This document is a detailed site plan and erosion and sediment pollution control (ESPC) plan prepared by Hanover Engineering Associates, Inc. for East Allen Township in Northampton County, Pennsylvania, for the Bicentennial Park Pavilion C and Roof Replacements project. The project encompasses the full replacement of Pavilion C (a 3,200 square foot structure) and roof replacements for Pavilion A, Pavilion B, the Restroom Building, and the Maintenance Building located at 5450 Liberto Lane and 5351 Park West Lane in Bethlehem, Pennsylvania. The project site encompasses a limit of disturbance area of 34,575.38 square feet (0.79 acres) and involves clearing, grubbing, demolition of existing structures, rough grading, construction of new pavement with ADA parking improvements, concrete walkways, and site stabilization. The project is scheduled with a pre-bid conference on November 17, 2026, at 2:00 p.m., final questions due by 4:00 p.m. on November 24, 2026, and proposal submissions due by 1:00 p.m. on December 3, 2026, when bids will be publicly opened. The plans detail the complete construction sequence, site layout, utility locations, soil types, and comprehensive erosion control measures including compost filter socks, rock construction entrances, topsoil stockpile areas, and concrete washout facilities.
The proposal requires a bid bond or acceptable security in the amount of 10% of the total base bid, with all bids effective for 60 calendar days from the opening date. The contractor must comply with Pennsylvania's Prevailing Wage Act (Act of August 15, 1961, P.L. 987) and must include these requirements in all subcontracts. The construction documents, including contract forms, specifications, and detailed drawings, are available through the PennBid Program at https://pennbid.bonfirehub.com. The project engineer is located at Hanover Engineering Associates, Inc., 252 Brodhead Road, Suite 100, Bethlehem, PA 18017-8944 (phone: 610.691.5644). East Allen Township reserves the right to reject any or all proposals. The work includes all equipment, materials, labor, and supervision necessary for complete execution, with contractors required to bid on all items listed on the bid form and comply with all local, state, and federal environmental regulations, including Pennsylvania's Clean Streams Law.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
P :61
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
RECEIVING WATERSHED
UN-NAMED TRIBUTARY TO
CATASAUQUA CREEK
(CWF, MF)
WaB WaA
UudB WaC
Pennsylvania811PE
NN
SYL
VAN
IA ONE CALL SYSTEM INC.
DIAL 8 - 1- 1 BEFORE YOU DI
G!
1-800-242-1776
A Privately funded non-profit Pennsylvania Corporation
AutoCAD SHX Text WaC
AutoCAD SHX Text WaB
AutoCAD SHX Text WaC
AutoCAD SHX Text WaA
AutoCAD SHX Text WaC
AutoCAD SHX Text UudB
AutoCAD SHX Text
EX. BASEBALL FIELD
AutoCAD SHX Text
EX. PARKING LOT (SHALL NOT BE USED AS A STAGING AREA)
AutoCAD SHX Text
PAVILION C (FULL REPLACEMENT)
AutoCAD SHX Text
PAVILION C (FULL REPLACEMENT)
AutoCAD SHX Text
PAVILION A (ROOF REPLACEMENT)
AutoCAD SHX Text
PAVILION A (ROOF REPLACEMENT)
AutoCAD SHX Text
PAVILION B (ROOF REPLACEMENT)
AutoCAD SHX Text
REST ROOM BUILDING (ROOF REPLACEMENT)
AutoCAD SHX Text
MAINTENANCE BUILDING (ROOF REPLACEMENT)
AutoCAD SHX Text
PAVILION B (ROOF REPLACEMENT)
AutoCAD SHX Text
REST ROOM BUILDING (ROOF REPLACEMENT)
AutoCAD SHX Text
MAINTENANCE BUILDING (ROOF REPLACEMENT)
AutoCAD SHX Text
APACHE LN
AutoCAD SHX Text
SHAWNEE DR
AutoCAD SHX Text
MOHAWK DR
AutoCAD SHX Text
APACHE LN
AutoCAD SHX Text
SHAWNEE DR
AutoCAD SHX Text
MOHAWK DR
AutoCAD SHX Text
MOHAWK DRIVE
AutoCAD SHX Text
MOHAWK DRIVE
AutoCAD SHX Text THIS DOCUMENT IS THE PROPERTY OF HANOVER ENGINEERING ASSOCIATES, INC. ANY USE OF A COPY OF THIS DOCUMENT THAT DOES NOT CONTAIN AN ORIGINAL SEAL AND SIGNATURE IS STRICTLY PROHIBITED. THIS DOCUMENT IS NOT PUBLISHED AND ALL RIGHTS ARE RESERVED BY HANOVER ENGINEERING ASSOCIATES, INC. THIS PLAN HAS BEEN SEALED WITH EITHER A RED INK SEAL OR A CRIMP SEAL. IF NEITHER APPEARS ON THIS PLAN, POSSIBLE REPRODUCTIONS OR ALTERATIONS MAY HAVE BEEN MADE WITHOUT THE APPROVAL OR KNOWLEDGE OF THE SIGNATORY.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
PLAN TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 1" = '
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"=100'
AutoCAD SHX Text
SSC
AutoCAD SHX Text
AVY
AutoCAD SHX Text 09/11/2026
AutoCAD SHX Text
EA26-28
AutoCAD SHX Text
AutoCAD SHX Text
BICENTENNIAL PARK PAVILION C & ROOF REPLACEMENTS
AutoCAD SHX Text
EAST ALLEN TOWNSHIP NORTHAMPTON COUNTY PENNSYLVANIA
AutoCAD SHX Text
PENNSYLVANIA
AutoCAD SHX Text
BICENTENNIAL PARK PAVILION C & ROOF REPLACEMENTS
AutoCAD SHX Text
NORTHAMPTON COUNTY
AutoCAD SHX Text
EAST ALLEN TOWNSHIP
AutoCAD SHX Text
PROJECT# EA26-28
AutoCAD SHX Text
%%USHEET INDEX
AutoCAD SHX Text
%%ULOCATION MAP / ROOF REPLACEMENT LOCATIONS
AutoCAD SHX Text
SCALE: 1"=100'
AutoCAD SHX Text
%%USITE ADDRESS
AutoCAD SHX Text
5450 LIBERTO LANE / 5351 PARK WEST LANE
AutoCAD SHX Text
BETHLEHEM, PA 18017
AutoCAD SHX Text SHEET 1 - COVER SHEET SHEET 2 - EXISTING CONDITIONS AND DEMOLITION PLAN SHEET 3 - ESPC AND GRADING PLAN SHEET 4 - ESPC NOTES SHEET 5 - ESPC DETAILS
AutoCAD SHX Text PROJECT NARRATIVE THE PROJECT CONSISTS OF THE REPLACEMENT OF PAVILION C LOCATED IN BICENTENNIAL PARK AND THE REPLACEMENT OF THE ROOFS OF PAVILION A, PAVILION B, THE REST ROOM BUILDING AND THE MAINTENANCE BUILDING.
AutoCAD SHX Text
1. ANY AREA DISTURBED BEYOND THE LIMIT OF CONSTRUCTION SHALL BE ANY AREA DISTURBED BEYOND THE LIMIT OF CONSTRUCTION SHALL BE RESTORED BY THE CONTRACTOR AT THEIR OWN EXPENSE. 2. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHY CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHY AND ELEVATIONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION. ANY DISCREPANCIES SHALL BE PROVIDED TO THE TOWNSHIP ENGINEER IN WRITING IMMEDIATELY. 3. LOCATION OF ALL EXISTING SERVICES ARE APPROXIMATE AND MUST BE LOCATION OF ALL EXISTING SERVICES ARE APPROXIMATE AND MUST BE CONFIRMED INDEPENDENTLY WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. ALL UTILITY SERVICES CONNECTION POINTS SHALL BE CONFIRMED INDEPENDENTLY BY THE CONTRACTOR IN FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED IMMEDIATELY IN WRITING TO THE TOWNSHIP ENGINEER. 4. THE SUITABILITY OF EXCAVATED MATERIAL FOR USE AS BACKFILL SHALL BE THE SUITABILITY OF EXCAVATED MATERIAL FOR USE AS BACKFILL SHALL BE DETERMINED BY THE TOWNSHIP ENGINEER. 5. SUBGRADE MATERIAL FOR FOUNDATION AND ASPHALT SHALL BE FREE OF SUBGRADE MATERIAL FOR FOUNDATION AND ASPHALT SHALL BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD THE SUBGRADE MATERIAL BE DEEMED UNSUITABLE, IT IS TO BE REMOVED AND REPLACED WITH APPROVED FILL MATERIAL COMPACTED TO 95% OPTIMUM DENSITY (AS DETERMINED BY MODIFIED PROCTOR METHOD). 6. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND THE REQUIREMENTS AND STANDARDS OF THE LOCAL GOVERNING AUTHORITY AND OSHA STANDARDS. 7. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER A.S.T.M. TEST D-1557. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2% ABOVE NOR 3% BELOW OPTIMUM. 8. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE TOWNSHIP ENGINEER AND/OR OWNER REPRESENTATIVE IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. 9. THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS, UNSUITABLE, THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS, UNSUITABLE, CONTAMINATED, ETC. SOILS, EXCAVATION, DEBRIS, VEGETATION, ETC., IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. 10. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS INDICATE FINISHED ALL PROPOSED CONTOURS AND SPOT ELEVATIONS INDICATE FINISHED GRADE. 11. ROUGH GRADING SHALL INCLUDE THE CLEARING AND GRUBBING OF ALL ROUGH GRADING SHALL INCLUDE THE CLEARING AND GRUBBING OF ALL AREAS WITHIN THE LIMIT OF DISTURBANCE. 12. ALL DISTURBED AREAS NOT RECEIVING IMPERVIOUS SURFACES OR ALL DISTURBED AREAS NOT RECEIVING IMPERVIOUS SURFACES OR LANDSCAPING SHALL BE RESTORED IN ACCORDANCE WITH THE LANDSCAPING/SOIL EROSION AND SEDIMENT CONTROL SEEDING SPECIFICATIONS AS NOTED ON E&S PLANS.
AutoCAD SHX Text
%%UGENERAL GRADING AND UTILITY NOTES:
AutoCAD SHX Text
SOIL TYPES
AutoCAD SHX Text
SOILS BOUNDARY
AutoCAD SHX Text WASHINGTON SILT LOAM, 0 TO 3 PERCENT SLOPES WASHINGTON SILT LOAM, 3 TO 8 PERCENT SLOPES WASHINGTON SILT LOAM, 8 TO 15 PERCENT SLOPES URBAN LAND-UDORTHENTS, LIMESTONE COMPLEX, 0 TO 8 PERCENT SLOPES
AutoCAD SHX Text
%%U"CALL BEFORE YOU DIG"
AutoCAD SHX Text 1-800-242-1776
AutoCAD SHX Text PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN STAGE - STOP CALL THIS PROJECT'S DESIGNER INQUIRY NO. XXXXXXX
AutoCAD SHX Text R
AutoCAD SHX Text
COVER SHEET & ROOF REPLACEMENT LOCATIONS
AutoCAD SHX Text
NOR-BATH TRAIL
AutoCAD SHX Text
NOR-BATH TRAIL
AutoCAD SHX Text
%%UOWNER
AutoCAD SHX Text
EAST ALLEN TOWNSHIP
AutoCAD SHX Text
5344 NOR-BATH BOULEVARD
AutoCAD SHX Text 610.262.7961
AutoCAD SHX Text
NORTHAMPTON, PA 18067
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
RECEIVING WATERSHED
UN-NAMED TRIBUTARY TO
CATASAUQUA CREEK
(CWF, MF)
AutoCAD SHX Text WaC
AutoCAD SHX Text WaB
AutoCAD SHX Text
15" PINE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
20" PINE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
24" PINE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
24" PINE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
EX. ELEC TRANSFORMER METER BASE
AutoCAD SHX Text
EX. GRAVEL (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
EX. PAVE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
SAWCUT EX. PAVE (BY TOWNSHIP)
AutoCAD SHX Text
EX. PAVE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
EX. PAVE (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
EX. PAVE (TO REMAIN)
AutoCAD SHX Text
SAWCUT EX. PAVE (BY TOWNSHIP)
AutoCAD SHX Text
EX. BASEBALL FIELD
AutoCAD SHX Text
(PPL TO RELOCATE EXISTING POLE)
AutoCAD SHX Text
EX. PAVE (TO REMAIN)
AutoCAD SHX Text
SAWCUT EX. PAVE FOR ADA PARKING SIGNS
AutoCAD SHX Text
(TO BE REMOVED TO BE REMOVED BY TOWNSHIP))
AutoCAD SHX Text
EX. PARKING LOT (SHALL NOT BE USED AS A STAGING AREA)
AutoCAD SHX Text
PARK MAINTENANCE USE ONLY
AutoCAD SHX Text
PPL 64178-S50131
AutoCAD SHX Text
PPL 64172-S50156
AutoCAD SHX Text
GRILL
AutoCAD SHX Text
REST ROOMS FF = 409.97
AutoCAD SHX Text
PAVILION "C"
AutoCAD SHX Text
TENNIS COURTS
AutoCAD SHX Text
(TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text
FLAG POLE
AutoCAD SHX Text
EX. PARKING LOT (SHALL NOT BE USED AS A STAGING AREA)
AutoCAD SHX Text 41.7'
AutoCAD SHX Text 35.4'
AutoCAD SHX Text
GRILL (TO BE REMOVED BY TOWNSHIP)
AutoCAD SHX Text THIS DOCUMENT IS THE PROPERTY OF HANOVER ENGINEERING ASSOCIATES, INC. ANY USE OF A COPY OF THIS DOCUMENT THAT DOES NOT CONTAIN AN ORIGINAL SEAL AND SIGNATURE IS STRICTLY PROHIBITED. THIS DOCUMENT IS NOT PUBLISHED AND ALL RIGHTS ARE RESERVED BY HANOVER ENGINEERING ASSOCIATES, INC. THIS PLAN HAS BEEN SEALED WITH EITHER A RED INK SEAL OR A CRIMP SEAL. IF NEITHER APPEARS ON THIS PLAN, POSSIBLE REPRODUCTIONS OR ALTERATIONS MAY HAVE BEEN MADE WITHOUT THE APPROVAL OR KNOWLEDGE OF THE SIGNATORY.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
PLAN TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 1" = '
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CONDITIONS AND DEMOLITION PLAN
AutoCAD SHX Text 1"=20'
AutoCAD SHX Text
SSC
AutoCAD SHX Text
AVY
AutoCAD SHX Text 09/11/2026
AutoCAD SHX Text
EA26-28
AutoCAD SHX Text
AutoCAD SHX Text
BICENTENNIAL PARK PAVILION C & ROOF REPLACEMENTS
AutoCAD SHX Text
EAST ALLEN TOWNSHIP NORTHAMPTON COUNTY PENNSYLVANIA
AutoCAD SHX Text N
AutoCAD SHX Text
%%UOWNER
AutoCAD SHX Text
EAST ALLEN TOWNSHIP
AutoCAD SHX Text
5344 NOR-BATH BOULEVARD
AutoCAD SHX Text 610.262.7961
AutoCAD SHX Text
NORTHAMPTON, PA 18067
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
EXISTING ROAD CENTER LINE
AutoCAD SHX Text
EXISTING EDGE OF PAVEMENT
AutoCAD SHX Text
EXISTING MINOR CONTOUR
AutoCAD SHX Text
EXISTING MAJOR CONTOUR
AutoCAD SHX Text
EXISTING UTILITY POLE
AutoCAD SHX Text
EXISTING IRON PIN/PIPE
AutoCAD SHX Text
EXISTING TREES
AutoCAD SHX Text
EXISTING GUY WIRE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING DRIVEWAY
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXISTING CHAIN LINK FENCE
AutoCAD SHX Text
EXISTING RIGHT-OF-WAY
AutoCAD SHX Text
EXISTING OVERHEAD WIRE
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
EXISTING SIGN
AutoCAD SHX Text
EXISTING MAILBOX
AutoCAD SHX Text
LIMIT OF DISTURBANCE AREA = 34,575.38 S.F. OR 0.79 AC.
AutoCAD SHX Text
EXISTING GRASS AREA
EXISTING GRAVEL DRIVE
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
AutoCAD SHX Text WaC
AutoCAD SHX Text WaB
AutoCAD SHX Text 10.0'
AutoCAD SHX Text 30.7'
AutoCAD SHX Text 38.5'
AutoCAD SHX Text 10.0'
AutoCAD SHX Text
EX. ELEC TRANSFORMER METER BASE
AutoCAD SHX Text
PROPOSED UNDERGROUND ELECTRIC LINE (BY TOWNSHIP)
AutoCAD SHX Text 40.0'
AutoCAD SHX Text 10.0'
AutoCAD SHX Text 10.0'
AutoCAD SHX Text
PROPOSED 3,200 S.F. PAVILION FF = 409.95
AutoCAD SHX Text
EX. PAVE (TO REMAIN)
AutoCAD SHX Text
EX. BASEBALL FIELD
AutoCAD SHX Text
(PPL TO RELOCATE EXISTING POLE)
AutoCAD SHX Text
NEW PAVEMENT
AutoCAD SHX Text
NEW PAVEMENT
AutoCAD SHX Text
ROOF DRAIN WITH CLEANOUT, TYP.
AutoCAD SHX Text
EX. PAVE (TO REMAIN)
AutoCAD SHX Text
4" BLUE LINE STRIPES TO REPLACE EXISTING (TYP.)
AutoCAD SHX Text
WHITE ADA PAVEMENT LEGEND (TYP.)
AutoCAD SHX Text
PROPOSED ADA PARKING SIGNS
AutoCAD SHX Text
CW
AutoCAD SHX Text
SP
AutoCAD SHX Text
HVF
AutoCAD SHX Text
LIMIT OF NEW PAVEMENT
AutoCAD SHX Text
STAGING AREA
AutoCAD SHX Text
RCE
AutoCAD SHX Text
LIMIT OF NEW PAVEMENT
AutoCAD SHX Text 19.1'
AutoCAD SHX Text 19.1'
AutoCAD SHX Text 30.7'
AutoCAD SHX Text R25.0'
AutoCAD SHX Text 12.0'
AutoCAD SHX Text 32.0'
AutoCAD SHX Text 35.7'
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
EX. PARKING LOT (SHALL NOT BE USED AS A STAGING AREA)
AutoCAD SHX Text
PARK MAINTENANCE USE ONLY
AutoCAD SHX Text
PPL 64178-S50131
AutoCAD SHX Text
PPL 64172-S50156
AutoCAD SHX Text
REST ROOMS FF = 409.97
AutoCAD SHX Text
TENNIS COURTS
AutoCAD SHX Text
FLAG POLE
AutoCAD SHX Text
EX. PARKING LOT (SHALL NOT BE USED AS A STAGING AREA)
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
6"PVC RAIN LEADER W/ SURFACE DRAIN OUTLET ENDWALL (2% MIN. SLOPE)
AutoCAD SHX Text
TREE PROTECTION FENCE, TYP.
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text 80.0'
AutoCAD SHX Text
2.0% MAX.
AutoCAD SHX Text
6"PVC RAIN LEADER W/ SURFACE DRAIN OUTLET ENDWALL (2% MIN. SLOPE)
AutoCAD SHX Text
SURFACE DRAIN OUTLET ENDWALL
AutoCAD SHX Text
SURFACE DRAIN OUTLET ENDWALL
AutoCAD SHX Text THIS DOCUMENT IS THE PROPERTY OF HANOVER ENGINEERING ASSOCIATES, INC. ANY USE OF A COPY OF THIS DOCUMENT THAT DOES NOT CONTAIN AN ORIGINAL SEAL AND SIGNATURE IS STRICTLY PROHIBITED. THIS DOCUMENT IS NOT PUBLISHED AND ALL RIGHTS ARE RESERVED BY HANOVER ENGINEERING ASSOCIATES, INC. THIS PLAN HAS BEEN SEALED WITH EITHER A RED INK SEAL OR A CRIMP SEAL. IF NEITHER APPEARS ON THIS PLAN, POSSIBLE REPRODUCTIONS OR ALTERATIONS MAY HAVE BEEN MADE WITHOUT THE APPROVAL OR KNOWLEDGE OF THE SIGNATORY.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
PLAN TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text 1" = '
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ESPC AND GRADING PLAN
AutoCAD SHX Text 1"=20'
AutoCAD SHX Text
SSC
AutoCAD SHX Text
AVY
AutoCAD SHX Text 09/11/2026
AutoCAD SHX Text
EA26-28
AutoCAD SHX Text
AutoCAD SHX Text
BICENTENNIAL PARK PAVILION C & ROOF REPLACEMENTS
AutoCAD SHX Text
EAST ALLEN TOWNSHIP NORTHAMPTON COUNTY PENNSYLVANIA
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
EXISTING ROAD CENTER LINE
AutoCAD SHX Text
EXISTING EDGE OF PAVEMENT
AutoCAD SHX Text
EXISTING MINOR CONTOUR
AutoCAD SHX Text
EXISTING MAJOR CONTOUR
AutoCAD SHX Text
EXISTING UTILITY POLE
AutoCAD SHX Text
EXISTING IRON PIN/PIPE
AutoCAD SHX Text
EXISTING TREES
AutoCAD SHX Text
EXISTING GUY WIRE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING DRIVEWAY
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXISTING CHAIN LINK FENCE
AutoCAD SHX Text
EXISTING RIGHT-OF-WAY
AutoCAD SHX Text
EXISTING OVERHEAD WIRE
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
EXISTING SIGN
AutoCAD SHX Text
EXISTING MAILBOX
AutoCAD SHX Text
LIMIT OF DISTURBANCE AREA = 34,575.38 S.F. OR 0.79 AC.
AutoCAD SHX Text
EXISTING GRASS AREA
AutoCAD SHX Text
EXISTING GRAVEL DRIVE
AutoCAD SHX Text
%%UESPC LEGEND
AutoCAD SHX Text
CONCRETE WASHOUT
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
CW
AutoCAD SHX Text
SP
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text
RCE
AutoCAD SHX Text
ROCK CONSTRUCTION ENTRANCE
AutoCAD SHX Text
PROPOSED BUILDING
AutoCAD SHX Text
PROPOSED CONCRETE WALKWAY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED CONTOUR MAJOR
AutoCAD SHX Text
PROPOSED CONTOUR MINOR
AutoCAD SHX Text 409.68
AutoCAD SHX Text
PROPOSED SPOT ELEVATION
AutoCAD SHX Text
PROPOSED ROOF DRAIN
AutoCAD SHX Text
HIGH VISIBILITY FENCE
AutoCAD SHX Text
HVF
AutoCAD SHX Text N
AutoCAD SHX Text 20'
50'
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
AutoCAD SHX Text THIS DOCUMENT IS THE PROPERTY OF HANOVER ENGINEERING ASSOCIATES, INC. ANY USE OF A COPY OF THIS DOCUMENT THAT DOES NOT CONTAIN AN ORIGINAL SEAL AND SIGNATURE IS STRICTLY PROHIBITED. THIS DOCUMENT IS NOT PUBLISHED AND ALL RIGHTS ARE RESERVED BY HANOVER ENGINEERING ASSOCIATES, INC. THIS PLAN HAS BEEN SEALED WITH EITHER A RED INK SEAL OR A CRIMP SEAL. IF NEITHER APPEARS ON THIS PLAN, POSSIBLE REPRODUCTIONS OR ALTERATIONS MAY HAVE BEEN MADE WITHOUT THE APPROVAL OR KNOWLEDGE OF THE SIGNATORY.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
PLAN TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SSC
AutoCAD SHX Text
AVY
AutoCAD SHX Text 09/11/2026
AutoCAD SHX Text
EA26-28
AutoCAD SHX Text
AutoCAD SHX Text
BICENTENNIAL PARK PAVILION C & ROOF REPLACEMENTS
AutoCAD SHX Text
EAST ALLEN TOWNSHIP NORTHAMPTON COUNTY PENNSYLVANIA
AutoCAD SHX Text
ESPC NOTES
AutoCAD SHX Text STANDARD EROSION AND SEDIMENT CONTROL PLAN NOTES 1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE ENGINEER) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE ENGINEER SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE ENGINEER MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION. 2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER TO AN ON-SITE PRE-CONSTRUCTION MEETING. 3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES. 4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE MUNICIPALITY. 5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. 6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN. 7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN. 8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER. 9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION. 10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE. 11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED. 12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING. 13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS. 14. VEHICLES AND EQUIPMENT MAY ONLY ENTER OR EXIT THE PROJECT SITE VIA THE STABILIZED ROCK CONSTRUCTION VEHICLES AND EQUIPMENT MAY ONLY ENTER OR EXIT THE PROJECT SITE VIA THE STABILIZED ROCK CONSTRUCTION ENTRANCE. 15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. 16. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION. 17. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER. 18. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. 19. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL. 20. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES. 21. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS. 22. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. 23. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. 24. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. 25. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD. 26. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN. 27. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS. 28. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS. 29. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT. 30. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE PROJECT ENGINEER FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS. 31. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON. 32. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE PROJECT ENGINEER TO SCHEDULE A FINAL INSPECTION. 33. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION. 34. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS. 35. FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS.
AutoCAD SHX Text SEQUENCE OF CONSTRUCTION: 1. SCHEDULE A PRE-CONSTRUCTION CONFERENCE AND PROVIDE AT LEAST TEN (10) WORKING DAYS' NOTICE TO SCHEDULE A PRE-CONSTRUCTION CONFERENCE AND PROVIDE AT LEAST TEN (10) WORKING DAYS' NOTICE TO THE FOLLOWING AGENCIES PRIOR TO THE COMMENCEMENT OF SITE WORK: a. PROJECT ENGINEER: 610.691.5644 PROJECT ENGINEER: 610.691.5644 b. PA ONE CALL: 1.800.242.1776 PA ONE CALL: 1.800.242.1776 c. EAST ALLEN TOWNSHIP: 610.262.7961 EAST ALLEN TOWNSHIP: 610.262.7961 2. THE CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER AT LEAST FORTY-EIGHT HOURS (48 HOURS) IN THE CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER AT LEAST FORTY-EIGHT HOURS (48 HOURS) IN ADVANCE OF EROSION CONTROL FACILITIES COMPONENT INSTALLATIONS. 3. DISTURBED AREAS SHALL NOT BE STRIPPED OF TOPSOIL FOR MORE THAN FOUR (4) DAYS WITHOUT TEMPORARY DISTURBED AREAS SHALL NOT BE STRIPPED OF TOPSOIL FOR MORE THAN FOUR (4) DAYS WITHOUT TEMPORARY STABILIZATION. 4. NO SOIL IS TO BE HAULED OFFSITE WITHOUT SEPARATE EROSION AND SEDIMENTATION POLLUTION CONTROL PLAN NO SOIL IS TO BE HAULED OFFSITE WITHOUT SEPARATE EROSION AND SEDIMENTATION POLLUTION CONTROL PLAN REVIEWED BY DESIGN ENGINEER. 5. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A UNIFORM MINIMUM AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A UNIFORM MINIMUM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING OR OTHER MOVEMENT. 6. INSTALL THE ROCK CONSTRUCTION AT THE LOCATION SHOWN ON THE PLANS. INSTALL THE ROCK CONSTRUCTION AT THE LOCATION SHOWN ON THE PLANS. 7. FLAG THE LIMITS OF DISTURBANCE/CONSTRUCTION AS SHOWN ON THE PLANS AND INSTALL THE HIGH VISIBILITY FLAG THE LIMITS OF DISTURBANCE/CONSTRUCTION AS SHOWN ON THE PLANS AND INSTALL THE HIGH VISIBILITY FENCE. NO EARTH DISTURBANCE SHALL TAKE PLACE OUTSIDE OF THESE LIMITS WITHOUT APPROVAL FROM THE APPROPRIATE LOCAL, STATE, AND FEDERAL AGENCIES. 8. LAY OUT AND ROUGH STAKE THE PROPOSED IMPROVEMENTS. SOIL STOCKPILE SHALL BE AT THE LOCATION LAY OUT AND ROUGH STAKE THE PROPOSED IMPROVEMENTS. SOIL STOCKPILE SHALL BE AT THE LOCATION SHOWN ON THE PLANS. 9. INSTALL THE SILT SOCKS AS SHOWN ON THE PLANS. INSTALL THE SILT SOCKS AS SHOWN ON THE PLANS. 10. REMOVE ALL ITEMS DESIGNATED ON THE PLANS AS TO BE REMOVED. THE MATERIAL SHALL BE DISPOSED IN REMOVE ALL ITEMS DESIGNATED ON THE PLANS AS TO BE REMOVED. THE MATERIAL SHALL BE DISPOSED IN ACCORDANCE WITH THE PLANS. 11. ROUGH GRADE THE SITE FOR THE INSTALLATION OF THE PAVILION AND CONCRETE WALKWAYS. ROUGH GRADE THE SITE FOR THE INSTALLATION OF THE PAVILION AND CONCRETE WALKWAYS. 12. CONSTRUCT THE PROPOSED PAVILION, INCLUDING THE RAIN LEADERS AS SHOWN ON THE PLANS. UTILIZE THE CONSTRUCT THE PROPOSED PAVILION, INCLUDING THE RAIN LEADERS AS SHOWN ON THE PLANS. UTILIZE THE CONCRETE WASHOUT AS NECESSARY. IMMEDIATELY STABILIZE ALL DISTURBED AREAS. 13. CONSTRUCT THE PROPOSED CONCRETE WALKWAY AND PATHWAY PAVEMENT AS SHOWN ON THE PLANS. UTILIZE CONSTRUCT THE PROPOSED CONCRETE WALKWAY AND PATHWAY PAVEMENT AS SHOWN ON THE PLANS. UTILIZE THE CONCRETE WASHOUT AS NECESSARY. IMMEDIATELY STABILIZE ALL DISTURBED AREAS. 14. INSTALL THE ADA PARKING SIGNS, ADA LEGEND, AND ADA LINE STRIPING AS SHOWN ON THE PLANS. INSTALL THE ADA PARKING SIGNS, ADA LEGEND, AND ADA LINE STRIPING AS SHOWN ON THE PLANS. 15. FINAL GRADE, TOPSOIL, SEED, AND MULCH ALL DISTURBED AREAS TO BE MADE LAWN. FINAL GRADE, TOPSOIL, SEED, AND MULCH ALL DISTURBED AREAS TO BE MADE LAWN. 16. REMOVE ANY REMAINING TEMPORARY EROSION CONTROLS ONCE THE ENTIRETY OF THE SITE HAS ACHIEVED REMOVE ANY REMAINING TEMPORARY EROSION CONTROLS ONCE THE ENTIRETY OF THE SITE HAS ACHIEVED PERMANENT STABILIZATION. ALL AREAS DISTURBED DURING THE REMOVAL OF THE TEMPORARY EROSION CONTROLS SHOULD BE IMMEDIATELY REPAIRED AND PERMANENTLY STABILIZED. 17. NO SOIL IS TO BE HAULED OFF-SITE WITHOUT SEPARATE EROSION AND SEDIMENTATION POLLUTION CONTROL NO SOIL IS TO BE HAULED OFF-SITE WITHOUT SEPARATE EROSION AND SEDIMENTATION POLLUTION CONTROL PLAN REVIEWED BY THE DESIGN ENGINEER. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A UNIFORM MINIMUM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING OR OTHER MOVEMENT.
AutoCAD SHX Text TEMPORARY STABILIZATION & PERMANENT STABILIZATION 1. HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE. HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE. 2. STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN. STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN. 102.4(B)(5)(X) "A MAINTENANCE PROGRAM WHICH PROVIDES FOR INSPECTION OF BMPS ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RAINFALL EVENT, INCLUDING THE REPAIR OF THE BMPS TO ENSURE EFFECTIVE AND EFFICIENT OPERATION." 3. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING, AND RE-NETTING, MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. E&SPCPM P168 4. SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN TOPSOIL STOCKPILES. 102.4(B)(5)(XI) "PROCEDURES WHICH ENSURE THAT THE PROPER MEASURES FOR THE RECYCLING OR DISPOSAL OF MATERIALS ASSOCIATED WITH OR FROM THE PROJECT SITE WILL BE UNDERTAKEN IN ACCORDANCE WITH THIS TITLE." 5. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE." 6. SOIL/ROCK DISPOSAL AREAS SHOULD BE ADDRESSED IN THE NARRATIVE AND ON THE DRAWINGS WITH APPROPRIATE BMPS SOIL/ROCK DISPOSAL AREAS SHOULD BE ADDRESSED IN THE NARRATIVE AND ON THE DRAWINGS WITH APPROPRIATE BMPS (E.G. THE OPERATOR SHALL ASSURE THAT AN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN PREPARED, APPROVED BY THE CONSERVATION DISTRICT AND IS BEING IMPLEMENTED AND MAINTAINED FOR ALL PROPOSED SOIL/ROCK SPOIL AND BORROW AREAS ON OR OFFSITE.).
AutoCAD SHX Text
CERTIFICATION OF ORIGIN/CLEAN FILL
AutoCAD SHX Text APPLICANTS MUST USE ENVIRONMENTAL DUE DILIGENCE TO ENSURE THAT FILL MATERIAL ON ALL PROJECTS QUALIFIES AS CLEAN FILL. ALL FILL MATERIAL MUST BE USED IN ACCORDANCE WITH THE DEPARTMENT OF ENVIRONMENTAL PROTECTION'S POLICY "MANAGEMENT OF FILL" DOCUMENT # 258-2182-773. ENVIRONMENTAL DUE DILIGENCE - INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF OWNERSHIP AND USE HISTORY OF PROPERTY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. CLEAN FILL - UNCONTAMINATED, NONWATER-SOLUBLE, NON-DECOMPOSABLE INERT SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND RECOGNIZABLE AS SUCH. (25 PA. CODE §§ 271.101 AND 287.101) THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. OFF-SITE BORROW OR DISPOSAL AREAS. IT IS INTENDED THAT ANY BORROW OR DISPOSAL AREAS FOR THIS SITE SHALL BE ACQUIRED FROM OR DISPOSED OF ON THIS SITE. COMPLETE AND SUBMIT FORM FP-001 CERTIFICATION FOR ALL FILL IMPORTED TO THE PROJECT SITE.
AutoCAD SHX Text LOCATION OF MEASURES AND FACILITIES THE REQUIRED LOCATIONS OF THE PERMANENT CONTROL MEASURES WILL BE DETERMINED BY THE ENGINEER DURING/AFTER CONSTRUCTION AND WILL BE INSTALLED TO STABILIZE THE PROJECT AS PART OF THE CONTRACTOR'S RESPONSIBILITY. DIMENSIONED DETAILS OF THE FACILITIES ALL ITEMS TO BE USED IN THIS PROJECT SHALL BE CONSTRUCTED TO PREVAILING STANDARDS. DETAILS OF SPECIAL EROSION CONTROL FACILITIES, I.E. SILT FENCE, ETC., ARE NOTED ON THE PROJECT PLANS. 102.5(B)(8) MAINTENANCE OF CONTROL FACILITIES DISPOSAL OF MATERIALS FROM THE CONTROL FACILITIES SEDIMENT WHICH HAS BEEN TRAPPED BY SILT BARRIER FACILITIES MUST BE REMOVED AND STOCKPILED OR REDISTRIBUTED ON THE PROJECT SITE. ALL CONSTRUCTION DEBRIS OR OTHER UNSUITABLE MATERIALS SHALL BE REMOVED BY THE CONTRACTOR AND DISPOSED OF IN A LAWFUL MANNER. WASHING OF FILTER STONE AND REDISTRIBUTION OF WET SEDIMENT SHALL BE ONLY PERMITTED UPHILL OF AN EFFECTIVE SEDIMENT FILTER FACILITY. SILT LADEN RUN-OFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY TO UNPROTECTED INLETS, BASINS, ADJACENT PROPERTIES, ROADWAYS, OR WETLANDS. ALL SILT BARRIER FACILITIES MUST BE CHECKED FOR CAPACITY AND PROPER FUNCTION WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL ALL UPSTREAM AREAS HAVE A UNIFORM PERENNIAL VEGETATIVE COVER OF OVER SEVENTY (70) PERCENT. RECYCLING AND/OR DISPOSAL OF MATERIALS ASSOCIATED WITH OR FROM THE PROJECT SITE MUST BE IN ACCORDANCE WITH PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
AutoCAD SHX Text RECYCLING AND DISPOSAL OF MATERIALS IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH, AND TO INFORM HIS WORKERS OF ALL LOCAL, STATE, AND FEDERAL ENVIRONMENTAL REGULATIONS REGARDING THE CONDUCT OF WORK AND HANDLING OF MATERIALS ON THE PROJECT, AND TO PERFORM ALL ACTIVITIES IN ACCORDANCE WITH THOSE REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING EMERGENCY RESPONSE PLANS FOR ANY HAZARDOUS OR POLLUTING MATERIALS USED IN THE WORK. ALL RUBBISH OR WASTE MATERIALS PRODUCED BY CONTRACTOR'S WORKERS SHALL BE PROTECTED FROM DISSEMINATION BY WIND, RAIN, OR ANIMALS, AND SHALL BE LEGALLY DISPOSED OF REGULARLY. ANY CONSTRUCTION DEBRIS OR OTHER UNSUITABLE MATERIALS TRAPPED BY SILT BARRIER FACILITIES SHALL BE SEPARATED FROM SOIL MATERIALS AND DISPOSED OF IN A LAWFUL MANNER. SEDIMENT WHICH HAS BEEN TRAPPED BY SILT BARRIER FACILITIES MUST BE REMOVED AND STOCKPILED OR REDISTRIBUTED ON THE PROJECT SITE. SEDIMENT WHICH COLLECTS TO THE SPECIFIED CLEAN-OUT ELEVATION IN THE BOTTOM OF STORMWATER MANAGEMENT PONDS, OR THE SPECIFIED ELEVATIONS IN SEDIMENT TRAPS, MUST BE REMOVED AND STOCKPILED OR REDISTRIBUTED AND STABILIZED ON THE PROJECT SITE. WASHING OF FILTER STONE AND RE-DISTRIBUTION OF WET SEDIMENT FROM BASINS, TRAPS OR OTHER FACILITIES SHALL BE ONLY PERMITTED UPHILL OF AN EFFECTIVE SEDIMENT FILTER FACILITY. SILT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY TO UNPROTECTED CATCH BASINS, PONDS, ADJACENT PROPERTIES, ROADS, STREAMS OR WETLANDS. IF THE CONTRACTOR EXPECTS TO RECYCLE OR DISPOSE OF ANY SOIL OR ROCK MATERIAL TO LOCATIONS OTHER THAN THE PROJECT AREA FOR WHICH THIS PLAN AND NARRATIVE HAVE BEEN PREPARED, THE CONTRACTOR SHALL ARRANGE FOR PREPARATION AND SUBMITTAL TO THE APPROPRIATE COUNTY CONSERVATION DISTRICT OF EROSION AND SEDIMENT CONTROL PLANS FOR ALL SUCH OFF-PROJECT AREAS PRIOR TO COMMENCEMENT OF WORK.
AutoCAD SHX Text PERMANENT SEEDING - IMMEDIATELY UPON FINAL GRADING OF ANY PHASE - IMMEDIATELY UPON FINAL GRADING OF ANY PHASE OR SECTION, TOPSOIL SHALL BE BROUGHT BACK OVER THE DISTURBED AREAS WHICH ARE NOT TO BE PAVED OR BUILT UPON. THIS TOPSOIL SHALL BE SPREAD TO A SMOOTH FINISH GRADE WITH A MINIMUM DEPTH OF SIX (6) INCHES. THE TOPSOIL SHALL THEN BE: A. RAKED FREE OF STONES; RAKED FREE OF STONES; B. LIMED AND FERTILIZED AS NECESSARY; LIMED AND FERTILIZED AS NECESSARY; C. PLANTED WITH GRASS OR OTHER SPECIFIED SEED; PLANTED WITH GRASS OR OTHER SPECIFIED SEED; D. MULCHED OR MATTED TO PROTECT THE SEED FROM DRYNESS AND EROSION (STRAW OR MULCHED OR MATTED TO PROTECT THE SEED FROM DRYNESS AND EROSION (STRAW OR HAY AT 1,200 LB. PER 1,000 SQ. YD.). IT IS RECOMMENDED THAT THE CONTRACTOR TAKE SOIL SAMPLES TO ENSURE THE PROPOSED SEED MIXTURE WILL PROVIDE ADEQUATE COVER. PERMANENT SEEDING SHALL BE UNDERTAKEN IN ACCORDANCE WITH PENNDOT, FORM 408 SPECIFICATIONS AS FOLLOWS: A. PENNDOT FORMULA "B" (PRIMARILY KENTUCKY BLUEGRASS AND CREEPING RED OR CHEWING PENNDOT FORMULA "B" (PRIMARILY KENTUCKY BLUEGRASS AND CREEPING RED OR CHEWING FESCUE) SPREAD AT A RATE OF 42 POUNDS PER 1,000 SQUARE YARDS, OR OTHER SEED MIX APPROVED FOR THE AREA. SPREAD FORMULA "B" FROM MARCH 15 TO JUNE 1, OR FROM AUGUST 1 TO OCTOBER 15. ALTERNATES SEED MIXTURES SHALL FOLLOW PENN STATE AGRONOMY GUIDE OR ERNST SEED GUIDELINES. A. ALTERNATE SEED MIXES, BASED ON SECTION IX OF THE "PENN STATE AGRONOMY GUIDE", ALTERNATE SEED MIXES, BASED ON SECTION IX OF THE "PENN STATE AGRONOMY GUIDE", MAY BE USED ONLY IF APPROVED IN WRITING IN ADVANCE OF PLACEMENT BY THE PROJECT ENGINEER AND THE LEHIGH COUNTY CONSERVATION DISTRICT. B. AREAS OF LANDSCAPING RESTORATION SHALL RECEIVE ERNST SEED MIX 114 OR APPROVED AREAS OF LANDSCAPING RESTORATION SHALL RECEIVE ERNST SEED MIX 114 OR APPROVED EQUAL. PULVERIZED AGR. LIMESTONE, 800 LBS. PER 1,000 S.Y. ANALYSIS COMMERCIAL 10-20-20, 140 LBS. PER 1,000 S.Y. UREAFORM FERTILIZER 38-0-0, 50 LBS. PER 1,000 S.Y. IBDUFERTILIZER 31-0-0, 61 LBS. PER 1,000 S.Y. MULCH OR APPLY HAY AT 1,200 LBS. PER 1,000 S.Y. TO SEEDED AREAS TO PROTECT THE SEED FROM DRYNESS AND EROSION.
LIME AND FERTILIZER SPECIFICATIONS
Br od he ad
R oa d, S ui te
Be th le he m , P
A
7-
0.
1.
F:
0.
1.
H an ov er
En g.
co m
Be th le he m O ffi ce
5'
(OUTLET ENDWALL)
AutoCAD SHX Text THIS DOCUMENT IS THE PROPERTY OF HANOVER ENGINEERING ASSOCIATES, INC. ANY USE OF A COPY OF THIS DOCUMENT THAT DOES NOT CONTAIN AN ORIGINAL SEAL AND SIGNATURE IS STRICTLY PROHIBITED. THIS DOCUMENT IS NOT PUBLISHED AND ALL RIGHTS ARE RESERVED BY HANOVER ENGINEERING ASSOCIATES, INC. THIS PLAN HAS BEEN SEALED WITH EITHER A RED INK SEAL OR A CRIMP SEAL. IF NEITHER APPEARS ON THIS PLAN, POSSIBLE REPRODUCTIONS OR ALTERATIONS MAY HAVE BEEN MADE WITHOUT THE APPROVAL OR KNOWLEDGE OF THE SIGNATORY.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
PLAN TITLE:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SEAL:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SSC
AutoCAD SHX Text
AVY
AutoCAD SHX Text 09/11/2026
AutoCAD SHX Text
EA26-28
AutoCAD SHX Text
AutoCAD SHX Text
BICENTENNIAL PARK PAVILION C & ROOF REPLACEMENTS
AutoCAD SHX Text
EAST ALLEN TOWNSHIP NORTHAMPTON COUNTY PENNSYLVANIA
AutoCAD SHX Text
ESPC DETAILS
AutoCAD SHX Text
12" MIN
AutoCAD SHX Text
SECTION VIEW
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL (MAR. 2012). COMPOST SHALL MEET THE FOLLOWING STANDARDS:
AutoCAD SHX Text Standard Construction Detail # 4-1
AutoCAD SHX Text
%%UCOMPOST FILTER SOCK
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
2"X2" WOODEN STAKES PLACED 10' O.C.
AutoCAD SHX Text
BROWN/PLACED FILTER MEDIA
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
2"X2" WOODEN STAKES PLACED 10' O.C.
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
ORGANIC MATTER CONTENT
AutoCAD SHX Text
80% - 100% (DRY WEIGHT BASIS)
AutoCAD SHX Text
ORGANIC PORTION
AutoCAD SHX Text
FIBROUS AND ELOGATED
AutoCAD SHX Text pH
AutoCAD SHX Text
5.5 - 8.0
AutoCAD SHX Text
MOISTURE CONTENT
AutoCAD SHX Text 35% - 55%
AutoCAD SHX Text
PARTICLE SIZE
AutoCAD SHX Text
98% PASS THROUGH 1" SCREEN
AutoCAD SHX Text
SOLUBLE SALT CONCENTRATION
AutoCAD SHX Text
5.0 dS/m (mmhos/cm) MAXIMUM
AutoCAD SHX Text %%UGeneral Notes:
AutoCAD SHX Text
1. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT (SEE FIGURE 4.1 OF THE PA DEP EROSION AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL, MAR. 2012). MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT SHOWN OF FIGURE 4.2 OF THE PA DEP EROSION AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL (MAR. 2012). STAKES MAY BE INSTALLED IMMEDIATELY DOWNSLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER. 2. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS. 3. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT OF THE SOCK AND DISPOSED IN THE ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN. 4. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION. 5. BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 6. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
AutoCAD SHX Text
MATERIAL TYPE
AutoCAD SHX Text 3 mil HDPE
AutoCAD SHX Text 5 mil HDPE
AutoCAD SHX Text 5 mil HDPE
AutoCAD SHX Text
MULTI-FILAMENT POLYPROPYLENE (MFPP)
AutoCAD SHX Text
HEAVY DUTY MULTI-FILAMENT POLYPROPYLENE (HDMFPP)
AutoCAD SHX Text
MATERIAL CHARACTERISTICS
AutoCAD SHX Text
SOCK DIAMETERS
AutoCAD SHX Text
MESH OPENING
AutoCAD SHX Text
TENSILE STRENGTH
AutoCAD SHX Text
ULTRAVIOLET STABILITY % ORIGINAL STRENGTH (ASTM G-155)
AutoCAD SHX Text
MINIMUM FUNCTIONAL LONGEVITY
AutoCAD SHX Text
TWO-PLY SYSTEMS
AutoCAD SHX Text
INNER CONTAINMENT NETTING
AutoCAD SHX Text
HDPE BIAXIAL NET
AutoCAD SHX Text
CONTINUOUSLY WOUND
AutoCAD SHX Text
FUSION-WELD JUNCTURES
AutoCAD SHX Text
3/4" X 3/4" MAX. APERTURE SIZE
AutoCAD SHX Text
OUTER FILTRATION MESH
AutoCAD SHX Text COMPOSITE POLYPROPYLENE FABRIC (WOVEN LAYER & NON-WOVEN FLEECE MECHANICALLY FUSED VIA NEEDLE PUNCH)
AutoCAD SHX Text
3/16" MAX. APERTURE SIZE
AutoCAD SHX Text SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS.
AutoCAD SHX Text 12" 18"
AutoCAD SHX Text 12" 18" 24" 32"
AutoCAD SHX Text 12" 18" 24" 32"
AutoCAD SHX Text 12" 18" 24" 32"
AutoCAD SHX Text 12" 18" 24" 32"
AutoCAD SHX Text 3/8"
AutoCAD SHX Text 3/8"
AutoCAD SHX Text 3/8"
AutoCAD SHX Text 3/8"
AutoCAD SHX Text 1/8"
AutoCAD SHX Text 26 psi
AutoCAD SHX Text 26 psi
AutoCAD SHX Text 44 psi
AutoCAD SHX Text 202 psi
AutoCAD SHX Text
PHOTO - DEGRADABLE
AutoCAD SHX Text
PHOTO - DEGRADABLE
AutoCAD SHX Text
PHOTO - DEGRADABLE
AutoCAD SHX Text
PHOTO - DEGRADABLE
AutoCAD SHX Text
BIO - DEGRADABLE
AutoCAD SHX Text
6 MONTHS
AutoCAD SHX Text
9 MONTHS
AutoCAD SHX Text
6 MONTHS
AutoCAD SHX Text
1 YEAR
AutoCAD SHX Text
2 YEARS
AutoCAD SHX Text
23% AT 1000 HR.
AutoCAD SHX Text
23% AT 1000 HR.
AutoCAD SHX Text
100% AT 1000 HR.
AutoCAD SHX Text
100% AT 1000 HR.
AutoCAD SHX Text
TABLE 4.1 COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
AutoCAD SHX Text
TABLE 4.2
AutoCAD SHX Text
COMPOST STANDARDS
AutoCAD SHX Text
ORGANIC MATTER CONTENT
AutoCAD SHX Text
25% - 100% (DRY WEIGHT BASIS)
AutoCAD SHX Text
ORGANIC PORTION
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .