1-CMGC RFP 5 Year revised 11.18.25.docx

DOCX document 24 KB Posted

Attached to
CMGC RFP
Solicitation number
LCSD11142025
Issued by
Box Elder County, Logan City, Utah

About this file

This is a Request for Proposal issued by Logan City School District in Utah for Construction Manager/General Contractor (CM/GC) services to perform modifications, additions, and repairs to various school district facilities located in Logan, Utah. The scope of work encompasses projects across multiple divisions of the Master Format 2016 specifications, including general requirements, concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, earthwork, exterior improvements, and utilities. The contract term is five years, during which projects will be designed and built as budgets allow with sequencing determined by the School District. The maximum price for any single project shall not exceed $2,000,000, and any project valued in excess of $50,000 requires performance and payment bonds. Proposals must be received by 2:00 P.M. on December 12, 2025, at the Logan City School District offices located at 101 West Center Street, Logan, Utah 84321. Questions must be submitted in writing to Paul Guymon, Director of Purchasing, no later than 2:00 P.M. on December 8, 2025. The selection process consists of two steps: Step One evaluates contractor qualifications for 80 points, and Step Two scores cost proposals for 20 points. The three highest-scoring firms from Step One will be invited to submit cost proposals.

The pricing structure requires contractors to submit management fees as percentages for six project value categories ranging from $0–$10,000 through $500,001–$1,000,000, which will be averaged and scored using a mathematical formula awarding up to 10 points. Additionally, contractors must provide hourly rates for both the Superintendent and Project Manager, which will be averaged and scored for up to 10 additional points. The firm with the highest combined score from both the technical proposal and cost proposal will be awarded the contract. Proposals must include five copies bound with tab dividers and one digital copy, with detailed information on general firm qualifications, K-12 school experience, CM/GC experience, key personnel qualifications and involvement, current workload and bond ability, self-performed work capabilities, and in-house design experience demonstrated through at least five projects valued at $40,000 or more. Local contractors will receive higher points for insurance and qualification criteria. The School District reserves the right to award future projects to other contractors in its best interest and retains the right to reject any or all proposals. Contracts will be executed using AIA Document A133–2009 as the standard form of agreement with modifications to certain conditions and claims procedures.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOGAN CITY SCHOOL DISTRICT

REQUEST FOR PROPOSAL

FOR

CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR SERVICES

NOTICE TO CONSTRUCTION MANAGERS/GENERAL CONTRACTORS

Logan City School District is accepting Proposals from qualified Construction Manager/General Contractor Firms (CM/GC) for construction services for modifications, additions and repairs to various school district facilities located in Logan City, Utah.

Proposals will be in accordance with the Request for Proposals prepared by the Logan City School District which may be obtained at https://utah.bonfirehub.com/portal/?tab=openOpportunities or from the Logan City School District website https://www.loganschools.org/currentbids.

Proposals will be received until 2:00 P.M., December 12, 2025 in the office of Paul Guymon at the Logan City School District offices at 101 W. Center, Logan, UT 84321.

Logan City School District reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the Logan City School District.

Logan City School District Paul Guymon Director of Purchasing

PROJECT DESCRIPTION

Logan City School District (LCSD) is accepting proposals from qualified Construction Manager/General Contractor Firms (CM/GC) for construction services for modifications, additions and repairs to various school district facilities located in Logan, Utah.

The length of time of this agreement shall be for a period of 5 (five) years.

As projects are identified during this 5-year time period they will be designed and built as budgets allow with the sequence determined by the School District. The School District reserves the right to award any future project to other contractors in the best interest of the School District.

The projects to be completed under this contract will consist of work from any of the Divisions from the Master format 2016 specifications as noted below:

01 General Requirements 02 Existing Conditions 03 Concrete 04 Masonry 05 Metals 06 Wood, Plastics and Composites 07 Thermal and Moisture Protection 08 Openings 09 Finishes 10 Specialties 11 Equipment 12 Furnishings 13 Special Construction 14 Conveying Equipment 21 Fire Suppression 22 Plumbing 23 Heating, Ventilating and Air Conditioning 25 Integrated Automation 26 Electrical 27 Communications 28 Electronic Safety and Security 31 Earthwork 32 Exterior Improvements 33 Utilities 34 Transportation AIA Document A133-2009 “Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price” will be the form used as a contract for this project.

The fixed cost of each of the projects as they are identified will be established by using AIA Document A133 – 2009 “Exhibit A Guaranteed Maximum Price Amendment.”

The maximum price of any single project will not exceed $2,000,000. Any project valued in excess of $50,000 will require the CM/GC to provide performance and payment bonds.

The majority of the work performed under this contract will be performed without the services of an Architect. On those specific projects the Amendment will indicate that the word “Owner” will be substituted for “Architect” where it appears in the AIA Document A133-2009 and AIA Document A201-2007. Paragraph 3.3 of AIA Document A133-2009 will be deleted and paragraph 9.3 will be replaced with the following: The Owner will serve as the Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007 for Claims arising from or relating to the Construction Manager’s Construction Phase services.

AIA Document A201 - 2007 “General Conditions of the Contract for Construction” will be the General Conditions of this Contract with the following modifications:

15.1.1 Add these sentences to the end of the paragraph: A claim must contain the following explicit language in order to be recognized as a “Claim”: “THIS IS A CLAIM AS DEFINED BY CLAUSE 15.1.1 OF AIA DOCUMENT A201.”

15.2.6 Delete paragraph in its entirety.

15.2.6.1 Delete paragraph in its entirety.

15.3.1 Substitute the word “may” for “shall” and add the following at the end of the paragraph: All claims and disputes between the Contractor and the Owner will be decided in a forum determined at the sole discretion of the Owner. If the Owner determines that a claim or dispute will be mediated, the guidelines set forth in Clause 15.3 will govern the mediation.

The CM/GC must be capable of creating bid and construction documents using in-house personnel. In some instances where LCSD retains the services of a Design Consultant, the CM/GC must and be willing to work closely with LCSD and the Design Consultant through the design phase, providing cost estimates, schedules and feedback on constructability of design details and availability of materials selected.

CM/GC Work Phases

The CM/GC Work consists of two (2) phases: Pre-construction and Construction.

A. Preconstruction Phase: This phase of the Work includes, but is not limited to, attending design meetings, estimating and cost control, schedule development, design document creation and bidding. The Construction Manager shall monitor the bid climate and make recommendations to LCSD as to the most advantageous bidding time/schedule and then solicit bids from sub-contractors. The CM/GC will be required to provide a Guaranteed Maximum Construction Price (GMP) after receiving bids from subcontractors and prior to beginning the Construction Phase.

B. Construction Phase: This phase of the Work consists of the Contractor furnishing and installing all Work as required in the Contract Documents.

Bidding Services.

When entering into a subcontract the CM/GC shall procure the subcontractor by using a standard procurement process in the same manner as if the subcontract work was procured directly by LCSD. Logan City School District shall be notified by the Construction Manager of the location, date, and time of each bid opening and LCSD shall have the right to be present and fully participate in such bid opening. Detailed, full, complete tabulations of all bidding must be submitted to LCSD.

A. Prequalification Criteria. The CM/GC shall prepare, when appropriate, prequalification criteria for bidders. Subcontractors and suppliers at all tiers must be properly licensed in the State of Utah and must meet all qualification requirements of the specifications/Contract Documents.

B. Ensure Bids are Received. The CM/GC is responsible for the procurement of subcontractors and suppliers for the Project. The CM/GC shall develop Subcontractor interest to ensure bids are received.

C. Pre-Bid Conferences. The CM/GC shall conduct pre-bid conferences as appropriate to familiarize potential bidders with the bidding documents. The CM/GC shall ensure that the Construction Documents are available to all potential bidders.

D. Comply with Procurement Code. All procurements recommended and conducted by the CM/GC shall be in accordance with one of the source selection methods provided for in the Utah Procurement Code, UCA 63G-6a in the same manner as if the subcontract Work was procured directly by LCSD.

E. Selection of Bidders. The CM/GC shall receive bids, prepare bid analyses and award subcontracts or reject bids. LCSD shall be consulted during this procurement process, however, the determination and responsibility for the procurement of the subcontractors and suppliers is that of the CM/GC.

F. Bidders Contract with CM/GC Only. There shall be no contractual relationship between the subcontractors/suppliers and LCSD or A/E. The CM/GC shall prepare and execute the required subcontractor/supplier agreements. The CM/GC shall be fully responsible for the performance of its Subcontractors and suppliers at any tier similar to a General Contractor under GSD’s General Conditions.

G. Self-Performed Work. The Contractor must bid self-performed work against other sub-contractors. The Contractor’s bid will then be evaluated by LCSD and must be determined to be the best value bid for the work to be awarded to the Contractor. The cost of any work that is self-performed will be part of the established GMP.

CM/GC PROCUREMENT PROCESS

The LCSD Selection Committee will conduct a two-step selection process.

Step One will consist of the evaluation and scoring of submitted responses on the basis of contractor qualifications and will comprise 80 points possible.

Submitting firms will be evaluated and scored by the LCSD Selection Committee based on the criteria outlined in the Request for Proposals.

Step Two is the scoring of the cost proposal for 20 points possible. Do not include the cost proposal with the proposal described in step one. The three highest scoring firms in step one will be invited to submit a Cost Proposal which will then be evaluated and scored. Please see attachment titled “Schedule of Costs.” This will be scored separately from the evaluation criteria by the Purchasing Director according to the following formula. The points assigned to each offeror’s fee proposal will be based on the lowest proposal price. The offeror with the lowest proposed price will receive 100% of the price points. 10 points are available for the contractor’s fee and 10 points are available for the combined average of the Superintendent and Project Manager. All other offerors will receive a portion of the total cost points based on what percentage higher their proposed price is than the lowest proposed price. An offeror whose proposed price is more than double (200%) the lowest proposed price will receive no points. The formula to compute points is: (Cost Points available) x (2- Proposed Price/Lowest Proposed Price).

After scoring this proposal separately, it will be added to the final score. The firm with the highest combined score comprised of the first Proposal score and the Cost Proposal score will be invited to enter into a contract with the Logan City School District to perform the work described in this Request for Proposals.

SUBMITTAL DUE DATES AND TIME

Proposals will be received until 2:00 P.M., December 12, 2025 in the office of Paul Guymon at the Logan City School District offices at 101 W. Center St., Logan, UT 84321. Proposals must be in a sealed envelope marked “CM/GC Services Proposal.” No faxed or emailed proposals will be accepted. Proposals received after the specified time, will not be accepted. Please allow adequate time for delivery. If using a courier service, the contractor is responsible for ensuring the delivery will be made directly to the required location.

REQUESTS FOR INFORMATION

All requests for information regarding this solicitation shall be in writing directed to:

Paul Guymon Director of Purchasing Logan City School District 101 West Center Street Logan, Utah 84321 435-755-2300 ext. 1402 Any contact made with others may be grounds for disqualification.

LAST DAY TO SUBMIT QUESTIONS

All questions must be received no later than 2:00 P.M. December 8, 2025.

ADDENDUM

All responses to questions and requests for clarification will be in writing and issued as addenda to the Request for Proposals. The addenda will be posted and the Logan City School District webpage.

Any addenda issued prior to the proposal deadline shall become part of the Request for Proposals and any information required shall be included in your proposal.

PROPOSAL REQUIREMENTS

Submit a minimum of five (5) copies of the Proposal.

The following information must be provided bound with tab dividers marked to correspond with the paragraph numbers of the requirements listed below.

1. General firm information

a. On the contractor’s letterhead provide the address of its current Utah office.

b. Provide the number of its current Utah State License as a General Contractor, the date of issuance and a statement that said license is in active status.

c. Demonstrate that it carries the following minimum insurance coverage:

$2,000,000 Each Occurrence $4,000,000 General Aggregate $2,000,000 Personal and Advertising Injury $2,000,000 Products-Completed Operations Aggregate 5 points possible. Local contractors will be awarded higher points.

2. School Experience a. Provide a list of all K-12 school related projects completed by the Construction Manager’s Utah office within the past ten years along with the dollar value of each of those projects as well as the Owner’s name, Owner’s representative and phone number.

20 Points Possible

3. CM/GC Experience a. Provide a list of all K-12 school projects that were completed by the Construction Manager’s Utah office within the past ten years using the Construction Manager/General Contractor method.

b. Provide a list of all other projects that were completed by the Construction Manager’s Utah office within the past ten years using the Construction Manager/General Contractor method.

10 Points Possible

4. Key Personnel a. Provide a description of the qualifications of key personnel, both field and office, that the Construction Manager proposes using on this project.

b. Provide a list of the K-12 CM/GC projects these key personnel were involved with showing specifically what their role was with each project. At a minimum, provide this information for the site superintendent and project manager along with a list of other projects the Construction Manager is currently aware of on which they will be employed concurrently with this project.

10 Points Possible

5. Current Work Load/Bond Ability

a. List of all projects along with their dollar values currently under construction.

b. Provide evidence of bond limit and all projects that are currently bonded.

5 Points Possible

6. Self-Performed Work

a. Identify which types of work the Construction Manager may elect to self-perform.

b. Provide a list of all field personnel currently employed directly by the Construction Manager that the Construction Manager may use to perform self-performed work, such as carpenters, laborers and other such personnel along with length of time each has been employed by the Construction Manager.

10 Points Possible

7. Design Experience

a. Provide copies of bid/construction documents prepared in-house by the Construction Manager’s personnel without using the services of an independent Design Consulting Firm or independent Design Professional for at least 5 projects that were valued at least $40,000.

20 Points Possible

Failure of any Construction Manager to submit any of the above information as set forth may result in the Construction Manager being disqualified.

Logan City School District CM/GC RFP Schedule of Costs

Proposed Fees will be scored in 3 different categories according to project values and will be awarded points based on the following criteria:

Project Value Contractor Management Fee

$0-$10,000_____________________% (percentage)
$10,001-$50,000_____________________% (percentage)
$50,001-$100,000_____________________% (percentage)
$100,001-$500,000_____________________% (percentage)
$500,001-$1,000,000_____________________% (percentage)

The percentage values will be averaged after which the points to be awarded will be calculated using the following mathematical formula: (Cost Points) x (2 - Proposed Cost/Lowest Proposed Cost) These points will then be added to the scoring of the RFP to determine a final scoring for each vendor. 10 points for the fee cost are available to be added to the final score.

Please provide the following:

The Cost of a Superintendent is$_______ per hour
The cost of Project Manager is$_______ per hour

The dollar values will be averaged after which the points to be awarded will be calculated using the following mathematical formula: (Cost Points) x (2 - Proposed Cost/Lowest Proposed Cost) These points will then be added to the scoring of the RFP to determine a final scoring for each vendor. 10 points for the Superintendent and Project Manager rates are available to be added to the final score.

LOGAN CITY SCHOOL DISTRICT

REQUEST FOR PROPOSAL

FOR

CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR SERVICES

Addendum 1

In addition to requested materials, RFP participants shall provide one copy of the bid proposal in digital format.