1.B.08. COMBO W50S9426QSY19_Attachment 1_FAQs.pdf

PDF 418 KB Posted

Attached to
143LRS Fall Protection Systems
Solicitation number
W50S9426QSY19
Issued by

About this file

This document is a solicitation for a Fall Protection System contract (W50S9426QSY19) for the 143rd Logistics Readiness Squadron at Quonset Air National Guard Base in North Kingstown, Rhode Island.

The contractor is required to design, furnish, install, and provide training for two (2) fall protection systems to support vehicle maintenance operations. Key facility specifications include an 18-foot elevation from floor to roof, a standing seam metal roof, and structural steel joists, purlins, posts, and lintels with spacing detailed in attached structural drawings. The finished floor to bottom joist clearance is 16 feet 8.5 inches, with a radiant heater hanging at 3 feet 6 inches clearance. Existing self-retracting fall protection devices will not be reused. The facility contains pitched and flat conduit bundles hanging 14-16 inches below joists, with the pitched conduit approximately 6 inches below the closest joist to the wall and extending to approximately 16 inches at the end of the open bay. The contractor must reference the Performance Work Statement (Attachment 2), floor plans, attached structural drawings, and provided photographs for complete design and installation requirements. The document includes FAQs addressing system quantity, elevations, roof construction, equipment clearances, and structural spacing to clarify technical specifications for bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S9426QSY19 – 143LRS FALL PROTECTION SYSTEM

Refer to Performance Work Statement (PWS) and Floor Plan in addition to specifications and photographs contained in this document.

The Contractor shall design, furnish, install and provide training for two (2) Fall Protection Systems in accordance with PWS (Attachment 2) to support vehicle maintenance operations at Quonset Air National Guard Base, North Kingstown

RI 02852.

FAQs:

Q. How many systems are you requesting?

A. The Government requires two systems – refer to PWS Section 1.2.

Q. What is the elevation from floor to roof?

A. 18’ (Sheet A-301 in attached drawings)

Q. What is the elevation from top of vehicle to the first roof joist?

A. Depends on vehicle. Finished floor to bottom of joist is 16’-8½” (Sheet A-351)

Q. What is the clearance of the radiant heater hanging from the ceiling?

A. 3’6” (Sheet M-301)

Q. Are you using the existing self-retracting devices for fall protection?

A. No

Q. What is the spacing between steel supports?

A. See attached structural drawings, joists, purlins, posts, and lintels shown.

Q. What is the roof made of?

A. Standing seam metal roof

The conduit is approximately 6” below the joist closest to the wall and is pitched to approximately 16” at the end of the open bay.

The conduit bundle pictured is pitched, not flat.

The pictured pipe and an additional pipe not pictured hang below the joists approximately 14-16”.

Refer to Performance Work Statement (PWS) and Floor Plan in addition to specifications and photographs contained in this document.