FTA Section 5310 NOFA Summary
This is a Notice of Funding Availability (NOFA) issued by the Atlanta Regional Commission (ARC), serving as the metro Atlanta Area Agency on Aging for an 11-county region including Cherokee, Clayton, Cobb, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, and Rockdale counties, plus the City of Atlanta. The NOFA seeks proposals for the FTA Section 5310 program, which funds transportation services for seniors and persons with disabilities in the Atlanta Urbanized Area. Eligible services include demand-response trips, fixed-route shuttle services, mobility management, travel training, and coordinated transportation technologies. Respondents must submit complete proposals including a Transmittal Cover Sheet, Proposal Response Template, Uniform Cost Methodology spreadsheet, and Financial Components Workbook through the ARC procurement website. A pre-proposal conference is scheduled for October 6, 2026, at 2:00 p.m. EST via Microsoft Teams. Questions must be submitted by October 12, 2026, at 5:00 p.m. EST, with answers posted by October 21, 2026. Proposals are due by November 9, 2026, at 5:00 p.m. EST, with awards announced by December 18, 2026. The contract term runs from October 1, 2027, through September 30, 2028, with an option to renew for one additional year based on satisfactory performance and fund availability.
The total funding available is $687,500 in FTA Section 5310 capital funds ($550,000 federal with $137,000 in required local match) for fiscal year 2027, allocated by the Georgia Department of Human Services at an 80/20 federal-to-local match ratio. All local match must come from non-DOT federal sources such as Medicaid, Temporary Assistance to Needy Families, or state/local appropriations; farebox revenue cannot be used as match. Eligible respondents include private nonprofit organizations, state or local government authorities, and public transportation operators. Proposals are evaluated on organizational capacity (40%), service proposed (40%), and budget (20%), with preference given to projects offering maximum consumer flexibility, filling transportation gaps, demonstrating cost effectiveness, serving larger geographic areas or multiple counties, and prioritizing high-need populations. Awarded grantees must comply with all federal and state requirements including Title VI civil rights compliance, Americans with Disabilities Act provisions, Disadvantaged Business Enterprise standards, and FTA circular requirements. Awardees are required to maintain comprehensive monitoring of subcontractors, conduct annual independent monitoring of all sub-contractors, and ensure all drivers meet federal criminal background and fingerprint check requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5_ Uniform Cost Methodology (UCM) ARC FY28 _ .xlsx | XLSX spreadsheet | |
| 2_ Transmittal Cover Page FTA 5310 FY28_FY29.pdf | ||
| 4_ Financial Components Workbook FTA 5310 FY2.xlsx | XLSX spreadsheet | |
| 6_ UCM Instruction Manual 2024.pdf | ||
| 3_ Proposal Response Template FTA 5310 FY28_F.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Atlanta Regional Commission
FTA Section 5310
NOFA FY2028 - FY2029*
ARC’s FTA 5310 – Notification of Funding Availability
(NOFA)
FY2028 - FY2029*
PROJECT PROPOSAL DEADLINE: November 9, 2026
Atlanta Regional Commission Aging and Independence Services 229 Peachtree Street, NE, Suite 100 Atlanta, Georgia 30303 (404)-463-3100
**One year contract, with option to renew
NOFA800
ARC’s FTA 5310 Funded Services – FY2028 - FY2029
2 | P a g e
This page intentionally left blank.
3 | P a g e
TABLE OF CONTENTS
TABLE OF CONTENTS
NOTIFICATION OF FUNDING AVAILABILITY (NOFA)
1. Important Information
CONFIDENTIALITY AND CONFLICT OF INTEREST
1.1. Questions and Answers
1.2. Restrictions on Communication with ARC
1.3. Pre-Proposal Conference
1.4. Amendments
1.5. Proposal Withdrawal
1.6. Submitting the Proposal
1.7. Rejection of Proposals and Cancellation of NOFA
2. Overview
2.1. Introduction
2.2 Program Goals
2.3 Program Funding
2.4 Program Eligibility
2.5 Funding Priorities
3. Award Terms
3.1 Period of Award
3.2 Expectations of Awarded Respondents
3.3 Monitoring Expectations for Subcontractors
3.4 Renewal Considerations
3.5 Funding Variance
3.6 Certifications, Assurances, and Requirements
4. Proposal Evaluation Criteria
4.1. Proposal Evaluation
5. Proposal Narrative
General Instructions
5.1. ORGANIZATIONAL CAPACITY (All responses to the below should be captured using the Proposal Response Template)
5.2. SERVICE PROPOSAL (All responses to the below should be captured using the Proposal Response Template)
5.3. BUDGET PROPOSAL
Appendix I
Appendix II: Demographic Characteristics
Appendix III: Civil Rights Requirements
4 | P a g e
NOTIFICATION OF FUNDING AVAILABILITY (NOFA)
1. Important Information
The Atlanta Regional Commission (ARC), the metro Atlanta Area Agency on Aging, issues this Notice of Funding Availability (NOFA) and is the sole point of contact. The ARC reserves the right to reject any or all proposals, or to award in whole or in part if deemed to be in the best interest of ARC to do so. The Executive Director of the ARC has authority to award contracts or agreements to the respondents that offer the best proposal, cost and other factors considered.
CONFIDENTIALITY AND CONFLICT OF INTEREST
ARC is subject to the Georgia Open Records law. All proposals submitted will become public records to be provided upon request. Any information containing trade secrets or proprietary information, as defined by state law, must be marked as confidential to prevent disclosure. Confidential markings must be limited to protected information. Entire proposals marked confidential will not be honored. Additionally, conflicts of interest are governed by the ARC Standards of Ethical Conduct available here: Standards of Ethical Conduct. Respondents must disclose any potential conflicts of interest that may arise from the provision of services described herein. Such disclosure should include the name of individual(s) with whom there is a conflict, any relevant facts to the potential conflict, and a description of the internal controls proposed to mitigate any such conflict.
ARC’s Staff Legal Counsel will determine whether such disclosure presents a potential organizational conflict of interest that should preclude award to the respondent.
1.1. Questions and Answers
All questions concerning this NOFA must be submitted electronically through the procurement website by
5:00pm EST on October 12, 2026. Questions submitted after this deadline or through any other means will not
DATE DESCRIPTION
October 5, 2026 NOFA Open
October 6, 2026 Pre-Proposal Conference virtually via Microsoft Teams 2:00pm – 3:00pm EST
October 12, 2026 Questions due by 5:00pm EST via ARC procurement website
October 21, 2026 Questions and answers posted to ARC procurement website by 5:00pm EST
November 9, 2026 Proposals due by 5:00pm EST, submitted via ARC procurement website
December 18, 2026 Award Announcement by 5:00pm EST
October 1, 2027 – September 30, 2028
Contract Year
October 1, 2028 – September 30, 2029
One-year renewal based on satisfactory performance https://cdn.atlantaregional.org/wp-content/uploads/arc-standards-of-ethical-conduct.pdf
5 | P a g e be considered. To ensure fairness and transparency, respondents are prohibited from contacting ARC staff, board members, or consultants regarding this solicitation outside of the formal Q & A process.
Official responses to all timely submitted questions will be posted on the procurement website as a written addendum by 5:00pm EST on October 21, 2026. Only written responses issued through the website shall be considered official and binding.
It is the responsibility of each respondent to regularly check the procurement website for addenda, clarifications, and updates. Failure to review posted addenda shall not relieve a respondent from compliance with any requirements of the NOFA.
NOFAs, RFPs and responses can be found on the ARC’s website:
https://procurement.atlantaregional.org/opportunities/
1.2. Restrictions on Communication with ARC
From the date of the advertisement of the solicitation through contract award and selection is announced, respondents are not allowed to communicate about this solicitation or scope with any staff of ARC, except for submission of questions as instructed in the NOFA or as provided by any existing work agreement(s). In the case of violation of this provision, ARC reserves the right to reject the submittal of the offending respondent.
1.3. Pre-Proposal Conference
A Pre-Proposal Conference will be held virtually via Microsoft Teams from 2:00pm – 3:00pm EST on October 6, 2026. Attendance at the Pre-Proposal Conference is not a requirement for responding to this Notice. However, any organization which intends to respond to this NOFA is highly encouraged to attend.
The purpose of the Conference is to provide information regarding the NOFA and the services sought by the ARC.
Please click on the Microsoft Teams link below or use the call-in information to access the Pre- Proposal Conference.
Microsoft TEAMS link here: Join ARC 5310 Pre-Proposal Conference
If you’d prefer to call in, please use the information below:
470-419-6063 Phone conference ID: 983 113 997#
1.4. Amendments
ARC reserves the right to revise this Notice at any time prior to award. In the event it becomes necessary to revise any part of this Notice, information regarding revisions will be provided to all respondents via ARC’s procurement website: https://procurement.atlantaregional.org/opportunities/ https://procurement.atlantaregional.org/opportunities/ https://teams.microsoft.com/meet/295806379317783?p=ONlLdlCvNhbaCrtGEz tel:+14704196063,,983113997 https://procurement.atlantaregional.org/opportunities/
6 | P a g e
1.5. Proposal Withdrawal
A submitted proposal may be withdrawn prior to the due date by sending a written request to the Issuing Officer, Meghan Murphy at mmurphy@atlantaregional.org. A request to withdraw a proposal must be signed by an authorized agency representative.
1.6. Submitting the Proposal
All proposals must be submitted electronically through the Atlanta Regional Commission (ARC) procurement website: https://procurement.atlantaregional.org/opportunities/ Proposals submitted by any other method (including email, mail, fax, or hand delivery) may not be accepted unless specified in the solicitation document.
Respondents must register and complete the application on the ARC procurement website to submit a proposal. It is the responsibility of the respondent to ensure successful registration and timely submission.
Proposals must be received no later than 5:00pm EST on November 9, 2026. The procurement system will automatically record the date and submission. Late proposals will not be accepted under any circumstances.
The Respondent(s) is solely responsible for:
• Uploading all required documents;
• Verifying that files are complete, readable, and properly labeled; and
• Ensuring submission is finalized prior to the deadline.
• Only one proposal containing all required information may be uploaded per responder (the system will only submit the latest uploaded).
ARC is not responsible for technical difficulties, internet outages, user errors, or system delays experienced by the respondent. Respondents are strongly encouraged to submit proposals well in advance of the deadline.
Upon successful submission, the system will provide email confirmation. This confirmation serves as proof of receipt.
1.7. Rejection of Proposals and Cancellation of NOFA
ARC reserves the right to reject any and all proposals, to waive any irregularity or informality in a proposal, and to accept or reject any item or combination of items, when to do so would be to the advantage of the ARC. It is also within the right of the ARC to reject proposals that do not contain all elements and information requested in this document. The ARC reserves the right to cancel this Notice at any time. The ARC will not be liable for any cost/losses incurred by the Respondents throughout this process.
2. Overview
2.1. Introduction
The Atlanta Regional Commission (ARC) is the regional planning and intergovernmental coordination agency for the metro Atlanta, Georgia region, defined as a 11-county area including Cherokee, Clayton, Cobb, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, and Rockdale counties, as well as the City of Atlanta. ARC
7 | P a g e serves as the Atlanta Area Agency on Aging, Workforce Development Agency, Regional Commission, and the Metropolitan Planning Organization (MPO).
The MPO is a 23-county area federally designated for regional transportation planning to meet air quality standards and for programming projects to implement the adopted Regional Transportation Plan. The Atlanta Urbanized Area (UZA) (see Appendix I, Figure 1.1) is a Census designated boundary for a population of 50,000 or more and is also represented by the Atlanta MPO.
The FTA Section 5310 program provides funds for the Atlanta UZA to improve mobility for seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services.
The program aims to improve mobility for seniors and individuals with disabilities by removing barriers to transportation service and expanding transportation mobility options. This program supports transportation services planned, designed, and carried out to meet the special transportation needs of seniors and individuals with disabilities in all areas – large urbanized (over 200,000), small urbanized (50,000-200,000), and rural (under 50,000). Eligible projects include both “traditional” capital investment and “nontraditional” investment beyond the Americans with Disabilities Act (ADA) complementary paratransit services.
2.2 Program Goals
The Atlanta Regional Commission’s overarching goal in the FTA Section 5310 Notification of Funding Availability is to improve mobility for older adults and individuals with disabilities in the metro region through activities and projects that remove barriers to transportation services, identify new/innovative approaches to transportation for clients, expand mobility options and allow maximum flexibility in allowing consumers to travel when and where they desire to go.
2.3 Program Funding
The amount available for the projects is based on the funding allocation to the Atlanta Regional Commission by the primary grantee, the Georgia Department of Human Services. Funds may be provided for continuation of the selected sub-recipients’ programs and projects for a second year, dependent on satisfactory project performance and availability of funds.
The FY27 Allocation that ARC received from the Georgia Department of Human Services totals $687,500 in Capital FTA 5310 funds. All funding is reimbursed at 80% with a 20% local match requirement. Any respondent awarded funding through 5310 will be responsible for the 20% match.
- FFY 2021 -
Capital (Mobility Management and operations)
ARC FY27 Federal Funds $550,000
ARC FY27 Local Match Requirements
$137,000
ARC FY27 TOTAL $687,500
8 | P a g e
LOCAL MATCH FUNDING REQUIREMENTS
Project proposals without required matches will be automatically disqualified.
All local match must be provided from sources other than Federal DOT funds. However, local match may be derived from other Federal funds that are eligible to be expended for transportation if relevant criteria are met. Examples include Temporary Assistance to Needy Families, Medicaid, Employment Training programs, Rehabilitation Services, and Older Americans Act.
To be eligible for local match for FTA funds, the other Federal funds must be used for activities included in the total net project costs of the FTA grant. Expenditure of other Federal funds for transportation outside of the scope of the project cannot be applied as a credit for local match in the FTA grant.
Farebox revenue may not be used as local match. Farebox revenue is the fraction of operating expenses which are met by the fares paid by passengers. It is computed by dividing the system's total fare revenue by its total operating expenses. Farebox revenue is considered income and is deducted from total operating cost to determine the net cost of the activity.
The use of a non-cash local match is restricted to volunteer transportation program services, physical improvements, and computer workstation hardware and software. Restricting the use of non-cash match to these select activities is designed to be consistent with the overarching goal of developing sustainable projects.
Income from contracts to provide human service transportation may be used to reduce the net project cost (treated as revenue). The cost of providing the contract service is included in the total project cost.
Examples of sources of local match that may be used, if not otherwise disqualified from serving as match, include the following:
• State or local appropriations
• Other non-DOT Federal funds Dedicated tax revenues
• Private donations
• Revenue from human service contracts
• Net income generated from advertising and concessions
2.4 Program Eligibility
ELIGIBLE RESPONDENTS
States and designated recipients are direct recipients; eligible subrecipients include private nonprofit organizations, states or local government authorities, or operators of public transportation
ELIGIBLE EXPENSES
The transportation section within the Offices of Facilities and Support Services in the Georgia Department of Human Services confirmed in writing to the Atlanta Regional Commission that Capital expenditures may include the following projects:
9 | P a g e
• mobility manager staff positions and related program costs,
• Trips (Paratransit, Demand-Response, Fixed/Flex Route Shuttles, etc.) regardless of whether they are voucher run programs with subcontractors
• short range transit planning if it is a part of mobility management,
• demonstration projects and technology such as scheduling software and hardware. planning and operation of coordinated systems inclusive of Geographic information Systems (GIS), global Positioning System Technology, coordinated vehicle scheduling, dispatching, and monitoring technologies. A description of the specific projects must be presented to DHS for review and approval, as well as to ensure DHS engages in the proper subrecipient oversight and ensure that FTA’s approval is not required for the specific project(s)
• technologies to track costs and billing in a coordinated system. The specific project/technology must be presented to DHS for review and approval, as well as to ensure DHS engages in the proper subrecipient oversight and ensure that FTA’s approval is not required for the specific project(s)
• single smart customer payment systems. The specific project/technology/payment system must be presented to DHS for review and approval, as well as to ensure DHS engages in the proper subrecipient oversight and ensure that FTA’s approval is not required for the specific project(s)
• Coordination of individualized travel training and trip planning activities projects and technology such as scheduling software and hardware. planning and operation of coordinated systems inclusive of Geographic information Systems (GIS), global Positioning System Technology, coordinated vehicle scheduling, dispatching and monitoring technologies
2.5 Funding Priorities
Award selection is competitive. Proposals must exhibit cost effectiveness. Preference in the evaluation and selection process will be given to projects that offer maximum flexibility in allowing consumers to travel when and where they desire to go and/or projects that fill a gap within existing transportation options available in the geographic area.
Higher priority will also be given to respondents who propose projects of greater scale (such as geographic, ridership partnerships) as well as projects serving one or more areas with highest level of need (see Appendix I).
Two or more eligible agencies may coordinate and submit a joint application for FTA Section 5310 funding. One agency must serve as the applicant agency to administer the funding and contract.
Transportation providers may also enter into operational agreements with other agencies that primarily serve older adults and individuals with disabilities to maximize funding and available resources.
10 | P a g e
3. Award Terms
3.1 Period of Award
This NOFA covers a one-year period beginning on October 1, 2027, and ending on September 30, 2028, with an option to renew for one additional year. All contracts resulting from this NOFA process are contingent on the availability of funds from the Georgia Department of Human Services (DHS). The terms and conditions of the contract with DHS and any subsequent policy decisions, laws or regulations shall be applied to the Grantees chosen through this process. The Atlanta Regional Commission may terminate the contract due to non-availability of funds, due to default, or for convenience.
3.2 Expectations of Awarded Respondents
If awarded, Grantees will be expected to:
• Attend ARC meetings and trainings designed for the Aging Services Provider Network
• Participate in ARC’s onsite and/or virtual financial and program monitoring
• Conduct annual independent monitoring of all sub-contractors
• Meet all required fiscal and programmatic deadlines
• Comply with federal and state fingerprint and background check guidelines
• Submit monthly invoices by the 6th of every month
• Spend down all awarded funds by the contract deadline
3.3 Monitoring Expectations for Subcontractors
All awardees are required to monitor their subcontractors using the ARC 5310 Transportation Monitoring Tool with related attachments and the ARC FTA 5310 Compliance Manual. All awardees are also responsible for ensuring that their procurement process for subcontracting meets ARC guidelines and that all contracts drawn up with subcontractors include all the requirements as established by ARC. ARC will review completed monitoring reports during site visits. ARC is not required by the state of Georgia to provide any notice of monitoring and must not provide more than 48 hours’ notice. This includes both programmatic and financial monitoring of services. Transportation services monitoring must take place before June 30th of each fiscal year.
3.4 Renewal Considerations
Contracts will be awarded on a yearly basis with renewal based on satisfactory performance and availability of funds. Budgets, one-way trips provided and/or service hours provided and cost per trip will be reviewed annually and adjustments to contracts will be made based on actual expenditures, units delivered, number of persons served, and allocations received through the Georgia Department of Human Services (DHS).
During this process, one-year budgets for each service the respondent is proposing will be reviewed in accordance with directives provided by DHS.
3.5 Funding Variance
If funding to the ARC AAA is reduced and reduction of grantee award levels is deemed necessary by ARC, ARC will determine a reduction strategy. ARC may reduce funding to each grantee on a straight percentage basis.
Alternatively, ARC may reduce or eliminate services ARC deems to not be effectively delivered. ARC reserves the right to establish additional strategies and/or new criteria for reductions during the term of the contract.
11 | P a g e
ARC further reserves the right to amend contracts based on project service levels and/or other performance factors to assure there will be cost effective service provision.
3.6 Certifications, Assurances, and Requirements
Grantees will comply with all applicable Atlanta Regional Commission, Georgia Department of Human Services, Federal Transportation Administration and other relevant federal and state standards, guidelines, policies, and procedures.
Detailed information concerning the legislation, regulation, program standards and guidelines in the delivery of services under the FTA 5310 grant is available at the following:
• Federal Transportation Administration. Enhanced Mobility of Seniors & Individuals with Disabilities - Section 5310 | Circular FTA C 9040.1G:
https://www.transit.dot.gov/regulations-and-programs/fta-circulars/enhanced-mobility-seniors-and-individuals-disabilities
The ARC website contains information and documents that may be useful to the completion of this NOFA application. Additionally, the Human Services Transportation webpage provides valuable information for those interested in learning more about public transportation programs and ARC’s Coordinated Human Services Transportation (HST) Plan: Managing Mobility in the Atlanta Region.
https://atlantaregional.org/plans-reports/human-services-transportation-plan/, as well as the 2020 Demand Response Implementation Plan.
Grantees will be required to submit the following documentation prior to contract execution:
• General Financial Requirements and Assurances (most recent Single Audit, or financial statements as applicable);
• Required Certificates of Insurance with ARC as a named party;
• Subcontractor Approval Form;
• Assurance of Compliance with Title VI of the Civil Rights Act of 1964;
• Assurance of Compliance with Section 504 of the Rehabilitation Act of 1973, as Amended, and the Americans with Disabilities Act of 1990;
• Disclosure of Lobbying Activities Form;
• Certifications Regarding Debarment, Suspension and Other Responsibility Matters; Drug-Free Workplace Requirements and Lobbying;
• Health Insurance Portability and Accountability Act (HIPAA) Business Associate Agreement;
• Procurement process and procedures for subcontracting to include notices of such procurement and copy of RFP and/or bidding process;
• Executed contracts with sub-contractors, and certificates of insurance; and
• Such other documentation as ARC determines is needed to successfully execute the Grantee’s contract.
**These forms are not to be submitted as part of the proposal but will be required as a part of the contract documents for successful awardees.
Awarded respondents must be prepared to meet all applicable Federal, State, and Local requirements in the areas including, but not limited, to: Legal; Financial; Vehicles; Maintenance; Training;
Procurement; Civil Rights; Title VI; Limited English Proficiency; Americans with Disabilities Act; Equal https://www.transit.dot.gov/regulations-and-programs/fta-circulars/enhanced-mobility-seniors-and-individuals-disabilities https://www.transit.dot.gov/regulations-and-programs/fta-circulars/enhanced-mobility-seniors-and-individuals-disabilities https://atlantaregional.org/plans-reports/human-services-transportation-plan/ https://cdn.atlantaregional.org/wp-content/uploads/atlanta-regional-demand-response-impmtn-pln.pdf https://cdn.atlantaregional.org/wp-content/uploads/atlanta-regional-demand-response-impmtn-pln.pdf
12 | P a g e
Employment Opportunity; Asset Management; Debarment & Suspension; Lobbying; Safety & Security (see Appendix III: Civil Rights Requirements).
Federal requirements, Certifications, and Assurances pass through to third party contractors. As such, ARC requires review and prior approval of any Third-Party Contracts to ensure all such requirements are part of Third-Party Contracts. Existing Third-Party Contracts should be included in the proposal submitted in response to this Notice.
4. Proposal Evaluation Criteria
4.1. Proposal Evaluation
All proposals will be evaluated using the criteria specified below with the relative weights shown in parenthesis. Selection will include an analysis of proposals by an Evaluation Committee composed of ARC personnel who will review the proposal submittals in accordance with the submittal requirements and the evaluation criteria set forth below. The committee may request oral interviews and/or site visits. ARC reserves the right to award this contract based on initial proposals received without formal interviews.
Awards will not necessarily be based on cost alone. Other factors, as detailed in the Notice, will be considered in determining what proposal will be deemed to best meet the needs of ARC.
Organizational capacity (40): responses will be scored on a scale based on amount of detail and clarity of the topics below:
• The respondent’s experience in delivering transportation services and ability to implement the project and experience in working with populations 65 and above
• The documented need for transportation in the service area
• Quality assurance process to ensure standards of promptness in service delivery, monitoring of subcontractors and ongoing quality improvements
• Outreach plan to ensure targeting of older populations in greatest socioeconomic need
• Continuous training and professional development for staff (and volunteer, if applicable)
• Emergency preparedness plan for weather related emergencies, fires, pandemics, and other disasters or emergencies
• Partnerships or collaborations that will work directly with this award
Service proposed (40): responses will be scored on a scale based on amount of detail and clarity of the criteria below:
• Responses clearly indicate why the services are needed
• Each response is unique and tailored to the service being proposed
• Response will also clearly indicate respondent’s experience in delivering this service and/or why the respondent would like to begin delivering this service
• Description of how the service will be provided that creates a full overview of the service
• All responses should answer all parts of each question completely
13 | P a g e
Budget (20): responses will be scored on a scale based on amount of detail and clarity of the topics below:
• The budget provides an accurate assessment of all costs associated with project/program activities as outlined in the Uniform Cost Methodology (UCM) form and the service proposal
• The budget corresponds to the descriptions in the narrative and demonstrates the capacity to carry out program activities in a cost-efficient manner comparable to regional rates
• The financial risk assessment tool is validated by the finance manager at ARC
• Review of financial management under any previous ARC grants, including funding left unspent
• The respondent clearly identifies and demonstrates capacity to provide required match funds in the budget narrative or other location
5. Proposal Narrative
General Instructions
To be considered for selection, respondents must submit a complete response to this NOFA online via https://procurement.atlantaregional.org/opportunities/ The contents of the proposal submitted by the successful respondent will become a part of any contract awarded. All NOFA documents must be completed in their entirety including the Transmittal Cover Sheet, Proposal Response Template, Uniform
Cost Methodology (UCM) and Financial Components Workbook.
Section 5.1: Every proposal must complete the Organizational Capacity section. This section should be completed using the Proposal Response Template.
Section 5.2: Complete the questions using the Proposal Response Template.
Section 5.3: Complete the Financial Components Workbook comprised of the Project Information sheet, Budget Narrative, Budget Summary and Pre-award Risk Assessment. Complete the Uniform Cost
Methodology (UCM) spreadsheet. The UCM should split out the cost of Mobility Management and associated costs of management. The cost of trips would be inclusive of all driver personnel and related costs for the trips.
Section 5.4: Complete the Applicant Transmittal Cover Page and submit all required documentation from the checklist.
5.1. ORGANIZATIONAL CAPACITY (All responses to the below should be captured using the Proposal Response Template)
1. Describe your agency’s experience in running a transportation program and its ability to implement the proposed transportation project. Include the number of years the agency has worked with the target population, adults aged 65 and over.
2. Identify how outreach is conducted to ensure that those most in need of this service are made aware of it.
3. Identify and describe any partnerships or collaborations with other community organizations or private businesses that will strengthen the services provided.
14 | P a g e
4. Describe how your agency will manage risk and provide safe delivery of services including your process for ensuring timely and up to date:
• Vehicle Maintenance
• Drivers’ records
• Driver training
• Equipment safety
• Background checks: Regardless of the type of transportation offered, all drivers must meet the DHS requirement for a federal criminal background and fingerprint check.
5. Describe your steps for quality assurance. Address each of the bullets below in your response.
a. How do you track rides and ensure they have taken place and were on time?
b. What is your process for no shows?
c. Monitoring of program whether internal or subcontracted
d. Continuous quality improvement processes
6. Describe how you handle various emergencies (i.e., Severe Weather, pandemics, etc.), and how your staff mobilizes to ensure client safety and continuity of service during the emergency.
5.2. SERVICE PROPOSAL (All responses to the below should be captured using the Proposal Response Template)
The are two types of trips eligible for funding as defined here:
DEMAND RESPONSE:
A service that provides a one-way trip from one location to another.
Demand-response trips can be delivered through volunteers, vouchers, or transportation providers’ staff and fleets. A unit of service is a one-way trip from an origin to a destination.
FIXED ROUTE SERVICE:
Fixed route shuttle services are defined as those that operate vehicles along a predetermined route and can carry multiple passengers. A unit of service is a one-way trip.
This section is your opportunity to describe the service to be provided and demonstrate the fiscal, managerial and operational capabilities of your organization.
1. Address the identified gaps in transportation that exist and how your proposal will address those gaps.
2. How many one-way trips do you estimate this project funded at the total amount would provide? Provide breakdown of costs that account for one one-way trip.
3. Program operations. Please address each bullet below.
a. Days of the week and hours of operation
15 | P a g e
b. If planning to provide fixed route trips, detail how many routes and to where
c. How individuals register for the program
d. Process clients would follow to order and/or request rides
e. Any established cost shares collected. Describe how those cost shares are assessed and collected
f. Any restrictions on the number of trips per month for each client
4. Describe the clientele that will be receiving the service, including eligibility criteria for clients requesting and receiving this service.
5. Outline the estimated number of unduplicated riders served annually by this project, including how this estimate was determined. Be sure to include demographic information such as age, disability status, income, and other factors.
6. Outline the estimated number of trips to be provided monthly, including how this estimate was determined.
7. Describe the types of trips you plan to provide with this grant funding (ex: dialysis trips, medical
(general appointments), quality of life including grocery, hair, visiting, shopping, etc.). Indicate whether the trips are demand route or fixed route.
8. List the type of vehicles used (in-house fleet, subcontractors, volunteer program, etc.); the type and number of personnel such as: drivers, dispatchers, mechanics, etc. (full or part-time?).
9. Describe provisions made to ensure proper maintenance of vehicles and indicate who will provide the maintenance; describe the driver hiring process and training given to the drivers.
10. If planning to provide services using volunteer drivers, please include your process for ensuring proper insurance coverage on personal vehicles and client notification of such coverages.
11. Do you plan to use 5310 grant funds to provide trips that cross county lines? If so, please explain how you will coordinate. If not, please explain your reasoning and any barriers we should be aware of.
5.3. BUDGET PROPOSAL
All respondents must submit a completed Uniform Cost Methodology (UCM) spreadsheet and a completed Financial Components Workbook. The Financial Components Workbook is comprised of the Project Information Sheet, Budget Narrative, Budget Summary and Pre-award Risk Assessment. The UCM should split out the cost of Mobility Management and associated costs of management. The cost of trips would be inclusive of all driver personnel and related costs for the trips. Instructions for completion of the UCM spreadsheet are attached in the NOFA posting. Each respondent may develop a separate line-item cost for mobility management and a unit cost for trips. ARC will consider the unit cost(s) and/or line-item cost in negotiating contract expectations with providers.
The budget for each service the respondent is proposing to provide must be developed for one year, beginning October 1, 2027, and ending September 30, 2028.
Funds for this contract are contingent upon receipt of funds from Federal and/or State sources. The available funding detailed in this NOFA are one-year projections based on planning allocations received for Fiscal Year 2027. The projections are subject to change based on the actual allocations received by ARC.
16 | P a g e
Appendix I
FIGURE 1.1 - ATLANTA URBANIZED AREA (2020)
FTA Section 5310 funding is apportioned based on the Atlanta UA. The U.S. Census determines
UA boundaries. The latest Atlanta UA boundary is from 2020 and includes portions of 20 counties:
Barrow Douglas Paulding
Bartow Fayette Rockdale
Cherokee Forsyth Spalding
Clayton Fulton Walton Cobb Gwinnett
Coweta Hall Dawson Henry
DeKalb Newton
17 | P a g e
FIGURE 1.2 - PERCENT OF POPULATION AGES 18-64 WITH A DISABILITY
Source: http://www.neighborhoodnexus.org/ http://www.neighborhoodnexus.org/
18 | P a g e
FIGURE 1.3 - PERCENT OF POPULATION AGES 65 AND OVER
19 | P a g e
FIGURE 1.4 - PERCENT OF POPULATION AGES 65 AND OVER WITH A DISABILITY
20 | P a g e
FIGURE 1.5 - PERCENT OF HOUSEHOLDS WITH NO CAR
21 | P a g e
FIGURE 1.6 - MEDIAN HOUSEHOLD INCOME
22 | P a g e
Appendix II: Demographic Characteristics
Persons with Disabilities:
Approximately 262,329 persons aged 18-64 have disabilities in the 10-county Atlanta region. This accounts for 8.7% of the region’s 18-64 population. Around 498,494 civilian, noninstitutionalized persons across all ages have disabilities as of the 2024 American Community Survey (ACS 5-year, Table S1810), meaning that 10.5% of that total population has one or more disabilities. There are many areas in the Atlanta region where persons with disabilities have no access to ADA complementary paratransit services. Persons with disabilities reported a lack of transportation options as one of the major barriers to being able to live inclusively within their communities.
Older Adults:
According to the 2024 5-year ACS (Table S1810), 12.9 percent of the 10-county Atlanta region’s population is 65 and older, amounting to almost 614,206 people. By the year 2050, the share will grow to 22.0 percent, with 1.3 million older adults projected to reside in the 10-county Atlanta region (ARC Series 17 Population Forecast).
Persons with Low Income (Poverty Status):
As of 2024 5-year ACS estimates (Table S1701), the 10-county Atlanta region is home to about
532,397 people living below the poverty line, with another 347,030 within 150% of this line. The
879,427 individuals living within 150% of the poverty line represents 18.6% of the region’s total population. It was found that areas where persons with low income live vary greatly from where they work, which often causes significant transportation challenges and costs to those earning the least.
Human Services Transportation Coordination Gaps and Barriers
Aside from funding, seven common variables are identified as being fundamental gaps or barriers to coordination in the region:
• Geographical boundaries / large and multi-jurisdictional region
• Individual agency and organizational restrictions
• Little or no incentive to coordinate
• Political vs. technical feasibility
• Lack of adequate infrastructure
• Lack of state coordination and support
• Other regional priorities (e.g., congestion)
23 | P a g e
Appendix III: Civil Rights Requirements 29 U.S.C. § 623, 42 U.S.C. § 2000; 42 U.S.C. § 6102; 42 U.S.C. § 12112;
42 U.S.C. § 12132; 49 U.S.C. § 5332; 29 CFR Part 1630; 41 CFR Parts 60 et seq.
(1) Nondiscrimination - In accordance with Title VI of the Civil Rights Act, as amended, 42
U.S.C. § 2000d, section 303 of the Age Discrimination Act of 1975, as amended, 42 U.S.C. §
6102, section 202 of the Americans with Disabilities Act of 1990, 42 U.S.C. § 12132, and
Federal transit law at 49 U.S.C. § 5332, the applicant agrees that it will not discriminate against any employee or applicant for employment because of race, color, creed, national origin, sex, age, or disability. In addition, the applicant agrees to comply with applicable Federal implementing regulations and other implementing requirements FTA may issue.
(2) Equal Employment Opportunity - The applicant agrees to the following equal employment opportunity requirements:
(a) Race, Color, Creed, National Origin, Sex - In accordance with Title VII of the Civil
Rights Act, as amended, 42 U.S.C. § 2000e, and Federal transit laws at 49 U.S.C. §
5332, the applicant agrees to comply with all applicable equal employment opportunity requirements of U.S. Department of Labor (U.S. DOL) regulations, "Office of Federal
Contract Compliance Programs, Equal Employment Opportunity, Department of Labor,"
41 C.F.R. Parts 60 et seq ., (which implement Executive Order No. 11246, "Equal
Employment Opportunity," as amended by Executive Order No. 11375, "Amending
Executive Order 11246 Relating to Equal Employment Opportunity," 42 U.S.C. § 2000e note), and with any applicable Federal statutes, executive orders, regulations, and
Federal policies that may in the future affect construction activities undertaken in the course of the Project. The applicant agrees to take affirmative action to ensure that respondents are employed, and that employees are treated during employment, without regard to their race, color, creed, national origin, sex, or age. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. In addition, the applicant agrees to comply with any implementing requirements FTA may issue.
(b) Age - In accordance with section 4 of the Age Discrimination in Employment Act of
1967, as amended, 29 U.S.C. § § 623 and Federal transit law at 49 U.S.C. § 5332, the applicant agrees to refrain from discrimination against present and prospective employees for reason of age. In addition, the applicant agrees to comply with any implementing requirements FTA may issue.
(c) Disabilities - In accordance with section 102 of the Americans with Disabilities Act, as amended, 42 U.S.C. § 12112, the applicant agrees that it will comply with the requirements of U.S. Equal Employment Opportunity Commission, "Regulations to
Implement the Equal Employment Provisions of the Americans with Disabilities Act," 29
C.F.R. Part 1630, pertaining to employment of persons with disabilities. In addition, the applicant agrees to comply with any implementing requirements FTA may issue.
(3) The applicant also agrees to include these requirements in each subcontract financed in whole or in part with Federal assistance provided by FTA, modified only if necessary, to identify the affected parties.
(4) The applicant also agrees to comply with the portion of Title VI of the 1964 Civil Rights Act that states, “No person in the United States shall, on the grounds of race, color or national
24 | P a g e origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance.” The applicant must supply any person who believes that he/she has been aggrieved by an unlawful discriminatory practice on the basis of race, color, or national origin by the applicant with a
Title VI Complaint form (see Applicant Resources) & must investigate the matter.
U.S. DOT Disadvantaged Business Enterprises (DBE) Requirements:
49 CFR Part 26
(1) The applicant agrees to meet the requirements of Title 49, Code of Federal Regulations, Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial
Assistance Programs.
(2) The applicant also agrees to not discriminate on the basis of race, color, national origin, or sex in the performance of this project. The applicant shall carry out applicable requirements of 49
CFR Part 26 in the award and administration of this project. Failure by the applicant to carry out these requirements is a material breach, which may result in the termination of this project or such other remedy as ARC deems appropriate. Each subcontract the contractor signs with a subcontractor must include the assurance in this paragraph (see 49 CFR 26.13(b)).
(3) The applicant also agrees to report its DBE participation obtained through race-neutral means throughout the period of performance.
(4) The applicant also agrees to pay its subcontractors performing work related to this project for satisfactory performance of that work no later than 30 days after the applicant’s receipt of payment for that work from the ARC. In addition, the applicant may not hold retainage from its subcontractors.
(5) The applicant also agrees to promptly notify ARC whenever a DBE subcontractor performing work related to this contract is terminated or fails to complete its work and must make good faith efforts to engage another DBE subcontractor to perform at least the same amount of work.
The applicant may not terminate any DBE subcontractor and perform that work through its own forces or those of an affiliate without prior written consent of ARC.
Lobbying Requirements: 31 U.S.C. 1352; 49 CFR Part 19; 49 CFR Part 20
(1) The applicant agrees that no Federal appropriated funds will be paid to any person for influencing or attempting to influence an officer or employee of an agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) The applicant also agrees that if any funds other than Federal appropriated funds will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the applicant shall complete and submit Standard Form--LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. (See Applicant Resources.)
(3) The applicant also agrees to require that the language of this certification be included in the
25 | P a g e award documents for all sub-awards at all tiers (including subcontracts, sub-grants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly.
(4) The applicant also agrees that, pursuant to 31 U.S.C. § 1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.
(5) The applicant also understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification and disclosure, if any.
File details come from the government source that posted it. Updated .