This is a Request for Proposals (RFP) issued by Vineyard City, Utah for the Construction Contract known as the Slide Hill at Grove Park, located at 350 North 100 East in Vineyard. The project involves constructing a slide hill feature within Grove Park, including a graded hill, asphalt trail, two embankment slides, soft-fall surfacing, grass sod, artificial turf, safety rail, landscaping, and irrigation system repairs. The RFP was released on July 1, 2025, with proposals due by July 31, 2025, at 5:00 PM (MST) through the U3P Utah Public Procurement - Bonfire Interactive Portal. Project construction is anticipated to commence in August 2025, with substantial completion expected in October 2025.
Vineyard City has budgeted $280,000 for the project, funded by a Utah County grant and general fund. The selected contractor will be responsible for all aspects of project design, including meetings, preliminary engineering, bidding assistance, and construction services. Proposers must demonstrate experience with at least five similar park and playground structure projects since 2017 and provide references. The evaluation will be based on a component-based system with the following weights: Qualifications & Experience (30%), Project Approach & Schedule (30%), Proposed Project Budget (30%), and Local References & Past Performance (10%). The city reserves the right to award the contract based on initial proposals and may conduct interviews with selected firms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Slides Measurements.pdf | ||
| 3-Slides Measurements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals:
Construct Slide Hill at Grove Park RFP No. 2025-15-103
Date: July 2, 2025
Reply to: Justine Marshall, Project Manager 125 S. Main Street Vineyard, Utah 84057
Pre-Proposal Meeting: Not Required
Available on Request by Contractor
Proposal Deadline: Thursday, July 31, 2025, 5:00 PM (MST)
Electronic Submission via U3P Utah Public Procurement – Bonfire Interactive Portal
The City of Vineyard invites qualified contractors to submit proposals for the Construction Contract known as the Slide Hill at Grove Park, located at Vineyard Grove Park (400 N & Main Street), Vineyard, Utah 84059 (Attachment A ‘Site Location Map’). The Work generally consists of, but is not limited to:
• Constructing a graded hill feature and asphalt trail
• Furnishing and installing two (2) embankment slides, soft-fall surfacing, grass sod, artificial turf, and safety rail
• Planting trees and shrubs, repairing irrigation and landscaping systems
• All appurtenant work, materials, equipment, and services as detailed in the Contract
Documents
Project construction is anticipated to commence in August 2025.
Pre-Proposal Meeting There will be no formal Pre-Proposal Meeting unless one is requested. To request a meeting, please email engineering@vineyardutah.gov. Site meetings may be scheduled between Monday, June 30, 2025 through Monday, July 21, 2025.
Proposers are welcome to tour the site independently at any time. However, do not open, expose, or interfere with any utilities without prior written approval from the City.
Questions & Communications All inquiries regarding the project or proposal requirements must be submitted through the U3P Utah Public Procurement – Bonfire Interactive Portal. Direct contact with Vineyard City staff outside of these channels is not permitted.
Interested firms are responsible for regularly checking the U3P Utah Public Procurement - Bonfire Interactive Portal website for updates, including any addenda related to the Request for Proposal
(RFP)
mailto:engineering@vineyardutah.gov
Proposers are required to provide contact information and professional licensing verification (Attachment B ‘Bidder Contact Information & Professional Licensing Verification’) and a separate cost breakdown (Attachment C ‘Bid Schedule’) for fees associated with bidding and construction management of the project. Site Construction Plans are attached (Attachment D ‘Site Construction Plans’). Additionally, each proposer must demonstrate that, since 2017, it has successfully completed at least five (5) similar park and playground structure projects. References and contact information for each project owner must be provided.
The preparation of bidding documents should be included in the project costs, as well as assistance in awarding bids to the selected contractor and addressing questions posted during the bid process. Assume at least one site visit during the pre-construction phase, and two site visits during construction.
The total proposal should not exceed fifteen (15) pages, with any supplemental information placed in an appendix if necessary. The fee schedule should be included in the 15-page document.
Proposals must be submitted by Thursday, July 31, 2025, at 5:00 PM (MST) electronically through the Utah Public Procurement Place (U3P) – Bonfire Interactive Portal. Proposals submitted in any other format will not be considered. Incomplete proposals shall not be considered. Late submissions will not be accepted. Any necessary revisions to the RFP will be communicated via addenda to all registered proposers through the U3P – Bonfire Interactive Portal. Inquiries should be made to Justine Marshall at engineering@vineyardutah.org or 801-266-1929.
The City reserves the right to award the contract based solely on the initial proposals, with or without further discussions. Proposers are encouraged to submit their most competitive price and service offers.
If deemed necessary, the City may select a few firms for additional interviews and presentations based on cost, quality, and experience. Selected firms should be prepared to commence work within 14 calendar days after the Notice to Proceed is provided by the City.
This RFP aims to provide sufficient information for firms to prepare their proposals in compliance with minimum requirements but does not restrict the inclusion of additional relevant details. Firms are encouraged to enhance their proposals beyond the specified requirements. The City is not responsible for any costs incurred in the preparation or presentation of proposals. The City retains the right to cancel or modify this solicitation at its discretion.
All contractual provisions must adhere to applicable state and local laws. All work shall conform to the requirements of the Construction Specifications and Drawings, Contract Documents, Vineyard City Standards, Utah Chapter APWA 2017 edition, Federal, State, and Local Permit requirements, and easement of use of property agreement or conditions. In case of conflict, the Contractor shall notify the Engineer for clarification and directions on which requirement to follow.
mailto:engineering@vineyardutah.org
RFP No. 2025-15-103
We look forward to reviewing your proposal and collaborating with the selected firm to achieve a successful project outcome. Please also note the division of costs related to engineering and design construction documents will be based on proportional amounts.
Sincerely, Justine K. Marshall, Vineyard City Project Manager
1. NOTICE TO PROFESSIONALS
Through this Request for Proposals (RFP), Vineyard City (hereinafter the ‘City’) is soliciting competitive sealed proposals from qualified contractors to submit proposals for the Construction Contract known as the Slide Hill at Grove Park, located at Vineyard Grove Park (350 N 100 E), Vineyard, Utah 84059. The City intends to compare and evaluate all eligible submittals and select the most qualified firm as outlined in Section 10 EVALUATION CRITERIA of this request. This is a Request for Proposals only and should not be interpreted as a solicitation for services or as a contract for services. Submittals should be comprehensive, concise, and directly responsive to the goals and format as outlined in this RFP.
2. BACKGROUND
Grove Park is Vineyard’s rapidly growing neighborhood park, serving families, kids, rollerbladers, and the occasional frisbee champion.
Vineyard City desires to construct the Slide Hill at Grove Park, located at Vineyard Grove Park (400 N & Main Street), Vineyard, Utah 84059. The Work generally consists of:, but is not limited to:
• Constructing a graded hill feature and asphalt trail
• Furnishing and installing two (2) embankment slides, soft-fall surfacing, grass sod, artificial turf, and safety rail
• Planting trees and shrubs, repairing irrigation and landscaping systems
• All appurtenant work, materials, equipment, and services as detailed in the Contract
Documents
Project construction is anticipated to commence in August2025.
The City has budgeted $280,000 for this project, funded by Utah County grant and general fund. The selected contractor will help turn our sloped turf into a safe, durable, and fun slide hill that meets IPEMA and ASTM playground safety standards.
This RFP is for all aspects of the project designs including:
• Meetings and project management
• Preliminary engineering
• Assistance during bidding
• Service during construction
3. SCOPE OF WORK
MEETINGS
Contractor should plan to have three (3) meetings with City Staff during the project. One of these meetings shall be the assumed site visit to verify ADA compliance and verify any potential construction issues.
Site Preparation & Earthwork
- Strip, stockpile, and re-grade existing slope to the lines shown on the drawings.
- Provide geotechnical testing per Appendix A and implement any recommendations.
Retaining Structures
- Furnish & install modular block wall or cast‐in‐place concrete retaining walls (min.
36″ tall at slide top).
- Provide wall drainage and backfill per geotech specs.
Slide Surface & Safety Features
- Supply and install a minimum 12′-wide slide trough system with UV-resistant polymer liner.
- Install safety curbs, catch zones, and fall‐attenuating surfacing (poured‐in‐place pad) at base.
ADA Access & Accessibility
- Construct a compliant access path from main park walkway to slide summit (max.
slope 1:12).
- Provide handrails, landing pads, and signage per ADAAG.
Site Utilities & Drainage
- Extend stormwater pipe to capture slide runoff; include energy dissipators.
- Coordinate with City on potable‐water spigot for future irrigation.
Landscaping & Site Restoration
- Reinstall topsoil, seed, or hydroseed disturbed turf areas.
- Install low‐water native shrubs along slide flanks per City’s xeriscape palette.
Closeout & Warranty
- As-built drawings, operation manuals, and warranties for all major components.
- One-year workmanship warranty; two-year plant survival warranty.
INSTRUCTIONS TO PROPOSERS
Project Timetable The following timetable has been established for this project.
Milestone Date RFP Issue July 1, 2025
Pre‐Proposal Walk-through Optional Upon Request (June 30, 2025 through July 21, 2025)
Questions Due Friday, July 18, 2025 at 5:00 PM (MST) Answers Issued (Addendum) Monday, July 21, 2025 at 5:00 PM (MST) Proposals Due Thursday, July 31, 2025 at 5:00 PM (MST) Award Notice Thursday, August 7, 2025 Construction Start August2025 Substantial Completion October2025
LATE PROPOSERS WILL NOT BE ACCEPTED.
Pre-Proposal Site Visit Proposers are strongly encouraged to visit the proposed site and examine the conditions prior to submitting their proposals (Attachment A: Site Location Map).
Proposals Evaluation The procedure for response to this RFP, evaluation of proposals, and selections of contractor is as follows:
• Interested entities will prepare and submit their proposals according to the Project timetable contained in Section 3 SCOPE OF WORK.
• Vineyard City and/or its representatives will evaluate all submitted proposals in accordance with the evaluation criteria as outlined in Section 10 EVALUATION CRITERIA.
• A Professional Services Agreement incorporating the provisions, terms and conditions of this RFP will be executed between the City and the selected contractor.
Proposal Submission – Electronic Submission Proposals will be received by the City until 5:00 p.m. (MST) on Thursday, July 31, 2025. Bids may only be submitted through the U3P – Bonfire Interactive Portal. The City will not accept any proposal submitted by facsimile, or any method other than that stated in the RFP. Any proposal that is received after the due date and time and through U3P – Bonfire Interactive Portal will not be accepted. If it becomes necessary to revise the RFP in whole or in part, an addendum will be provided to all proposers on record through U3P – Bonfire Interactive Portal.
4. PROPOSAL ORGANIZATION AND CONTENT
All requested documentation must be included. The proposal must include (in the following order):
Transmittal letter stating the respondent’s intent to participate in the contract. The letter of transmittal shall be on official business letterhead and shall include the following:
•A statement that the respondent will comply with all terms and conditions as indicated in the RFP.
• A statement indicating whether the respondent is a corporation or other legal entity.
• A statement of affirmative action that the respondent does not discriminate in its employment practices with regard to race, color, religion, age (except as provided by law), sex, marital status, political affiliation, national origin, or handicap.
• A certification statement to the effect that the person signing the proposal is authorized to do so, on behalf of the respondent.
• Names of the key contact persons with their title and telephone numbers. Also, indicate first and second back-up contact persons if the person signing the proposal is not available to take a call from the City.
• Name and complete mailing address of the respondent along with telephone number and email.
Comprehensive RFP response including all requested information and documentation, each subject section in the document shall be tabbed for quick reference. The proposed price shall be inclusive of all costs to complete the work, including, but not limited to, travel, equipment, testing, and plan reproduction costs. Proposals shall also include a copy of current billing rates for key personnel.
The proposal response shall include at a minimum the following sections:
• Cover Letter: Identify project, RFP number, contractor contact.
• Company Profile: License numbers, years in business, local references.
• Experience & Qualifications: 3–5 past playground or earthwork projects (photos + clients).
• Project Team: Resumes of PM, lead superintendent, key subcontractors.
• Approach & Schedule: Workplan, phasing, critical path, and proposed completion by
October 18, 2025.
• Fee Proposal: Lump-sum cost; broken out by major bid items.
• Forms & Attachments: Acknowledgment of Addenda, non-collusion affidavit, company insurance certificate.
Proposer Qualifications: This section should describe the proposer’s experience on similar projects, including the individual team members’ involvement on the specific projects described.
Project information, such as photographs and plans for the identified projects should be briefly included. Resumes of principals and other key staff scheduled to participate on the projects should be included. For all major participants, note the approximate full-time equivalent hours to be devoted to the project. Provide a minimum of three references, including name, address and telephone number, of persons who can attest to performance on relevant projects.
Work Plan: This section should describe the methodology and process proposed to be used to complete the scope of work defined in Section 3, including any potentially innovative or creative solutions for the project. It should address the proposed schedule for the Consultant’s work, identify any proposed strategies to be used to control costs, maximize construction economy and ensure operational effectiveness; describe outputs to be delivered; and identify advantages of the proposal to the City.
5. SUBMITTAL OWNERSHIP
All proposals (and the information contained therein) shall become the property of the City.
Proposers should carefully consider the items submitted before submitting items that would not be disposable to the proposer. Proposals submitted may be reviewed and evaluated by any persons at the discretion of the City. No proposal shall be returned to the respondent regardless of the outcome of the selection process. Cost for developing proposals and making proposal presentations are entirely the responsibility of the proposer and shall not be chargeable in any manner to the City.
CITY USE OF PROPOSAL IDEAS
The City reserves the right to use any or all ideas presented. Selection or rejection of the proposal does not affect this right.
6. QUESTIONS AND CLARIFICATIONS
Questions regarding this RFP should be submitted in writing through U3P – Bonfire Interactive Portal or be directed to:
Justine Marshall, Project Manager 125 S. Main Street Vineyard, Utah 84059 engineering@vineyardutah.gov Business Hours: M-Th 8am-5pm; F 8am-12Noon
7. ACCEPTANCE OF PROPOSAL
The City reserves the right to reject any or all proposals for any reason and/or waive minor irregularities when to do so would be in the best interests of the City. Minor irregularities are those which will not have a significant adverse effect on overall competition or performance levels. ii. The responding party agrees that the City may terminate this procurement procedure at any time, and the City shall have no liability or responsibility to the responding party for any costs or expenses incurred in connection with this RFP, or such party's response.
mailto:engineering@vineyardutah.gov
8. DISQUALIFICATION OF PROPOSAL
The City reserves the right to reject any and all proposals received by reason of this RFP, or to negotiate separately with any source whatsoever in any manner necessary to serve the best interests of the City. The City may or may not award a contract solely on the basis of this RFP and will not pay for the information solicited or obtained. The information obtained will be used in determining the proposal that best meets the City’s needs and is the most advantageous proposal received. No oral, telegraphic or telephonic proposals or modifications will be considered.
The occurrence of any of the following may result in the disqualification of a proposal:
• Failure to respond by the established submission deadline.
• Failure to completely answer all questions posed in the RFP.
• Use of any other type of form or format other than those indicated in the RFP.
• Failure to provide requested documentation at the time of proposal submission.
• Illegible responses.
• If the proposer adds any provisions reserving the right to accept or reject an award or to enter into a contract pursuant to an award, or any other unauthorized conditions, limitations or provisions.
• If the proposer is unable to evidence a satisfactory record of integrity.
• If the proposer is not qualified legally to contract
THE CITY RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS
9. WITHDRAWAL OF PROPOSAL
The proposal may be withdrawn upon request by the proposer, without prejudice, prior to, but not after, the time fixed to receive proposals.
10. EVALUATION CRITERIA
All requirements identified in this RFP must be satisfied to ensure that the proposal will qualify for consideration. The City desires to receive proposals from firms who can demonstrate operational and technical qualifications and capabilities.
All proposals will be evaluated by representatives of the City to identify the proposal that best meets the needs of the City as set forth in the RFP. A component-based system will be used to evaluate all proposals. A brief description of each component includes:
Qualifications and Experience
• Qualifications: This category represents an evaluation of the Consultant’s understanding of the Slide Hill at Grove Park project and the technical approach to be used to meet the City’s needs for site analysis and construction management.
• Key Personnel: This category deals with the experience level of key personnel proposed for this project and the proposer’s willingness and demonstrated ability to work effectively with the City. Experience relates to the overall assessment of the proposer’s assigned personnel. Evaluation will be based on resumes that are provided, direct contact with identified current and previous clients, and submitted information in response to the RFP.
Project Approach & Schedule This category represents an evaluation of the Consultant’s plan for managing the project including information acquisition, bidding, construction management, and construction inspection. This category will also evaluate the Consultant’s proposed start and completion date for the complete design.
Proposed Project Budget This category will evaluate the Consultant’s proposed fees. This category evaluates the clarity, completeness, and reasonableness of the proposed budget, including a detailed breakdown of costs for labor, materials, and other expenses. Consideration will be given to cost competitiveness, alignment with industry standards, efficient resource allocation, inclusion of reasonable contingencies, and overall value in balancing cost and quality to ensure project success.
Local References & Past Performance This category deals with the proposer’s performance on similar prior projects and the proposer’s willingness and demonstrated ability to work effectively with the City. Experience relates to the overall assessment of the proposer’s assigned personnel. Evaluation will be based on resumes that are provided, direct contact with identified current and previous clients, submitted information in response to the RFP, and the oral interviews.
Category Weight (%) Qualifications & Experience 30% Project Approach & Schedule 30% Proposed Project Budget 30% Local References & Past Performance 10%
11. GENERAL REQUIREMENTS
AMENDMENTS
No oral modifications or amendments to this RFP shall be effective. If it becomes necessary to revise any part of the RFP, an addendum will be provided through U3P – Bonfire Interactive Portal.
EMPLOYMENT STATUS VERIFICATION
Consultant shall register and participate in the Status Verification System and comply with Utah Code Annotated Section 63G-11-103 of the Identity Documents and Verification Act. Consultant shall, by contract, require its contractors, subcontractors, contract employees, staffing agencies, or any contractors regardless of their tier to register and participate in the Status Verification System and comply with Utah Code Annotated Section 63G-11-103 of the Identity Documents and Verification Act. Consultant shall also agree to abide by the Federal and State regulations pertaining to Equal Opportunity Employment that requires project participants not to discriminate against any employee or applicant for employment because of race, color, religion, sex, age, disability, or national origin. The City will make every effort to ensure all bidders are treated fairly and equally throughout the entire advertisement, review, and selection process.
COMPENSATION FOR SERVICES
The City intends to enter into a professional services contract covering the projects outlined in this RFP. Failure of the successful proposer to enter into a written contract may result in cancellation of the award. Compensation for the services rendered will be based on a task completion basis and may not exceed the fees provided in the response to this proposal.
NON-COLLUSION
Consultant shall guarantee that the proposal submitted is not a product of collusion with any other bidder and no effort has been made to fix the proposal price of any bidder or to fix any overhead, profit, or cost estimate of any proposal or its price.
OMISSIONS
Should the RFP not contain sufficient information in order for the firm to obtain a clear understanding of the services required by the City, or should it appear that the instructions outlined in the RFP are not clear or contradictory, the Consultant may obtain written clarification from the City at least 24 hours prior to the required time and date for proposal submission. The Consultant shall include a copy of the written clarification with its submission.
GOVERNING LAWS AND REGULATIONS
All work shall conform to the requirements of the Construction Specifications and Drawings, Contract Documents, Vineyard City Standards, Utah Chapter APWA 2017 edition, Federal, State, and Local Permit requirements, and easement of use of property agreement or conditions. In case of conflict, the Contractor shall notify the Engineer for clarification and directions on which requirement to follow.
Bidders on this Work will be subject to the applicable provisions of all federal rules, laws and regulations or orders.
List of Attachments:
Attachment A: Site Location Map ‘Slide Hill at Grove Park’ Attachment B: Bidder Contact Information & Professional Licensing Attachment C: Bid Schedule Attachment D: Site Construction Documents
Attachment A: Site Location Map ‘Slide Hill at Grove Park’
Attachment B: Bidder Contact Information & Professional Licensing Verification
The Bidder is as follows
Name:
Address:
Telephone number:
Facsimile number:
Tax identification number:
E-Mail Address:
Bidder holds license number _______________________________________, issued on the _____ day of ________________________, ________, by the Utah State Department of Commerce, Division of Occupational and Professional Licensing. Bidder is licensed to practice as a ___________________________ Contractor. License renewal date is the ___________ day of
The undersigned hereby acknowledges receipt of the following Addenda.
Attachment C: Bid Schedule
Item No.
Spec. No.
Approx.
Quantity
Item Unit
Item Description (with Unit Bid Price written in words)
Unit Bid Price
Amount
1 01 55 26 1 LS Traffic Control $ $
2 01 71 13 1 LS Mobilization and Demobilization $ $
3 31 23 16 540 CY Excavation $ $
4 31 11 00 1 LS Site Clearing $ $ 5 32 11 23 30 CY Untreated Base Course $ $
6 32 12 05 38 TON 1/2” Hot Mix Asphalt $ $
7 32 17 23 104 SF Concrete $ $
8 32 92 00 5,677 SF Turf And Grass $ $
9 32 84 23 1 LS Planting Irrigation $ $
10 32 93 13 17,917 SF Ground Cover (Native Grasses) $ $
11 32 98 00 1 LS Landscaping features (flowers) $ $
12 S 32 31 20 248 LF Railing $ $
32 92 00 32 93 13 32 98 00 S 32 92 10
319 LF Edging Material
14 S 32 31 30 2 EA Embankment Slides $ $
15 S 32 92 10 380 SF Soft Fall Surface $ $
Total Project Costs: $
Attachment D: Site Construction Documents
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
6/
/2 p:
\2
4-
- s lid e hi ll si te d es ig n\
0_ ca d\
4_ si te d es ig n\
-4 c0 -0
_c ov er p ag e.
dw g
R
EV
IS
IO
N S:
SHEET TITLE
SHEET NO.
Detailer
Designer
Checker
Av en ue P ro je ct N o.
OF
A ve nu e
C on su lt an ts
, I nc
S ou th R ed w oo d
R oa d, S ui te
T ay lo rs vi lle
, U T w w w
.a ve nu ec on su lt an ts .c om
Stamp
IL
C O
VE
R
S H
EE
T
VI
N
EY
AR
D C
IT
Y
S
LI
D E
H
IL
L A
T
VI
N
EY
A R
D G
R O
VE
PA
R K
N O
R
TH
E
AS
T , V
IN
EY
AR
D
, U
TA
H , 8
C0-0
-4
IL
LL
Xref .\XR_STAMP.dwg
PROJECT CONTACTS
OWNER
VINEYARD CITY
CIVIL ENGINEER
AVENUE CONSULTANTS
6605 REDWOOD ROAD
TAYLORSVILLE, UTAH 84123
CONTACT:
LINGKUN LI, P.E., PMP
PHONE: (385) 485-6987
EMAIL:LLI@AVENUECONSULTANTS.COM
SURVEYOR
CONSOR ENGINEERS
986 WEST 9000 SOUTH
WEST JORDAN, UTAH 84088
CONTACT:
JEFFREY C. STROMBERG, PLS
PHONE: (801) 495-4240
EMAIL:OFFICE@CONSORENG.COM
SLIDE HILL AT
VINEYARD GROVE PARK
350 NORTH 100 EAST, VINEYARD, UTAH 84059
400 N
M
AI
N S
T PROJECT
LOCATION
VICINITY MAP
NOT TO SCALE
230 N
W 24
E
E
370 N
330 N
250 N
425 N
460 N
Sheet List Table Sheet
Number Sheet Title Sheet Description
1 C0-0 COVER SHEET
2 C0-1 GENERAL NOTES
3 C0-2 LEGEND
4 C1-0 SITE PLAN
5 C1-1 SITE PLAN DETAILS
6 C2-0 GRADING PLAN
7 C3-0 EROSION CONTROL
8 C3-1 EROSION CONTROL DETAILS
06/20/2025
/2 p:
\2
4-
- s lid e hi ll si te d es ig n\
0_ ca d\
4_ si te d es ig n\
-4 c0 -0
_c ov er p ag e.
dw g
R
EV
IS
IO
N S:
SHEET TITLE
SHEET NO.
Detailer
Designer
Checker
Av en ue P ro je ct ve nu e
C on su lt an ts
, I nc
S ou th R ed w oo d
R oa d, S ui te
T ay lo rs vi lle
, U T w w w
.a ve nu ec on su lt an ts .c om
Stamp
IL
G
EN
ER
A
L N
O
TE
S
VI
N
EY
AR
D
C
IT
Y
S
LI
D E
H
IL
L A
T
VI
N
EY
A R
D G
R O
VE
PA
R K
N O
R
TH
E
AS
T , V
IN
EY
AR
D
, U
TA
H , 8
C0-1
-4
GOVERNING DISTRICTS AND AGENCIES
ALL IMPROVEMENTS TO BE CONSTRUCTED TO GOVERNING DISTRICT/ AGENCIES
STANDARDS AND SPECIFICATIONS.
CITY: VINEYARD CITY
SEWER: VINEYARD CITY
STORM DRAIN: VINEYARD CITY
NATURAL GAS: ENBRIDGE
ELECTRICAL: ROCKY MOUNTAIN (RMP)
WATER: VINEYARD CITY
GENERAL CONSTRUCTION NOTES
1. ALL CONSTRUCTION AND MATERIALS ARE TO BE IN ACCORDANCE WITH THE MOST
CURRENT EDITION OF VINEYARD CITY STANDARDS; AND OTHER APPLICABLE APPROVED
STANDARDS ISSUED BY THE CONTROLLING AGENCY; THE INTERNATIONAL BUILDING CODE;
THE INTERNATIONAL FIRE CODE; AND ALL LOCAL CITY CODES AND ORDINANCES AS
APPLICABLE, EXCEPT AS NOTED ON THIS SHEET AS "DEVIATIONS FROM STANDARDS".
2. THE EXISTENCE AND LOCATION OF ANY OVERHEAD OR UNDERGROUND UTILITY LINES,
PIPES, OR STRUCTURES SHOWN ON THESE DRAWINGS ARE OBTAINED BY A RESEARCH OF
THE AVAILABLE RECORDS. EXISTING UTILITIES ARE LOCATED ON THE DRAWINGS ONLY FOR
THE CONVENIENCE OF THE CONTRACTOR. EXISTING UTILITY LINES OR SERVICE LATERALS
MAY NOT BE SHOWN ON THE DRAWINGS. THE CONTRACTOR IS TO, AT HIS OWN EXPENSE,
LOCATE ALL UNDERGROUND AND OVERHEAD INTERFERENCES WHICH MAY AFFECT HIS
OPERATION DURING CONSTRUCTION AND IS TO TAKE ALL NECESSARY PRECAUTIONS TO
AVOID DAMAGE TO IT. THE CONTRACTOR IS TO USE EXTREME CAUTION WHEN WORKING
NEAR OVERHEAD UTILITIES SO AS TO SAFELY PROTECT ALL PERSONNEL AND EQUIPMENT,
AND IS TO BE RESPONSIBLE FOR ALL COST AND LIABILITY IN CONNECTION THEREWITH.
3. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT
EXISTING UTILITY LINES, STRUCTURES AND STREET IMPROVEMENT WHICH ARE TO REMAIN
IN PLACE, FROM DAMAGE. ALL SUCH IMPROVEMENTS OR STRUCTURES DAMAGED BY THE
CONTRACTOR'S OPERATIONS ARE TO BE REPAIRED OR REPLACED SATISFACTORILY TO
VINEYARD CITY ENGINEERING DEPARTMENT AND/OR OWNING UTILITY COMPANY AT THE
EXPENSE OF THE CONTRACTOR.
4. ALL CONSTRUCTION IS TO BE AS SHOWN ON THE "RELEASED FOR CONSTRUCTION"
DRAWINGS. ANY REVISIONS ARE TO HAVE THE PRIOR WRITTEN APPROVAL OF THE
ENGINEER THROUGH THE CHANGE ORDER PROCESS.
5. TYPE II CEMENT IS TO BE USED IN ALL OFF-SITE CONCRETE WORK. CONCRETE IS TO BE
4,000 P.S.I. MINIMUM @ 28 DAYS. MIX DESIGNS TO BE APPROVED BY THE CITY, PRIOR TO
THE USE ON THE PROJECT.
6. AN ENCROACHMENT PERMIT IS REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT-OF-WAY.
THE CONTRACTOR IS TO SECURE ALL PERMITS AND INSPECTIONS REQUIRED FOR THIS
CONSTRUCTION.
7. IT IS THE CONTRACTOR’S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF
UNDERGROUND OBSTRUCTIONS AND AVOID DAMAGE AND CONFLICTS. EXPOSE POSSIBLE
CONFLICTS IN ADVANCE OF CONSTRUCTION, SUCH AS UTILITY LINES AND DRAINAGE
STRUCTURES. CONTRACTOR SHALL VERIFY ELEVATIONS AND LOCATIONS OF EACH AND
VERIFY CLEARANCE FOR PROPOSED CONSTRUCTION. IMMEDIATELY NOTIFY ENGINEER OF
CONFLICTS DISCOVERED OR CHANGES NEEDED TO ACCOMMODATE UNKNOWN OR CHANGED
CONDITIONS.
8. THE CONTRACTOR IS TO TAKE ALL PRECAUTIONS NECESSARY TO PROTECT EXISTING
PERMANENT SURVEYING MONUMENTS. ANY MONUMENT DISTURBED IS TO BE REPLACED
AND ADJUSTED PER AVAILABLE RECORDS.
9. CONTRACTOR IS TO ADJUST ALL NEW AND EXISTING INLETS, VALVE BOXES, MANHOLE
RIMS, AND SEWER CLEAN OUTS, ETC. TO FINISH GRADE AS APPLICABLE WHETHER OR NOT
THEY ARE SHOWN ON THE DRAWINGS.
10. CONTRACTOR SHALL COORDINATE WITH BUILDING OWNER TO ENSURE ADEQUATE ACCESS
TO ALLOW THE BUILDING TO REMAIN ACCESSIBLE TO CUSTOMERS DURING ALL
CONSTRUCTION ACTIVITIES. MAINTAIN A MINIMUM 10'-0" WIDE ACCESS INTO THE PARKING
LOT AT ALL TIMES.
11. CONTRACTOR SHALL PROVIDE BARRICADES, FENCING, ETC., TO PROTECT INDIVIDUALS
ACCESSING THE BUILDING FROM ANY CONSTRUCTION AREAS.
12. ANY WORK REQUIRING "NO ACCESS" TO THE PARKING LOT OR BUILDING MUST BE
COORDINATED WITH THE BUILDING OWNER AT LEAST 7 DAYS IN ADVANCE AND BE AGREED
UPON IN WRITING.
13. CONTRACTOR SHALL REPLACE AT NO COST TO THE OWNER ALL PAVING, SIDEWALK, AND
EXISTING AND ANY FACILITIES THAT ARE DAMAGED DURING THE COURSE OF WORK.
14. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, CONTRACTOR SHALL
OBTAIN AND PAY FOR ALL CONSTRUCTION PERMITS AND LICENSES.
15. EXPANSION JOINTS ARE REQUIRED AT 60-FEET SPACING IN EXTRUDED-TYPE CURB AND
GUTTER.
16. ASPHALT CEMENT (AC) PAVEMENT IS TO BE ½-INCH ABOVE LIP OF ALL GUTTERS AFTER
COMPACTION, EXCEPT AT SIDEWALK RAMPS AND CROSS GUTTERS.
17. RIGHT-OF-WAY CURB AND GUTTER FOUND TO BE UNACCEPTABLE TO THE GOVERNING
AGENCY IS TO BE REMOVED AND REPLACED.
18. CONTRACTOR IS TO PROVIDE ALL NECESSARY HORIZONTAL AND VERTICAL TRANSITIONS
BETWEEN NEW CONSTRUCTION AND EXISTING SURFACES TO PROVIDE FOR PROPER
DRAINAGE AND FOR INGRESS AND EGRESS TO NEW CONSTRUCTION. THE EXTENT OF
TRANSITIONS TO BE AS SHOWN ON THE DRAWINGS.
19. ALL GRADING WORK IS TO CONFORM TO THE SOILS REPORT AS PREPARED BY THE SOILS
ENGINEER, REVIEWED BY THE ENGINEERING DEPARTMENT, AND AS SHOWN ON THESE
DRAWINGS.
20. EXACT LOCATION OF ALL SAW CUT LINES MAY BE ADJUSTED OR DETERMINED IN THE FIELD
BY A CITY ENGINEERING STAFF, IF THE LOCATION OF THESE SAW CUT LINES IS NOT
CLEARLY SHOWN ON THE DRAWINGS, OR EXISTING PAVEMENT CONDITION REQUIRES
RELOCATION.
21. UTILITY COMPANY METER BOXES, MANHOLE LIDS, VALVE COVERS, ETC., ARE TO BE
LOCATED OUT OF DRIVEWAYS, DRIVEWAY APRONS, FLOW LINES, AND CROSS GUTTERS,
UNLESS WRITTEN APPROVAL IS GRANTED BY THE UTILITY COMPANY AND THE CITY
ENGINEER.
22. ALL RETAINING WALLS, NEW OR EXISTING, ARE ONLY SHOWN ON CIVIL DRAWINGS FOR THE
PURPOSE OF REVIEWING GRADING RELATIONSHIPS; FLOOD CONTROL AND SIGHT DISTANCE
AT INTERSECTIONS. NEW RETAINING WALLS REQUIRE A SEPARATE PERMIT AND
INSPECTION BY THE BUILDING DIVISION.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OSHA STANDARDS AND PUBLIC SAFETY.
24. CONTRACTOR WILL ATTEND ALL PRE-CONSTRUCTION MEETING WITH REQUIRED DISTRICTS
AND AGENCIES.
FULL DEPTH ASPHALT NOTES
1. ASPHALT PAVING SHALL BE PER VINEYARD CITY STANDARDS AND SPECIFICATIONS.
2. SAW CUT AREAS TO BE REPAIRED AND REMOVE ASPHALT AND BASE NECESSARY TO
OBTAIN FIRM SUPPORT.
3. IF EXISTING SUBBASE AND/OR SUBGRADE ARE UNSUITABLE FOR PLACEMENT OF
ASPHALT PATCH, OVER EXCAVATE TO FIRM SUBGRADE AND PLACE STABILIZING
MATERIAL.
4. PRIME EDGES OF EXISTING ASPHALT.
5. REMOVE LOOSE AND FOREIGN MATERIAL FROM COMPACTED SUBGRADE OR SUBBASE
IMMEDIATELY BEFORE APPLICATION.
6. INSTALL FULL DEPTH MATERIAL AND COMPACT. FINISH TO BE LEVEL WITH
SURROUNDING PAVEMENT. ANY LOW POINTS OR PONDING IN THE PATCH AREA SHALL BE
CORRECTED BY THE CONTRACTOR AT NO COST TO THE OWNER.
7. CLEANING: AFTER COMPLETION OF PAVING OPERATIONS, CLEAN SURFACES OF EXCESS
OR SPILLED ASPHALT MATERIALS TO THE SATISFACTION OF OWNER'S REPRESENTATIVE.
8. AFTER FINAL ROLLING, DO NOT PERMIT VEHICULAR TRAFFIC ON ASPHALT CONCRETE
PAVEMENT UNTIL IT HAS COOLED AND HARDENED, AND IN NO CASE SOONER THAN SIX
HOURS.
9. PROVIDE BARRICADES AND WARNING DEVICES AS REQUIRED TO PROTECT
CONSTRUCTION AREA, PAVEMENT AND THE GENERAL PUBLIC.
10. COVER OPENINGS OF STRUCTURES IN THE AREA OF PAVING UNTIL PERMANENT
COVERINGS ARE PLACED.
EXCAVATION, EARTHWORK, & SETTLEMENT
NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SETTLEMENT OF BACKFILL WHICH
MAY OCCUR WITHIN THE CORRECTION PERIOD STIPULATED WITHIN THE CONTRACT
DOCUMENTS.
2. THE CONTRACTOR SHALL MAKE, OR CAUSE TO BE MADE, ALL REPAIRS OR
REPLACEMENTS MADE NECESSARY BY SETTLEMENT WITHIN 30 DAYS AFTER NOTICE
FROM THE ENGINEER OR OWNER.
3. ALL CUT AND FILL SLOPES ARE TO BE PROTECTED EVEN AFTER EFFECTIVE EROSION
CONTROL HAS BEEN ESTABLISHED.
4. IN THE EVENT THAT ANY UNFORESEEN CONDITIONS NOT COVERED BY THESE NOTES, ARE
ENCOUNTERED DURING GRADING OPERATIONS, THE OWNER/ENGINEER IS TO BE
IMMEDIATELY NOTIFIED FOR DIRECTION. CHANGES TO THE "RELEASED FOR
CONSTRUCTION" DRAWINGS ARE TO BE APPROVED THROUGH THE CHANGE ORDER
PROCESS.
5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS
AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND THE RELATED OFF-SITE WORK, SO
AS TO GENERATE THE DESIRED SUBGRADE, FINISH GRADES AND SLOPES SHOWN.
6. CONTRACTOR IS TO TAKE FULL RESPONSIBILITY FOR ALL EXCAVATION. ADEQUATE
SHORING IS TO BE DESIGNED AND PROVIDED BY THE CONTRACTOR TO PREVENT
UNDERMINING OF ANY ADJACENT FEATURES OR FACILITIES AND/OR CAVING OF THE
EXCAVATION.
7. THE CONTRACTOR IS WARNED THAT AN EARTHWORK BALANCE WAS NOT NECESSARILY
THE INTENT OF THIS PROJECT. ANY ADDITIONAL MATERIAL REQUIRED OR LEFTOVER
MATERIAL FOLLOWING EARTHWORK OPERATIONS BECOMES THE RESPONSIBILITY OF THE
CONTRACTOR.
8. THE GRADING CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE OWNER TO
PROVIDE FOR THE REQUIREMENTS OF THE PROJECT STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) AND ASSOCIATED PERMIT(S).
9. CONTRACTOR IS TO GRADE TO THE LINES AND ELEVATIONS SHOWN ON THE "RELEASED
FOR CONSTRUCTION" DRAWINGS WITHIN THE HORIZONTAL AND VERTICAL TOLERANCES
AND DEGREES OF COMPACTION AS LISTED IN THE SOILS REPORT.
10. THE USE OF POTABLE WATER WITHOUT A SPECIAL PERMIT FOR BUILDING OR
CONSTRUCTION PURPOSES INCLUDING CONSOLIDATION OF BACKFILL OR DUST CONTROL
IS PROHIBITED. THE CONTRACTOR IS TO OBTAIN ALL NECESSARY PERMITS FOR
CONSTRUCTION WATER.
11. THE CONTRACTOR IS TO PROTECT IN PLACE THE STREETS, SIDEWALKS AND ALL OTHER
PUBLIC RIGHT-OF-WAY IN A SAFE, CLEAN AND USABLE CONDITION. ALL SPILLS OF SOIL,
ROCK OR CONSTRUCTION DEBRIS IS TO BE IMMEDIATELY REMOVED FROM THE PUBLICLY
OWNED PROPERTY DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT.
ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC IS TO BE MAINTAINED IN CLEAN, SAFE
AND USABLE CONDITION.
12. IN THE EVENT THAT ANY TEMPORARY CONSTRUCTION ITEMS ARE REQUIRED THAT ARE
NOT SHOWN ON THESE DRAWINGS, THE OWNER AGREES TO PROVIDE AND INSTALL SUCH
ITEM AT HIS OWN EXPENSE AND AT THE DIRECTION OF THE ENGINEER. TEMPORARY
CONSTRUCTION INCLUDES DITCHES, BERMS, ROAD SIGNS, AND BARRICADES, ETC.
13. IF RETAINING WALLS ARE REQUIRED THEN ARE BEING DESIGNED BY OTHERS. REFERENCE
GEOTECHNICAL AND STRUCTURAL PLANS FOR DESIGN DETAILS AND EXACT LOCATIONS.
PROVIDE FENCE OR BARRIER ALONG WALLS NEAR PARKING OR CIRCULATION AREAS.
ANY RETAINING WALL 4' OR HIGHER MUST BE DESIGNED BY GEOTECHNICAL ENGINEER
AND SUBMITTED TO CITY ENGINEER FOR REVIEW AND APPROVAL.
14. CONTRACTOR SHALL HAVE UTILITIES MARKED BY BLUE STAKES PRIOR TO ANY
EXCAVATION ON SITE OR IN LOCALIZED AREAS.
15. CONTRACTOR IS TO TAKE FULL RESPONSIBILITY FOR ALL EXCAVATION. ADEQUATE
SHORING IS TO BE DESIGNED AND PROVIDED BY THE CONTRACTOR TO PREVENT
UNDERMINING OF ANY ADJACENT FEATURES OR FACILITIES AND/OR CAVING OF THE
EXCAVATION.
SEWER NOTES
1. THE LOCATION OF, AND EXISTENCE OR NON-EXISTENCE OF UNDERGROUND UTILITIES HAS
BEEN DETERMINED TO THE BEST OF THE ENGINEER'S ABILITY, BUT IT SHALL BE THE SOLE
DUTY OF THE CONTRACTOR TO VERIFY THE LOCATION OF THE EXISTING UTILITIES AND TO
TAKE ALL NECESSARY PRECAUTIONS TO AVOID DAMAGE TO THESE UTILITIES. THE
CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY DAMAGE DONE TO EXISTING
UTILITIES DURING CONSTRUCTION.
2. THE CONTRACTOR SHALL MAINTAIN A RECORD OF THE LOCATIONS OF ALL WASTEWATER
LATERALS, TEES AND STUB OUTS. THIS RECORD SHALL BE DELIVERED TO THE
DEVELOPER'S ENGINEERS PRIOR TO FINAL PAYMENT BEING AUTHORIZED.
3. BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED WHERE NECESSARY.
4. ALL LATERALS TO NEW PIPELINES ARE TO BE TIED INTO MAIN LINE THROUGH USE OF
FITTINGS. CUT-IN SADDLES ARE NOT ALLOWED.
5. THE WASTEWATER SYSTEM SHALL BE COMPLETED AND ACCEPTED BY THE SEWER SERVICE
PROVIDER PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
6. WASTEWATER LINES WILL BE INTERNALLY INSPECTED BY A UTILITY COMPANY
REPRESENTATIVE AT THE OWNER/DEVELOPER'S EXPENSE.
7. THE HOUSE LATERALS SHALL BE EXTENDED BEYOND THE STREET RIGHT-OF-WAY TO EDGE
OF P.U. E. (PUBLIC UTILITY EASEMENT).
8. CONTRACTOR TO OBTAIN LATEST VERSION OF VINEYARD CITY DEVELOPMENT MANUAL
AND CONFORM TO ALL CONSTRUCTION STANDARDS SET FORTH WITHIN.
9. ALL CONSTRUCTION SHALL COMPLY WITH VINEYARD CITY DESIGN STANDARDS AND
CONSTRUCTION SPECIFICATIONS
10. FOUR FEET OF COVER IS REQUIRED OVER ALL SEWER LINES.
25. THE CONTRACTOR SHALL EXAMINE THE PLANS, THE GEOLOGY REPORTS AND THE
SITE CONDITIONS PRIOR TO BEGGINING WORK. CONTRACTOR SHALL INSPECT THE
SITE OF WORK BEFORE BIDDING TO SATISFY THEMSELVES BY PERSONAL
EXAMINATION, OF THE LOCATION OF THE PROPOSED WORK, AND OF THE ACTUAL
CONDITIONS OF THE SITE OF WORK. ANY CONDITIONS THAT APPEAR TO BE IN
CONFLICT WITH THE PLANS SHALL BE REPORTED TO AVENUE CONSULTANTS FOR
CLARIFICATION BEFORE BID SUBMITTAL.
26. FOOTING AND FOUNDATION EXCAVATIONS SHALL BE INSPECTED AND APPROVED IN
WRITING BY A QUALIFIED GEOTECHNICAL ENGINEER PRIOR TO THE PLACEMENT OF
CONCRETE FORMS OR REBAR.
/2 p:
\2
4-
- s lid e hi ll si te d es ig n\
0_ ca d\
4_ si te d es ig n\
-4 c0 -0
_c ov er p ag e.
dw g
R
EV
IS
IO
N S:
SHEET TITLE
SHEET NO.
Detailer
Designer
Checker
Av en ue P ro je ct ve nu e
C on su lt an ts
, I nc
S ou th R ed w oo d
R oa d, S ui te
T ay lo rs vi lle
, U T w w w
.a ve nu ec on su lt an ts .c om
Stamp
IL
LE
G
EN
D
VI
N
EY
AR
D C
IT
Y
SL
ID
E
H
IL
L A
T
VI
N
EY
A R
D G
R O
VE
PA
R K
N O
R
TH
E
AS
T , V
IN
EY
AR
D
, U
TA
H , 8
C0-2
-4
LEGEND ABBREVIATIONS ABBREVIATIONS
SET CONTROL POINT
EXISTING TREE
EXISTING GATE / BOLLARD
EXISTING POWER / GUYED / LIGHT POLE
EXISTING COMMUNICATIONS UTILITY
EXISTING ELECTRICAL UTILITY
EXISTING GAS METER / SIGN
EXISTING WATER METER / VALVE
EXISTING FIRE HYDRANT
EXISTING IRRIGATION METER / VALVE
EXISTING UTILITY MANHOLE
EXISTING CURB INLET, JUNCTION BOX &
COMBO BOX
EXISTING FENCE - WIRE
EXISTING FENCE - CHAIN LINK
EXISTING FENCE - DECORATIVE
EXISTING CURB & GUTTER
EDGE OF ASPHALT
EXISTING SANITARY SEWER
EXISTING STORM DRAIN
EXISTING CULINARY WATER
EXISTING IRRIGATION
EXISTING GAS
EXISTING BURIED ELECTRIC
EXISTING OVERHEAD POWER
EXISTING FIBER OPTIC
EXISTING COMMUNICATIONS
BUILDING
P
CT TP
EJBET
G
WM
IR
MHSD SS
SD
x swr sd wtr ir gas be ohp fo cm
SECTION CORNER FOUND / SECTION
CORNER NOT FOUND
BENCHMARK / CENTER MON
FOUND CORNER
SET REBAR W/ CAP
NEW LOT CORNER (NOT SET)
SECTION LINE
QUARTER SECTION LINE
SIXTEENTH SECTION LINE
TIE LINE
SUBDIVISION BOUNDARY
ADJOINING PROPERTIES
CENTERLINE
EASEMENT
LOT LINE
NEW EASEMENT
NEW LOT LINE
NEW SETBACK LINE
PROPOSED SANITARY SEWER MANHOLE
PROPOSED STORM DRAIN MANHOLE
PROPOSED CURB, JUNCTION AND COMBO
BOX
PROPOSED FIRE HYDRANT
PROPOSED WATER METER / VALVE
PROPOSED IRRIGATION METER / VALVE
PROPOSED POWER / LIGHT POLE & SIGNAL
PROPOSED ELECTRICAL BOX
PROPOSED SANITARY SEWER
PROPOSED STORM DRAIN
PROPOSED ROOF DRAIN
PROPOSED CULINARY WATER
PROPOSED IRRIGATION
PROPOSED GAS
PROPOSED POWER BURIED
SWR
SD
RD
WTR
IR
GAS
BE
ET EJB
P
IR
WM
SD
SD
SS
COLLECTING GUTTER
SHEDDING GUTTER
GRADE BREAK
EX MAJOR CONTOUR
EX MINOR CONTOUR
MAJOR CONTOUR
MINOR CONTOUR
PROPERTY BOUNDARY
CUT LIMIT
FILL LIMIT
CUT
FILL
(4200) (4201)
AD ALGEBRAIC DIFFERENCE
BM BENCHMARK
BV BUTTERFLY VALVE
BVC BEGIN VERTICAL CURVE
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
C&G CURB AND GUTTER
CB CATCH BASIN
CL CENTERLINE
CONST CONSTRUCTION
EL ELBOW
EVC END VERTICAL CURVE
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EX EXISTING
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOWLINE
GB GRADE BREAK
GV GATE VALVE
HP HIGH POINT
HPE HIGH POINT ELEVATION
HPS HIGH POINT STATION
IRR IRRIGATION
IRRMH IRRIGATION MANHOLE
L LENGTH
LAT LATERAL SERVICE
LD LAND DRAIN
LDMH LAND DRAIN MANHOLE
LG LIP OF GUTTER
LP LOW POINT
LPE LOW POINT ELEVATION
LPS LOW POINT STATION
MH MANHOLE
K RADIUS OF CURVATURE
ADS CORRUGATED BLACK PLASTIC PIPE
BOW BACK OF WALK
BRG BEARING
CH CHORD
CHB CHORD BEARING
CI CAST IRON
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CUL CULINARY
CW CULINARY WATER
DELTA
DEMO DEMOLITION
DI DUCTILE IRON
DIAMETER
DIAM DIAMETER
DIST DISTANCE
EG EXISTING GRADE
E EAST, ELECTRICITY, ELECTRICAL
° DEGREES
FND FOUNDATION
FTG FOOTING
ID INSIDE DIAMETER
INV INVERT
MON MONUMENT
N NORTH
NE NORTHEAST
OC ON CENTER
PL PROPERTY LINE
PROP PROPERTY
PUE PUBLIC UTILTIY EASEMENT
PUE&DE PUBLIC UTILITY EASEMENT & DRAINAGE EASEMENT
R RADIUS
RCL ROADWAY CENTERLINE
RCP REINFORCED CONCRETE PIPE
CO CLEANOUT
S SOUTH
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEANOUT
SEC SECONDARY
SEC SECTION
SLB&M SALT LAKE BASE & MERIDIAN
SPP STEEL PIPE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEANOUT
SSMH SANITARY SEWER MANHOLE
SW SOUTHWEST
TAN TANGENT
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBW TOP BACK OF WALK
TCW TOP OF CURBWALL
TOA TOP OF ASPHALT
TOC TOP OF CONCRETE
TOG TOP OF GRATE
TOW TOP OF WALL
VC VERTICAL CURVE
WL WATERLINE
W WEST, WATER
SDMH STORM DRAIN MANHOLE
EASE EASEMENT
CWL CULINARY WATERLINE
SWL SECONDARY WATERLINE
' MINUTES, FEET
" SECONDS, INCHES
UTIL UTILITY
STD STANDARD
SPEC SPECIFICATION
SPECS SPECIFICATIONS
STDS STANDARDS
WM WATER METER
BND BOUNDARY
BLA BOUNDARY LINE AGREEMENT
SE SOUTHEAST
SW SECONDARY WATER
NW NORTHWEST
NR NON-RADIAL
OD OUTSIDE DIAMETER
B&C BAR & CAP
ADA AMERICAN DISABILITIES ACT
EOA EDGE OF ASPHALT
ARCH ARCHITECT, ARCHITECTURAL
MECH MECHANICAL
HDPE HIGH-DENSITY POLYETHYLENE PIPE
TEL TELEPHONE
TOE TOE OF SLOPE OR WALL
COMM COMMUNICATIONS
WP WORK POINT
RC REBAR & CAP
UD UNDERDRAIN
OHP OVERHEAD POWER
BLDG BUILDING
CIP CAST IN PLACE
ELEC ELECTRICAL
ROW RIGHT OF WAY
PT POINT OF TANGENCY
PC POINT OF CURVATURE
PI POINT OF INFLECTION
PVI POINT OF VERTICAL INFLECTION
NG NATURAL GRADE
PCC PORTLAND CONCRETE CEMENT
LF LINEAL FEET
IE INVERT ELEVATION
MD MEASURE DOWN
G GAS, NATURAL GAS
FP FIRE PROTECTION
FFE FINISH FLOOR ELEVATION
ELEV ELEVATION
UGP UNDERGROUND POWER
JBI
JBI
eoa eoa eoa eoa eoa eoa eoa eo a eoa eoa eoa eoa eoa eoa eoa eoa eo a eo a eo a eo a eo a
6/
/2 p:
\2
4-
- s lid e hi ll si te d es ig n\
0_ ca d\
4_ si te d es ig n\
-4 c1 -0
_s ite
_p la n.
dw g
R
EV
IS
IO
N S:
SHEET TITLE
SHEET NO.
Detailer
Designer
Checker
Av en ue P ro je ct ve nu e
C on su lt an ts
, I nc
S ou th R ed w oo d
R oa d, S ui te
T ay lo rs vi lle
, U T w w w
.a ve nu ec on su lt an ts .c om
Stamp
IL
SI
TE
P
LA
N
VI
N
EY
AR
D
C
IT
Y
SL
ID
E H
IL
L
A T
VI
N
EY
A
R D
G R
O
VE
PA
R
K
N
O R
TH
E
AS
T
, V
IN
EY
AR
D , U
TA
H
, 8
C1-0
-4
LEGEND
ASPHALT TRAIL
EMBANKMENT SLIDE
IMPACT ATTENUATION TURF
SAFETY RAIL
SEED NATIVE GRASS
GRASS SOD
EXISTING EDGE OF ASPHALT
EDGING MATERIAL
LANDSCAPED AREA
ARTIFICIAL TURF
CONCRETE SLAB
BENCH
SCALE
10 10 20
1" = 10' US FT
SLIDE HILL AT
VINEYARD GROVE PARK
350 NORTH 100 EAST, VINEYARD, UTAH 84059
eoa
R2.5'
R9.5'
5'
5'
6' 6'
6'
6'
KEYED NOTES
FURNISH AND INSTALL ASPHALT TRAIL PER DETAIL A, SHEET C1-1
FURNISH AND INSTALL EMBANKMENT SLIDE, PROVIDED BY CONTRACTOR PER
MANUFACTURER SPECIFICATIONS
FURNISH AND INSTALL IMPACT ATTENUATION TURF PER DETAIL B, SHEET C1-1
FURNISH AND INSTALL SAFETY RAIL PER DETAIL D, SHEET C1-1
SEED NATIVE GRASS PER APWA 32 93 13
FURNISH AND INSTALL GRASS SOD
EXISTING ASPHALT TRAIL
FURNISH AND INSTALL EDGING MATERIAL
FURNISH AND INSTALL LANDSCAPED GROUND COVER, BUSHES , ETC.
FURNISH AND INSTALL ARTIFICIAL TURF
FURNISH AND INSTALL CONCRETE SLAB PER DETAIL C, SHEET C1-1
BENCH PROVIDED BY OWNER
TRAIL ADA LANDING AREA
/2 p:
\2
4-
- s lid e hi ll si te d es ig n\
0_ ca d\
4_ si te d es ig n\
-4 c1 -0
_s ite
_p la n.
dw g
R
EV
IS
IO
N S:
SHEET TITLE
SHEET NO.
Detailer
Designer
Checker
Av en ue P ro je ct ve nu e
C on su lt an ts
, I nc
S ou th R ed w oo d
R oa d, S ui te
T ay lo rs vi lle
, U T w w w
.a ve nu ec on su lt an ts .c om
Stamp
IL
SI
TE
P
LA
N D
ET
A
IL
S
VI
N
EY
AR
D C
IT
Y
SL
ID
E H
IL
L
A T
VI
N
EY
A
R D
G R
O
VE
PA
R
K
N
O R
TH
E
AS
T
, V
IN
EY
AR
D , U
TA
H
, 8
C1-1
-4
8'
6'
4'
ASPHALT TRAIL TYPICAL SECTION
NOT TO SCALEA SAFETY SURFACING AREA
NOT TO SCALEB
6'
5.00'
4" ASPHALT
6" UNTREATED BASE COURSE
UNDISTURBED NATIVE SOIL
OR GRANULAR IMPORT FILL
MAX 2%
ASPHALT TRAIL
CL
EMBANKMENT SLIDE
IMPACT ATTENUATION AREA
R6'
R6'
6" UNTREATED
BASE COURSE
UNDISTURBED NATIVE SOIL
OR GRANULAR IMPORT FILL
5" CONCRETE SLAB WITH
POLYMER STRAND
REINFORCEMENT
NOTES
1. BASE COURSE IS TO BE COMPACTED PER THE GEOTECHNICAL
ENGINEER'S RECOMMENDATIONS. IF NO SUCH RECOMMENDATIONS
PERTAIN, COMPACT TO 95% APWA 31 23 26.
2. CONCRETE IS TO BE 4,000 PSI TEST.
PRIVATE CONCRETE PAVING SLAB SECTION
NOT TO SCALEC
SAFETY POST RAIL
SAFETY RAIL
NOT TO SCALED
CLASS C CONCRETE
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
%%UTYPE 4
AutoCAD SHX Text
GROUND INSTALLATION DETAIL
AutoCAD SHX Text
PIPE SLEEVE DETAIL
AutoCAD SHX Text
%%UTYPE 3
AutoCAD SHX Text
%%UTYPE 2
AutoCAD SHX Text
EXPANSION BOLT DETAIL
AutoCAD SHX Text
ANCHOR PLATE DETAIL
AutoCAD SHX Text
%%UTYPE 1
AutoCAD SHX Text
%%UELEVATION
AutoCAD SHX Text
GRIND SMOOTH
AutoCAD SHX Text
(TYPICAL)
AutoCAD SHX Text
4'-8" AT BIKE PATHS
AutoCAD SHX Text
(4 RAILS AT 1'-2" SPACING)
AutoCAD SHX Text
3'-6" (TYP)
AutoCAD SHX Text 1'-2"
AutoCAD SHX Text 1'-2"
AutoCAD SHX Text 1'-2"
AutoCAD SHX Text 6"
AutoCAD SHX Text
TOP OF DOUBLE REINFORCED CONCRETE
AutoCAD SHX Text
ANCHOR CONNECTION
AutoCAD SHX Text
TYPE 1, 2 OR 3 PER PLANS
AutoCAD SHX Text
COPE ENDS
AutoCAD SHX Text
POST AND RAIL (TYPICAL)
AutoCAD SHX Text
TOP OF WINGWALL
AutoCAD SHX Text
WING WALL RAILING
AutoCAD SHX Text
(WHERE APPLICABLE)
AutoCAD SHX Text
VERTICAL POSTS EQUALLY SPACED
AutoCAD SHX Text
8'-0" MAXIMUM
AutoCAD SHX Text
LONG RADIUS
AutoCAD SHX Text
ELBOW TYPICAL
AutoCAD SHX Text
(C RADIUS > 2.25")
AutoCAD SHX Text
3'-6" (TYP)
AutoCAD SHX Text
PRIOR TO WELDING
AutoCAD SHX Text
VERTICAL POSTS EQUALLY SPACED
AutoCAD SHX Text
8'-0" MAXIMUM
AutoCAD SHX Text
GRIND SMOOTH
AutoCAD SHX Text
(TYPICAL)
AutoCAD SHX Text
1/4" X 5" X 5" MILD STEEL PLATE
AutoCAD SHX Text
1/2" X 6" ANCHOR BOLTS (2 EACH PLATE)
AutoCAD SHX Text
RAIL POST
AutoCAD SHX Text
TOP OF CONCRETE
AutoCAD SHX Text
1/4" X 5" X 5" MILD STEEL PLATE
AutoCAD SHX Text
TOP OF CONCRETE
AutoCAD SHX Text
RAIL POST
AutoCAD SHX Text
RAIL POST
AutoCAD SHX Text
SHRINK PROOF
AutoCAD SHX Text
BOLTS & WASHERS
AutoCAD SHX Text
ANSI TYPE 304
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text 4"
AutoCAD SHX Text
GROUT UNDER PLATE AS REQUIRED (MAX 1/2")
AutoCAD SHX Text 9-3/4"
AutoCAD SHX Text
1/4" X 5" X 5" MILD STEEL PLATE
AutoCAD SHX Text
RAIL POST
AutoCAD SHX Text
10" X 2-1/2" DIA. STANDARD PIPE
AutoCAD SHX Text
PIPE TO EXTEND 1/2" ABOVE TOP OF CONCRETE
AutoCAD SHX Text 3/8
AutoCAD SHX Text
1" MIN
AutoCAD SHX Text
30" MIN
AutoCAD SHX Text
6" MIN
AutoCAD SHX Text
CLASS C CONCRETE
AutoCAD SHX Text
4" MIN
AutoCAD SHX Text
4" MIN
AutoCAD SHX Text
TYP
AutoCAD SHX Text
WALL REINF.
AutoCAD SHX Text
PER PLANS
AutoCAD SHX Text
WALL REINF.
AutoCAD SHX Text
PER PLANS
AutoCAD SHX Text
WALL REINF.
AutoCAD SHX Text
PER PLANS
AutoCAD SHX Text
HEADWALL OR WINGWALL
AutoCAD SHX Text
1. POSTS AND RAILS SHALL BE 1.90 INCH POSTS AND RAILS SHALL BE 1.90 INCH OUTSIDE DIAMETER, HIGH STRENGTH HEAVY INDUSTRIAL STEEL PIPE CONFORMING TO ASTM F1043 MATERIAL GROUP IA-2 (2.72 LB/FT, MINIMUM YIELD STRENGTH=50 KSI) OR MATERIAL GROUP IC GALVANIZED AFTER FORMING (2.28 LB/FT, MINIMUM YIELD STRENGTH=50 KSI) 2. PAINT RAIL PER APWA SECTION 09 91 00 PAINT RAIL PER APWA SECTION 09 91 00 WHEN REQUIRED BY PLANS, SHOP PRIME WITH RUST INHIBITING PRIMER (FIELD REPAIR PRIMER AS NEEDED). COLOR PER PLANS. 3. VERTICAL POSTS TO BE EVENLY SPACED. VERTICAL POSTS TO BE EVENLY SPACED. 4. REMOVE ALL SHARP EDGES. REMOVE ALL SHARP EDGES. 5. INSTALL SAFETY RAIL AS REQUIRED BY INSTALL SAFETY RAIL AS REQUIRED BY PLANS OR SPECIFICATIONS. 6. THE EMBEDMENT FOR ANCHOR TYPES 1, 2, THE EMBEDMENT FOR ANCHOR TYPES 1, 2, AND 3 SHALL BE LOCATED INSIDE THE WALL REINFORCEMENT CAGE. 7. SAFETY RAIL IS NOT TO BE USED AS A SAFETY RAIL IS NOT TO BE USED AS A PEDESTRIAN BRIDGE RAIL. 8. FOR SAFETY RAIL ON 8" BLOCK (CMU) FOR SAFETY RAIL ON 8" BLOCK (CMU) WALLS, THE TOP COURSE SHALL BE A BOND BEAM WITH 2-#4 LONGITUDINAL REBAR AND GROUT.
AutoCAD SHX Text
8" MIN.
AutoCAD SHX Text
8" MIN.
AutoCAD SHX Text
8" MIN.
AutoCAD SHX Text
(4) 3/8" X 5" NUTS,
AutoCAD SHX Text
EPOXY EMBEDDED
AutoCAD SHX Text
EXPANSION OR
4521.80 ME
4521.70 ME
4528.62 TOA
4528.72 TOA
4528.80 TOA
4522.03 FG
4536.40 TOC
4522.73 FG
-2 9.
-1 .5
7%
-6.17%
-8.27%
-1.44%
-29.00%
-7.21%
-1.90%
-2 4.
4536.82 TOC
4537.10 TOC
4528.54 TOA
4528.64 TOA
4533.61 TOA
4533.54 TOA
4537.20 TOA
4536.89 TOA
4536.47 TOA
4523.00 TOA
4522.93 TOA
4525.93 TOA
4525.84 TOA
JBI
JBI
JBI
eoa eoa eoa eoa eoaeoa eoa eoa eoa eoa eoa eoa eoa eo a eo a eo a eo a eo a
4533.51 TOA
4533.44 TOA
4523.41 TOA
4523.31 TOA
4523.40 TOA
4523.50 TOA
-6 .1
3%
-6 .9
2%
(4525)
(4530)
(4535)
(4523)
(4524)
(4526)
(4527)
(4528)
(4529)
(4531)
(4532)
(4533)
(4534)
(4536)
(4537)
(4538)
(4539)
(4
0)
(45
(45
(4
7)(45
)(45
(4
1)
(4
2)(45
(45
)(45
(45
(45
(45
)(45
)(4
2)(4
3)
(4525)
(4530)
(4535)
(4522)
(4523)
(4524)
(4526)
(4527)
(4528)
(4529)
(4531)
(4532)
(4533)
(4534)
(4536)
(4537)
(4538) (4539)
-0.25%
4537.19 TOA
4537.11 TOA
4536.90 TOA
4536.98 TOA
(4521)
(4522)
(4523)
(4524)
-70.04%
-6 8.
4521.95 FG
4522.65 FG
6/
/2 p:
\2
4-
- s lid e hi ll si te d es ig n\
0_ ca d\
4_ si te d es ig n\
-4 c2 -0
_g ra di ng
.d w g
R
EV
IS
IO
N S:
SHEET TITLE
SHEET NO.
Detailer
Designer
Checker
Av en ue P ro je ct ve nu e
C on su lt an…