This is a Request for Proposals (RFP) issued by the Kearns Improvement District (KID) in Utah for CIPP (Cured-In-Place Pipe) rehabilitation and lateral reinstatement services within the District's sanitary sewer system. The project scope includes cleaning and CCTV inspection of sewer mains, CIPP lining of approximately 2,292 linear feet of 8-inch diameter clay sanitary sewer, robotic reinstatement of approximately 65 service laterals, trimming and sealing of reinstated laterals, post-installation CCTV inspection, bypass pumping, traffic control, and final documentation with warranty. All work must comply with ASTM standards, Utah state regulations, and KID technical requirements. The RFP was issued on March 19, 2026, with questions due by April 2, 2026, at 2:00 PM and proposals due on April 9, 2026, at 2:00 PM. The anticipated contract award date is April 23, 2026, with substantial completion targeted for November 2026.
Proposals must include unit pricing for six line items: mobilization, traffic control, 8-inch CIPP rehabilitation, lateral reinstatement, bypass pumping, and permits. Qualified contractors must have completed at least three similar municipal CIPP projects within the past five years, maintain certified installation crews, provide three municipal client references, and hold appropriate Utah contractor licensing. Selected contractors must provide general liability insurance of $1,000,000 per occurrence (with no pollution exclusion or separate pollution liability coverage of equal limits), auto liability insurance of $1,000,000, statutory workers compensation coverage, and performance and payment bonds equal to 100 percent of contract value if required. The contractor shall provide a minimum one-year workmanship warranty and the manufacturer's warranty for the CIPP liner. All communications regarding the RFP should be directed to Robert Lutz, Director of Operations, at RLutz@kidwater4UT.gov or 801-912-0284.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS (RFP)
CIPP Rehabilitation & Lateral Reinstatement Project
Kearns Improvement District (KID)
1. INVITATION TO PROPOSERS
The Kearns Improvement District (KID) is soliciting sealed proposals from qualified contractors to provide all labor, materials, equipment, and supervision necessary to complete Cured-In-Place Pipe (CIPP) rehabilitation and associated lateral reinstatements within the District’s sanitary sewer system.
Qualified contractors with demonstrated experience in municipal sewer rehabilitation are invited to submit proposals in accordance with the requirements outlined herein.
2. PROJECT OVERVIEW
The project consists of rehabilitation of existing gravity sanitary sewer mains using CIPP lining methods and reinstatement of active service laterals. Work includes, but is not limited to:
• Cleaning and CCTV inspection of sewer mains
• CIPP lining of approximately 2292 linear feet of 8” diameter clay sanitary sewer
• Robotic reinstatement of approximately 65 service laterals
• Trimming and sealing of reinstated laterals
• Post-installation CCTV inspection
• Bypass pumping
• Traffic control
• Final documentation and warranty
All work shall comply with applicable ASTM standards, Utah state regulations, and KID technical requirements.
Click here for KID Design Standards & Construction Specifications alopez Image https://www.kidwater4ut.gov/engineering-specifications#docaccess-146c8b43252f4ac600db56f283f0358bf6d49f099ffe0659ffe8f03b9e1fddf3
3. SCOPE OF WORK
3.1 Pre-Construction Requirements
• Attend pre-construction meeting
• Obtain required permits.
• Submit traffic control plan (if required)
• Provide for bypassing host pipe flows and lateral flows received by the host pipe
• Submit product data and resin specifications
• Provide proof of insurance and bonding
• Submit project schedule
• Notify all impacted residents 48-Hr prior to work
3.2 Cleaning and Inspection
• Remove debris, roots, and obstructions
• Perform pre-lining CCTV per NASSCO PACP standards & provide digital video files
3.3 CIPP Installation
• Furnish and install ASTM F1216 compliant CIPP liner
• Design liner thickness for full structural capacity (assume fully deteriorated host pipe unless otherwise specified)
• Use steam, hot water or UV curing unless otherwise approved
• Maintain resin impregnation quality control
• Ensure proper liner termination at manholes
3.4 Lateral Reinstatement
• Locate active service connections
• Robotically reinstate all active laterals
• Smoothly trim openings
• Provide watertight sealing if required
• Document each reinstatement via CCTV
3.5 Post-Installation Requirements
• Perform post-lining CCTV inspection
• Conduct thickness and cure verification testing
• Provide sample coupons for flexural testing (ASTM D790)
• Submit final report including:
o Before and after videos o Liner thickness calculations o Test results o Warranty documentation
4. CONTRACTOR QUALIFICATIONS
Proposers must:
• Have completed at least 3 municipal CIPP projects of similar size within the past 5 years.
• Have certified CIPP installation crews.
• Provide references from at least three (3) municipal clients.
• Hold appropriate Utah contractor licensing.
5. PROPOSAL SUBMITTAL REQUIREMENTS
Proposals shall include:
1. Company profile and qualifications
2. Proposed schedule
3. Unit pricing breakdown as shown below.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT UNIT COST
TOTAL
AMOUNT
1 Mobilization 1 LS $
2 Traffic control 1 LS $
3 8-Inch CIPP Rehabilitation 2,292 LF $
4 Lateral Reinstatement 65 EA
5 Bypass Pumping 1 LS
6 Permits 1 LS
BID ALT TOTAL $
4. List of references
5. Insurance certificate
6. Bid bond (if required)
6. EVALUATION CRITERIA
KID reserves the right to reject any or all proposals and to award the contract in the best interest of the District.
7. PROJECT SCHEDULE
• RFP Issued: March 19, 2026, 8:00 AM
• Questions Due: April 02, 2026, 2:00 PM
• Proposals Due: April 09, 2026, 2:00 PM
• Anticipated Award: April 23, 2026, 2:00 PM
• Substantial Completion: November 2026
8. INSURANCE & BONDING REQUIREMENTS
The selected contractor shall provide:
• General Liability: $1,000,000 per occurrence minimum. General Liability may not contain any pollution exclusion or the contractor must maintain a separate Pollution Liability policy with the same limit as the GL policy.
• Auto Liability: $1,000,000 minimum
• Workers Compensation: Statutory limits
• Performance and Payment Bonds (100% of contract value, if required)
9. WARRANTY
The contractor shall provide a minimum one (1) year workmanship warranty and manufacturer’s warranty for the CIPP liner as provided by the resin/liner manufacturer.
10. CONTACT INFORMATION
All communications regarding this RFP shall be directed to:
Robert Lutz RLutz@kidwater4UT.gov 5350 West 5400 South Kearns, Utah 84118 801-912-0284
11. CONSTRUCTION DRAWINGS