Station 2 Expansion - Contract No. 2026-01 Bid Specifications
This document comprises the bidding specifications and instructions for a construction contract issued by the Imperial Volunteer Fire Department, a volunteer entity located in Findlay Township, Allegheny County, Pennsylvania. The project involves demolition and replacement of the existing vehicle garage at Imperial Volunteer Fire Department Station 2. Sealed bids will be received electronically via the PennBid Program until Tuesday, July 7, 2026, at 1:00 P.M. local time. A non-mandatory pre-bid conference is scheduled for Wednesday, June 24, 2026, at 10:00 A.M. at the Imperial Volunteer Fire Department Substation located at 28 Matchette Road, Clinton, PA 15026. The expected project duration is 210 calendar days for substantial completion and 270 calendar days for final payment readiness. Bidding documents are available at no cost through the PennBid website (pennbid.bonfirehub.com), and all official notifications and addenda will be distributed exclusively through this platform.
The contract requires bidders to submit lump-sum pricing across multiple work categories, including HVAC, plumbing, electrical, demolition, site work, concrete work, pre-engineered building construction, modifications to existing structures, general conditions, and miscellaneous work. Bid security equal to 10 percent of the total bid price in the form of a bid bond is required. The project is subject to the Pennsylvania Prevailing Wage Act of 1961 and compliance with various federal and state requirements, including Title VI of the Civil Rights Act of 1964, the Department of Labor Equal Opportunity Clause, Executive Orders 11625 and 12138, Section 504 of the Rehabilitation Act of 1973, and the Americans with Disabilities Act of 1990. Bidders must meet Allegheny County's Minority and Female Business Enterprise goals of 13 percent MBE and 2 percent WBE participation, as well as 5 percent Veteran Owned Small Businesses participation as established by Allegheny County Ordinance #6867-12. All steel products used in the project must be manufactured in the United States in accordance with the Steel Products Procurement Act. The owner reserves the right to reject any or all bids and waive minor bid informalities. Bids will remain open for 90 days following the bid opening date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-G3135-01 Released For Bid.pdf | ||
| 3-3135-01 2026-01 Addendum 1 06.11.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUED TO:
IMPERIAL VOLUNTEER FIRE DEPARTMENT
ALLEGHENY COUNTY, PENNSYLVANIA
BIDDING DOCUMENTS FOR
CONTRACT NO. 2026-01
STATION 2 EXPANSION
RELEASED FOR BID
JUNE 2026
Copyright © 2026 KLH Engineers, Inc., All Rights Reserved Worldwide. No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.
5173 Campbells Run Road
Pittsburgh, PA 15205
Telephone: (412) 494-0510
Fax: (412) 494-0426
E-mail: info@klhengineers.com
Ref. No. 3135-01
THIS PAGE LEFT INTENTIONALLY BLANK
Copyright © 2026 KLH Engineers, Inc.
All Rights Reserved Worldwide i 3135/2026-01
IMPERIAL VOLUNTEER FIRE DEPARTMENT
STATION 2 EXPANSION
TABLE OF CONTENTS
SECTION PAGE NO.
Advertisement ....................................................................................................................................... C-111
Instructions to Bidders ........................................................................................................................... C-200
Bid Form ................................................................................................................................................. C-410
Bid Bond (Penal Sum) ............................................................................................................................. C-430
Notice of Award ..................................................................................................................................... C-510
Agreement Between Owner and Contractor for Construction Contract (Stipulated Price) .................. C-520
Performance Bond ................................................................................................................................. C-610
Payment Bond ........................................................................................................................................ C-615
Warranty Bond ....................................................................................................................................... C-612
Notice to Proceed .................................................................................................................................. C-550
Application for Payment ........................................................................................................................ C-620
Certificate of Substantial Completion .................................................................................................... C-625
Notice of Acceptability of Work ............................................................................................................. C-626
Construction Schedule ........................................................................................................ Document 00650
General Conditions ................................................................................................................................ C-700
Supplementary Conditions .................................................................................................................... C-800
Work Change Directive .......................................................................................................................... C-940
Change Order ......................................................................................................................................... C-941
Field Order ............................................................................................................................................. C-942
Affidavit of Payment and Release of Liens ......................................................................... Document 00950
Acceptance of Final Payment and General Release............................................................ Document 00955
Consent of Surety Company to Final Payment ................................................................... Document 00960
TECHNICAL SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01000 – Project Description .................................................................................................. 01000-1
Section 01010 – Drawings Index ........................................................................................................ 01010-1
Section 01025 – Measurement and Payment ................................................................................... 01025-1
Section 01040 – Coordination............................................................................................................ 01040-1
Section 01041 – Supplemental Mechanical Conditions..................................................................... 01041-1
Section 01042 – Supplemental Construction Conditions .................................................................. 01042-1
Section 01090 – References ............................................................................................................... 01090-1
Section 01200 – Project Meetings ..................................................................................................... 01200-1
Section 01300 – Submittals................................................................................................................ 01300-1
Section 01501 – Construction Facilities ............................................................................................. 01501-1
All Rights Reserved Worldwide ii 3135/2026-01
Section 01551 – Barriers and Enclosures ........................................................................................... 01551-1
Section 01570 – Temporary Erosion and Sediment Control .............................................................. 01570-1
Section 01650 – Facility Startup/Commissioning .............................................................................. 01650-1
Section 01700 – Rights of Way .......................................................................................................... 01700-1
Section 01740 – Clean Up of Work Site ............................................................................................. 01740-1
Section 01741 – Dust and Mud Control ............................................................................................. 01741-1
Section 01800 – Substantial Completion ........................................................................................... 01800-1
GENERAL CONSTRUCTION/BUILDING TECHNICAL SPECIFICATIONS
Section 024100 – Demolition ........................................................................................................... 024100-1
Section 030000 – Concrete .............................................................................................................. 030000-1
Section 030100 – Concrete Work .................................................................................................... 030100-1
Section 031000 – Concrete Formwork ............................................................................................ 031000-1
Section 032000 – Concrete Reinforcement ..................................................................................... 032000-1
Section 033000 – Cast-In-Place Concrete ........................................................................................ 033000-1
Section 036200 – Non-Shrinking Grout ........................................................................................... 036200-1
Section 042200 – Concrete Unit Masonry ....................................................................................... 042200-1
Section 054000 – Cold-Formed Metal Framing ............................................................................... 054000-1
Section 061000 – Rough Carpentry ................................................................................................. 061000-1
Section 072116 – Blanket Insulation for Metal Buildings ................................................................ 072116-1
Section 072119 – Foamed-In-Place Masonry Wall Insulation ......................................................... 072119-1
Section 074113 – Standing-Seam Metal Roof Panels ...................................................................... 074113-1
Section 077253 – Snow Guards ....................................................................................................... 077253-1
Section 080671 – Door Hardware Schedule .................................................................................... 080671-1
Section 085100 – Aluminum Window ............................................................................................. 085100-1
Section 086300 – Overhead Doors .................................................................................................. 086300-1
Section 087100 – Door Hardware .................................................................................................... 087100-1
Section 089000 – Aluminum Operable Louver ................................................................................ 089000-1
Section 089100 – Steel Fixed Louver ............................................................................................... 089100-1
Section 096500 – Rubber Wall Base ................................................................................................ 096500-1
Section 097200 – Wall Coverings ..................................................................................................... 097200-1
Section 099100 – Painting ............................................................................................................... 099100-1
Section 133419 – Metal Building System ......................................................................................... 133419-1
Section 220000 – Plumbing Master ................................................................................................. 220000-1
Section 220517 – Sleeves and Sleeve Seals for Plumbing Piping ..................................................... 220517-1
Section 220523 – Duty Valves for Plumbing Piping ......................................................................... 220523-1
Section 220719 – Plumbing Piping Insulation .................................................................................. 220719-1
Section 221426 – Trench Drain ........................................................................................................ 221426-1
Section 224329 – Tankless Water Heater ........................................................................................ 224329-1
Section 230000 – Mechanical Master .............................................................................................. 230000-1
Section 230593 – Testing, Adjusting, and Balancing for HVAC ........................................................ 230593-1
Section 230713 – Duct Installation .................................................................................................. 230713-1
Section 233100 – HVAC Ducts and Castings .................................................................................... 233100-1
Section 233400A – Commercial Ceiling Fans .................................................................................233400A-1
Section 233400B – Roof Exhaust Fan ............................................................................................. 233400B-1
Section 233700 – Air Outlets and Inlets........................................................................................... 233700-1
Section 235400 – Furnaces .............................................................................................................. 235400-1
All Rights Reserved Worldwide iii 3135/2026-01
Section 235523 – Infrared Radiant Heaters ..................................................................................... 235523-1
Section 236213 – Packaged Air-Cooled Refrigerant Compressor and Condenser Units ................. 236213-1
Section 260500 – Electrical Work – General .................................................................................... 260500-1
Section 260506 – Control Panels/Devices – Furnished with Equipment ......................................... 260506-1
Section 260519 – Wires, Cables, and Connectors ........................................................................... 260519-1
Section 260526 – Grounding............................................................................................................ 260526-1
Section 260529 – Supporting Devices .............................................................................................. 260529-1
Section 260533 – Raceways ............................................................................................................. 260533-1
Section 260544 – Underground Ducts and Raceways for Electrical Systems .................................. 260544-1
Section 260553 – Electrical Identification ....................................................................................... 260553-1
Section 260630 – Utility Service ...................................................................................................... 260630-1
Section 260800 – Electrical Field Acceptance Tests ........................................................................ 260800-1
Section 260919 – Lighting Contactors ............................................................................................. 260919-1
Section 262416 – Panelboards ......................................................................................................... 262416-1
Section 262716 – Cabinets, Boxes, and Fittings .............................................................................. 262716-1
Section 262726 – Wiring Devices ..................................................................................................... 262726-1
Section 262913 – Motor Controllers................................................................................................ 262913-1
Section 263213 – Engine Generator ................................................................................................ 263213-1
Section 264313 – Surge Protective Devices ..................................................................................... 264313-1
Section 265600 – Exterior Lighting .................................................................................................. 265600-1
Section 265601 – Interior Lighting ................................................................................................... 265601-1
SITE TECHNICAL SPECIFICATIONS
Section 02000 – General Requirements ............................................................................................ 02000-1
Section 02010 – Subsurface Exploration ........................................................................................... 02010-1
Section 02055 – Removal and Abandonment of Existing Facilities ................................................... 02055-1
Section 02075 – Demolition and Removal of Sidewalk, Curbs, and Bituminous Pavement .............. 02075-1
Section 02100 – Site Preparation ....................................................................................................... 02100-1
Section 02105 – Pre-Construction Video Taping ............................................................................... 02105-1
Section 02120 – Demolition ............................................................................................................... 02120-1
Section 02144 – Dewatering .............................................................................................................. 02144-1
Section 02151 – Shoring .................................................................................................................... 02151-1
Section 02200 – Earthwork ................................................................................................................ 02200-1
Section 02220 – Excavating, Backfilling and Compacting for Utilities ............................................... 02220-1
Section 02370 – Soil Surface Erosion Control .................................................................................... 02370-1
Section 02505 – Bituminous Paving – Trench Restoration ................................................................ 02505-1
Section 02511 – Stone and Bituminous Concrete Drives and Parking Areas .................................... 02511-1
Section 02520 – Concrete Curbs, Walks, Ramps and Driveways ....................................................... 02520-1
Section 02601 – Manholes ................................................................................................................. 02601-1
Section 02602 – Utility Line Cast-In-Place ......................................................................................... 02602-1
Section 02721 – Storm Sewers .......................................................................................................... 02721-1
Section 02723 – Pipe Underdrains ..................................................................................................... 02723-1
Section 02725 – Site Drainage and Sewage Piping ............................................................................ 02725-1
Section 02830 – Fences and Gates .................................................................................................... 02830-1
Section 02930 – Lawns and Grasses .................................................................................................. 02930-1
Section 02940 – Landscape Plantings ................................................................................................ 02940-1
Section 03000 – General .................................................................................................................... 03000-1
All Rights Reserved Worldwide iv 3135/2026-01
Section 03100 – Concrete Formwork ................................................................................................ 03100-1
Section 03200 – Concrete Reinforcement ......................................................................................... 03200-1
Section 03300 – Cast-In-Place Concrete ............................................................................................ 03300-1
Section 03600 – Non-Shrinking Grout ............................................................................................... 03600-1
APPENDICES
Appendix A – Erosion and Sedimentation Control Narrative
Appendix B – Post-Construction Stormwater Management Report
Appendix C – Allegheny County Economic Development (ACED) State-Funded Projects Procurement
Packet
Appendix D – Geotechnical Exploration Report
PROJECT INFORMATION
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
ADVERTISEMENT FOR BIDS
IMPERIAL VOLUNTEER FIRE DEPARTMENT
FINDLAY TOWNSHIP, ALLEGHENY COUNTY, PA
STATION 2 EXPANSION
General Notice
Imperial Volunteer Fire Department (Owner) is requesting Bids for the construction of the following
Project:
Station 2 Expansion
Contract No. 2026-01
Sealed bids for the construction of the Project will be received electronically via the PennBid Program by the Imperial Volunteer Fire Department until Tuesday, July 7, 2026, at 1:00 P.M. local time.
The Project includes the following Work:
Work under Contract No. 2026-01 can be generally described as demolition and replacement of the existing vehicle garage at Imperial Volunteer Fire Department Station 2.
The Project has an expected duration of two hundred ten (210) days.
Obtaining the Bidding Documents
Information and Bidding Documents for the Project are available at no cost at PennBid:
pennbid.bonfirehub.com
Bidding Documents may be downloaded from the designated website. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website.
Pre-bid Conference
A non-mandatory pre-bid conference for the Project will be held on Wednesday, June 24, 2026, at 10:00
A.M. at Imperial Volunteer Fire Department Substation located at 28 Matchette Road, Clinton, PA 15026.
Instructions to Bidders.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Compliance is required with the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal
Opportunity Clause (41 CFR 60 -1.4); Executive Order 11625 (Utilization of Minority Business
Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with
Section 504 of Rehabilitation Act of 1973 and Americans with Disabilities Act of 1990; the Allegheny
County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran Owned Small Businesses.
Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the
Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01 religion, sex, national origin, or handicap. Each contractor is required to meet the requirements of Public
Works Employment Verification Act, Act 127 of 2012.
Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States.
The Owner herby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received.
Except as otherwise provided by law, no bidder may withdraw its bid for ninety (90) days after the Bid
Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of ninety (90) days after the Bid Due Date.
This Advertisement is issued by:
Owner: Imperial Volunteer Fire Department
By: Bob Sterner
Title: Member of the Board of Directors
+ + END OF ADVERTISEMENT FOR BIDS + +
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 1 of 2
3135/2026-01
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Steel Procurements Act
Article 23— Labor Requirements
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
TOC Page 2 of 2
3135/2026-01
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 “Bidding documents are available at no cost via the PennBid Program
(https://pennbid.bonfirehub.com)”
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete unless an omission is blatant. Registered plan holders will receive Addenda issued by
Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding
Documents are available, such documents will be made available to the Bidders as Electronic
Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in
Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01 that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the
Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the
Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain
Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of
Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in
Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data. Call Before You Dig! Pennsylvania State law requires a three (3) business day notice (does not include holidays or weekends), but no more than ten (10) business days prior to the start of excavation and ten (10) business day notice, but not more than ninety (90) business days in Design Stage. Call 8-1-1 or 1-800-242-1776, PA One Call
Serial No. N/A. The Designer has obtained this Serial Number as required by PA Act 287, as amended.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit, the Bidder must not disturb any ongoing operations at the
Site.
A Site visit is scheduled following the pre-bid conference.
B. Bidders visiting the Site are required to arrange their own transportation to the Site.
C. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the Owner. Bidder must conduct the required Site visit during normal working hours.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
D. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
E. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
F. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the
Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the
Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the
Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the
“Messages/Vendor Discussions” feature in PennBid no later than seven (7) days prior to the date for receipt of bids.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract
Documents unless set forth in an Addendum that expressly modifies or supplements the Contract
Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the
General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required
Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if
Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the
Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial
Completion, or completion of the Work in readiness for final payment, are set forth in the
Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by
Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01 substitute unless written request for approval has been submitted by Bidder and has been received by Engineer within 10 days of the issuance of the Advertisement for Bids or invitation to
Bidders. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders.
Bidders cannot rely upon approvals made in any other manner.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of
“or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening.
11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such
Subcontractor or Supplier if Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of
Awards is given, request apparent Successful Bidder to submit an acceptable substitute, without an increase in Bid price.
11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in
Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents for Reference. Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab).
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the
Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the
Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint ventures in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.09 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.10 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.11 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the
Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
12.12 The Bid must be accompanied by the completed forms in Appendix C – ACED State-Funded
Projects Procurement Packet.
12.13 Bidders are required to make a good faith effort to meet the ACED M/W/DBE/VOSB contract goals of 13% MBE, 2% WBE, and 5% VOSB participation in accordance with the Procurement
Packet included as Appendix C within these specifications.
ARTICLE 13—BASIS OF BID
13.01 Lump Sum
A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.
13.02 Allowances
A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for
Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General
Conditions.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01
ARTICLE 14—SUBMITTAL OF BID
14.01 Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com/) by the date and time indicated in the invitation for Bids along with Bid security and other documents required to be submitted as identified herein.
14.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
14.03 In addition to completing the Pricing Section via PennBid, the Bid Form for Construction Contracts must be completed, signed by an Authorized signatory of the Bidder, scanned to pdf and uploaded to the PennBid site along with all supporting documentation. In the event a discrepancy exists between the uploaded pdf Bid Form and the Pricing Section, the Pricing Section shall supersede.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 A Bid may be withdrawn or modified at any time within PennBid prior to the due date and time identified in the invitation to bid.
15.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 A summary of bids received will be issued via a Public Notice on PennBid shortly after bid opening, the time of which is listed in the Invitation to Bid. It should be noted that bid results are subject to further review and should not be constructed as issuance of an award.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor
Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the
Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
3135/2026-01 the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then
Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the
Bid Form or prior to the Notice of Award.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTIC…