1.1.4a JC SOW Admin Area layout.pdf

PDF 143 KB Posted

Attached to
Amendment 3 - RFP for Janitorial Services--Bothell, Washington
Solicitation number
2258
Issued by

About this file

This document is a floor plan layout diagram of a multi-room facility. The layout depicts a building footprint organized with cardinal directions marked (North, South, East, West) and an entrance/tunnel access point on the eastern side.

The facility contains approximately 30 labeled rooms distributed across two levels. Upper level rooms include M128-M130, M113-M118, and M112, with a Mechanical Room (N/A) and M127 positioned centrally. Lower level accommodations include rooms M120-M126, M131-M133E, and M133A-M133D. Several rooms are marked as "N/A" (M123, M131, M133E), indicating spaces not available or designated for specific use. The layout uses color-coded borders (purple, red, blue, green, and orange) to distinguish between different room groupings or functional zones. A tunnel connection extends from the eastern entrance, and stairwell access points are marked along the western side of the structure.

View the file

Other files

File Type Posted
2.2.1 - RFP.docx DOCX document
1.1.4 - Statement of Work for Janitorial 2027.docx DOCX document
1.1.4b JC SOW VSAB layout.pdf PDF
1.1.4c SOW - Janitorial Services - Work-Task breakdown.pdf PDF
1.1.4 - Statement of Work for Janitorial 2027.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .