1-Approved NOI.pdf

PDF 196 KB Posted

Attached to
WDS SWD #562 SSI to serve Midland Baptist Church 3rd Addition
Solicitation number
260187
Issued by
Sedgwick County, Kansas

About this file

This is a Notice of Intent (NOI) for Stormwater Runoff Discharge from Construction Activities issued by the Kansas Department of Health and Environment (KDHE) under the National Pollutant Discharge Elimination System (NPDES) for a construction project in Wichita, Kansas. The project involves the construction of a residential subdivision with related utilities at the Midland Baptist Church 3rd Addition site located at 4200 Church Circle, Wichita, Kansas 67205. The total estimated area to be disturbed is 21.17 acres, with an anticipated project start date of June 16, 2026 and completion date of June 16, 2031. The NOI was submitted on February 2, 2026, and received approval from KDHE on March 5, 2026, with authorization expiring on July 31, 2027. The owner/operator is Eric Gilbert of Liberty Communities, LLC, responsible for implementing erosion and sediment control measures, including the installation of a sedimentation basin in the drainage area where more than ten acres will be disturbed.

The erosion control and stormwater management plan was developed by engineer Austin Gottlob (License #17919) and includes a detailed sequence of soil-disturbing activities with corresponding best management practices (BMPs) and pollution control features. Stormwater runoff from the site will discharge to Little Slough Creek in the Lower Arkansas River Basin. The annual permit fee is $60.00, which must be paid before the NOI is processed. The project includes no conditional authorizations or special considerations. The Stormwater Pollution Prevention Plan (SWP2 Plan) must be implemented at the time construction begins and revised as necessary to maintain compliance with NPDES permit requirements throughout the construction period and until permanent sediment and erosion control measures are established and 95% permanent stabilization is achieved.

View the file

Other files

File Type Posted
3-260187 Bid Table.pdf PDF
2-BP 448-2026-005521.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 1 of 4

NOTICE OF INTENT (NOI)

For Authorization to Discharge Stormwater Runoff from Construction Activities In accordance with the Kansas Water Pollution Control General Permit Under the National Pollutant Discharge Elimination System (NPDES)

Submission of this Notice of Intent constitutes notice that the party identified in Section I of this form requests authorization for coverage under the Kansas Water Pollution Control general permit, or KDHE issued successor permits, issued for stormwater runoff from construction activities in the State of Kansas. Becoming a permittee obligates the discharger to comply with the terms and conditions of the general permit. A complete request for Authorization for coverage under the general permit must be submitted or the request will not be processed. KDHE will notify owners or operators whose Notice of Intent (NOI) and supporting documentation for Authorization of stormwater runoff associated with construction activities are incomplete, deficient, or denied.

I. OWNER OR OPERATOR ADDRESS, BILLING, CONTACT & RECORDS LOCATION INFORMATION

Owner/Operator Eric Gilbert Mailing Address: 305 S Laura Ave Company Name: Liberty Communities, LLC City, State Zip: Wichita, KS 67211 Phone: (316) 650-7536 Email: emgilbert13@gmail.com

Contact Name: Eric Gilbert Mailing Address: 305 S Laura Ave Company Name: Liberty Communities, LLC City, State Zip: Wichita, KS 67211 Phone: (316) 650-7536 E-mail: emgilbert13@gmail.com

PERMIT FEE BILLING INFORMATION

Billing Contact: Eric Gilbert Billing Address: 305 S Laura Ave Wichita, KS 67211

Phone: (316) 650-7536 E-mail: emgilbert13@gmail.com

Address where records will be kept (if not on-site):

Records Address: 315 S Ellis St Wichita, KS 67211

II. SITE INFORMATION

Project Name: Midland Baptist Church 3rd Addition Street Address: 4200 Church Cir

Wichita, KS 67205 County: Sedgwick

Legal Site Description:

Qtr: Qtr: E2 Qtr: NW Section: 27 Township: 26S Range: 01W

Decimal Degrees Latitude: 37.760673 Decimal Degrees Longitude: -97.420835

AUTHORIZED:Submission Received: 2/2/2026 Submission Number:

HQJ-N4SY-AATDB YES X NO

Reviewer: Is Authorization Conditional

YES NO X

(if yes, see Section V for conditions)

Larry Hook Are there any Considerations

YES NO X

(if yes, see Section V for considerationsAuthorized By:

Secretary, Kansas Department of Health and Environment KS Permit No.: S-AR94-2033

Issued: Federal Permit No.: KSR123903

KEIMS Watermark KSR123903 v1.0

Approved Issued On:03/05/2026

Expires On:07/31/2027

Project Name: Midland Baptist Church 3rd Addition Notice of Intent (NOI)

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 2 of 4

B. Existing Conditions/Uses

1) Is any part of the project located on Indian Country Land?

No

2) If stormwater runoff drains to or through a Municipal Separate Storm sewer System (MS4): MS4 Name:

3) Name of the first receiving water, stream, or lake Little Slough Cr (10270103805), River Basin AR -

LOWER ARKANSAS

4) Are contaminated soils present on the site or is there groundwater contamination located within the site boundary?

No

5) Are there any contaminated soils that will be disturbed or any contaminated groundwater that will be pumped by the proposed construction activity?

No

6) Are there any surface water intakes for public drinking water supplies located within ½ mile of the site discharge points?

No

7) Are there any known historical or archeological sites present within the site boundary or any historic structures located within 1000 feet of the project site?

No

Note: Include documentation of project-specific coordination with the Kansas Historical Society in making this determination

8) Is any threatened or endangered species habitat located within the site boundary or in the receiving water body?

No

Note: Include documentation of project-specific coordination with the Kansas Department of Wildlife, Parks & Tourism in making this determination.

9) Will the project impact the line or grade of a stream or does it include dredge or fill of a potential jurisdictional water body or wetlands?

No

10) Are any Critical Water Quality Management Areas, Special Aquatic Life Use Waters, or Outstanding National Resource Waters located within ½ mile of the facility boundary?

No

C. Project Description

1) Project Description:

Construction of a residential subdivision with related utilities

Does this NOI include all proposed soil disturbing activities associated with the entire common plan of development? Yes

2) Anticipated project Start Date: June 16, 2026 and Completion Date: June 16, 2031

3) Estimated total area to be disturbed: 21.17 Acres

4) Total area of the site: 21.17 Acres

5) Do you plan to disturb ten or more acres that are within a common drainage area? Yes

Will a sedimentation basin be installed in that drainage area? Yes

(Attach design calculations for each sedimentation basin.) If a sediment basin is not feasible, on a separate sheet describe similarly effective erosion and sediment control measures to be implemented in lieu of a sedimentation basin.

KEIMS Watermark KSR123903 v1.0

Approved

Project Name: Midland Baptist Church 3rd Addition Notice of Intent (NOI)

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 3 of 4

D. Maps

Include an area map showing the outline of the construction site and the topographic features of the area at least one mile beyond the project site.

E. Erosion Control Plan and Best Management Practices

1) Provide a summary of the sequence of major soil disturbing activities including installation of the corresponding stormwater management and pollution control features.

1. Install site boundary erosion control devices downstream from areas to be disturbed.

2. Clear and grub for site grading.

3. Strip existing topsoil and stockpile, commence mass grading of site.

4. Construct utilities, drainage pipes and inlets.

5. Staging and maintenance of BMPs to be accomplished to ensure effective sediment and erosion control.

6. Spread topsoil over future site finish grades and install temporary seeding and erosion control measures.

7. Install localized permanent seeding/sod and landscape when possible and maintain temporary BMPs until permanent landscape and sediment control devices are established.

8. Temporary BMPs are to be removed after permanent water quality BMPs are established. PPD As-builts are to be completed and approved.

9. Upon establishment of 95% permanent sediment and erosion control measures are complete, contractor to coordinate and turn-over permanent erosion control inspection and maintenance manual responsibility to the owner/operator. 10.When all construction activity is completed, the site is stabilized, all temporary structural BMPs removed and permanent water quality measures are operating, the contractor may delegate the post construction and maintenance duties to the owner/operator.

2) Provide one or more site plans covering the anticipated soil disturbing activities showing the limits of disturbance, the existing and proposed elevation contours, the types and locations of erosion/sediment control measures and stormwater management/pollution control features during each phase of construction and the locations where stormwater runoff leaves the construction site.

3) Provide a description of the best management practices to be utilized to control erosion and the discharge of sediment and other pollutants in stormwater runoff throughout construction and the design calculations for each sediment basin including total drainage area and storage capacity below the elevation of the mass volume flow outlet device.

See Attached

4) Provide the name and License or Certification Number of the engineer, geologist, architect, landscape architect, or Certified Professional in Erosion and Sediment Control (CPESC) under which the construction stormwater pollution prevention plan has been developed.

Austin Gottlob 17919 Engineer Name License or Certification Number Profession or Field

III. ANNUAL FEES

The first year of the annual permit fee specified in K.A.R 28-16-56 et seq. as amended is currently $60.00 and can be paid through the KEIMS system at time of submittal. The fee must be paid before this NOI will be processed. An invoice for the annual permit fee will be sent to the contact person requesting a permit until such time as the permittee submits a Notice of Termination (NOT).

Failure to pay the annual fee timely may result in termination of the construction stormwater discharge Authorization.

IV. OWNER OR OPERATOR CERTIFICATIONS

KEIMS Watermark

KSR123903 v1.0 Approved

Project Name: Midland Baptist Church 3rd Addition Notice of Intent (NOI)

Effective: August 1, 2022 Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activites Page 4 of 4

I, the undersigned, certify that a Stormwater Pollution Prevention Plan (SWP2 Plan) will be or has been developed for the construction site described in this NOI and supporting documentation. I further certify that the plan will be implemented at the time construction begins, and, as required by the NPDES general permit for Stormwater Runoff from Construction Activity, will revise the SWP2 plan if necessary.

I understand that continued coverage under the NPDES general permit for Stormwater Runoff from Construction Activities is contingent upon maintaining eligibility as provided for in the requirements and conditions of the general permit, and paying the annual fee.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

Eric Gilbert 2/2/2026 11:56:51 AM Signature (owner or operator) Date

Official Title

V. CONDITIONS AND/OR CONSIDERATIONS OF APPROVAL

Conditions of Authorization - For Official Use Only:

When indicated, Conditions of Authorization are as follows:

NONE

Notes on Consideration – For Official Use Only:

NONE

KEIMS Watermark KSR123903 v1.0

Approved