CONTRACTOR BUT TO ALL
SUBCONTRACTORS AND SUPPLIERS FOR THE PROJECT. THE WORD "CONTRACTOR" SHALL
HEREAFTER APPLY EQUALLY AND WITHOUT EXCEPTION TO ALL SUBS AND SUPPLIERS. ALL
CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH BOTH THESE
NOTES AND THE SPECIFICATIONS.
14. GENERAL NOTES ARE AN AID TO THE CONTRACTOR IN UNDERSTANDING THE WORK AND
SHOULD NOT BE CONSTRUED AS BEING COMPLETE IN EVERY DETAIL. IT IS THE EXPLICIT AND
SPECIFIC RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, VERIFY THE EXISTING
CONDITIONS AND FAMILIARIZE HIMSELF THOROUGHLY WITH THE SCOPE OF WORK, AND
REPORT ALL DISCREPANCIES BETWEEN THE DRAWINGS AND THE ASSUMED OR ACTUAL
CONDITIONS TO THE ATTENTION OF THE DESIGNER (ARCHITECT).
15. NO ONE DRAWING OR SPECIFICATION SECTION SHALL "GOVERN". CONTRACTOR SHALL
CORRELATE WORK BETWEEN ARCHITECTURAL DRAWINGS AND SPECIFICATIONS AND
CONSULTANT DRAWINGS AND SPECIFICATIONS. CONTRACTOR SHALL ALSO CORRELATE
WORK BETWEEN DRAWINGS OF DIFFERENT SCALES WITHIN EACH SECTION. IT IS THE
EXPLICIT AND SPECIFIC RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE CONTRACT
DOCUMENTS IN THEIR ENTIRETY, REPORT ALL DISCREPANCIES ENCOUNTERED THEREIN TO
THE ATTENTION OF THE DESIGNER AND AWAIT RESOLUTION BEFORE PROCEEDING WITH
ANY WORK AFFECTED BY SUCH DISCREPANCIES. WHERE THE REQUIREMENTS OF EITHER
THE GENERAL NOTES OR THE SPECIFICATIONS MAY BE AT VARIANCE WITH THE GENERAL
CONDITIONS, THE MORE RESTRICTIVE PROVISION SHALL GOVERN.
16. ALL LINES, SYMBOLS, NOTES, TONES, AND OTHER GRAPHIC DEVICES CONTAINED IN THE
CONTRACT DOCUMENTS CARRY SPECIFIC OR INFERENTIAL MEANING. ITEMS INDICATED IN
THESE WAYS ARE A PART OF THE SCOPE OF WORK AND WILL BE REQUIRED BY THE OWNER
AND DESIGNER TO BE INCLUDED IN THE SCOPE OF THE CONTRACTOR'S WORK WHETHER
THEY HAVE BEEN INCLUDED IN THE CONTRACTOR'S ORIGINAL BID OR NOT. ANY ITEMS WHICH
REQUIRE FURTHER CLARIFICATION BY THE DESIGNER FOR THE SPECIFIC BENEFIT OF THE
CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGNER FOR SUCH
CLARIFICATION BEFORE COMMENCEMENT OF ANY WORK.
17. DESIGN WORK IS THE RESPONSIBILITY OF THE DESIGNER. THE CONTRACTOR SHALL ASSUME
DESIGN LIABILITY AND ALL RESPONSIBILITY FOR CHANGES IN THE SCOPE OF WORK NOT
BROUGHT TO THE ATTENTION OF THE DESIGNER.
18. THE CONTRACTOR SHALL PAY SPECIFIC ATTENTION TO ALL DIMENSIONED OR INFERENTIAL
PLAN AND SECTIONAL SPECIAL RELATIONSHIPS, AND SHALL VERIFY ALL ALIGNMENTS
BEFORE COMMENCING WORK.
19. DIMENSIONS MARKED "VERIFY" ARE TO BE CHECKED FOR ACCURACY BY THE CONTRACTOR
AS WORK PROGRESSES, AND ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE DESIGNER BEFORE PROCEEDING.
20. DIMENSIONS MARKED "CLEAR" OR MINIMUM ARE NOT ADJUSTABLE WITHOUT THE
AUTHORIZATION FROM THE DESIGNER. "ALIGN" MEANS TO ACCURATELY LOCATE FINISHED
FACES IN THE SAME PLANE AS INDICATED.
21. CONTRACTOR SHALL NOT SCALE THE DRAWINGS, FIGURED DIMENSIONS ONLY ARE TO BE
USED FOR ALL ASPECTS OF THE WORK. ALL DIMENSIONS ARE TO FACE OF FINISH SURFACE,
U.O.N.
1. THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO RECONSTRUCT THE HOSPITAL BUILDING
IN ACCORDANCE WITH THE 2022 CBSC. SHOULD ANY CONDITION DEVELOP NOT COVERED BY
THE APPROVED CONSTRUCTION DOCUMENTS, WHEREIN THE FINISHED WORK WILL NOT COMPLY
WITH THE 2022 CBSC, AMENDED CONSTRUCTION DOCUMENTS (ACDS) DETAILING AND
SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY THE AUTHORITY
HAVING JURISDICTION (AHJ) BEFORE PROCEEDING WITH THE WORK.
2. SUPPORTS AND ATTACHMENTS OF ALL EQUIPMENT TO BE INSTALLED AS A PART OF THIS
PROJECT SHALL BE DETAILED ON CONSTRUCTION DOCUMENTS, EXCEPT THOSE EXEMPT BY THE
2022 CBC SECTION 1617A.1.18.
EQUIPMENT SUPPORTS AND ATTACHMENTS SHALL BE APPROVED BY THE APPROPRIATE DESIGN
PROFESSIONAL OF RECORD (RDP) AND THE AHJ AS A PART OF FIELD REVIEWS/OBSERVATIONS.
THE INSPECTOR OF RECORD (IOR) SHALL ASSURE THAT THE ABOVE REQUIREMENTS ARE
ENFORCED.
3. WHEN INSTALLING DRILLED-IN ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED
CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING
REINFORCING BARS SEE STRUCTURAL DRAWINGS FOR REQUIREMENTS. MAINTAIN A
MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN
ANCHOR.
4. A PROJECT INSPECTOR EMPLOYED BY THE OWNER AND APPROVED BY THE AHJ SHALL
PROVIDE CONTINUOUS INSPECTION OF THE WORK. THE DUTIES OF THE INSPECTOR ARE
DEFINED IN PART 1,TITLE 24,CCR.
5. UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS,
STANDARDS, MANUFACTURER'S INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY
AGENCIES, WHEN USED TO SPECIFY REQUIREMENTS FOR MATERIALS OF DESIGN ELEMENTS
SHALL MEAN THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF SUBMISSION OF
BIDS, OR THE DATE OF THE CHANGE ORDER OR FIELD ORDER, AS APPLICABLE.
6. ALL RATED ASSEMBLIES NOTED HERE ARE APPLICABLE ONLY TO MANUFACTURERS
SPECIFIED IN THESE ASSEMBLIES. IF AN ALTERNATE MANUFACTURER IS PROPOSED, THE
CONTRACTOR MUST SUBMIT ALTERNATE & LISTED ASSEMBLIES FOR REVIEW AND
APPROVAL BY THE OWNERS REP. PRIOR TO BEGINNING ANY PARTITION WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK BEGUN OR COMPLETED WHICH DOES
NOT CONFORM TO ASSEMBLIES LISTED.
7. ALL WORK SHALL BE PERFORMED DURING REGULAR BUSINESS HOURS. UNLESS OTHERWISE
REQUESTED/DETERMINED BY THE OWNER AND SHALL BE DONE ON AN OVERTIME BASIS TO
BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AS REQUIRED.
8. FOR DETAILED REQUIREMENTS FOR THE USE OF PRE-APPROVED PIPES, DUCTS, AND
CONDUITS SEISMIC BRACING SYSTEMS, SEE MECHANICAL & ELECTRICAL DRAWINGS.
ELECTRICAL GENERAL NOTES
1. BRANCH CIRCUITS INDICATED ON DRAWINGS ARE BASED ON THE BEST AVAILABLE
INFORMATION AT THE TIME OF DESIGN. THE CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AVAILABLE SPARES AND SPACES AND MAKING ADJUSTMENTS TO PROVIDE
POWER TO ALL NEW FIELD DEVICES.
2. UPDATE ALL SCHEDULES TO REFLECT FINAL CONDITIONS.
3. CONTRACTOR IS RESPONSIBLE FOR VERIFYING LENGTHS OF CONDUITS AND CONDUCTORS
IN THE FIELD AND MAKING ADJUSTMENTS ACCORDINGLY.
ELECTRICAL SYMBOL LIST
PANELBOARD 240/120V, 1Ø, 3W OR 208V/120V, 3Ø, 4W
P4-10 BRANCH CIRCUIT DESTINATION (PANEL NAME-CIRCUIT
NUMBER)
HOMERUN INDICATES PROVIDING CONDUIT AND
CONDUCTORS
MINIMUM CONDUIT SIZE: 3/4"
MINIMUM CONDUCTOR SIZE: #12AWG
PROVIDE 3/4"C-2#12+1#12G WHERE NO CONDUIT/WIRE SIZE IS
STATED.
PROVIDE DEDICATED NEUTRAL FOR ALL BRANCH CIRCUIT
WIRING.
CONTRACTOR RESPONSIBLE FOR DE-RATING CONDUIT WITH
MORE THAN SIX CURRENT CARRYING CONDUCTORS PER CEC
310.
#12 AWG FOR CIRCUITS UP TO 100'
#10 AWG FOR CIRCUITS FROM 100' TO 200'
#8 AWG FOR CIRCUIT GREATER THAN 200'
JUNCTION BOX
20A, 125V DUPLEX RECEPTACLE (NEMA 5-20R)
SUBSCRIPTS DENOTE THE FOLLOWING:
"GFCI" - GROUND-FAULT CIRCUIT INTERRUPTER
DATA PORT RECEPTACLE, # INDICATES NUMBER OF DROPS#
DOOR MARK - SEE DOOR SCHEDULE
ON SHEET - 00-A3.3
07/09/2024
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
519520
509A
510A
508A
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls D S H
A D S H
-M D S H
-N D S H
-P D S H
-C C
A D
\D S H -A ta s c a d e ro
\2 -A
.d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
00-A0.2
OVERALL SITE PLAN
OVERALL SITE PLAN
NO TO SCALE
N
SEE SHEET
15-A0.1 FIRST FLOOR &
15-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 521
SEE SHEET
17-A0.1 FIRST FLOOR &
17-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 523
SEE SHEET
16-A0.1 FIRST FLOOR &
16-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 522
SEE SHEET
14-A0.1 FIRST FLOOR &
14-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 520
SEE SHEET
13-A0.1 FIRST FLOOR &
13-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 519
SEE SHEET
12-A0.1 FIRST FLOOR &
12-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 518
SEE SHEET
11-A0.1 FIRST FLOOR &
11-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 517
SEE SHEET
1-A0.1 FIRST FLOOR &
1-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 24
SEE SHEET
03-A0.1 FIRST FLOOR &
03-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 509A
SEE SHEET
04-A0.1 FIRST FLOOR &
04-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 510A
SEE SHEET
07-A0.1 FIRST FLOOR &
07-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 513
SEE SHEET
08-A0.1 FIRST FLOOR &
08-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 514
SEE SHEET
10-A0.1 FIRST FLOOR &
10-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 516
SEE SHEET
09-A0.1 FIRST FLOOR &
09-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 515
SEE SHEET
06-A0.1 FIRST FLOOR &
06-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 512
SEE SHEET
05-A0.1 FIRST FLOOR &
05-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 511
SEE SHEET
02-A0.1 FIRST FLOOR &
02-A0.2 SECOND FLOOR
02-A0.3 THIRD FLOOR
OVERALL FLOOR PLAN - BLDG. 508A
SEE SHEET
18-A0.1 FIRST FLOOR &
18-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 972
07/09/2024
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
00-A3.1
DETAIL SHEET
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls
D
S H
A D S H
-M D S H
-N D S H
-P D S H
-C C
A D
\D S H
-A ta s c a d e ro
\2 -A
.d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
BACK WALL
S
ID
E W
A L L W
H E R
E O
C C
U R S
L
C L
CL
CL
C
1'-111
"4"
MIN.
T Y P
M
IN
PERIMETER OUTLINE OF EQUIPMENT
SEE EQUIPMENT
SCHEDULE AND
STRUCTURAL DRAWINGS
FOR BOLT PATTERN
SEE EQUIPMENT
SCHEDULE AND
STRUCTURAL DRAWINGS
FOR BOLT PATTERN
OPM-0406-13 ANCHOR PLATE - SIDE BY SIDE MOUNTING DIMENSIONS - DM UNITS
SCALE: 00-A3.1
3" = 1'-0"
0 2 84 INCHES 1
MIN.
A D
J A C
E N
T E
Q U
IP
M
E N
T W
H E R
E O
C C
U R
S
4"
MIN.
ALIGN PLATES
4"
MIN.
T Y P
M
IN
L
1 1
5 8
1'-1013
C L
C
OPM-0406-13 ANCHOR PLATE - 8 BOLT PATTERN
SCALE: 00-A3.1
3" = 1'-0"
0 2 84 INCHES 1
PERIMETER OUTLINE
OF EQUIPMENT
8 BOLT PATTERN
ANCHOR PLATE
1'-01 2"
PERMANENT STOP/ALIGNMENT
FLOOR PLATE
ANCHOR PLATE
BACK WALL
S
ID
E W
A L L W
H E R
E O
C C
U R S
S3.1
A D
J A C
E N
T E
Q U
IP
M
E N
T W
H E R
E O
C C
U R
S
4"
MIN.
BACK WALL
PERIMETER OUTLINE
OF EQUIPMENT
20 BOLT PATTERN
ANCHOR PLATE
S
ID
E W
A L L W
H E R
E O
C C
U R S
4"
MIN.
M
IN
C L
C L
1 1
5 8
1'-1013
1'-01 2"
PERMANENT STOP/ALIGNMENT
FLOOR PLATE
ANCHOR PLATE
OPM-0406-13 ANCHOR PLATE - 20 BOLT PATTERN
SCALE: 00-A3.1
3" = 1'-0"
0 2 84 INCHES 1
S3.1
A D
J A C
E N
T E
Q U
IP
M
E N
T W
H E R
E O
C C
U R
S
4"
MIN.
(OFVI) OWNER FURNISHED / VENDOR INSTALLED
EQUIPMENT & ACCESSORY SCHEDULE
DESCRIPTION
GENERAL
NO MANUFACTURER WGT
/LBS
ANCHORAGE
SUPPORT
ELEMENT
DIMENSIONS (INCH)
BTU
W D H
REMARKS
COORDINATE W/
VENDOR FOR SPECIAL
NUMBER
DETAIL
INSTALLATION REQ'MTS.
NOTES:
MEDSELECT FLEX CABINET
DRAWER MODULE
(DM)
ARxIUM
925 - 22.8 27.6 39.4 NEW FLOOR
MEDSELECT FLEX CABINET
DRAWER MOD./UNIT DOSE MOD./CPU-UPS/
MONITOR & KEYBOARD (DM/UDM/DT-CPU/DT-UI)
ARxIUM
1270 - 22.8 27.6 73 NEW FLOOR
MEDSELECT FLEX CABINET
DRAWER MODULE
(DM)
ARxIUM
828.4 - 22.8 27.6 39.4 NEW FLOOR
MEDSELECT FLEX CABINET
DRAWER MOD./UNIT DOSE MOD./CPU-UPS/
MONITOR & KEYBOARD (DM/UDM/DT-CPU/DT-UI)
ARxIUM
1270 - 22.8 27.6 73 NEW FLOOR
MEDSELECT FLEX CABINET
DRAWER MOD../CPU-UPS/MONITOR
& KEYBOARD (DM/DT-CPU/DT-UI)
ARxIUM
1020 - 22.8 27.6 73 NEW FLOOR
MS-1.1
MS-1.2
MS-1.3
MS-2.1
MS-2.2
00-A3.1
S3.1
00-A3.1
S3.1
00-A3.1
S3.1
00-A3.1
S3.1
00-A3.1
S3.1
FP-01FP-01 FP-01 FP-01
FLOOR MOUNTING PLATE - OPM-0406 - 13
ARxIUM
N/A - 10.5 22 2.125 NEW FLOORFP-01
00-A3.1 1,2&3
(OFCI) OWNER FURNISHED / CONTRACTOR INSTALLED
COORDINATION OF FLOOR ANCHOR PLATE LOCATIONS IN EACH ROOM IS REQUIRED PER
NOTES ON FLOOR PLANS, ELEVATIONS AND DETAILS. SEE EQUIPMENT NUMBER DESIGNATION
ON FLOOR PLANS AND ELEVATIONS TO DETERMINE REQUIRED BOLT PATTERN.
MEDSELECT FLEX CABINET
DRAWER MOD./UNIT DOSE MOD./CPU-UPS/
MONITOR & KEYBOARD (DM/UDM/DT-CPU/DT-UI)
ARxIUM
1270 - 22.8 27.6 73 NEW FLOORMS-3.2
00-A3.1
S3.1
S3.1
07/09/2024
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/01/24
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
DETAIL SHEET
00-A3.2
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
Date Issue
JCCA #23790-8
00000000000XXXX
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
MEDICATION
DISPENSING UNIT
INSTALLATION
Client Agency
JCCA
385 VAN NESS AVENUE, SUITE 208
ASSOCIATES, INC.
J.C. CHANG &
ARCHITECTS PLANNERSENGINEERS
TORRANCE, CALIFORNIA 90501
PH (310) 212-7644
FAX (310) 212-5272
03/04/2024
DEPARTMENT OF STATE HOSPITALS
V1 OSFM - 100% SUBMITTAL
F
IL
E L \2
-8
M e d ic a ti o n D is p e n s in g U n it I n s ta lla ti o n F iv e H o s p it a ls
D
S H
A D S H
-M D S H
-N D S H
-P D S H
-C C
A D
\D S H
-A ta s c a d e ro
\2 -A
.d w g
D A T E /T
IM
E J u l :2
P M
JCCA
DSH
FIRE STOPPING @ GYP. BD./PLASTER WALL
00-A3.2
System No. W-L-1290
SECTION A-A
W L
1. Wall Assembly — The 1 or 2 hr fire rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300, U400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features.
A. Studs — Wall framing shall consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102 mm) lumber spaced 16 in. (406 mm) OC. Steel studs to be min 2-1/2 in. (64 mm) wide and spaced max 24 in. (610 mm) OC. For M Rating, steel studs to be min 3-5/8 in. (92 mm) wide.
B. Gypsum Board*- — Nom 5/8 in. (16 mm) thick, 4 ft (1.2 m) wide with square or tapered edges. The gypsum board type, thickness, number of layers, fastener type and sheet orientation shall be as specified in the individual Design in the Fire Resistance Directory. Max diam of opening is 5 in. (127 mm). For M Rating, max diam of opening is 4-3/8 in. (111 mm).
The hourly F and T Ratings of the firestop system are equal to the hourly fire rating of the wall assembly in which it is installed. The M Rating is applicable only to 1 hr rated walls.
2. Through Penetrant — One metallic pipe, conduit or tubing installed concentrically or eccentrically within the firestop system. Pipe, conduit or tube to be rigidly supported on both sides of wall assembly. The annular space between the pipe or tube and periphery of the opening shall be min 0 in (point contact) to max 1/2 in. (13 mm). As an option, for through penetrant types 2A, 2B and 2C only in nom diameters not exceeding 4 in. (102 mm), the penetrant can be installed with continuous point contact. As an option, for 1 hr F Rating, the annular space between pipe and opening can be max 1 in. (25 mm) for Item 2A penetrant in 2 in. (51 mm) diam (or smaller). The following types and sizes of metallic pipes, conduit or tube may be used:
A. Steel Pipe — Nom 4 in. (102 mm) diam (or smaller) Schedule 40 (or heavier) steel pipe.
B. Iron Pipe — Nom 4 in. (102 mm) diam (or smaller) cast or ductile iron pipe.
C. Conduit — Nom 4 in. (102 mm) diam (or smaller) steel electrical metallic tubing (EMT) or steel conduit.
D. Copper Tube — Nom 4 in. (102 mm) diam (or smaller) Type L (or heavier) copper tube.
E. Copper Pipe — Nom 4 in. (102 mm) diam (or smaller) Regular (or heavier) copper pipe.
A
Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc.
January 21, 2020
F Rating — 1 and 2 Hr (See Item 1) T Rating — 0 Hr
L Rating (Without Movement) at Ambient — Less than 1 CFM/Sq Ft L Rating (Without Movement) at 400°F — Less than 1 CFM/Sq Ft
M Rating (Movement) — See Table 1
A
2 3
C
C
LA
SSIF IED
Classified by Underwriters Laboratories, Inc.
to UL 1479 and CAN/ULC-S115
US
3. Fill, Void or Cavity Material*-Sealant — Min 5/8 in. (16 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall. At the point contact and continuous point contact locations between pipe and wall, a min 1/2 in. (13 mm) diam bead of fill material shall be applied at the pipe/wall interface.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — CP606 Flexible Firestop Sealant
The M Rating for the firestop system is dependent on the variables as noted in the Table 1 below.
Table 1
Movement Direction
Penetrant Item
Nominal Penetrant Diameter
Annular Space Movement
Sealant Depth
F Rating
L Rating
Y 2A 2 in. Max 1 in. 5% 5/8 in. 1 hr. N/A
Z 2A 2 in. 1 in. 0.25 in. 5/8 in. 1 hr. N/A
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
System No. C-AJ-0090
SECTION A-A
C A J
1. Floor or Wall Assembly — Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Max diameter of opening is 6 in. (152 mm).
See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers.
2. Steel Sleeve — (Optional)-Nom 6 in. (152 mm) diameter (or smaller) Schedule 40 (or heavier) steel pipe cast or grouted into the floor or wall assembly, flush with floor or wall surfaces.
3. Firestop System — The firestop system shall consist of the following:
A. Packing Material — Min 4 in. (102 mm) thickness of 4 pcf (64 kg/m3) mineral wool batt insulation tightly packed into the opening as a permanent form. Packing material to be recessed from top surface of floor and both surfaces of wall to accommodate the required thickness of fill material.
B. Fill, Void or Cavity Materials* — Sealant — Min 1/4 in. (6 mm) thickness of fill material applied within the annulus, flush with top surface of floor.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-ONE Sealant or FS-ONE MAX Intumescent Sealant
* Indicates such products shall bear the UL or cUL Certification Mark…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .