About this file

This Statement of Work (SOW) details U.S. Customs and Border Protection's (CBP) requirements for signage installation and relocation at the Wilcox/Douglas Highway 191 Checkpoint in Arizona. The project involves creating new hinged signs and relocating existing signs to meet Arizona Department of Transportation (AzDOT) specifications, with specific tasks including manufacturing and installing various traffic and checkpoint signs such as "All Vehicles Must Stop Ahead" signs, Stop signs, speed limit indicators, and enforcement zone signs.

The contract scope requires the contractor to design and produce signs according to AzDOT traffic safety requirements, with some signs designed to be folded open during checkpoint operations and closed when non-operational. The installation must utilize the approved Traffic Control Plan with a spacing tolerance of 1 foot in any direction. The performance location is the Willcox, AZ Highway 191 and Rucker Canyon Rd. Checkpoint, with a one-month performance period from award date. The solicitation indicates a sole source intent to award to Quail Construction LLC, with potential for vendor submissions demonstrating capability by May 27, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Wilcox/Douglas Hwy 191 Checkpoint Hinged Signage, newest first.
File Type Posted
1.15.1 Att_2-Sole_Source_Determination_Not_Exceeding_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work U.S. Customs and Border Protection (CBP), U.S. Border Patrol (USBP) Tucson Sector

Wilcox/Douglas Hwy 191 Checkpoint Hinged Signage Relocation and New Installations

1. BACKGROUND:

U.S. CBP has a requirement to upgrade Tactical Checkpoint hinged signs and install new hinged signs to be in-line with the current Arizona Department of Transportation (AzDOT) requirements. AzDOT required that USBP Tucson Sector provide a 'Traffic and Site Control Plan' for this checkpoint. AzDOT approved the plan to operate the Checkpoint at Arizona Highway 191, requiring the manufacturing and installation of several signs to ensure the travelling public is aware of the status of speed limits leading up to the checkpoint.

SCP

2. SCOPE:

Tucson Sector requires services to create and install new hinged signs and ensure all signage is in alignment with the AzDOT permit in hand.

The contractor will utilize the approved AzDOT Traffic Control Plan and/or Site Control Plan for the checkpoint to install traffic and safety signs. The signs will be a mixture of rigid and folding signs at various intervals and locations spanning the permitted area of the checkpoint. Some signage already on site may be relocated and reused, some materials may be salvaged and reused for signs on site or new signs that the service provider will provide.

The contractor will design and produce all signs to AzDOT specifications and requirements for traffic safety along with some signs being made to be folded and opened with the checkpoint is operational and folded closed when the checkpoint is non-operational.

The contractor will ensure that the folding signs have a readily and accessible opening and closing method that can be utilized by agents in the event of a status change of the checkpoint (e.g. open & closed).

3. APPLICABLE DOCUMENTS:

AzDOT Hwy 191 Checkpoint Permit. Permit #1233934

4. SPECIFIC TASKS:

Task 1 – create the new hinged signs

• All Vehicles Must Stop Ahead Sign 36x36 New Sign, Post and Base

• 2 – Stop Signs on Mobile Stand 36x36 New Signs, Rigid Sign Stand with 4

Sandbags, top of sign to be at 6’

• 2 – Keep Right Signs on Mobile Stands 24x30 0 New signs, Rigid Stand 4’ tall with 4 sand bags each, top of sign to be at 4’

• All Vehicles Must Stop Ahead Folding Sign 36x36, install to a Pre-existing Base, New Sign, Salvage and reutilize Existing Post

• Use Low Beams Folding Sign 36x24 New Sign, New Post, New Base

• Enforcement Zone Sign 48x48, New sign, new post, new base

Task 2 –Relocate the following:

• 1 - 36x48 65MPH Sign, Post and Base

• 3 - US Border Patrol Checkpoint Ahead sign 48x48, Post and Base

• 2 - Speed Reduced Ahead Folding Sigh 48x48, relocate existing Sign, Salvage and relocated existing Post, New Base

• 55MPH Speed Limit Folding Sign 36x38 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• 45 MPH Speed Limit Folding Sign 36x38 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• 25 MPH Speed Limit Folding Sign 36x38 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• Be Prepared To Stop Folding Sign 48x48 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• 35MPH Speed Limit Folding Sign 36x48 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• 45MPH Speed Limit Folding Sign 36x48 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• 55MPH Speed Limit Folding Sign 36x48 Relocate Existing Sign, Salvage and

Relocate Existing Post, New Base

• Rumble Strips Ahead Folding Sign 48x48 Install to a pre-existing Base, New

Sign, Salvage and relocate existing post

Task 3 – Ensure installation of all Signs, Bases, and Posts to approved locations utilizing ADOT approved TCP Spacing, Tolerance of 1’ in any direction

5. DELIVERABLES AND DELIVERY SCHEDULE:

See period of performance.

6. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION:

Not applicable

7. PLACE OF PERFORMANCE:

Willcox, AZ Highway 191 and Rucker Canyon Rd. Checkpoint:

GPS: 31.758781, -109.689366

8. PERIOD OF PERFORMANCE:

One month from ARO

9. SECURITY: UNCLASSIFIED

10. SPECIAL CONSIDERATIONS:

Not applicable

11. POINTS OF CONTACT: List the Program/Customer Point of Contact, the COTR (if applicable) and the Contracting Officer.

Local POC:

To be provided upon award.