1-140FGA25Q0019_Specifications_Redacted.pdf
PDF 207 KB Posted
- Attached to
- AK-KENAI NWR-GAOA-BULK GRAVEL
- Solicitation number
- 140FGA25Q0019
About this file
The document is a Specifications file for the Dolly Varden Campground Road Repair project, solicitation number 140FGA25Q0019, issued by the Department of the Interior Fish and Wildlife Service. The project requires 2,254 tons of gravel materials, specifically 840 tons of D1 Gravel, 1,400 tons of Pit Run Screened Fill, and 14 tons of Crushed Gravel, to be delivered to the Dolly Varden Campground on Swanson River Road in Sterling, Alaska.
The scope of work involves rehabilitating 0.5 miles of gravel road in "fair" condition, focusing on improving drainage, addressing vegetation, blading, wayfinding, surfacing, and evaluating fish and wildlife passage. The campground, constructed in 1963, has 13 sites with fire pits and concrete picnic tables. Delivery will be coordinated with the technical point of contact, with materials to be delivered via rear-load dump truck, and the Fish and Wildlife Service will provide the unloading area and personnel with equipment to stack or displace the material.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-140FGA25Q0019_QuoteSchedule.docx | DOCX document | |
| 3-140FGA25Q0019_Notice_to_Quoters.pdf | ||
| Sol_140FGA25Q0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Project: Dolly Varden Campground Road Repair
Item: Gravel Material Solicitation Number: 140FGA25Q0019
1. Product Features
Road base material and delivery requested to Dolly Varden Campground, located on Swanson River Rd. in Sterling AK.
Total amount of material requested: 2254 tons.
• D1 Gravel 840 tons
• Pit Run Screened Fill 1400 tons
• Crushed Gravel 14 tons
2. Scope of Work
Materials needed to accomplish the GAOA project to rehab the Dolly Varden campground road and camp sites. Project is to rehab the 0.5 miles of the gravel at Dolly Varden which is rated in "fair" condition. Project improves drainage, addresses vegetation, blading, wayfinding, surfacing, and evaluates fish and wildlife passage along the corridor. Includes design details for resetting culverts, improving drainage, and prescribing road profile.
• Asset# 10035125 CAMPGROUND DOLLY VARDEN CAMPGROUND (OWNED BY FWS
(G)) 1.0 EACH
Notes:
(1) Supports outdoor recreation, public access, or habitat.
(2) 13 Campsites with fire pits and concrete picnic table.
Description:
(1) Dimensions: 13.0 Number of Sites
(2) Constructed Material: Gravel
(3) Geo Coords: 60.700485 Start Latitude / -150.798846 Start Longitude
(4) Constructed Date: 04/01/1963
(5) Electric Meter: No Electricity / No Power
(6) Water Meter: Not Metered
(7) Historic Criteria: 5 Not Evaluated
(8) Historic Preservation Recommendation: ____
(9) Disable Access: No
(10) Public Use: Yes
3. Delivery
Delivery schedule will be coordinated with the technical POC provided below. The pit run delivery first followed by the D1 and lastly the crushed gravel. The FWS will be responsible for providing the unloading area and personnel on the ground with equipment to stack or displace the material. Vendor will need to use rear load dump truck to deliver materials due to small area of unload.
File details come from the government source that posted it. Updated .