About this file

This is a site layout attachment related to a Power and Grounding Inspection Services solicitation issued by the Utah Communications Authority (UCA) for the Windy Ridge Communications Site. The document provides a visual schematic of the facility's grounding infrastructure, depicting the physical arrangement of two racks, ducting systems, an external HVAC unit centered within the layout, and antenna and tower grounding configurations. The attachment illustrates the technical site conditions that bidders must understand to provide accurate inspection services. Questions regarding the solicitation must be submitted by July 13, 2026, no later than 2:00 p.m. Mountain Time to Chris Hughes at chughes@uca911.org, with proposals due by July 17, 2026, no later than 10:00 a.m. Mountain Time via the U3P portal, subject to a 1GB file upload limit per submission.

The document serves as a supporting exhibit to establish the existing site configuration and grounding infrastructure layout that will be subject to inspection. This visual reference is essential for prospective bidders to assess the scope of work, facility complexity, and technical requirements associated with evaluating the power and grounding systems at the Windy Ridge Communications Site. No specific pricing information, set-asides, incumbent contractor details, or funding amounts are detailed within this attachment.

View the file

Other files

File Type Posted
2-UCA Windy Ridge Inspection RFP v2.docx DOCX document
3-UCA Inspection RFP Scoring Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ducting

DUCTING

Rack

Rack

P25

R1

In t.

H

V A

C

C e n te re d

External HVAC

ATTACHMENT I

Parker Draft 2, 3-13-26.vsdx
Site Layout
Shelter
Antenna & Tower
Grounding
Page-5