1-BPM005274 Price Sheet.xls
XLS spreadsheet 33 KB Posted
- Attached to
- Master Agreement AZ|CTR066441
- Contract number
- CTR066441
- Issued by
- Arizona
About this file
This document is a pricing sheet for an emergency roadside assistance and towing service contract, identified by the reference number 1-BPM005274. The contractor is Professional Towing and Recovery, providing a comprehensive rate schedule for towing services across different vehicle weight classifications: Light Duty (1-10,000 GVW), Medium Duty (10,001-26,000 GVW), and Heavy Duty (26,001-80,000 GVW).
The pricing sheet details specific rates for various towing service components, including hook fees, mileage charges, recovery rates, and fees for Gone on Arrival (GOA) scenarios. Rates vary by vehicle classification, with light duty hook fees at $185, medium duty at $250/hr, and heavy duty at $350/hr. Additional charges include a 10% fuel surcharge applied to all calls, roadside assistance at $115, and varying rates for loaded and unloaded miles. Recovery rates range from $145/hr for light duty to $525/hr for heavy duty, with supplemental fees for different service scenarios such as GOA within and outside one hour. The document provides a comprehensive, transparent pricing structure for emergency towing and roadside assistance services across different vehicle weight categories.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Light Duty Rates
| PRICING SHEET | |||||
| Emergency Roadside Equipment and Towing Service | |||||
| Offeror: | OFFEROR: | Professional Towing and recovery | |||
| Roadside Assistance/Towing Rates for Light Duty 1-10000 GVW | |||||
| Instructions: The Contractor shall provide rates for any fees that may be applicable to the service being offered. This may include Service Fee/non-tow base fee, Hook,After-Hook, Recovery, Gone on Arrival (GOA) and Enroute. All applicable rates for Light Duty equipment shall be listed. | |||||
| Rate description (i.e. Service fee, Hook, etc.) | Rate | ||||
| Light Duty | |||||
| Hook | $ 185.00 | ||||
| Miles Unloaded | $ 5.00 | First 15 miles free | |||
| Miles loaded | $ 8.00 | First 15 miles free | |||
| Recovery | $145/hr | ||||
| GOA 1hr | $ 85.00 | ||||
| Goa Outside 1 hr | $ 185.00 | ||||
| Roadside | $ 115.00 | ||||
| Fuel fee | $8.5/gallon | ||||
| Medium Duty | |||||
| Hook | $250/hr Port to Port | ||||
| Recovery | $250/hr Port to Port | ||||
| GOA 1hr | $ 125.00 | ||||
| Goa Outside 1 hr | $ 250.00 | ||||
| Heavy Duty | |||||
| Hook | $ 353.00 | ||||
| Recovery | $ 505.00 | ||||
| GOA 1 hr | $ 176.00 | ||||
| GOA outside 1 hr | $ 353.00 | ||||
| Rotator | |||||
| Hook | $700/hr | ||||
| Recovery | $700/hr | ||||
| GOA 1hr | $ 350.00 | ||||
| GOA outside 1 hr | $ 700.00 | ||||
| Applied to all calls | |||||
| Fuel Surcharge | 10% |
Medium Duty Rates
| PRICING SHEET | |||||
| Emergency Roadside Assistance and Towing Service | |||||
| Offeror: | OFFEROR: | Professional Towing and Recovery | |||
| Roadside Assistance/Towing Rates for Medium Duty 10001-26000 GVW | |||||
| Instructions: The Contractor shall provide rates for any fees that may be applicable to the service being offered. This may include Service Fee/non-tow base fee, Hook,After-Hook, Recovery, Gone on Arrival (GOA) and Enroute. All applicable rates for Medium Duty equipment shall be listed. | |||||
| Rate description (i.e. Service fee, Hook, etc.) | Rate | ||||
| Hook | Hook | Hook | $250/hr | ||
| Miles Loaded | Miles Loaded | Miles Loaded | $ - 0 | ||
| Miles unloaded | Miles unloaded | Miles unloaded | $ - 0 | ||
| Recovery | Recovery | Recovery | $250/hr | ||
| GOA 1hr | GOA 1hr | GOA 1hr | $ 125.00 | ||
| Goa Outside 1 hr | Goa Outside 1 hr | Goa Outside 1 hr | $ 250.00 |
Heavy Duty Rates
| PRICING SHEET | |||||
| Emergency Roadside Assistance and Towing Service | |||||
| Offeror: | OFFEROR: | Professional Towing and Recovery | |||
| Roadside Assistance/Towing Rates for Heavy Duty 26001-80000 GVW | |||||
| Instructions: The Contractor shall provide rates for any fees that may be applicable to the service being offered. This may include Service Fee/non-tow base fee, Hook,After-Hook, Recovery, Gone on Arrival (GOA) and Enroute. All applicable rates for Heavy Duty equipment shall be listed. | |||||
| Rate description (i.e. Service fee, Hook, etc.) | Rate | ||||
| Hook | Hook | Hook | 350/hr | ||
| Miles Loaded | Miles Loaded | Miles Loaded | $ - 0 | ||
| Miles unloaded | Miles unloaded | Miles unloaded | $ - 0 | ||
| Recovery | Recovery | Recovery | 525/hr | ||
| GOA 1hr | GOA 1hr | GOA 1hr | $ 125.00 | ||
| Goa Outside 1 hr | Goa Outside 1 hr | Goa Outside 1 hr | $ 350.00 | ||
| Rotator | $690/hr |
File details come from the government source that posted it. Updated .