1.02 38DJ266202_01_A02.pdf
PDF 172 KB Posted
- Solicitation number
- N6264926Q0556
About this file
This is a Job Specification document for a naval maintenance work order on the USS TRIPOLI (LHA-7).
The specification details work to preserve the bilge area in Fire Pump and Refrigerant Machinery Room 6-45-0-E and provide temporary freezer and chill boxes during the 7J1 availability period. The contractor must provide and maintain three 40-foot freezer boxes set to minus 5 to zero degrees Fahrenheit, two 40-foot chill boxes set to plus 33 to plus 36 degrees Fahrenheit, and one waterproof power distribution panel with a 440VAC-220VAC transformer, circuit breakers, and power cables to support these units. Work will be performed at USS TRIPOLI Pier Side in Sasebo. The Period of Performance runs from October 7, 2026 through January 29, 2027, with an anticipated award date of September 11, 2026 and production completion date of December 18, 2026. The contractor must install and connect all equipment, ground the freezer and chill boxes, perform electrical insulation resistance and continuity testing on installed cables, install emergency contact information tags on each unit, maintain daily temperature logs at 09:00 and 16:00, and immediately repair equipment as needed. Upon completion, the contractor must remove all freezer and chill boxes. The government will remove and return ship's foods. No government-furnished material is provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - N6264926Q0556.pdf | ||
| 1.02 38DJ266202_00_A01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LHA-7 USS TRIPOLI
JON: 380J266202 01 A02
TITLE: Bilge Area in Fire Pump and Refrigerant Machinery Room 6-45-0-E; preserve
REV-I (FOI )-Temporary Freezer Box and Chill Box; provide
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:
SASEBOPOP Start Date: POP End Date:
PREPARED BY:
T.AKAGI
CODE
M_AK
DATE
8/4/2026
APPROVED BY:
S.MURAKAMI
CODE
S225
CONCURRED BY:
N.SASHI
2 CODE
S232
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
ASSIST PLANNER'S NAME: CODE
DESCRIPTION:
JSN(S): EAO5-1375 CASREP #
S/F CONTACT: OBJIO MM2 I HAN NA MMC CWP # CCNS #
Approved by S300/590
Manager
Date: AVL: 7J1
Work Completed
S/Force: Rate:
Ship Supt: Date:
Date:
SRF CONTROL NO.:________________________
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
1/
Sakura.Yamaguchi.ja Typewritten Text 09/11/2026
Sakura.Yamaguchi.ja Typewritten Text 12/18/2026
Sakura.Yamaguchi.ja Typewritten Text 01/29/2027
Sakura.Yamaguchi.ja Typewritten Text 10/07/2026
Sakura.Yamaguchi.ja Typewritten Text 1301401348
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
LHA-7 USS TRIPOLI JON: 38DJ266202 01 A02
TITLE: Bilge Area in Fire Pump and Refrigerant Machinery Room 6-45-O-E; preserve
REV-I (FOI)-Temporary Freezer Box and Chill Box; provide
1. SCOPE:
1.1 Title: Bilge Area in Fire Pump and Refrigerant Machinery Room 6-45-0-- E; preserve REV-l(FO1) -Temporary Freezer Box and Chill Box; provide
1.2 Location of Work:
1.2.1 LHA-7 USS TRIPOLI Pier Side
1.3 Identification:
1.3.1 Quantity (One SE), Temporary Freezer Box and Chill Box located in 1.2.1
Period of service: Throughout 7Jl availability
1.3.1.1 Quantity (3 EA), 40 Feet Length Freezer Box, Temperature Setting Minus 5 to Zero degrees Fahrenheit
1.3.1.2 Quantity (2 EA), 40 Feet Length Chill Box, Temperature Setting Plus 33 to Plus 36 degrees Fahrenheit
1.3.1.3 Quantity (One SE), Power Distribution Panel
(Waterproof Type) including Transformer (44OVAC-22OvAC), Circuit Breakers, and Power Cables (2PNCT) for the Temporary Freezer Box and Chill Box listed in 1.3.1.1 and l.31.2
2. REFERENCES:
2.1 None.
3. REQUIREMENTS:
3.1 Provide and maintain each temporary freezer box and chill box listed in 1.3.1.1 and 1.3.1.2 for storage of ship's frozen and chill food substances installing power distribution panel with power cable listed in 1.3.1.3. Each temporary freezer box and chill box location will be designated by SHIPSUPT.
3.1.1 Prior to provision of each freezer box and chill box, contact SHIPSUPT to make sure the commencing of the installation.
3.1.2 Install and connect power distribution panel and power cable for each freezer box and chill box.
3.1.2.1 Each transformer, power distribution panel, and power cable must be suited to rated load.
3.1.2.2 Ground each freezer box and chiller box.
2/
ShipIHULL NO. ShipIHULL NAME ICN: Rev: Key Op:
LHA-7 USS TRIPOLI JON. 38DJ266202 01 A02
TITLE: Bilge Area in Fire Pump and Refrigerant Machinery Room 6-45-O-E; preserve
REV-I (FOI)-Temporary Freezer Box and Chill Box; provide
3.1.2.3 Accomplish electrical insulation resistance and point to point continuity test of installed cables.
3.1.3 Install following tag on each freezer box and chill box.
EMERGENCY CALL
CONTRACTOR : XXXXXXXXXXXXXX
IN CHARGE : 00000000000000
NIGHT TIME AND HOLIDAY : 00-0000
3.1.4 Maintain and immediately repair each freezer box and chill box when they are in trouble during the period specified in 1.3.1.
3.1.4.1 Measure and record a log book for temperature of each freezer box and chill box at 09:00 and 16:00 on every day.
3.1.5 Remove each freezer box and chill box, upon completion of the Period of utilizing listed in 1.3.1.
4. NOTES:
4.1 Initial Condition - The bilge in fire pump and refrigerant machinery room was in need preservation.
4.1.1 Temporary freezer box and chill box will be required on the pier during this work.
4.2 Ship's Foods will be removed and returned by Ship's Force.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 None.
File details come from the government source that posted it. Updated .