09 -- CONFORMED IFB -- 21B0002 -- HH Domestic Water Well (3-8-21).pdf
PDF 4 MB Posted
- Attached to
- Hungry Horse Domestic Water Well Plan
- Solicitation number
- 140R1021B0002
About this file
This invitation for bid solicits offers for the Hungry Horse Domestic Water Well Plan project located in Flathead County, Montana. The scope of work includes mobilizing a drill rig to the site, drilling a groundwater well, installing casing and liner, conducting a pump test, and demobilizing. Offers are due by April 13, 2021 and the performance period is 180 calendar days after notice to proceed. The government will award a firm-fixed price contract to the responsible bidder with the lowest price based on Price Schedule A, which includes line items for mobilization, drilling, casing installation, annular sealing, well development, pump testing, video inspection, disinfection, and demobilization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HH H20 Q-A (Amend 00001) (4-5-21)_0001.pdf | ||
| HH Domestic Well SITE VISIT Roster_0001.pdf | ||
| Sol_140R1021B0002_Amd_0001.pdf | ||
| Sol_140R1021B0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Columbia Pacific Northwest Interior Region 9 Boise, Idaho September 2020
Hungry Horse Domestic Water Well Plan
Hungry Horse Project, Montana
Columbia-Pacific 9
HUNGRY HORSE DOMESTIC WATER WELL PLAN
HUNGRY HORSE PROJECT, MONTANA
FOREWORD
Domestic Drinking Water Supply Groundwater Well Development Hungry Horse Dam Domestic Well Hungry Horse Dam Field Office, Montana
Work is located approximately 8 miles Southeast of Columbia Falls, Montana in Flathead County. Principal components of the work includes mobilizing a drill rig to the site, drilling a groundwater well, and testing the well.
PRE-BID SITE VISIT: SEE SECTION L FOR SITE VISIT INFORMATION.
ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD HATS,
AND SAFETY VESTS.
FOR DATE AND PLACE OF BID OPENING, SEE "SOLICITATION, OFFER,
AND AWARD," STANDARD FORM 1442.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S
PUBLICATION "RECLAMATION SAFETY AND HEALTH STANDARDS"
INCLUDING REVISIONS AT http://www.usbr.gov/ssle/safety/RSHS/rshs.html)
WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE
AT "WBR 1452.223-81 SAFETY AND HEALTH."
Hungry Horse Dam Domestic Water Well Plan Hungry Horse Project, Montana Solicitation No. 140R1021B0002 i
PART I THE SCHEDULE .............................................................................................. A-1
SECTION A SOLICITATION/CONTRACT FORM ..................................................... A-2
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS................................... B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ............... C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 31 22 Coordination Meetings 01 31 30 Contract Document Management System 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 35 Oil Spill Prevention 01 74 00 Cleaning and Waste Management
DIVISION 31 - EARTHWORK
31 11 00 Clearing and Grubbing 31 25 10 Erosion Control
DIVISION 33 - UTILITIES
33 21 00 Construction Facilities and Temporary Controls 33 21 01 Drilling 33 21 02 Well Casing and Liner 33 21 03 Annular Seal 33 21 04 Well Development 33 21 05 Pump Testing 33 21 06 Water Quality Testing 33 21 07 Video Inspection 33 21 08 Disinfection and Capping 33 21 09 Demobilization and Site Clean Up 33 21 10 Well Abandonment
DIVISION 52 - DRAWINGS
52 00 00 Drawings ii
SECTION D PACKAGING AND MARKING.............................................................. D-1
SECTION E INSPECTION AND ACCEPTANCE ........................................................E-1
E.1. 52.236-5 Material and Workmanship (Apr 1984)..................................................E-1
E.2. 52.246-12 Inspection of Construction (Aug 1996) ................................................E-1
E.3. 52.246-21 Warranty of Construction (Mar 1994) Alternate I (Apr 1984). ..............E-1
SECTION F DELIVERIES AND PERFORMANCE ..................................................... F-1
F.1. 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) ..... F-1
F.2. 52.211-12 Liquidated Damages - Construction (Sep 2000) ................................... F-1
F.3. 52.211-18 Variation in Estimated Quantity (Apr 1984) ......................................... F-1
F.4. 52.242-14 Suspension of Work (Apr 1984) .......................................................... F-1
SECTION G CONTRACT ADMINISTRATION .......................................................... G-1
G.1. Government Point of Contact.............................................................................. G-1
G.2. 1452.201-70 Authorities and Delegations ............................................................ G-1
G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) ............................................................................................. G-1
G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018).......................................................... G-2
SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................. H-1
H.1. Key Personnel Requirements – Bureau of Reclamation – PN Region (Feb 1995) .. H-1
PART II CONTRACT CLAUSES .................................................................................... H-1
SECTION I CONTRACT CLAUSES ............................................................................I-1
I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) .......................................I-1
I.2. 52.202-1 Definitions (Nov 2013) ..........................................................................I-1
I.3. 52.203-3 Gratuities (Apr 1984) .............................................................................I-1
I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) ......................................I-1
I.5. 52.203-6 Restriction on Subcontractor Sales to the Government (June 2020)..........I-1
I.6. 52.203-7 Anti-Kickback Procedures (June 2020) ...................................................I-1
I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) .......................................................................................................I-1
I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ....I-1
I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Actions (June 2020) I-1 iii
I.10. 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (June 2020) .............................................................I-1
I.11. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) .....................................................................................................I-1
I.12. 1452.203-70 Restrictions on Endorsements – Department of Interior (Jul 1996) .....I-1
I.13. 52.204-4 Printed or Copied Doubled-Sided on Postconsumer Fiber Content Paper (May2011) .....................................................................................................................I-1
I.14. DOI-AAAP-0081 Security Requirements: Facility Access Information Technology (Aug 2016).....................................................................................................................I-1
I.15. 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) ...........I-6
I.16. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) ......................................................................................................................I-6
I.17. 52.204-12 Unique Entity Identifier Maintenance (Oct 2016) ..................................I-6
I.18. 52.204-13 System for Award Management (Oct 2018) ..........................................I-6
I.19. 52.204-14 Service Contract Reporting Requirements (Oct 2016)............................I-6
I.20. 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) .....I-6
I.21. 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) I-6
I.22. 52.204-21 Basic Safeguarding of Covered Contract Information Systems (Jun 2016)I-
I.23. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) .............I-8
I.24. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) ..............................................................I-8
I.25. 1452.204-70 Release of Claims – Department of Interior (Jul 1996).....................I-10
I.26. 52.204-19 Incorporation by Reference Representations and Certifications (Dec 2014) I-10
I.27. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (June 2020) ....................I-10
I.28. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) I-10
I.29. 52.214-26 Audit and Records-Sealed Bidding (Jun 2020). ...................................I-10
I.30. 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data- Modifications-Sealed Bidding (Jun 2020)......................................................................I-11 iv
I.31. 52.214-28 Subcontractor Certified Cost or Pricing Data-Modifications-Sealed Bidding (Jun 2020). ......................................................................................................I-11
I.32. 52.214-29 Order of Precedence-Sealed Bidding (Jan 1986)..................................I-11
I.33. 52.219-8 Utilization of Small Business Concerns (Nov 2016) ..............................I-11
I.34. 52.219-28 Post Award Small Business Program Representation (May 2020) ........I-11
I.35. 52.222-3 Convict Labor (Jun 2003).....................................................................I-11
I.36. 52.222-4 Contract Work Hours and Safety Standards (Mar 2018) ........................I-11
I.37. 52.222-6 Construction Wage Rate Requirements (Oct 2020)................................I-11
I.38. 52.222-7 Withholding of Funds (May 2014)........................................................I-11
I.39. 52.222-8 Payrolls and Basic Records (Aug 2018) ................................................I-11
I.40. 52.222-9 Apprentices and Trainees (Jul 2005) .....................................................I-11
I.41. 52.222-10 Compliance with Copeland Act Requirements (Feb 1998) ...................I-11
I.42. 52.222-11 Subcontracts (Labor Standards) (May 2014) .......................................I-11
I.43. 52.222-12 Contract Termination – Debarment (May 2014) ..................................I-11
I.44. 52.222-13 Compliance with Construction Wage Rate Requirements and Relation Regulations (May 2014) ...............................................................................................I-11
I.45. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) ...............................I-11
I.46. 52.222-15 Certification of Eligibility (May 2014)................................................I-11
I.47. 52.222-19 Child Labor – Cooperation with Authorities and Remedies (Jan 2020).I-11
I.48. 52.222-21 Prohibition of Segregated Facilities (Apr 2015)...................................I-11
I.49. 52.222-26 Equal Opportunity (Sep 2016) ............................................................I-11
I.50. 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) I-11
I.51. 52.222-35 Equal Opportunity for Veterans(June 2020) ........................................I-11
I.52. 52.222-36 Equal Opportunity for Workers with Disabilities (June 2020) ..............I-12
I.53. 52.222-37 Employment Reports on Veterans (Jun 2020)......................................I-12
I.54. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ...................................................................................................................I-12
I.55. 52.222-50 Combating Trafficking of Persons (Oct 2020) .....................................I-12
I.56. 52.222-54 Employment Eligibility Verification (Oct 2015) ..................................I-12
I.57. 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) ...............I-12
I.58. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) ..................I-13 v
I.59. 52.222-99 Combating Race and Sex Stereotyping. [(DEVIATION 20-09)](Nov 2020) I-13
I.60. 52.223-3 Hazardous Materials Identification and Material Safety Data (Jan 1997), Alternate I (July 1995) ..................................................................................................I-14
I.61. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) .........I-14
I.62. 52.223-6 Drug Free Workplace (May 2001) ........................................................I-14
I.63. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (June 2020) ..................................................................................................................I-15
I.64. 52.223-20 Aerosols (Jun 2016) ...........................................................................I-15
I.65. 52.223-21 Foams (Jun 2016)...............................................................................I-15
I.66. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Oct 1992) I-15
I.67. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Dec 2009) .........I-15
I.68. WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace (Dec 2009) ...................................................I-16
I.69. WBR 1452.223-84 Nonconforming Hazardous Materials (October 2017) ............I-16
I.70. WBR 1452.223-85 Preservation, Packaging, Packing, Marking, and Labeling of Hazardous Materials (HAZMAT) For Shipments (October 2017)...................................I-17
I.71. 52.225-9 Buy American -Construction Materials (May 2014) ..............................I-18
I.72. 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008) .........................I-22
I.73. 52.227-1 Authorization and Consent (Jun 2020) ..................................................I-23
I.74. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) I-24
I.75. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) .........................I-24
I.76. 52.227-17 Rights in Data-Special Works (Dec 2007). ..........................................I-24
I.77. 52.228-2 Additional Bond Security (Oct 1997)....................................................I-24
I.78. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) ...................I-24
I.79. 52.228-11 Pledges of Assets (Aug 2018) .............................................................I-24
I.80. 52.228-12 Prospective Subcontract Requests for Bonds (May 2014) ....................I-24
I.81. 52.228-14 Irrevocable Letter of Credit (Nov 2014) ..............................................I-24
I.82. 52.228-15 Performance and Payment Bonds – Construction (Jun 2020) ...............I-24
I.83. 1452.228-70 Liability Insurance – Department of Interior (Jul 1996)....................I-25
I.84. WBR 1452.228-84 Certification of Representatives for Corporate Sureties (Jul 1993) I-26 vi
I.85. 52.229-3 Federal, State, and Local Taxes (Feb 2013)...........................................I-26
I.86. WBR 1452.231-81 Equipment Ownership and Operating Expense (Jul 1998) ......I-26
I.87. 52.232-5 Payment Under Fixed-Price Construction Contracts (May 2014) ...........I-28
I.88. 52.232-16 Progress Payments (Jun 2020), Alternate I (Mar 2000). .......................I-28
I.89. 52.232-17 Interest (May 2014)............................................................................I-28
I.90. 52.232-23 Assignment of Claims (May 2014) .....................................................I-28
I.91. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017).......................I-28
I.92. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) ....................................................................................................................I-28
I.93. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) ...................I-28
I.94. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) I-28
I.95. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (Sep 2003), Alternate I (May 2000) ...........................................................I-29
I.96. WBR 1452.232-82 Other Invoice Requirements – Bureau of Reclamation (Dec 2002) I-30
I.97. 52.233-1 Disputes (Mar 2014), Alternate I (Dec 1991) ........................................I-31
I.98. 52.233-3 Protest After Award (Aug 1996) ...........................................................I-31
I.99. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) .....................I-31
I.100. WBR 1452.233-81 Claims Accounting – Bureau of Reclamation (Jul 1993).........I-31
I.101. 52.236-2 Differing Site Conditions (Apr 1984)....................................................I-31
I.102. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) ...............I-31
I.103. 52.236-6 Superintendence by the Contractor (Apr 1984)......................................I-31
I.104. 52.236-7 Permits and Responsibilities (Nov 1991) ..............................................I-31
I.105. 52.236-8 Other Contracts (Apr 1984) ..................................................................I-31
I.106. 52.236-9 Protecting Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) .............................................................................................I-31
I.107. 52.236-10 Operation and Storage Areas (Apr 1984).............................................I-31
I.108. 52.236-11 Use and Possession Prior to Completion of Work (Apr 1984) ..............I-31
I.109. 52.236-12 Cleaning Up (Apr 1984) .....................................................................I-31
I.110. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) ....................I-31
I.111. 52.236-14 Availability and Use of Utility Services (Apr 1984) ............................I-31 vii
I.112. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate II (Apr 1984) ...................................................................................................................I-32
I.113. 52.236-26 Preconstruction Conference (Feb 1995) ..............................................I-32
I.114. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Feb 2000) I-32
I.115. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Feb 2017) ..I-34
I.116. Implementation of Security Requirements – Construction Contract – Bureau of Reclamation – PN Region (Aug 2010)...........................................................................I-45
I.117. 52.242-13 Bankruptcy (Jul 1995) ........................................................................I-46
I.118. 52.243-4 Changes (Jun 2007)..............................................................................I-46
I.119. WBR 1452.243-80 Modification Proposals, Alternate IV – Bureau of Reclamation (Jul 1998) .....................................................................................................................I-46
I.120. 52.244-2 Subcontracts (Jun 2020) .......................................................................I-47
I.121. 52.244-6 Subcontracts for Commercial Items (Jun 2020) .....................................I-47
I.122. 52.248-3 Value Engineering-Construction (Oct 2020), Alternate 1 (Apr 1984) .....I-47
I.123. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) ..................................................................................................I-47
I.124. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) ...................................I-47
I.125. 52.252-6 Authorized Deviation in Clauses (Apr 1984).........................................I-47
I.126. 52.253-1 Computer Generated Forms (Jan 1991) .................................................I-47
I.127. Projection of Invoices – Columbia-Pacific Northwest Region (Mar 2000) ............I-47
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ...........I-1
SECTION J LIST OF ATTACHMENTS ...................................................................... J-1
J.1. Department of Labor, General Wage Decision No. MT20200070 10/23/2020 (5 Pages) J-1
J.2. Bid Bond, Standard Form 24, OMB Control Number 9000-0045 Exp Date 8/31/2022 (2 Pages) ....................................................................................................................... J-1
J.3. Drawings: Hungry Horse Dam -- HHFO Domestic Water Well Plan (2 Pages) ..... J-1
PART IV REPRESENTATIONS AND INSTRUCTIONS ............................................... J-1
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS ............................................................................. K-1
K.1. 52.203-2 Certificate of Independent Price Determination (Apr 1985) ................... K-1
K.2. 52.204-8 Annual Representations and Certifications (Mar 2020) .......................... K-2 viii
K.3. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services and Equipment (Oct 2020)........................................................... K-6
K.4. 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020).K-8
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ........L-1
L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) ................L-1
L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality (Jan 2017)..............................................................................................L-2
L.3. 52.204-7 System for Award Management (Oct 2018) ...........................................L-2
L.4. 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) .........L-2
L.5. 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Aug 1998) L-2
L.6. 52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisitions Streamlining and Standardization Information System (ASSIST) (Apr 2014) L-2
L.7. 52.214-3 Amendments to Invitations for Bids (Dec 2016).....................................L-2
L.8. 52.214-4 False Statements in Bids (Apr 1984) ......................................................L-2
L.9. 52.214-5 Submission of Bids (Dec 2016) .............................................................L-2
L.10. 52.214-6 Explanation to Prospective Bidders (Apr 1984) ......................................L-2
L.11. 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) .L-2
L.12. 52.214-12 Preparation of Bids (Apr 1984) ............................................................L-2
L.13. 52.214-18 Preparation of Bids -- Construction (Apr 1984) ....................................L-2
L.14. 52.214-19 Contract Award -- Sealed Bidding -- Construction (Aug 1996) .............L-2
L.15. 52.214-34 Submission of Offers in the English Language (Apr 1991) ...................L-2
L.16. 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) ..............................L-2
L.17. 52.216-1 Type of Contract (Apr 1984) .................................................................L-2
L.18. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014) .L-
L.19. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) ...................................................L-3
L.20. Non-Discrimination Notice to U.S. DOI Contractors, Subcontractors, and Lessors (May 2014) ...................................................................................................................L-4 ix
L.21. 52.225-10 Notice of Buy American Requirement-Construction Materials (May 2014) L-4
L.22. 52.228-1 Bid Guarantee (Sep 1996) .....................................................................L-5
L.23. 52.232-13 Notice of Progress Payments (Apr 1984) .............................................L-6
L.24. 52.233-2 Service of Protest – Department of Interior (Deviation) (Aug 1996)........L-6
L.25. 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995).................L-7
L.26. 52.236-28 Preparation of Offers – Construction (Oct 1997) ..................................L-7
L.27. Site Visit Attendance Restriction – Bureau of Reclamation – Pacific Northwest Region (May 2004)........................................................................................................L-8
L.28. WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation (May 2000) .....................................................................L-8
L.29. 52.252-5 Authorized Deviation in Provisions (Apr 1984)......................................L-8
L.30. Invoicing Projection Information -- Pacific Northwest Region (Mar 2000) ............L-9
SECTION M EVALUATION FACTORS FOR AWARD ..............................................M-1
M.1. Price Reasonableness Determination (May 2010) ................................................M-1
M.2. WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations - Bureau of Reclamation (May 2005) ........................................M-1
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040517724
Bureau of Reclamation
Columbia-Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
US BOR -- Columbia-Pacific Northwest Office
Attn: William Roberts / CPN-7205 1150 N. Curtis Road Boise, Idaho 83706
William Roberts 208-378-5302 x
03/09/2021
140R1021B0002
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Hungry Horse Domestic Water Well Plan -- Flathead County, Montana
GPS Location: 48° 20' 27.6" N, 114° 0' 50.4" W
The construction cost magnitude for this work effort is estimated to be between
$100,000 and $250,000.
This Invitation for Bid (IFB) will be open for Full and Open Competition.
Electronic bid, amendment, modifications, bid withdrawal submission(s) (e.g.;
e-mail, facsimile, etc...) are not authorized and will not be accepted or considered. Only sealed envelopes or packages adhering to submission of bid (see
52.214-5) procedures will be accepted.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 180 calendar days and complete it within ________________ ________________ calendar days after receiving
Clause 52.211-10
a. Sealed offers in original and
4/13/2021
NSN 7540-01-155-3212
x x x x
______1_____ copies to perform the work required are due at the place specified in Item 8 by ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Columbia-Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Colby Clifford
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
( ))( X
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R1021B0002
Hungry Horse Domestic Water Well Plan -- Flathead
County, Montana
Legacy Doc #: BOR
00001 Hungry Horse Domestic Water Well Plan - Flathead 1 AU
County, Montana
(Price Schedule CLINS 1 through 17)
See following continuation page(s)
Product/Service Code: Z2KA
Product/Service Description: REPAIR OR ALTERATION
OF DAMS
Requisition No: 0040517724
Delivery: 180 Days After Notice to Proceed
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Hungry Horse Domestic Water Well Plan Hungry Horse Project, Montana Solicitation No.140R1021B0002
Section B
00 00 50 - 1
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 PRICE SCHEDULE A
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(1) Offerors shall complete Price Schedules. Offers for less than the total of the full Schedules will be considered nonresponsive and will not be evaluated for award.
(2) Offers will be evaluated based on the total of Price Schedule[s]. Award will be made to responsible Offeror with the lowest responsive offer for the total of Price Schedule[s].
(3) The Government will award the Price Schedules depending on available funds.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule[s] are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
(2) LF – Linear Feet
(3) HR – Hours
(4) CF – Cubic Feet
PRICE SCHEDULE A
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
00 00 50 - 2 and Unit
Unit Price
Amount
2 01 31 30 Contract Document Management System For the lump sum of
3 33 21 01 Drill Borehole for 12-inch Temporary Conductor Casing 35 LF $ $
4 33 21 01 Drill 8-inch Borehole for Permanent Well Liner 614 LF $ $
5 33 21 02 Furnish and Install 12-inch Temporary Conductor Casing 35 LF $ $
6 33 21 02 Furnish and Install Permanent 8-inch Surface Casing with Drive Shoe
36 LF
7 33 21 02 Furnish and Install Permanent 6-inch Diameter Steel Well Liner with Appurtenances
585 LF
8 33 21 02 Furnish and Install Permanent 6-inch Diameter Slotted Steel Well Liner
50 LF
9 33 21 02 Perform Well Plumbness and Alignment Test
For the lump sum of
10 33 21 03 Provide and Install Annular Grout Seal 24 CF $ $
11 33 21 04 Well Development 32 HR $ $
12 33 21 05 Furnish and Install Temporary Test Pump and Required Appurtenances
For the lump sum of
13 33 21 05 Furnish and Install Temporary Pump Test Header For the lump sum of
14 33 21 05 Complete Aquifer Pumping Test For the lump sum of
15 33 21 07 Video Inspection For the lump sum of
16 33 21 08
Disinfection and Temporary Capping For the lump sum of
00 00 50 - 3 and Unit
Unit Price
Amount
17 33 21 09 Demobilization and Site Cleanup For the lump sum of
TOTAL FOR PRICE SCHEDULE A $_________________
B.2 OPTIONAL PRICE SCHEDULE B
(a) The Government reserves the right to award or not award Optional Price Schedule B.
TOTAL FOR PRICE SCHEDULE B $ _______________
TOTAL PRICE FOR SCHEDULES A and B $ _______________
END OF SUPPLIES OR SERVICES AND PRICES
OPTIONAL PRICE SCHEDULE B
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 33 21 10 Well Abandonment For the lump sum of $
Signature Sheet / Certification of Technical Specifications
Project Title: HHFO Domestic Water Well Plan Hungry Horse Project, Montana
Region: Columbia-Pacific Northwest
Prepared by: ________________________________________ (HDR) Date: _________
Prepared by: ________________________________________ (WET) Date: _________
Technical Approval: _______________________________________ Date: _________
1. The person signing the Specifications package as “Prepared by” shall have developed or assembled the written Specifications.
2. The person signing the Specifications package for “Technical Approval” shall have been in responsible charge of the overall design including developing or assembling the Specifications. This person will typically be the design team leader. In cases where the designs described by the Specifications meet the criteria for preparation by a registered engineer or architect, this person shall be registered with the applicable professional designation after their signature, such as P.E. for professional engineer or R.A. for registered architect. By this signature, this person is certifying the written Specifications convey the design intent as portrayed on the Drawings included therein. For Specifications package containing designs from multiple disciplines, it is the signing individual’s responsibility to ensure (using procedures defined by his/her organization) that the technical information prepared by other professions and disciplines and depicted in the document is compatible with the overall design intent and that the documents used to depict that information (e.g., drawings) include signatures with appropriate professional registration designations.
10/23/20
10/27/20
10/27/20
DIVISION 01 - GENERAL REQUIREMENTS
This page intentionally left blank.
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located approximately 8.0 miles southeast of Columbia Falls, Montana in Flathead County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. The work to be done includes the furnishing of all labor, material, transportation, tools, supplies, plant equipment and appurtenances, unless hereinafter specifically excepted, necessary for the complete and satisfactory construction and testing of a public water supply well to serve the Hungry Horse Dam. The work will be done on a unit rate basis in accordance with the Price Schedule.
B. Coordination with Engineer and Bureau of Reclamation is required prior to the contractor mobilizing and demobilizing drill rig, or any vehicle in excess of 32 kips, across the BPA Access Bridge. A load analysis was performed for the bridge and safety precautions must be coordinated. Longitudinal movement of the bridge beams must be prevented while the drill rig crosses the bridge. BOR will be responsible for providing all materials and manpower to facilitate the modifications to the bridge for safe passage. Contractor is prohibited from crossing the bridge with the drill rig, or any vehicle in excess of 32 kips, without consent from Engineer and BOR. Contractor shall limit truck speed to 5mph on the bridge and avoid any spontaneous braking or accelerating.
C. The well is designed to be drilled to a total depth between 450 and 750 feet below ground surface (bgs), with an designed well yield of 10 to 35 gallons per minute (GPM). Contract Drawings is a schematic of the proposed well design. As shown, a temporary 12-inch inner diameter (ID) temporary conductor casing will initially be drilled to facilitate construction of the surface seal. The 12-inch temporary conductor casing shall be installed to a depth of 35 feet or at least 3 feet into competent bedrock, whichever is greater. An 8-inch ID permanent surface casing (with drive shoe) will be installed to a depth of at least 1-foot greater than the temporary conductor casing. The 8-inch ID surface casing shall be seated into competent bedrock to allow for installation of the surface seal. An 8-inch borehole will then be advanced to the anticipated final depth of 450 to 650 feet bgs, the bottom 50-feet of liner will have slots approximately ¼-inch wide by 6-inches long. The exact depth and location of the plasma cut slots will be determined in the field based on the conditions encountered. The 6-inch liner shall extend from the bottom of the borehole to a depth of 15-feet bgs to ensure it
Summary of Work
01 11 00 - 2 does not interfere with installation of a pitless adapter (to be installed under future contract). The annulus between the temporary conductor casing and permanent surface casing will be sealed with bentonite-cement grout (including up to four-percent bentonite).
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
B. Engineer
1. When specifications reference Engineer, the term shall refer to the design engineer HDR or their sub-consultant Water and Environmental Technologies (WET).
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 33:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86- 68220-07-05) 2012 Edition Available online at:
http://www.usbr.gov/mussels/prevent ion
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 14 10-1, Site Use:
1. For each Contractor use site on Government land.
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including air, power, and water lines; fire hydrants;
and compressor station.
4) First-aid and medical facilities.
5) Areas for processing, storing, and disposing of waste materials from construction operations.
6) Temporary fences.
Use of Site 01 14 10 - 2
b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.
d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. Government land as shown on drawings may be used for required construction facilities.
B. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.
C. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CLEANING
A. Construction equipment:
1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.
2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Cleaning Manual.
3. COR will inspect construction equipment following procedures described in Cleaning Manual before allowing equipment onsite.
Use of Site 01 14 10 - 3
3.02 RESTORATION
A. After completion of work, regrade and scarify Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate revegetation, provide proper drainage, and prevent erosion.
Use of Site 01 14 10 - 4
Coordination Meetings 01 31 22 - 1
SECTION 01 31 22
COORDINATION MEETINGS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 SPECIFICATION DRAWINGS
A. AUTOCAD files of drawings are available to Contractor. With at least 14 days’ notice, Government will make these files available to Contractor.
1.03 COORDINATION MEETING[S]
A. Preconstruction Coordination Meeting:
1. Date: Approximately 7 days prior to any work being performed.
a. Coordinate with Government and Engineer the meeting date at least 10 days before meeting.
b. Coordination with Engineer and Bureau of Reclamation is required prior to the contractor mobilizing and demobilizing drill rig, or any vehicle in excess of 32 kips, across the BPA Access Bridge. See Section 01 11 00.
2. Location: Bureau of Reclamation Hungry Horse Dam Field Office, Hungry Horse, MT 59919-0130
3. Purpose: Review with Government personnel establish a working understanding among the parties as to the Work and to discuss the schedules, procedures for handling Shop Drawings, Samples, and other submittals, processing Applications for Payment, electronic or digital transmittals, designate individuals to act as its authorized representative with respect to the services and responsibilities under the Contract, and maintaining required records.
4. Attendees: Responsible engineering representatives who understand these specifications with respect to technical requirements, equipment to be furnished, and coordination necessary to complete the project per design.
Representatives shall include:
a. Owner, Bureau of Reclamation: 1
b. Engineer: 2
Coordination Meetings 01 31 22 - 2
c. Contractor: 1
d. Each subcontractor: 1
5. Within 40 calendar days after conclusion of meeting, Government will furnish Contractor a letter regarding items discussed at meeting with enclosed copies of pertinent drawings and data marked with Government’s comments.
B. Construction Progress Meetings
1. Date: As needed during drilling operations.
a. Coordinate with Government and Engineer meeting date at least 7 days before meeting.
2. Location: Bureau of Reclamation, Hungry Horse Dam Field Office, Hungry Horse, MT 59919-0130
3. Purpose:
a. Review with Government personnel and Engineer construction activities to date, in field observations, and technical requirements of specifications.
b. Responsible engineering representatives who understand these specifications with respect to technical requirements, equipment to be furnished, and coordination necessary to complete project.
c. Representatives shall include, at least, 1 person from:
1) Owner, Bureau of Reclamation: 1
2) Engineer
3) Contractor.
4) Any subcontractors.
4. Within 14 calendar days after conclusion of meeting, Engineer will furnish Contractor and Government a meeting notes summarizing any discussion and decisions.
C. Well Testing and Performance Summary Meeting
1. Conduct after all testing has been performed as required per Specification Section 33 21 00 – Water Supply Wells.
2. Date: Within 7 days of receiving and compiling results from well tests.
a. Coordinate with Government and Engineer meeting date at least 7 days before meeting.
3. Location: Bureau of Reclamation, Hungry Horse Dam Field Office, Hungry Horse, MT 59919-0130
Coordination Meetings 01 31 22 - 3
4. Purpose:
a. Review with Government personnel and Engineer construction activities to date, in field observations, and technical requirements of specifications.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Coordination Meetings 01 31 22 - 4
Contract Document Management System 01 31 30 - 1
SECTION 01 31 30
CONTRACT DOCUMENT MANAGEMENT SYSTEM
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Contract Document Management System:
1. Payment: Lump sum price offered in the Price Schedules.
1.02 DEFINITIONS
A. CDMS: Contract Document Management System.
1. Contract Documents include, but are not limited to:
a. Specifications.
b. Contract Drawings.
c. Submittals.
d. RFCs: Request for Change (Contractor generated document).
e. RFIs: Request for Information (Contractor generated document).
f. RFPs: Request for Proposal (Reclamation generated document).
g. CMs: Contract Modifications.
h. Contractor Proposals.
i. Value Engineering Proposals.
j. Bureau of Reclamation (Reclamation) Inspection Reports.
k. Invoices and Progress Payments.
l. Contract Schedules.
m. Meeting Agendas and Meeting Minutes.
n. Letters and Memos.
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals.
B. RSN 01 31 30-1, Approval Data:
1. Documentation of system capabilities.
2. Instructions for system use.
Contract Document Management System 01 31 30 - 2
C. RSN 01 31 30-2, Final Data:
1. DVD or CD of documents uploaded to CDMS.
1.04 QUALIFICATIONS
A. System provider: At least 5-years successful performance in providing required services.
1.05 CDMS REQUIREMENTS
A. CDMS shall be capable of generating, storing, tracking, categorizing, and managing Contract Documents.
B. Access:
1. Web-based:
a. Contract Documents are stored and accessed by authorized individuals via an internet site.
b. Compatible with web browsers MS Internet Explorer, Apple Safari, Mozilla Firefox, and Google Chrome.
2. Ability to upload Contract Documents and make available for user download in supported file formats, minimum:
a. Portable Document Format (.pdf).
b. MS Word.
c. MS Excel.
d. MS Project.
e. Oracle Primavera P6 Project Manager.
f. Drawing (.dwg).
g. Contract Manager.
3. Allow Contract Documents to be prepared by Contractor or by Government.
a. Preparing organization will control access of documents. See Document Security and Backup paragraph below.
4. Contractor and Government shall each have a project manager for CDMS:
a. Each project manager shall have capabilities to assign users within their organization and to assign user rights which control access to documents based on user class and document type.
b. Each organization shall be capable of defining its access hierarchy.
c. Inclusion of users will be prerogative of organizational project manager.
Contract Document Management System 01 31 30 - 3
d. Government shall be able to create and modify project properties (i.e., Contractor, project location, description, bid amount, project directory, etc.).
5. Email notifications shall be automatically sent to selectable users when new documents are submitted and available for viewing, or alerts are generated.
Examples:
a. Updates to project information (e.g., entry of a new submittal);
b. Changes to project information (e.g., approval of a submittal);
c. Alerts (e.g., submittal under review for >15 days without action).
6. Ability to link files; examples:
a. RFP…
This is the start of the file's text. The full file is on GovTribe.