1-ADVERTISEMENT FOR SOQs 05-18-2026 - Well.pdf

PDF 125 KB Posted

Attached to
NS26-143 Neola Water & Sewer District - Neola 2026 Upper Well Project
Solicitation number
NS26-143
Issued by
Utah County, Utah

About this file

This is an Advertisement for Statements of Qualifications issued by the Neola Water and Sewer District in partnership with Sunrise Engineering for the Neola 2026 Upper Well Project located in Utah. The solicitation seeks qualified contractors to complete a two-phase groundwater project consisting of drilling a test well to evaluate groundwater availability and aquifer conditions, followed by construction of a new culinary production well including drilling, logging, casing, perforating, and well development. The Request for Qualifications will be available beginning May 18, 2026, through the Sunrise Engineering Planroom at planroom.sunrise-eng.com. Questions regarding the solicitation must be submitted via email to Jeff McCarty, Project Engineer at jmccarty@sunrise-eng.com, with a deadline of Tuesday, May 26, 2026, by 5:00 PM. Statements of Qualifications are due on Friday, May 29, 2026, by 10:00 AM and must be submitted via mail or in-person delivery to Sunrise Engineering, 148 South Vernal Avenue, Vernal, Utah 84078. The District anticipates selecting pre-qualified contractors by June 5, 2026.

No pricing terms, budget information, set asides, or funding sources are specified in this advertisement. RFQ documents are available for free download through the Sunrise Engineering Planroom; however, hard copies will not be provided. Offerors are required to follow the District's purchasing process to track document downloads. Any addenda issued during the solicitation period will be posted on the Sunrise Engineering Planroom website, and offerors are encouraged to regularly check the website for updates and must acknowledge all addenda in their proposals.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR STATEMENTS OF QUALIFICATIONS

NEOLA 2026 UPPER WELL PROJECT

The Neola Water and Sewer District and Sunrise Engineering are soliciting Statements of Qualifications (SOQs) from qualified contractors for drilling a test well to evaluate groundwater availability and aquifer conditions, followed by construction of a new culinary production well including drilling, logging, casing, perforating, and well development.

RFQ Availability The Request for Qualifications (RFQ) will be available beginning May 18, 2026, to interested parties through the Sunrise Engineering Planroom at:

Visit the Sunrise Engineering Planroom to download documents:

planroom.sunrise-eng.com

Documents may be downloaded free of charge; however, contractors are required to follow the District’s purchasing process to track downloads. Hard copies of the RFQ documents will not be provided.

Important Dates

• RFQ Available: May 18, 2026

• Questions Due: Tuesday, May 26, 2026, by 5:00 PM

• SOQ Due Date: Friday, May 29, 2026, by 10:00 AM

• Anticipated Selection Date: By June 5, 2026

Questions and Contact Information Questions regarding this solicitation must be submitted via email to:

Jeff McCarty, Project Engineer jmccarty@sunrise-eng.com

Submission Requirements SOQs will be accepted via mail or in-person delivery at:

Sunrise Engineering 148 South Vernal Avenue Vernal, Utah 84078 https://planroom.sunrise-eng.com/%23p/home https://planroom.sunrise-eng.com/%23p/home https://planroom.sunrise-eng.com/%23p/home mailto:jmccarty@sunrise-eng.com

Any addenda issued for this solicitation will be posted on the Sunrise Engineering Planroom website. Offerors shall acknowledge all addenda in their proposal and are encouraged to check the Planroom regularly for updates.

Selection Process It is the intent of the District to select pre-qualified contractors by June 5, 2026.

https://planroom.sunrise-eng.com/%23p/home

RFQ Availability
Important Dates
Questions and Contact Information
Submission Requirements
Selection Process

File details come from the government source that posted it. Updated .