1-C-DFCM Performance References Form 2.5.25 (1).docx
DOCX document 55 KB Posted
- Solicitation number
- DA27008-Stage I
- Issued by
- Utah
About this file
This is a Past Performance References Form for the Utah Division of Facilities Construction and Management (DFCM) related to a construction project for the Department of Public Safety's Central Evidence Warehouse. The form requires contractors to provide up to five past performance references for projects completed within the past five years where the contractor served as the prime contractor and held the contract directly with the stakeholder. Each reference entry requires detailed information including the project name, point of contact name and contact details, project location, the contact's role, project completion date, project construction cost, a brief description of work performed, and key individuals who worked on the project. The form emphasizes that submission of complete and accurate information is the contractor's responsibility, and failure to comply with reference requirements will result in disqualification from the selection process. Attachments and hyperlinks are not permitted in the submission.
The related construction project is a new single-story Central Evidence Warehouse for the Department of Public Safety in Utah, with an approximate size of 18,599 square feet and a construction cost estimate of $11,300,000. The form itself is a blank template with placeholder text fields for contractors to populate with their specific project information. Contractors must identify their firm name and contact information along with the DFCM Project Name and Number at the top of the form. The form includes a section for DFCM internal use only, which tracks the due date and time, the number of references needed, and verification of references received.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM PAST PERFORMANCE REFERENCES
Provide references only for projects completed within the past five years where you served as the prime Contractor and held the contract directly with the stakeholder. It is the Contractors responsibility to ensure that all submitted information is complete and accurate. Failure to comply with the reference requirements will result in disqualification from the selection process. Attachments and hyperlinks are not permitted.
DFCM Project Name & Number: Click to enter text
Firm Name: Click to enter text
| Firm Contact Name: Click to enter text |
| Contact Info: Click to enter text |
REFERENCE NO. 1
| Project Name: Click to enter text |
| Point of Contact Name: (person able to answer questions about the project) |
| Click to enter text |
| Project Location (city, state): |
| Click to enter text |
| Point of Contact’s Role for the Project: |
| Click to enter text |
| Project Completion Date: |
| Click to enter text |
(month and year)
| Point of Contact Email: |
| Click to enter text |
Project Construction Cost:
| Click to enter text |
| Point of Contact Phone Number: |
Click to enter text
Brief Description of the work performed: Click to enter text
Key individuals who worked on the project: Click to enter text
REFERENCE NO. 2
| Project Name: Click to enter text |
| Point of Contact Name: (person able to answer questions about the project) |
| Click to enter text |
| Project Location (city, state): |
| Click to enter text |
| Point of Contact’s Role for the Project: |
| Click to enter text |
| Project Completion Date: |
| Click to enter text |
(month and year)
| Point of Contact Email: |
| Click to enter text |
Project Construction Cost:
| Click to enter text |
| Point of Contact Phone Number: |
Click to enter text
Brief Description of the work performed: Click to enter text
Key individuals who worked on the project: Click to enter text
REFERENCE NO. 3
| Project Name: Click to enter text |
| Point of Contact Name: (person able to answer questions about the project) |
| Click to enter text |
| Project Location (city, state): |
| Click to enter text |
| Point of Contact’s Role for the Project: |
| Click to enter text |
| Project Completion Date: |
| Click to enter text |
(month and year)
| Point of Contact Email: |
| Click to enter text |
Project Construction Cost:
| Click to enter text |
| Point of Contact Phone Number: |
Click to enter text
Brief Description of the work performed: Click to enter text
Key individuals who worked on the project: Click to enter text
REFERENCE NO. 4
| Project Name: Click to enter text |
| Point of Contact Name: (person able to answer questions about the project) |
| Click to enter text |
| Project Location (city, state): |
| Click to enter text |
| Point of Contact’s Role for the Project: |
| Click to enter text |
| Project Completion Date: |
| Click to enter text |
(month and year)
| Point of Contact Email: |
| Click to enter text |
Project Construction Cost:
| Click to enter text |
| Point of Contact Phone Number: |
Click to enter text
Brief Description of the work performed: Click to enter text
Key individuals who worked on the project: Click to enter text
REFERENCE NO. 5
| Project Name: Click to enter text |
| Point of Contact Name: (person able to answer questions about the project) |
| Click to enter text |
| Project Location (city, state): |
| Click to enter text |
| Point of Contact’s Role for the Project: |
| Click to enter text |
| Project Completion Date: |
| Click to enter text |
(month and year)
| Point of Contact Email: |
| Click to enter text |
Project Construction Cost:
| Click to enter text |
| Point of Contact Phone Number: |
Click to enter text
Brief Description of the work performed: Click to enter text
Key individuals who worked on the project: Click to enter text
--For DFCM Internal Use Only--
DFCM Project Number: Click to enter text
Due date and time: Click to enter text
Number of references needed: Click to enter text
Verified references on file with DFCM: ☐ 1 ☐ 2 ☐ 3 ☐ 4 ☐ 5
DFCM Construction Performance References Form, 2.5.25 image1.jpeg
File details come from the government source that posted it. Updated .