1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- SLCo PAR127552 Fairmont Aquatics RTU Replacement - CONST
- Issued by
- Salt Lake County, Utah
About this file
This is a Schedule of Values document for a construction project submitted to Salt Lake County, Utah for the Fairmont Aquatics RTU Replacement project (PAR127552). The project involves replacing air handling units (RTU) on the roof of the Salt Lake County Fairmont Aquatics Center, with work to be coordinated with a separate re-roofing project. The Schedule of Values is a required bid submission form that outlines the breakdown of contract costs across various divisions of work, including Payment and Performance Bond, Insurance and Builder's Risk, and Division 01-General Conditions, along with provisions for a base bid and three alternates (Alternate 1, Alternate 2, and Alternate 3, with additional alternates labeled B and C). Bidders are required to enter line-item costs for each division of work and provide totals that must match amounts previously submitted in the Online Solicitation System (OSS).
The Schedule of Values form presented contains no populated cost data, as all line items and totals display zero values. This template requires the bidding company to complete the document with detailed cost breakdowns and certify that the base bid total and each alternate total match the corresponding amounts submitted through the OSS. The document serves as the official record of how the contractor proposes to allocate contract value across the various work divisions and must be submitted as part of the bid package to Salt Lake County for evaluation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | |||||||
| Schedule Of Values | |||||||
| Project: PAR127552 Fairmont Aquatics RTU Replacement | |||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | |||
| (Specify entire work scope; examples are listed below) | Alternate B | Alternate C | Total | ||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .