This is a Request for Qualifications (RFQ) issued by the California Department of Transportation (Caltrans), Division of Engineering Services, Structure Construction Program, District 4, for A&E Structure Construction Engineering and Inspection Services for the San Francisco Oakland Bay Bridge Paint Project (SFOBB). The project involves providing professional engineering services for construction engineering, general contract administration, change order preparation and administration, engineering support for reviewing construction claims, final construction estimates, and final project reports to support the painting and preservation of existing steel structures on the SFOBB, including cleaning, painting of the bridge superstructure, truss, deck support system, interior surfaces, box girders, miscellaneous deck and soffit repairs, and necklace light fixture upgrades. The project is located in San Francisco County in District 4. Questions concerning the RFQ must be submitted in writing no later than seven business days after the RFQ advertisement. Interviews will be held in person on May 4, 2026, with negotiations scheduled for the week of June 8, 2026, and cost negotiations to be completed by June 23, 2026. The estimated contract term is five years, with a tentative construction start of April 2026 and completion of December 2031. Electronic SOQ submissions are required by 10:00 a.m. on April 17, 2026, submitted via Novell Filr account.
The estimated contract amount is $11,062,020.00 to $17,975,782.00, with a 10 percent fee for profit and escalation rates ranging from 1.71 percent in year one to 3.42 percent in subsequent years. A five percent Disabled Veteran Business Enterprise (DVBE) participation goal is required, and a 25 percent Small Business participation goal is encouraged. Federal and state prevailing wage rates may apply as specified in the draft agreement. The most highly qualified firm will be required to submit financial documents within four days of selection notification. The consultant must provide required personnel including a Consultant Contract Manager (registered professional engineer with minimum ten years' experience in structure construction engineering), Consultant Task Order Manager, Structure Representative, Assistant Structure Representatives (3-5 positions), Transportation Engineering Technician (0-1 positions), and a Certified Industrial Hygienist. The anticipated classification and approximate total hours include 2,389 hours for Consultant Contract Manager, 4,777 hours for Consultant Task Order Manager, 7,318 hours for Structure Representative, 26,215 hours for Assistant Structure Representatives, 4,032 hours for Transportation Engineering Technician, and 520 hours for Certified Industrial Hygienist. The consultant must provide all necessary office and field equipment, tools, and supplies, and must maintain compliance with all applicable federal, state, and local regulations, including Cal/OSHA, prevailing wage requirements, and Caltrans standards and manuals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-soq-responsiveness-checklist.pdf | ||
| 2025-RFQ-125.pdf | ||
| 3-Addendum_1_-_DBE_CM_GenAI_and_SOQ.pdf | ||
| 2-soq-submittal-instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 17, 2026 RFQ Number 59A1409
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
REQUEST FOR QUALIFICATIONS NOTICE
NUMBER 59A1409
Read carefully as the following revisions have been made to this document:
• On February 2, 2026, new escalations rates.
• On February 2, 2026, interviews will be held in person.
• On September 30, 2025, the U.S. Department of Transportation (U.S.
DOT) issued an interim final rule (IFR) which, among other things, implemented changes to the Disadvantaged Business Enterprise (DBE) Program via modifications to 49 Code of Federal Regulations Part
26. (Docket Number DOT-OST-2025-0897.) The IFR was published in the Federal Register on October 3, 2025, and took immediate effect. (90 FR 47969 (Oct. 3, 2025).)
• On 03/07/25, GENERAL, Executive Order N-12-23 replaces Executive Order N-12-12. GenAI Reporting and Factsheet Form STD1000 is retired.
• On 01/31/25, GENERAL the Fee & Escalation table has been revised.
Note: Questions concerning this Request for Qualifications (RFQ) must be submitted in writing to the attention of Lisa Pallesen at Lisa.Pallesen@dot.ca.gov. Questions must be received no later than seven (7) business days after the RFQ advertisement. Consultants contacting the District or Division directly seeking information about this RFQ will be disqualified from consideration in the selection process.
As required by Executive Order S-02-06, Caltrans is committed to meeting the State’s 25 percent Small Business (SB) participation goal. Certified SBs, Microbusinesses (MB), and consultants willing to commit to subcontracting a minimum of 25 percent of the contract amount to certified SBs or MBs are encouraged to submit Statements of Qualifications. Section I. H. has the specific goals established for this RFQ.
The Disabled Veteran Business Enterprise (DVBE) Participation Program applies, and a five percent (5%) goal is required for this RFQ. See section I. H. in this RFQ for requirements.
I. GENERAL INFORMATION
A. Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for A&E Structure Construction Engineering and Inspection Services for the San Francisco Oakland Bay Bridge Paint Project (SFOBB) in District 4. In submitting your SOQ, you shall comply with the instructions found herein. In addition to those programs that are specified in this solicitation, prospective consultants are encouraged to consider mailto:Lisa.Pallesen@dot.ca.gov programs that are available, such as those for the use of small businesses, disadvantaged businesses, disabled veteran businesses, new emerging firms, and other businesses covered by State and Federal programs.
B. The estimated contract amount is $11,062,020.00 - $17,975,782.00.
C. The estimated contract term is five (5) years.
D. Interviews will be held in person on May 4, 2026. Confirmation letters will be sent to those firms short-listed.
E. The most highly qualified consulting firm will be required to submit an electronic copy of the financial documents listed on the appropriate Financial Documents Submittal Checklist available on the AE Contract Information website. The most highly qualified consulting firm will be notified of their selection and receive instructions for the electronic submission of the financial documents.
The most highly qualified consulting firm must submit a complete financial documents package no later than four (4) days after notification of selection. The prime consultant must submit the complete financial documents package in order for Caltrans to have the information necessary to engage in negotiations. The prime consultant is solely responsible for timely and complete submission of financial documents on behalf of the entire proposed team; financial documents will not be accepted from proposed subconsultant firms. Failure to submit a complete financial documents package by the specified due date may result in termination of negotiations with the most highly qualified consulting firm.
F. Negotiations will be held with the top-ranked firm by teleconference/WebEx during the week of June 8, 2026. The fee for profit shall be 10 percent, and the escalation shall be as follows:
Year Period Escalation 1 04/17/2026 – 04/30/2027 1.71% 2 05/01/2027 – 04/30/2028 3.42% 3 05/01/2028 – 04/30/2029 3.42% 4 05/01/2029 – 04/30/2030 3.42% 5 05/01/2030 – 04/30/2031 3.42% 6 05/01/2031 – 04/30/2032 3.42%
Notes:
1. Partial year will only occur on the last year of the contract term. All other periods are full years.
2. Increases to the loaded billing rates after contract execution is not authorized for any reason per Article IV, Section 17 and Article XVI, Section 6 of the California Constitution.
https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information
G. The scheduled date to complete cost negotiations and submit final cost proposal is June 23, 2026.
H. A Disabled Veteran Business Enterprise (DVBE) Participation
Goal of five percent (5%) is required for the contract. As of July 28, 2009, the Good Faith Effort (GFE) is no longer an option to meet the DVBE participation goal, pursuant to Assembly Bill 21 of the Fourth Extraordinary Session (AB4X 21).
I. Federal and/or State prevailing wage rates may apply. This requirement, if applicable, will be specified in the draft Agreement.
See SOQ Submittal Instructions, Section I.,G. regarding the California Department of Industrial Relations (DIR) Consultant/Contractor Registration Program on the AE Contract Information website.
J. Caltrans does not guarantee, either expressly or by implication, that any work or services will be required under any contract issued as a result of this RFQ.
K. A Pre-award or Post-award Audit will be performed on any contract issued as a result of this RFQ.
L. Contract boilerplate can be obtained on the AE Contract Information website.
M. Pursuant to Executive Order (EO) N-6-22 issued March 4, 2022, persons identified in the list established by the US Department of the Treasury are ineligible to bid on, submit a proposal for, enter into, or renew any Agreement with the State for any goods and/or services.
Any person who submits a bid or proposal to Caltrans certifies that it is not identified in the most current lists located https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions.
If applicable, any person who submits a bid or proposal to Caltrans certifies that its subcontractors are not identified in the most current lists located https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions
N. Pursuant to Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting, effective February 20, 2025.
1. The State of California seeks to realize the potential benefits of
GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
2. Bidder / Offeror must notify the State in writing if it:
A) intends to provide GenAI as a deliverable to the State; or B) intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
1) functionality of a State system,
2) risk to the State, or https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions
3) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
3. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
4. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
5. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
II. SCOPE OF WORK/DELIVERABLES
The work to be performed for this RFQ is described in the Scope of Work/Deliverables and is hereby incorporated as Attachment 1.
III. CONFLICT OF INTEREST
A. Conflicts of interest may occur due to direct or indirect financial or business interests in the work to be performed or in any real property acquired for such project. Conflicts of interest can include, but are not limited to, past, existing or planned activities or because of relationships with other persons or firms. If there is a conflict of interest, the proposed team, including both the prime consultants and subconsultants, and individual employees of team members would actually or potentially be unable to render impartial assistance or advice to Caltrans. The proposer’s objectivity or availability in performing the contract work may be impaired due to actual or potential conflicts of interest.
B. If the proposed team determines that any actual or potential conflicts of interest exist, it must identity and describe in detail each conflict of interest to Caltrans, using the Disclosure of Potential Conflict of Interest Form, which can be found on the A&E Contract Information website. Along with the description of the actual or potential conflicts of interest, the proposed team shall also offer measures to avoid, neutralize, or mitigate all listed conflicts.
The list of conflicts, including conflicts that apply to individuals as well as firms, and the mitigation measures on the Disclosure of Potential Conflict of Interest Form must be submitted as a separate section in the Statement of Qualifications. Disclosure of information will not disqualify a proposed team from competing for a contract. The existence of actual or potential conflicts of interest will be used as a criterion to evaluate team availability during the evaluation and selection process. Caltrans reserves the right to terminate negotiations with the first selected firm and begin negotiations with the next selected firm or to cancel the procurement prior to execution if Caltrans learns that the selected firm failed to disclose any actual or potential conflicts, which it knew or should have known about, or if the proposed team provided or omitted information on the disclosure form that results in the information being false or misleading.
C. After award, conflict of interest guidelines and policies shall continue to be monitored and enforced by the Caltrans Contract Manager. Additional information about Conflict-of-Interest issues can be found in the SOQ Submittal Instructions and General Contract Process Information document (Section V. Post Government Employment Restrictions and Section VI.
Conflict of Interest Concerning Consultant(s)) found on the AE Contract Information website (see link below). The State and Federal contract boilerplates on DPAC’s website also contain information on conflict-of-interest issues (Exhibit D) and can be found on the AE Contract Information website (see link below).
D. The prime consultant and subconsultants may be proposed on SOQs for other Caltrans A&E on-call contracts; however, the Caltrans Contract Manager may prohibit work on specific project(s) where Caltrans determines that a conflict of interest exists.
IV. SUBMISSION OF STATEMENTS OF QUALIFICATIONS (SOQs)
A. IMPORTANT: Download “Statement of Qualifications Submittal Instructions and General Contract Process Information” from the AE Contract Information website (Dated Rev. 10/07/2020) . Failure to follow these instructions may result in rejection of your SOQs.
B. SOQ Package Submittal Instructions
Read instructions below carefully. You will be required to submit an electronic SOQ file to Sacramento.
1. The electronic submission of a single unprotected (i.e. not password protected) PDF file of the SOQ is required. The electronic submittal will be accepted until 10:00 a.m. on 04/17/2026. Hard copies of the SOQs are NOT required. Fax copies or copies transmitted by email will not be allowed.
2. You will be required to create a Novell Filr account with Caltrans.
Send an email message to the Contract Analyst, Lisa Pallesen, at Lisa.Pallesen@dot.ca.gov containing the information listed below for a link and instructions to complete the self-registration page and submit the SOQ electronically.
Your firm’s name Your email address The solicitation number for which you would like to submit a
SOQ
The file name shall include the contract number, consultant name (max.
25 characters) separated by an underscore (_), ending with the “.pdf” extension.
Example A: 50A0694_JohnDoeConsulting.pdf https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information mailto:Lisa.Pallesen@dot.ca.gov
Example B: 50A0694_aaa1234engineer.pdf
3. SOQ submittals will be considered non-responsive if the electronic submittal is not received by the date and time specified in this RFQ.
C. Request for RFQ Copies Copies of this RFQ may be obtained on the CaleProcure website.
https://www.caleprocure.ca.gov/pages/index.aspx
Attachment 1
Revised 03/14/25
SCOPE OF WORK/DELIVERABLES
Structure Construction Engineering and Inspection Services for Caltrans, Division of Engineering Services, Structure Construction Program, District 04 San Francisco Oakland Bay Bridge Paint Project (SFOBB Project)
Project Specific Contract
Table of Contents
A. GENERAL PROJECT DESCRIPTION AND OVERVIEW OF SERVICES
1. Purpose of Work
2. SFOBB Project Description
3. Explanation of Work
4. Exclusion of Work
5. Location of Work
B. REQUIRED SERVICES
1. Structure Construction Engineering and Inspection Services
2. Proposed Caltrans Projects/Services
3. Partnering
4. Workplan Standards Guide Codes
5. Quality Control Plan
C. GENERAL REQUIREMENT - PERSONNEL
1. Independent Contractor Status
2. Consultant Work Hours and Availability
3. Assigned Personnel on Task Orders
4. Personnel Substitutions or Additions
5. Stable Workforce
6. Safety
7. Other Personnel Requirements
D. INCIDENTAL SERVICES
1. Non-Architectural and Engineering (non-A&E) services
2. Training Services
E. CONSULTANT PERSONNEL REQUIREMENTS
1. Consultant Contract Manager
2. Consultant Task Order Manager
3. Structure Representative
4. Assistant Structure Representative
5. Consultant Structure Construction Transportation Engineering Technician
6. Certified Industrial Hygienist
7. Consultant Personnel and Team Member Qualifications
F. COORDINATION
G. GENERAL REQUIREMENTS – DELIVERABLES AND DATA
1. Ownership of Proprietary Property
2. Format for Unprotected and Modifiable Electronic File Transfers
3. Submittals
4. Project Files
H. REVIEW AND ACCEPTANCE PROCESS
1. General
2. Reviews of Deliverables
3. Acceptance of Deliverables
4. Rejection of Deliverables
I. GENERAL REQUIREMENTS –EQUIPMENT AND APPURTENANCES
1. General
2. Office Equipment and Supplies (Consultant’s Office)
3. Field Equipment and Supplies:
4. Office Equipment and Supplies (Use of Caltrans Office)
J. GENERAL REQUIREMENTS – STANDARDS
1. Federal, State, and Local Requirements
2. Prevailing Wages
3. Caltrans Standards
4. Manuals
5. Policies / Directives
6. Guidance
K. GENERAL MATERIALS AND ORIENTATION PROVIDED BY CALTRANS
1. General Materials
2. Permits to Enter Property (“Permit to Enter”)
3. Orientation
L. CONFLICT OF INTEREST
1. General Requirements
2. Conflict of Interest Examples
A. GENERAL PROJECT DESCRIPTION AND OVERVIEW OF SERVICES.
1. Purpose of Work
The Consultant shall provide professional engineering services to perform Structure Construction Engineering and Inspection Services, including, but not limited to, performing construction engineering and general contract administration, preparing and administrating the San Francisco Oakland Bay Bridge Project (“SFOBB Project”) construction contract (“SFOBB Project Construction Contract”) change orders, providing engineering support reviewing and assessing potential construction claims and provide recommendations of proposed claim resolution and support on accepting SFOBB Project Construction Contract, prepare final construction estimate, and prepare final report, to support the Department of Transportation (“Caltrans, or Department”), Division of Engineering Services, Structure Construction Program, District 04, on phase 3 of SFOBB Project.
2. SFOBB Project Description
This project proposes to maintain and preserve existing steel structures of SFOBB. The work involves cleaning and painting of the bridge superstructure, including the truss, deck support system, interior surfaces, and box girders. Additional work consists of miscellaneous deck, soffit, and joint repairs, and necklace light fixture upgrades.
3. Explanation of Work
The Caltrans Contract Manager assigned to this Contract (“Caltrans Contract Manager”) may assign specific work to the Consultant through the issuance of task orders describing in detail the services to be performed under this Contract (“Task Order(s)”). The Consultant shall only perform work that is assigned in an authorized Task Order. This Contract does not guarantee that Task Orders shall be issued.
4. Exclusion of Work
Except for structure construction engineering and inspection services for the SFOBB Project, all other construction and structural engineering services, including, but not limited to the following, are excluded from the Contract’s scope of work:
a) Professional and technical engineering services required for Roadway Design and related Project Development and Construction Services.
b) Professional and technical engineering services required for Architecture and Structural Engineering - includes new or retrofit design of bridge or major building facility structures.
The following disciplines are also excluded from the Contract:
a) Hydraulic Engineering - includes drainage design, run-off calculations, hydraulic studies, Hydraulic Reports, Rapid Stability Assessment (RSA) and higher levels of analysis, such as HEC.
b) Traffic Engineering - includes traffic forecasting, traffic modeling, traffic studies, and development of Traffic Management Plans.
c) Environmental Studies - includes Preparation of Draft and Final Environmental
Document and all permit activities to environmental agencies.
d) Geotechnical Engineering - includes all geotechnical testing, analysis, studies and reports.
e) Land Surveying.
f) Right of Way Engineering.
g) Water Quality.
h) Visual Impact Analysis.
i) Value Analysis.
j) Landscape Architecture.
The following additional activities are excluded from the scope of work of this Contract:
Information Technology (IT) related activities are excluded from the A&E scope of work. Information Technology related activities such as auxiliary automated information handling, including systems design and analysis, conversion of data, computer programming, information storage and retrieval, voice systems that use interactive databases, video including videoconferencing systems that transmit sensitive data, data communications, requisite systems controls, the use of interactive databases and simulation are excluded.
5. Location of Work
The work shall be performed on the SFOBB Project which is located in San Francisco County in District 4.The specific location within the above-described geographical limits of the work to be performed under this Contract shall be identified in each Task Order and the SFOBB Project Plan. The Draft Structure Plan for the SFOBB Project attached as Attachment A.
Figure 1: San Francisco Oakland Bay Bridge Project Vicinity Map
B. REQUIRED SERVICES
1. Structure Construction Engineering and Inspection Services
A wide range of tasks associated with Structure Construction Engineering and Inspection Services should be expected. The Consultant shall perform and have the expertise, capability, and equipment necessary to perform the scope of work for this Contract (“Scope of Work”). Structure Construction Engineering and Inspection Services for the SFOBB Project include, but are not limited to, the following required services:
a) Perform and assist in performing the duties of construction inspection, engineering and ensuring compliance with project plans, specifications, authorized submittal and shop drawings and related regulations for SFOBB Project work that includes, but not limited to:
i. Construction surveying for control of lines and grades.
ii. Installation of temporary structures.
iii. Cleaning and painting of the bridge superstructure, including the truss, deck support system, interior surfaces, and box girders.
iv. Miscellaneous deck, soffit, and joint repairs.
v. Light fixture upgrades.
b) Pursuant to an authorized Task Order, the Consultant shall provide Structure
Construction Engineering and Inspection Services within the geographical jurisdiction of the Contract set forth in “Location of Work” Section, and all necessary personnel, material, transportation, lodging, instrumentation, and the specialized facilities and equipment necessary to satisfy all appropriate agencies and required to assure compliance with all applicable federal, state, and local statutes, laws, codes, regulations, policies, procedures, ordinances, standards, specifications, performance standards, and guidelines, applicable to the Consultant's services and work product.
c) The Consultant shall begin the required work within two (2) working days after receiving a fully executed Task Order and the issuance of the Notice to Proceed (NTP) from the Caltrans Contract Manager to the Consultant Contract Manager. Some work, however, may require Consultant personnel to mobilize within 24-hour of notifications.
Once the work begins, the work shall be executed and performed diligently until all required work has been completed to the satisfaction of the Caltrans Contract Manager or Caltrans designee.
d) The Consultant Contract Manager, Consultant Task Order Manager, and Consultant key personnel shall be accessible to the Caltrans Contract Manager at all times during normal Caltrans working hours or after hours as required by the Caltrans Contract Manager.
e) The Caltrans Contract Manager may advise the Consultant’s Contract Manager of the perceived need to have the Consultant’s employees work overtime to meet changing Caltrans needs, and the Consultant Contract Manager shall take effective measures to address the Caltrans’ Contract Manager’s needs. All overtime shall be pre-approved by the Caltrans’ Contract Manager or designee. Overtime pay shall be paid only to persons covered by the Fair Labor Standards Act and as per Caltrans’ Division of Procurement and Contracts (“DPAC”) Interpretive Guidance on premium overtime reimbursement.
f) The Consultant shall assure compliance with the construction contract requirements (as supplemented by authorized shop drawings prepared by the SFOBB Construction Contractor) including the verification of field dimensions, vertical and horizontal field control for structures.
g) Perform and assist in monitoring and controlling bridge profile, grades, and alignment in accordance with project plans and specifications.
h) Perform bridge deck profile, grade and alignment control with survey equipment and utilize standard industry software such as Civil 3D and follow Caltrans’ Survey Manual, Bridge Deck Construction Manual, Bridge Construction Records and Procedures Manual Record to ensure the accuracy of the final bridge deck grade and alignment.
i) Perform survey calculation and adjustment for the final bridge deck grade if needed.
Perform and assist in daily bridge geometric control in accordance with authorized Bridge Geometric Control Plans submitted by the SFOBB Construction Contractor.
j) Assist Caltrans Surveyor with geometric control monitoring if requested.
k) Record the monitoring and observation in the daily Assistant Structure Representative diary.
l) Analyze the project plans and specifications for possible errors and deficiencies and report such findings to the Caltrans Structure Representative.
m) Adhere to all safety and health code and regulations and enforce applicable contract provisions of this Contract for the public and project personnel.
n) Prepare Assistant Structure Representative daily diaries in accordance with the
Caltrans construction manual and Caltrans Bridge Construction Records and Procedure Manual.
o) Review submittals including shop drawings, product data, samples, test samples, quality control plans, work plans, material sources, test data, test results, and evaluation reports, as required by the contract and/or submitted by the SFOBB Construction Contractor. These shop drawings may include, but are not limited to, fabrication and erection plans, demolition plans, equipment lists, cofferdams, falsework, temporary support systems, form-work, and for other temporary work and methods of construction the SFOBB Construction Contractor proposes to use. Review SFOBB Construction Contractor’s submitted Requests For Information (RFI) and recommend sound engineering solutions in a timely manner.
p) Create and maintain the following documentation and provide the following deliverables:
i. Daily reports and extra-work diaries,
ii. Monthly progress report prepared by Consultant’s Contract Manager,
iii. SFOBB Construction Contractor’s contract with Caltrans for construction of the SFOBB Project (“SFOBB Construction Contract”) progress payment and quality documents,
iv. Monthly Progress Payment as specified in Section 9 of the contract Standard Specifications delivered to the Caltrans Structure Representative by no later than 15th of each month,
v. Field measurements, field, and laboratory test data and other documents as required by Caltrans procedure,
vi. All reports, engineering calculations, temporary structure analysis and other applicable documents prepared for the SFOBB Project,
vii. SFOBB Project survey records, points, lines and monuments shall be established, identified, referenced and included in daily reports,
viii. All original survey documents resulting from this Contract (including original field notes, adjustment calculations, final results, and appropriate intermediate documents) shall be delivered to Caltrans Structure Representative and shall become the property of Caltrans. A copy of all survey documents furnished to Caltrans Structure Representative shall be retained by Consultant for future reference.
q) Review and assist in responding to Requests for Information from the SFOBB
Construction Contractor.
r) The Consultant shall assure compliance with applicable regulations controlling the work being inspected including California Division of Occupational Safety and Health (Cal/OSHA), SFOBB Project approved Storm Water Pollution Prevention Plans (SWPPP), and shall periodically monitor SFOBB Prime Contractor’s Construction safety program for compliance with Safety Audits and all State and Federal laws, policies, and procedures and other applicable regulations.
s) Prepare and assist in preparation of As-Built plans.
t) Prepare calculation, records, reports and correspondence related to SFOBB Project activities.
u) The Consultant shall maintain an awareness of safety and health requirements and enforce applicable regulations and contract provisions for the protection of the public and project personnel.
v) Review product data, samples, test samples, quality control plans, work plans, material sources, test data, test results, and evaluation reports, as required by SFOBB Construction Contract and/or submitted by the SFOBB Construction Contractor.
These shop drawings may include, but are not limited to, stress sheets, anchor bolt layouts, shop details, overhead sign structures, fabrication and erection plans, demolition plans, equipment lists, cofferdams, falsework, temporary support systems, cast-in-drilled hole pile placement and mitigation, haul bridges, formwork, and for other temporary work and methods of construction the SFOBB Construction Contractor proposes to use. Review SFOBB Construction Contractor’s submitted RFI and recommend sound engineering solutions in a timely manner.
w) Ensure compliance with applicable regulations controlling the work being inspected including California Division of Occupational Safety and Health (Cal/OSHA), Storm Water Pollution Prevention Plans (SWPPP) and other applicable regulations and permits included in the SFOBB Construction Contract specifications and SFOBB Construction Contract Information Handout.
x) The Consultant shall perform calculations (stress and deflection) of temporary structures as used in the construction of bridges (falsework, temporary shoring, working platforms, temporary supports).
y) The Consultant shall take samples and perform field-controlled tests of construction materials for quality assurance in accordance with California Test Methods (CTMs) and/or American Society for Testing Materials (ASTM) and/or American Concrete Institute (ACI) procedures.
z) The Consultant shall obtain and maintain certification with applicable CTMs, ASTMs and/or ACI procedures as required.
aa) Identify actual and potential problems associated with the SFOBB Project and recommend sound engineering solutions to Caltrans Structure Representative. If a change is determined to be necessary by Caltrans, Consultant’s personnel shall assist in implementing the processing of “Change Orders” in accordance with Caltrans’ Standard Specifications and Policies.
2. Proposed Caltrans Projects/Services
a) The projects that Caltrans, Division of Engineering Services, Structure Construction Program, District 04, plans to work on under the Contract is: a
Project EA/PIN* Co-Route-PM Project Description
04-3G487/0412000087 SF-080-5.7/7.7 San Francisco Oakland Bay Bridge Paint Project
*EA: Expenditure Authorization PIN: Project Identification Number
b) Tentative Construction Schedule
Shown below are the tentative SFOBB Project Ready-To-List, construction start, and construction completion dates:
Ready-To-List August 2025 Construction Start April 2026 Construction Completion December 2031
c) Consultant must be available on two (2) days’ written notice:
a. To meet with Caltrans; to participate in internal Project Development Team (PDT) meetings or other Caltrans meetings.
b. To attend public meetings (day and evening) where an expert is required.
c. To participate in any public hearings necessary for a project.
d. To provide technical expertise on an “as-needed” basis.
d) The Consultant must periodically submit progress reports and meet with the
Caltrans Contract Manager and/or Task Order Manager.
When applicable, progress reports must indicate an estimated percentage of work completed and a corresponding estimate of budget spent to date for work deliverables. Estimate of work completion and budget spent must be for the same time period.
a. The Consultant Contract Manager must meet with the Caltrans Contract Manager as needed to discuss progress on the contract.
b. Progress reports must include the total number of hours worked by the Consultant and subconsultants’ personnel by use of the Department of Transportation’s WBS level element(s). The monthly project reports must generate and deliver the information given below:
i. Field Personnel Assignment Summary Task Order (TO) budget Status
ii. Monthly Narrative report
iii. Current Fiscal Year Monthly questionnaire
iv. Task Order Billing report
v. Current Fiscal Year Monthly Cost for EAs
vi. Area Construction Manager (ACM) graphic report for Capital outlay Task Order
vii. Reports for maintenance Task Order & Summary
viii. DBE utilization rate on monthly and cumulative basis.
3. Partnering
Partnering is a way of conducting business in which both Consultant and Caltrans make commitments to achieve mutual goals.
a) Consultant and Caltrans’ Contract Managers shall schedule a kick-off partnering meeting, set expectations, roles and goals, establish the project-specific partnering process, develop risk/opportunity management strategies, discuss monthly invoice processing requirements, and get buy-in and commitment from the project team.
b) Consultant shall partner with all parties and stakeholders to establish and maintain cooperative communication channels and mutually resolve conflicts at the lowest responsible level. Consultant will participate in dispute resolution plan to establish a common understanding of the team process to resolve disputes most efficiently and effectively.
c) Consultant is expected to work on task orders in good faith, proceed diligently, avoid hindering, stay within the law and delegated authority, conforming with the established rules and collaborate with Caltrans Contract Manager with impartiality and honesty.
4. Workplan Standards Guide Codes
a) Task Orders are based on the Caltrans Workplan Standards Guide (WSG). The latest WSG is found in the Guide to Project Delivery Workplan Standards Guide, which is available from the Caltrans’ Publication Unit and on the Internet at https://projmgmt.onramp.dot.ca.gov/project-management-application-systems-pmas/workplan-standards. The WSG references the Work Breakdown Structure (WBS) categories, which are potential and related work activities applicable to the Contract.
b) The WGS references WBS categories which present the potential and related work activities that the Consultant may be required to perform. All revisions to the current version of the Work Breakdown Structure (WBS) shall apply during the life of the
The WBS activities below applicable to the Contract are limited to those set forth below:
275 Construction Engineering and General Contract Administration of Structures Work
275.20 Field Administration Work for Structures
275.30 Change Order Inspection for Structures Work
285 Contract Changes Order Administration
285.05 Change Order (CO) Process
285.10 Functional Support
285.10.10 Staking for Change Order
285.10.15 Other Functional Support
290* Resolve Contract Claims
290.40 Potential Claim Record
290.50 Alternative Dispute Resolution
290.60 Claim Resolution
290.70 Arbitration
295 Final Construction Estimate and Final Report
295.05 Processed Estimate after Acceptance
295.10 Proposed Final Contract Estimate
295.15 As-Built Plans
295.20 Project History File
295.25 Final Report
295.30 Processed Final Estimate
295.99 Other Accept Contract/Prepare Final Construction Estimate and
Final Report
*Provide engineering support only. The Department has a separate contract for contract claim resolution services
The Consultant shall not work on any projects that are in the planning phase (K-Phase) and the Consultant shall not be reimbursed for any work performed during this phase of a project.
5. Quality Control Plan
a) Prior to commencing work, the Consultant shall prepare the quality control plan and the minimum standard of work quality and obtain approval from the Caltrans Contract Manager, in effect for each and every Task Order during the entire time work is being performed under the Contract. The Consultant shall complete the quality control plan and certify at the completion of work that all measures contained therein were satisfied. Caltrans shall perform quality assurance on the quality control plan to assure that quality control was satisfied.
b) The Consultant’s quality control plan shall establish a process whereby:
i. All deliverables are reviewed for accuracy, completeness, and readability before submittal to Caltrans.
ii. Calculations and plans are independently checked, corrected, and re-checked.
iii. All job-related correspondence and memoranda are routed and received by affected persons and then filed in the appropriate Task Order file.
iv. Field activities are routinely verified for accuracy and completeness, such that any discovered deficiencies do not become systemic or affect the result of a Task Order deliverable.
c) The Consultant shall provide an outline of the quality control program before a specific task begins and shall identify critical quality control reviews within each Task Order. The Caltrans Contract Manager shall periodically request evidence that the Quality Control/Quality Assurance (QC/QA) plan is functioning.
d) All analytical results, plans, designs, specifications, estimates, notes, calculations, analysis, reports, graphics, drawings, visual simulations, studies, product, data, manuals, details, deliverables, backup documents, other documents, and other items required by this Contract submitted to the Caltrans Contract Manager for review shall be marked clearly as being fully checked or unchecked, and that the preparation of the material followed the quality control plan established for the work.
e) The QC/QA plan shall contain provisions for the development of appropriate
“checklists” to maintain product quality and control. These “checklists” shall be delivered to the Caltrans Contract Manager with the QC/QA plan. The Consultant shall update these documents when directed by the Caltrans Contract Manager.
Within thirty (30) calendar days of the Notice to Proceed (NTP), the Consultant shall submit to the Caltrans Contract Manager or Caltrans designee a job specific QC/QA plan and staffing plan.
f) The Consultant Contract Manager shall address all questions which may arise as to the quality or acceptability of deliverables furnished and work performed for this
C. GENERAL REQUIREMENT - PERSONNEL
1. Independent Contractor Status
For circumstances when Consultant personnel perform work at the Consultant home office or within Caltrans facilities alongside with Caltrans staff, all supervision and instructions shall be transmitted by the Consultant Task Order Manager. Consultant Task Order Manager shall exercise comprehensive control authority over its personnel in the manner and means to fulfill work performed without any involvement of the Caltrans Task Order Manager or designee.
a) Consultant Personnel Relationship
i. Consultant is an independent contractor, and nothing contained in the Contract shall be construed as constituting any relationship with Caltrans other than that of project owner and independent contractor. In no event shall the relationship between Consultant personnel and Caltrans be construed as creating any relationship whatsoever between Caltrans and any of Consultant’s employees.
ii. Neither Consultant nor any of its employees is or shall be deemed to be an employee of Caltrans. The Consultant has the sole right to terminate its personnel at-will without cause and demonstrate its right to control over the personnel.
b) Consultant Personnel - Supervision Control and Instructions
i. Consultant personnel shall operate as independent contractors whereby free to perform jobs in their own ways and means, using their own specific methodologies to achieve the desired task order services and deliverables.
ii. Consultant personnel are not required to follow Caltrans functional office protocols nor Caltrans specific instructions on how to perform its work.
iii. Except as otherwise specified in the Contract, Consultant Contract Manager has sole authority and responsibility to employ, discharge, terminate and otherwise control its employees and has complete and sole responsibility as a principal for its agents, for all Subconsultants and for all other persons that Consultant or any Subconsultant hires or engages to perform or assist in performing the Scope of Work.
iv. Consultant shall make all its own business including personnel decisions and bear the risk for its decisions without any burden or liability placed upon the Department.
c) Skilled and Qualified Labor
i. The Consultant will provide professional services in an area of its specialization as an essential part of the purpose of the business enterprise, considered as skilled professionals and do not require training.
ii. Consultant shall provide its own training to its employees and Subconsultants, and Consultant shall not rely upon Caltrans to provide such training.
d) Consultant agrees that:
i. The Consultant Contract Manager or designee shall manage, instruct, and supervise all Consultant employees and Subconsultants, and shall not allow any other party to manage, instruct and supervise such parties.
ii. Unless approved in writing by Caltrans Contract Manager, Consultant shall not hire employees or Subconsultants to work on Caltrans matters exclusively and only. Consultant may hire employees and Subconsultants for a specific Caltrans matter provided such party has the skills and knowledge to work on other matters and they are assigned to other matters from time to time.
iii. Consultant shall provide its own tools, equipment and supplies, and Consultant shall not rely on Caltrans to provide such tools, equipment, and supplies. Notwithstanding the foregoing, Caltrans may, during the term of the Contract, allow Consultant to access selected items of equipment; provide non-employee User-Ids and related access to Caltrans computer systems to Consultant employees and Subconsultants; and provide non-employee access cards and other such forms of identification to Consultant employees and Subconsultants.
iv. Consultant shall advise its employees and Subconsultants of the foregoing contract terms that apply to them, and Consultant advise such employees and Subconsultants to report to Consultant any apparent or actual breaches. Consultant shall relay any such reports to Caltrans Contact Manager.
2. Consultant Work Hours and Availability
a) Unless otherwise specified in the Task Order, or directed by the Caltrans Contract
Manager, the normal workday shall be Monday through Friday, from 7 a.m. to 4 p.m.
or any combination of five (5) consecutive days which may include Saturday and/or Sunday, and the normal workweek shall consist of forty (40) hours. If Saturday and/or Sunday is part of a regular work week as determined by Caltrans, then the Saturday and/or Sunday work shall be treated as work performed on a regular workday, and no overtime shall be paid for the first eight (8) hours on Saturday or Sunday. Consultant
Contract Manager shall be responsible for providing Consultant personnel who can satisfy the requirements set forth in this Contract.
b) If Caltrans determines that the Consultant’s services and work product need to be received outside of normal business hours (including instances where receipt of services is required to avoid danger to life or property), the Consultant may be directed to provide its services and work product during specific hours during the week (including hours that are outside of normal business hours). Night work may be required on project services. Any shift differential rate pay for prevailing wage tasks shall be reimbursed in accordance with the applicable Department of Industrial Relations (DIR) determination.
c) It is anticipated that variations in the Caltrans' construction contract activities of the
Structure Construction Engineering and Inspection Support services Contract activities covered under this Contract will occur. During the Contract period, the Caltrans Contract Manager or designee may ask the Consultant Contract Manager to reassign Consultant employees from a project or an office with low activity to assist on another project or office with high activity. The Consultant Contract Manager will be notified at least two (2) working days prior to this reassignment.
d) The Consultant’s typical workday(s) shall include, but not be limited to, working in conjunction, in coordination, and in cooperation with all of the following:
i. Caltrans Contract Manager
ii. Caltrans Task Order Manager
iii. Caltrans Resident Engineer including Construction Inspection Staff and with other Caltrans Functional Units as needed
iv. Other federal, state, and/or local Agencies such as Bay Area Toll Authority (BATA) , San Francisco Bay Regional Water Quality Control Board
e) The Consultant shall obtain approval from the Caltrans facility manager prior to conducting activities within a maintenance station or other Caltrans facility.
f) Unless specified in each Task Order or notified otherwise by the Caltrans Contract Manager, the Consultant must begin the required work within five (5) working days after receiving a fully executed Task Order. Once the work begins, the work must be prosecuted diligently until all required work has been completed to the satisfaction of the Caltrans Contract Manager.
g) Overtime may be required. However, overtime must be worked only when directed in writing by the Caltrans Contract Manager, Caltrans structure representative, or specifically required by the Task Order.
h) The SFOBB Construction Contractor’s operations may be restricted to specific hours during the week. These restricted hours must become the normal workday for the Consultant’s personnel.
3. Assigned Personnel on Task Orders
a) In responding to Caltrans’ Task Order and in consultation with the Caltrans Contract Manager, the Consultant Contract Manager shall identify the specific individuals proposed for the task and their job assignments. The Consultant shall provide documentation that proposed personnel meet the appropriate minimum qualifications as required by this Contract.
b) The Consultant’s personnel shall be assigned to and remain on specific Caltrans project services/deliverables until completion and acceptance of the project services /deliverables by Caltrans. Personnel assigned by the Consultant shall be available at the start of a Task Order and after acceptance of the project/deliverable by Caltrans.
c) After the Caltrans Contract Manager’s approval of the Consultant’s personnel proposal and finalization of a Task Order, the Consultant may not add, delete or substitute personnel without the Caltrans Contract Manager’s prior written approval.
d) Resumes containing the qualifications and experience of the Consultant’s and
Subconsultant’s personnel, which include existing and additional personnel, and copies of their minimum required certifications, shall be submitted to the Caltrans Contract Manager for review before assignment on a project or Task Order. The resume and copies of current certification for each candidate shall be submitted to the Caltrans Contract Manager within one (1) week of receiving the request.
e) The Caltrans Contract Manager or designee may interview the Consultant’s personnel for the qualifications and experience. The Caltrans Contract Manager’s decision to select the Consultant’s personnel shall be binding to the Consultant and its Subconsultants. The Consultant shall provide adequate qualified personnel to be interviewed by the Caltrans Contract Manager within one (1) week of receiving the request.
f) The Caltrans Contract Manager or designee shall evaluate the adequacy (quality and quantity) of the work performed by the Consultant’s personnel, and determining whether the deliverables satisfy the acceptance tests and criteria. The Caltrans Contract Manager may reject any Consultant personnel who are determined by the Caltrans Contract Manager to lack the minimum qualifications. If at any time the level of performance is below expectations, the Caltrans Contract Manager may direct the Consultant to immediately remove Consultant personnel from the project specified in a Task Order and request that the Consultant provide another qualified person be assigned as needed. The Consultant personnel shall meet the qualifications required by this Contract for performance of the work as demonstrated by a resume and copies of current certifications submitted by the Consultant. Consultant personnel shall receive prior written approval from the Caltrans Contract Manager. Invoices with charges for personnel not pre-approved by the Caltrans Contract Manager for work on the Contract and for each Task Order shall not be reimbursed.
g) The Consultant’s personnel shall be capable, competent, and experienced in performing the types of work in this Contract with minimal instruction. Personnel skill level should match the specific job classifications, as set forth herein or in the Consultant’s Cost Proposal, Attachment 2 and task complexity. The Consultant’s personnel shall be knowledgeable about, and comply with, all applicable federal, state, and local laws and regulations.
4. Personnel Substitutions or Additions
a) In this Contract is a list of proposed personnel classifications for which services are anticipated to be needed by Caltrans during the term of this Contract and as depicted on the proposed Consultant’s Organization Chart and the Consultant’s cost proposal - Attachment 2 with specific rates of compensation. Caltrans reserves the right to add and/or delete personnel classifications from this list.
b) Pursuant to Exhibit D - Special Terms and Conditions, Section 1 - Amendment (Change in Terms), the Consultant is required to submit a written Personnel Request form with justifications and obtain the Caltrans Contract Manager’s prior written approval for any substitutions, additions, alterations, or modifications to the Consultant’s originally proposed personnel and project organization, as depicted on the proposed Consultant’s Organization Chart or the Consultant’s cost proposals - Attachment 2. Additions of personnel is only permitted from the original firms proposed in Consultant’s Organization Chart or in the Consultant’s cost proposal - Attachment 2, or as approved by the Caltrans Contract Manager.
c) The…