This is a Schedule of Values document for a construction project involving the State of Utah and Salt Lake County for the Draper Library HVAC AHU-1 Replacement (Project ID: LIB131605). The document serves as a bidding template requiring contractors to itemize labor, materials, and costs across multiple work divisions including Payment & Performance Bond, Insurance & Builder's Risk, and Division 01-General Conditions. The schedule accommodates a base bid and three alternate bid options (Alternate 1, Alternate B, and Alternate C), with all bidders required to specify their company name and ensure that submitted totals match those entered into the Online Solicitation System (OSS).

The document as provided contains no populated pricing data, as all line items and totals display zero values. Bidders are responsible for completing this form with their actual cost estimates for each division of work and submitting it in conjunction with their proposal to the OSS. The schedule serves as the official pricing document and must reconcile with all bids submitted through the online system to ensure accuracy and compliance with bidding requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: LIB131605 Draper Library HVAC AHU-1 Replacement
Divisions of WorkBase BidAlternate 1Alternate 2Alternate 3
(Specify entire work scope; examples are listed below)Alternate 1Alternate BAlternate CTotal
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance & Builder's Risk$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________