1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- SLCo FAC134232 Adult Detention Center Roof Top Unit Replacement - CONST
- Issued by
- Utah
About this file
This is a Schedule of Values document for a construction project issued by Salt Lake County, Utah, for FAC134232 Adult Detention Center Roof Top Unit Replacement. The project involves replacing all roof top units (RTUs) according to specified plans and specifications. The Schedule of Values form is structured to itemize costs across multiple divisions of work, including Payment and Performance Bond, Insurance and Builder's Risk, and Division 01-General Conditions, with columns provided for a base bid and three alternates (Alternate 1, Alternate B, and Alternate C). Bidders are required to complete this document by entering their proposed costs for each line item and ensuring that the base bid total matches the amount submitted in the Online Solicitation System (OSS), as well as confirming that each alternate total corresponds to its respective OSS submission.
The document does not contain specific pricing information, as all values shown are blank or zero placeholders awaiting bidder input. No set-asides, incumbent information, funding sources, or other financial details are indicated in this Schedule of Values form. The form requires bidders to identify their company name and submit the completed document as part of their bid package, with the totals serving as reconciliation points between the detailed Schedule of Values and the summary pricing entered into the Online Solicitation System.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section 2 - Document 3.0 | ||||||||
| Schedule Of Values | ||||||||
| Project: FAC134232 Adult Detention Center Roof Top Unit Replacement | ||||||||
| Divisions of Work | Base Bid | Alternate 1 | Alternate 2 | Alternate 3 | ||||
| (Specify entire work scope; examples are listed below) | Alternate 1 | Alternate B | Alternate C | Total | ||||
| Payment & Performance Bond | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Insurance & Builder's Risk | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Division 01-General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Totals (Enter in OSS) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS). |
| The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS) |
| Name of Company Bidding ________________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .