1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SLCo FAC134232 Adult Detention Center Roof Top Unit Replacement - CONST
Solicitation number
SLCo FAC134232 Adult Detention Center Roof Top Unit Replacement - CONST
Issued by
Utah

About this file

This is a Schedule of Values document for a construction project issued by Salt Lake County, Utah, for FAC134232 Adult Detention Center Roof Top Unit Replacement. The project involves replacing all roof top units (RTUs) according to specified plans and specifications. The Schedule of Values form is structured to itemize costs across multiple divisions of work, including Payment and Performance Bond, Insurance and Builder's Risk, and Division 01-General Conditions, with columns provided for a base bid and three alternates (Alternate 1, Alternate B, and Alternate C). Bidders are required to complete this document by entering their proposed costs for each line item and ensuring that the base bid total matches the amount submitted in the Online Solicitation System (OSS), as well as confirming that each alternate total corresponds to its respective OSS submission.

The document does not contain specific pricing information, as all values shown are blank or zero placeholders awaiting bidder input. No set-asides, incumbent information, funding sources, or other financial details are indicated in this Schedule of Values form. The form requires bidders to identify their company name and submit the completed document as part of their bid package, with the totals serving as reconciliation points between the detailed Schedule of Values and the summary pricing entered into the Online Solicitation System.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: FAC134232 Adult Detention Center Roof Top Unit Replacement
Divisions of WorkBase BidAlternate 1Alternate 2Alternate 3
(Specify entire work scope; examples are listed below)Alternate 1Alternate BAlternate CTotal
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance & Builder's Risk$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________

Sheet2

Sheet3

File details come from the government source that posted it. Updated .