1.1.4a JC SOW Admin Area layout.pdf
PDF 143 KB Posted
- Solicitation number
- 2258
About this file
This document is a floor plan layout diagram of a multi-room facility. The layout depicts a building footprint organized with cardinal directions marked (North, South, East, West) and an entrance/tunnel access point on the eastern side.
The facility contains approximately 30 labeled rooms distributed across two levels. Upper level rooms include M128-M130, M113-M118, and M112, with a Mechanical Room (N/A) and M127 positioned centrally. Lower level accommodations include rooms M120-M126, M131-M133E, and M133A-M133D. Several rooms are marked as "N/A" (M123, M131, M133E), indicating spaces not available or designated for specific use. The layout uses color-coded borders (purple, red, blue, green, and orange) to distinguish between different room groupings or functional zones. A tunnel connection extends from the eastern entrance, and stairwell access points are marked along the western side of the structure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.2.1 - RFP.docx | DOCX document | |
| 1.1.4 - Statement of Work for Janitorial 2027.docx | DOCX document | |
| 1.1.4b JC SOW VSAB layout.pdf | ||
| 1.1.4c SOW - Janitorial Services - Work-Task breakdown.pdf | ||
| 1.1.4 - Statement of Work for Janitorial 2027.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .