1-Attachment B - Bid Schedule - Pricing Form.pdf

PDF 13 KB Posted

Attached to
ITB - Construction of the Brookglen Stormwater Detention Basin for Harris County Flood Control District (CDBG-DR/GLO)
Solicitation number
25/0353
Issued by
Harris County, Texas

About this file

This document is Attachment B, a Bid Schedule / Pricing Form for Harris County, Texas, which provides instructions for bidders submitting proposals through the Bonfire online portal. Bidders are required to provide pricing in specified units, with the understanding that estimated quantities may vary, and unit pricing will take precedence over extended pricing. The document outlines that pricing for goods and services must remain firm for the entire contract duration, with all-inclusive costs that cover transportation, freight, and other charges.

The pricing instructions emphasize that no price changes, additions, or subsequent qualifications will be accepted during the contract term. All prices must be written in ink or typed, and bidders must explicitly list any additional charges or forfeit the right to payment for unspecified items. If maintenance is applicable for proposed equipment, it must be available through a manufacturer-authorized facility in Harris County, with associated costs detailed on the Bid Schedule / Pricing Form. Maintenance services will commence only after warranty expiration and should be priced accordingly.

View the file

Other files

File Type Posted
26-Attachment S - Plans Drawings.pdf PDF
25-Attachment U - Project Manual.pdf PDF
10-Attachment W - GLO Compliance Package.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
22-Attachment M - Minimum Insurance Requirements.pdf PDF
16-Attachment G - Contractor Profile.pdf PDF
15-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
13-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
11-Attachment Y - Pre-Award Risk Questionnaire.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
12-Attachment FF - Heat Protection Safety Requirements.pdf PDF
19-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
27-Attachment V - Project Signs - Plaques.pdf PDF
24-Attachment P - Required Contract Provisions.pdf PDF
18-Attachment A - Bid Addenda Acknowledgement.pdf PDF
20-Attachment BB – MWBE Goal Participation Information Packet.pdf PDF
9-Attachment U - General Notices, Notes Information.docx DOCX document
14-Attachment T - General Conditions.pdf PDF
23-Attachment O - Davis Bacon Current Wage Decision.pdf PDF
21-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
28-Federal IFB General Conditions and Specifications - Construction.pdf PDF
4-Attachment F - References.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
17-Attachment Q - Section 3 Bid Requirements.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

BID SCHEDULE / PRICING FORM

PRICING

Bid Schedule / Pricing Form (BidTable) is available and submitted online through Bonfire at:

https://harriscountytx.bonfirehub.com/portal/.

Bidder must provide pricing in the units requested within this IFB. Any quantities provided are based on estimates, and Bidder acknowledges that Harris County may require more or less. Where unit pricing and extended pricing differ, unit pricing governs.

Prices for all goods and/or services shall be firm for the duration of this contract. Prices shall be all inclusive. No price changes, additions, or subsequent qualifications will be honored during the course of the contract. All prices must be written in ink or typed. Pricing on all transportation, freight, drayage and other charges are to be prepaid by the successful Bidder and included in the Bid prices. If there are any additional charges of any kind, other than those mentioned above, specified or unspecified, Bidder MUST indicate the items required and attendant costs or forfeit the right to payment for such items.

MAINTENANCE

If applicable, maintenance required for equipment proposed should be available in Harris County by a manufacturer-authorized maintenance facility. Costs for this service shall be shown on the Bid Schedule / Pricing Form. If Harris County opts to include maintenance, it shall be so stated in the Scope of Work and resulting contract, and said cost shall be included. Service will commence only upon expiration of applicable warranties and should be priced accordingly, if applicable.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fharriscountytx.bonfirehub.com%2Fportal%2F&data=04%7C01%7COwais.Badat%40us.hctx.net%7C24866352b92f437705e308d8f3a3304e%7C0d9bc79c581b4477acf78d70dd3e555a%7C0%7C0%7C637527229497223924%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=WeBfCVeqFx54cm8LIzZasFLa7hiiPNuRTbuPdn7k0aA%3D&reserved=0

File details come from the government source that posted it. Updated .