1.12 Attachment 5 - CDRL.pdf
PDF 296 KB Posted
- Solicitation number
- N0018926R3103
About this file
This is a Contract Data Requirements List (DD Form 1423-1) specifying ten technical report data items that must be delivered under a Performance Work Statement (PWS) for NCTAMS LANT Norfolk. All data items are categorized as "OTHER" technical reports related to study/services and reference authority DI-MISC-80508B.
The ten required data items are: (A001) Switch Platform Report, (A002) User Service Guide due ten calendar days after contract performance start, (A003) Damage Report, (A004) Preventive Maintenance Schedule on a quarterly basis, (A005) Preventive Maintenance Record on a quarterly basis, (A006) Equipment Database, (A007) OEM Engineering Change Release, (A008) Pre-Existing Conditions Report (one-time delivery), (A009) Preliminary Injury Report, and (A010) Detailed Injury Report. Reports with "AS REQUIRED" frequency have submission dates and subsequent revision dates set forth in the PWS paragraphs referenced (7.1.4, 7.1.6.1.3, 7.1.7, 7.2, 7.2.2, 7.5, 7.7, 7.15, 9.2, and 9.2 respectively). Distribution statements are required per PWS paragraph 13.1, with email distribution preferred. All deliverables are submitted to the Contracting Officer Representative (COR) and Alternate Contracting Officer Representative (ACOR) at NCTAMS LANT, with one final copy of each document required. The form was prepared by Douglas S. Smith on 16 December 2025.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A001
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
SWITCH PLATFORM REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.1.4
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 1 of 10
Attachment (5)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A002
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
USER SERVICE GUIDE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.1.6.1.3
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: Ten (10) calendar days after start of contract performance.
Block 13: Ten (10) calendar days after need for revision is identified.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 2 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A003
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
DAMAGE REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.1.7
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 3 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A004
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
PREVENTIVE MAINTENANCE SCHEDULE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.2
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
QUARTERLY
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 4 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A005
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
PREVENTIVE MAINTENANCE RECORD
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.2.2
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
QUARTERLY
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 5 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A006
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
EQUIPMENT DATABASE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.5
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 6 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A007
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
OEM ENGINEERING CHANGE RELEASE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.7
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARS. 13.1
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 7 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A008
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
PRE-EXISTING CONDITIONS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 7.15
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
ONE REPORT
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 8 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A009
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
PRELIMINARY INJURY REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 9.2
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 9 of 10
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-
0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM
NO.
A010
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
DETAILED INJURY REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 9.2
6. REQUIRING OFFICE
NCTAMS LANT NORFOLK
7. D.D. 250 REQ
N/A
9. DISTRIBUTION
STATEMENT
REQUIRED
PWS PARA. 13.1
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
Block 11: Start of contract performance.
Block 12: and 13; As set forth in Block 5.
Block 14: Use of email distribution is preferred.
COR – NCTAMS LANT 1
ACOR – NCTAMS LANT 1
15. TOTALS 2
G. PREPARED BY
Douglas S. Smith
H. DATE
16 DEC 2025
I. APPROVED BY J. DATE
D.D. Form 1423-1, JUN 90 previous editions are obsolete Page 10 of 10
File details come from the government source that posted it. Updated .