09 AL-1746-5384A SOW.pdf
PDF 2 MB Posted
- Attached to
- LBNL ALS-U Welded Bellows
- Solicitation number
- JS-2024-008
- Issued by
-
Department of Energy
About this file
This document is a Statement of Work (SOW) for the fabrication, dimensional inspection, assembly, vacuum testing, and delivery of 97 RF bellows assemblies with BPM for the ALS-U project at Lawrence Berkeley National Laboratory (LBNL).
The SOW details the six types of RF bellows, the required first article and production quantities, and the documentation deliverables. It outlines the roles and responsibilities, management and quality assurance requirements, fabrication details, packaging and shipping specifications, and quality assurance processes. The SOW requires a Final Design Review, production of first article units, and subsequent production units. Detailed control plans, inspection reports, and acceptance criteria are required prior to shipment. The SOW includes a schedule with specified hold points and notice to proceed requirements. Applicable drawings, CAD models, and documentation requirements are also provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12 Vendor Q-A 2024Aug13.pdf | ||
| 11 AL-1208-0209C Quality Evaluation Survey.pdf | ||
| 02 Sample Subk 2 - Welded Bellows.pdf | ||
| 08 AL-1746-5383A Documents List.pdf | ||
| 03 GP-Commercial Supplies and Services.pdf | ||
| 05 Rep Cert Form (7-26-24).docx | DOCX document | |
| 06 AL-1220-7841F Component Prod Reqts.pdf | ||
| 04 GP-Commercial Foreign.pdf | ||
| 07 AL-1746-5379A.pdf | ||
| 01 JS-2024-008 Solicitation.docx | DOCX document | |
| 10 AL-1746-5385A ESD.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SR - RF Bellows (with BPM) - SOW
Release Date: Jul 24 2024 7:56:18 AM PDT
Document Number: AL-1746-5384 Revision: A
Document Status: Released
Document Type: SPECIFICATION
Category Code: AL7531
ALS-U - STORAGE RING
VACUUM CHAMBERS
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V F3
Downloaded by: Windchill Watermarker
AL-1746-5384 Rev. A Doc. Status: Released Page 2 of 24
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document
Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
Table of Contents
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Introduction
4.1 Project Overview
4.2 Scope of Work Summary
4.3 Description of Items
4.4 Roles and Responsibilities
5 Deliverables / Scope of Work
5.1 Documentation Deliverables
5.2 Hardware Deliverables
5.2.1 First Article
5.2.2 Production Articles
5.2.3 Components provided by LBNL
5.3 Scope of Work Execution Requirements
5.3.1 Management and Quality Assurance
5.3.2 Final Design Review Requirements
5.3.3 First article
5.3.4 First article delivery
5.3.5 Complete Production
5.3.6 Delivery
5.4 Final documentation package
6 Management, Reporting, Documentation and reviews
6.1 Schedule
6.2 Reporting requirements
6.3 Technical documentation requirements
6.4 Reviews
6.5 Hold points
7 Fabrication
8 Packaging and shipping specifications
8.1 Container
8.2 Marking
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 3 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
8.3 Packaging
8.4 Handling and storage
9 Quality Assurance
9.1 Quality plan
9.2 Control plan
9.3 Type of control points
9.4 Deviation requests
9.5 Nonconformance reports
9.6 Numbering and/or Serialization
9.7 ACL upon receipt at LBL
10 Applicable Documents
Appendix A: Control Plan
Appendix B: CAD Model and drawing requirements ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 4 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
1 REVISION HISTORY
Rev. CM Number Description of Change A Initial Release
2 APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Ken Chow Chief Engineer/ Accelerator Mechanical Systems lead Jiani Niu Project QA manager Olusola Omolayo Vacuum CAM and Technical Lead Windchill Approved / Concurred By oomolayo,KPChow
3 ABBREVIATIONS AND ACRONYMS
ACL Acceptance Criteria List ALS Advanced Light Source ALS-U Advanced Light Source Upgrade ARO After Receipt of Order CAD Computer Aid Design CP Control Plan FDR Final Design Review HP Hold Point LBNL Lawrence Berkeley National Laboratory NTP Notice to Proceed QA Quality Assurance RF Radio Frequency RFP Request For Proposal SR Storage Ring University The Regents of the University of California ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 5 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
4 INTRODUCTION
4.1 Project Overview
ALS-U is an upgrade project to the LBNL Advanced Light Source (ALS). The ALS is a 1.9
GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to
40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario.
The ALS will be upgraded with a multibend achromat (MBA) lattice design that will provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.
Any resulting Subcontract will be between the University and the party identified as the
Subcontractor and will be issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter “U.S.
Government”), represented by the Department of Energy (hereinafter “DOE”) for the management and operation of LBNL and the performance of research and related work.
4.2 Scope of Work Summary
This scope of work is for the fabrication, dimensional inspection, assembly, vacuum testing and delivery of RF bellows assemblies with BPM for the ALS-U project. There are six types of RF bellows in this scope. The total quantity of RF bellows units to be delivered is 97. The BPM button to be welded to the RF bellows assembly will be provided by LBNL
4.3 Description of Items
The detailed design of the RF bellows has been completed by LBNL. Some of the RF bellows designs has been prototyped and tested by LBL. This fabrication is a “build to print” however the subcontractor is able to propose minor changes for ease of fabrication.
The Figure 4-1 shows an image of the six RF bellows designs.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 6 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
Elliptical - QF50-F 18mm Round – QF50-F 13mm Round - QF50-F
13mm Round – QF50-F 13mm Keyhole – QF50-F 13mm Keyhole - QF63-F
Figure 4-1: RF Bellows Designs
The RF bellow assembly consist of sub components assembled together as illustrated in
Figure 4-2.
Figure 4-2: SR RF Bellows with BPM: Elliptical – QF50-F
Adapter plate
Contact finger
BPM Housing
Spring finger
Bellow Weldment ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 7 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
4.4 Roles and Responsibilities
The subcontract will name two University specialists to oversee the contractual aspects and another to oversee the technical aspects of the procurement:
The University Procurement Specialist is responsible for contract administration from solicitation to subcontract award, and any contractual issues that arise thereafter.
The University Technical Representative is responsible for the technical aspects, beginning with the subcontract award through receipt and acceptance of deliverables.
The Subcontractor must identify a project manager who will act as the single point of contact for the University representatives. The project manager must be available for the duration of the subcontract to resolve issues and provide technical, programmatic, and schedule updates as specified in this SOW and in the subcontract.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 8 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
5 DELIVERABLES / SCOPE OF WORK
This section details the required deliverables for each phase of the RF bellows build process.
5.1 Documentation Deliverables
The Table 5-1 provides the list of documentations to be submitted by the selected subcontractor to LBNL.
Table 5-1: list of documentation to be provided to LBNL.
Id Documentation Due Date*
Project Documentation 1 Initial schedule 7 days ARO
Bimonthly status / progress meeting until the delivery of the first batch and then monthly status / progress meeting
For the duration of the contract
3 Monthly Updated Schedule 5th of each month 4 Monthly Progress report 5th of each month
Quality Documentation 5 Quality Plan 7 days ARO 6 Control plan (see Table 5-6 and §9.2) 10 days before FDR 7 Control plan duly completed and signed 10 days prior shipment 8 Acceptance Criteria List duly completed and signed 10 days prior shipment
Manufacturing Documentation 9 Final 2D drawing – if applicable 10 days before FDR 10 Final 3D CAD model – if applicable 10 days before FDR 11 Final Bill of material 10 days before FDR 12 Manufacturing plan for each type RF Bellow 10 days before FDR 13 Assembly / Disassembly plan for each type RF Bellow 10 days before FDR 14 Test report (dimension, He leak, …) 10 days prior shipment
15 Nonconformance Report or / and deviation request Within 3 business days of occurrence
16 Material Certification 10 days before manufacturing
Delivery documentation 17 List of packing crate(s) and contents 10 days prior shipment
Other 18 Certificate(s) of conformity 10 days prior shipment 19 Final document package 10 days prior shipment
Fabrication cannot start prior to the review, approval, and closure of all related FDR action items.
*Days noted herein are based on a 5 business day work week ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 9 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
5.2 Hardware Deliverables
5.2.1 First Article
The selected subcontractor is required to produce the following quantities and designs of
RF Bellows as a first Article.
Table 5-2: List of hardware to be provided to LBNL Id Designation Windchill number Qty Due Date 17 Elliptical w/BPM AL-1549-7111 5 14 weeks ARO 18 13mm Keyhole w/BPM AL-1669-8822 5 14 weeks ARO
5.2.2 Production Articles
The selected subcontractor is required to produce the following quantities and designs of production units.
Table 5-3: List of hardware to be provided to LBNL
Id Designation Windchill number Qty Due Date 19 Elliptical w/BPM AL-1549-7111 8 36 weeks ARO 20 18mm Round w/BPM AL-1652-5436 29 36 weeks ARO 21 13mm Round w/BPM AL-1645-6458 23 36 weeks ARO 22 13mm Round w/BPM AL-1682-7511 7 36 weeks ARO 23 13mm Keyhole w/BPM AL-1669-8822 11 36 weeks ARO 24 13mm Keyhole w/BPM AL-1691-6812 9 36 weeks ARO
In addition to the fully assembled first article and production units, the selected subcontractor is required to produce the following quantities of spare subcomponents.
Table 5-4: List of hardware to be provided to LBNL
Id Designation Windchill number
Qty Due Date
25 Spring fingers, elliptical aperture, bpm Al-1662-5735 5 36 weeks ARO 26 Contact fingers, bpm, elliptical aperture Al-1664-4212 5 36 weeks ARO 27 Contact fingers, bpm, 13mm rnd aperture Al-1566-0871 10 36 weeks ARO 28 Spring fingers, 13mm rnd aperture, bpm Al-1645-6993 10 36 weeks ARO 29 Spring fingers, 18mm rnd aperture, bpm Al-1645-7384 5 36 weeks ARO 30 Contact fingers, bpm, 18mm rnd aperture Al-1652-5595 5 36 weeks ARO 31 Spring fingers, 13mm kh aperture Al-1691-7022 10 36 weeks ARO 32 Contact fingers, side, 13mm kh aperture Al-1698-7877 5 36 weeks ARO 33 Contact fingers, bpm, 13mm kh aperture Al-1698-7932 5 36 weeks ARO 34 Contact fingers, bpm, 13mm kh aperture Al-1582-0710 5 36 weeks ARO 35 Contact fingers, side, 13mm kh aperture Al-1691-6934 5 36 weeks ARO ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 10 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
5.2.3 Components provided by LBNL
The following components will provided by LBNL at the beginning of the contract.
Table 5-5: List of hardware provided by LBNL Id Designation Windchill number Qty 36 RF Gasket BPM 8.4 Dia AL-1461-4498 170 37 RF Gasket BPM 10.4 Dia HW-1000-7414 260 38 Button, bpm, welded, 4 mm, 35.5 L AL-1455-2849 52 39 Button, bpm, welded, 6mm, 28.5 L AL-1455-1567 116 40 Button, bpm, welded, 6mm, 28.5 L AL-1455-1567 92 41 Button, bpm, welded, 6mm, 28.5 L AL-1455-1567 28 42 Button, bpm, welded, 4 mm, 35.5 L AL-1455-2849 64 43 Button, bpm, welded, 4 mm, 35.5 L AL-1455-2849 36
5.3 Scope of Work Execution Requirements
5.3.1 Management and Quality Assurance
The selected subcontractor will be responsible for supplying an initial schedule 7 days
ARO.
5.3.2 Final Design Review Requirements
A final design review is required once the subcontractor has completed the detail manufacturing design for all RF bellows and relevant tooling. The selected subcontractor must be responsible for supplying all documentation related to the FDR prior to fabrication of the RF bellows. Documentations shall take into account the RF bellows
(with BPM) engineering specification (AL-1746-5385) and drawings (see applicable document in section 10). CAD model and drawing requirements are detailed in Appendix
B:
The FDR is required to include of the following documentation:
1. Final 2D drawing (if modified by subcontractor)
2. Final 3D CAD model (if modified by subcontractor)
3. Bill of material
4. Control plan for each type of RF Bellow
5. Manufacturing plan (see table below for detail)
6. Assembly / Disassembly procedure ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 11 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
Table 5-6: Documentation description Documents Description
Manufacturing plan
The manufacturing plan documents step-by-step all the manufacturing process from the procurement of raw material to the delivery (except tests for FAT, which are covered in the test plan). The manufacturing plan has to contain at least the following details:
Standards required for the procurement of raw material
Description of each step of the fabrication
Internal procedures applicable to this effort
Procedures and/or standards used for fabrication must be referenced in the manufacturing plan.
Control plan
The control plan must describe all steps of the fabrication, including, verification of materials, manufacturing/execution operations, inspection, tests and delivery and any work to be performed by subcontractor. LBNL will provide a template to the selected subcontractor (see §9.2 and Appendix A: for more detail)
Close out of the FDR includes review, written approval, and resolution of all related FDR action items prior to fabrication.
5.3.3 First article
Following approval of the FDR, the first articles must be produced. The first article must be subjected to the same testing and quality assurance processes as the production units.
After assessments of the first article, LBNL will give the selected subcontractor approval for the rest of the production. Reference §5.2.1 First Article, and §9.3 Notice to Proceed for additional information.
5.3.4 First article delivery
The selected subcontractor will be responsible for delivering the first article production to LBNL in accordance with the parameters outlined in this document. Refer to section §5.3.6 for the delivery conditions.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 12 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
5.3.5 Complete Production
In accordance with section 5.3.3 LBNL will give final approval for the commencement of fabrication of the production units once the first article unit has been received and satisfactorily tested.
Prior to shipment of the production units, the subcontractor must provide the following:
1. Fully completed and signed ACL for each RF bellow.
2. Fully completed and signed CP for each RF bellow.
3. A complete mechanical inspection report for each RF bellow.
4. A complete vacuum inspection report for each RF bellow.
5. Quality assurance receipts and certifications
6. Nonconformance or deviation documentation pertaining to each individual assembly
7. Written authorization from LBNL to proceed with shipping
LBNL personnel reserve the right to perform an evaluation of hardware, documentation, and shipping scheme at the subcontractor’s production site prior to authorizing shipment.
5.3.6 Delivery
The selected subcontractor will be responsible for delivering the complete production to LBNL in accordance with the parameters outlined in this document. All RF bellows, contacts fingers and spring fingers shall be packed and sealed individually in compatible UHV plastic bags under clean conditions.
5.4 Final documentation package
LBNL shall be provided with a full and complete documentation package for the whole production. The documentation package shall contain the items listed below.
1. A complete, as-built bill of materials identifying both fabricated and commercially available components,
2. A complete, as built CAD model in an editable format (if available),
3. Complete, as built drawings in English, in an editable format (if available),
4. Other documentation as requested.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 13 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
6 MANAGEMENT, REPORTING, DOCUMENTATION AND REVIEWS
6.1 Schedule
The following table provides the main schedule point and hold point.
Table 6-1 : Summary timetable of the project
Section # Designation Schedule Responsibility
§5.3.1 Initial Schedule 7 days ARO subcontractor
§5.3.2 Final Design Review 3 weeks ARO subcontractor
HP#1 Completion of FDR 1 week after submission of the final drawings
LBNL
§5.3.3 Completion of Manufacturing of the first batch 8 weeks after approval of final drawing subcontractor
§5.3.4 Delivery 2 weeks after completion of the first batch subcontractor
HP#2 Approval of the first batch 2 weeks after receiving of the first batch
LBNL
§5.3.5 Completion of the rest of the production and spare 16 weeks after approval of first batch subcontractor
HP#3 Approval of the production 2 weeks after completion of production
LBNL
§5.3.6 Delivery 2 weeks after approval of complete production subcontractor ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 14 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
6.2 Reporting requirements
Upon award of the subcontract, the LBNL technical representative will contact the selected subcontractor to set up a Project Kick-off meeting. This meeting will establish the requirements for communication and introduce the portal that will be used for data exchange.
Written progress updates are required on before the fifth of each month. This may include information on drawings, manufacturing plans, test plans, QA plans, schedule updated or other documents upon request in any state.
Visits by LBNL personnel, including access to the factory where the units are being built, as the discretion of LBNL, may be required.
Subcontractor must be responsible for maintaining an action item list for documenting the actions resulting from each meeting, identifying the responsible party and providing an anticipated completion date for each action.
Other reports or data as requested in writing.
6.3 Technical documentation requirements
Upon subcontract award, a Windchill Project portal will be established by LBNL and access provided to the subcontractor. Windchill will be used as the repository for all information, QA data, and drawing transference related to the magnet development and production. A brief overview of Windchill will be provided at the kickoff meeting.
Additional training may be available upon request.
An electronic copy of all required documentation noted in the Deliverables section of this document is required. Appendix B: specifies acceptable file formats for the final drawings and CAD models.
Other document formats include .docx, .xlsx, and other editable file formats may be used with advance written approval from the LBNL technical representative.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 15 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
6.4 Reviews
A final design review is required for this project. The LBNL technical representative will work with the subcontractor to establish an appropriate timeline and location for all reviews. Reviews may be conducted at either the subcontractor’s or the LBNL site or via web/video conference tools. External, non-LBNL reviewers may be included at LBNL’s discretion.
Review drawings, documentation, and presentations are required to be delivered to the
LBNL technical representative a minimum of 10 business days prior to the scheduled review.
6.5 Hold points
The Table 6-2 provides the list of control points.
Table 6-2: List of hold points
Section Activity Control point Type
5.3.2 Closeout of FDR NTP
5.3.3 Approval of first article NTP
5.3.5 Approval of complete production NTP
Control point types are defined in section 9.3
7 FABRICATION
The selected subcontractor shall follow the RF bellows (with BPM) Engineering Specification referenced as AL-1746-5385 for the fabrication of all Bellows.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 16 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
8 PACKAGING AND SHIPPING SPECIFICATIONS
8.1 Container
Containers for the RF bellows may be used for both shipping and storage. Construction of the containers must be sufficient to adequately support and protect the RF bellows throughout shipping. Containers shall be shrink wrapped and palletized.
8.2 Marking
Mark the exterior of the containers with clear and obvious labels indicating the presence of fragile contents. Shipments originating outside of the United States must have pictorial labels or labels written in both the originating native language and English.
The exterior of the containers shall have up arrows indicating the appropriate boxes orientation.
Boxes shall be marked with the serial numbers of each Bellows contained therein.
All shipping containers must be labeled with all subcontract information including subcontract number, contact, and delivery information.
8.3 Packaging
All Bellows must be free of any liquid prior to shipping. The use of desiccant is strictly forbidden.
The RF bellows shall be blocked/cribbed/supported to prevent movement or overstressing the component during transport. The following has to be included:
Bellows shall each be boxed in its own shipping carton
Place foam between the Bellows and the sides of the carton to assist in minimizing movement during transportation.
Bellows shall be cleanroom double bagged.
The exterior of each shipping SR RF bellow carton shall be equipped with a self-adhesive shock indicator.
8.4 Handling and storage
The subcontractor must pay particular attention during phases of lifting operation to avoid damage on the chambers
Should the chambers require storage, the storage location must be a temperature and moisture controlled, secured storage facility. Ambient air temperature during storage is between 10 C and 40 C.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 17 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
9 QUALITY ASSURANCE
The RF Bellow with BPM must follow the same quality assurance during the first article and production fabrication. The quality assurance is depicted in the following subsection.
9.1 Quality plan
As part of our project requirements, we are requesting that the vendor provide a comprehensive quality plan to ensure the successful execution and delivery of the project.
The quality plan should encompass various essential components to guarantee adherence to high standards throughout the project lifecycle. Below are the specific elements that should be included:
Quality Manual: The vendor must provide a detailed quality manual outlining the company's quality management system (QMS). This manual should encompass all relevant quality procedures, standards, and methodologies adopted by the company to ensure consistency and effectiveness in delivering quality products or services.
Organizational Chart: An organizational chart specific to the project should be included, illustrating the hierarchical structure of the team involved. This chart will help delineate roles, responsibilities, and reporting lines within the project team, ensuring clarity and accountability.
Key Personnel: A list of key personnel involved in the project, along with their respective roles and responsibilities should be provided. This includes project managers, quality assurance personnel, technical experts, and any other relevant stakeholders critical to the project's success.
Subcontractor Information: If any subcontractors are engaged in the project, their names, roles, and scope of work should be clearly stated in the quality plan.
Additionally, measures to ensure the quality and performance of subcontracted work should be outlined.
Project-Specific Procedures: The quality plan should outline specific procedures and protocols to be applied within the context of the project. This may include quality control measures, inspection processes, testing methodologies, and any other relevant procedures tailored to the project's requirements.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 18 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
QA Documentation Presentation: A presentation of the quality assurance (QA) documentation should be included, highlighting the key documents, records, and forms utilized to manage and track quality throughout the project lifecycle. This shall include Control Plans (see §9.2), inspection reports, non-conformance reports (see §0), deviation request (see §0) and corrective action plans.
9.2 Control plan
The Control Plan must cover the entire scope of the phase/task, including any work to be performed by subcontractors like verification of materials, manufacturing / execution operations, inspection and test and delivery. LBNL will provide the selected subcontractor the template of Control Plan (see Appendix A:) and applicable document in section 10
Each activity once finished must be dated and signed by the subcontractor and the LBNL technical representative. The identification of the records released during activity execution (test report, dimensional report, NCR) must be registered with the Control Plan. The Control Plan must be delivered to and approved by the University prior to the FDR. Notification points (NP, W, HP) will be added by LBNL before returning to the selected subcontractor.
9.3 Type of control points
Notification point (NP): means that a notification must be sent to the entity before a task is performed. The notified can decide to visit or not. NP does not affect the production flow of the selected subcontractor. Notification sent to LBNL 10 working days before scheduled operation, LBNL will respond to the subcontractor within 5 working days of the scheduled operation of its intention.
Witness (W): means a visit/presence at the action to witness/monitor. Action cannot occur without the presence or without a written waiver. The production flow is interrupted (before the action) in order to allow the mandatory inspection/surveillance.
Notification sent to LBNL 10 working days before scheduled operation, LBNL will respond to subcontractor within 5 working days of schedule operation of its intention.
In case of “no-show” of a technical representative or delegate: the subcontractor must formally notify the technical representative and may proceed with production after 2 working days.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 19 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
Hold point (HP): the process and all related activities cannot continue (work cannot proceed beyond this point) without the relevant HP being cleared. This can be a record of acceptance, an event or a written waiver. Production flow for the associated process is interrupted (after the action) until clearance is given.
Notification sent to LBNL 10 working days before scheduled operation, LBNL notifies the selected subcontractor within 10 working days of the result on the HP activity:
o On rejection: The selected subcontractor has 5 working days to propose a recovery plan, o On objection (duly justified): The selected subcontractor has 10 working days to answer (and if applicable propose a recovery plan).
For HP requiring witness by LBNL, in case of “no-show” of a technical representative or delegate: the subcontractor must formally notify the technical representative and may proceed with production after 2 working day.
Notice to Proceed (NTP): the current process cannot continue (next tasks) without the relevant NTP being cleared. The NTP notification point for this contract must be the following:
Successful completion and acceptance of the FDR. LBNL will provide a written approval to the selected subcontractor indicating the NTP that has been satisfied.
Successful completion and acceptance of the First article. LBNL will provide a written approval to the selected subcontractor indicating the NTP that has been satisfied
Successful completion and acceptance of production articles test report prior to shipment. LBNL will provide a written approval to the selected subcontractor indicating the NTP that has been satisfied
9.4 Deviation requests
Any deviations from the LBNL documents must be requested by the subcontractor and approved by LBNL prior to implementation. LBNL will provide a standard deviation request form however; a subcontractor’s existing or internal document may be utilized with LBNL approval. Deviation requests apply to requests to modify processes or documented drawings. Deviation requests DO NOT apply to hardware that is built and does not conform to the specification.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 20 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
9.5 Nonconformance reports
A nonconformance report provides a summary for products or procedures, which do not conform to the defined requirements. Nonconformance may be determined and reported by either the subcontractor or LBNL staff. LBNL will provide a standard nonconformance report form however; a subcontractor’s existing or internal document may be utilized with LBNL approval. Nonconformance reports are to be submitted to LBNL within 2 business days of the nonconformance identification.
Nonconformance reports apply to hardware that is built and does not conform to the specification(s). LBNL will provide a written disposition establishing a path forward for each nonconformance. No operations may be performed on the nonconforming item without LBNL’s written disposition or approval to proceed.
9.6 Numbering and/or Serialization
Each Bellows shall be serialized. The following indicate the methodology of serialization for the Bellows (18mm Round / QF50-F). The same methodology shall be applied on all Bellows
Windchill Number Serialization
AL-1669-8822 AL-1669-8822-0001
AL-1669-8822-0002
AL-1669-8822-0003
AL-1669-8822-0016
The serialization shall be laser etched
Figure 9-1: RF Bellows with BPM (13mm Keyhole / QF50-F)
Serialization ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 21 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
9.7 ACL upon receipt at LBL
The subcontractor shall provide a completed ACL to the LBNL technical representative for each Bellows. The ACL shows that the following requirements are validated:
1. Visual inspection
2. Presence of the RF Gasket in the BPM housing after BPM welded
3. Magnetic permeability inspection
4. Verification of functional dimension
5. RF bellows movement inspection
6. He Leak Test of the RF bellows
7. Test report
See doc AL-1746-5379, Acceptance Criteria List for Bellows.
10 APPLICABLE DOCUMENTS
See document references AL-1746-5383_SR – Bellows (with BPM) - Applicable
Documents List ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
APPENDIX A: CONTROL PLAN
Extract of the control plan to be completed by the subcontractor ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
APPENDIX B: CAD MODEL AND DRAWING REQUIREMENTS
The following requirements are applicable to 2-d drawings and 3D CAD models supplied in support of the MRR
1. All dimensions are to be in millimeters.
2. Dimensioning scheme to adhere to ASME Y14.5 (2009 or later), “Dimensioning and Tolerancing”.
3. Unless otherwise specified, all features to be modeled at the mean.
4. Threads, both internal and external to be modeled as cosmetic, for external threads the solid geometry to be at the maximum minor diameter, for internal threads the solid geometry to be at the maximum minor diameter. Threads represented as helical features is forbidden.
5. A material must be specified and the properties of the material must be applied to the object, such that the weight/mass of the object is a property of the file/object.
The material file must include these properties, density, modulus of elasticity, Poisson’s ratio, Coefficient of Thermal Expansion and Thermal Conductivity. The units of these properties to be consistent with the units of the model, and in SI
Units (International System of Quantities).
6. All solid models must be “water tight”, meaning there cannot be “holes” or “gaps” in the solid surface such that the feature does not close upon itself.
7. Drawings and Models must use English as the language used to describe the dimensions, notes, descriptions, text and features.
8. A minimum note based tolerance scheme to use is, X ± 1, X.X ± 0.5, X.XX ± 0.15, Angles ± 0.5°. Alternate: Individual tolerance of each dimension, not making use of a note based scheme. The vendor may use a scheme which has tolerances that are smaller than the minimum.
9. ALS-U will supply the batch of serial numbers to be applied/consumed for items requiring serial numbers. ALS-U Serial Numbers must be used, vendor generated serial numbers are not allowed.
10. If an item is to be serialized ALS-U must approve of the marking method to be used for attaching the ALS-U supplied serial number to the object, and the process must be included in the drawing describing the object, possibly included in the notes of the drawing.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
AL-1746-5384 Rev. A Doc. Status: Released Page 24 of 24
All officially released LBNL documents are watermarked and contain LBNL Document
11. The 3-D CAD Model digital file must one that is consumable by PTC’s Creo
Parametric software. The preferred format is Creo Parametric (check with LBNL for current version). Consumable in this context means when imported into Creo
Parametric (check with LBNL for current version), the file is interpreted by Creo properly, there are no failures, and the integrated model can be regenerated successfully. If the vendor does not use Creo Parametric, then they must supply the software name and version, along with the file format they would supply to be used by LBNL.
12. The CAD Drawing digital file must one that is consumable by PTC’s Creo
Parametric software. The preferred format is Creo Parametric (check with LBNL for current version). Consumable in this context means when imported into Creo
Parametric (check with LBNL for current version), the file is interpreted by Creo properly, there are no failures, and the integrated model and drawing can be regenerated successfully.
13. The 3-D CAD Model and the Drawing files must be parametric. Parametric meaning that if any feature, dimension, attribute, data set is modified in one object, the other object automatically inherits the change upon regeneration.
14. Drawings should use driven dimensions inherited from the model. Creating dimensions which only exist in the drawing is not recommended and may be a cause for rejection of the drawing.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J ul y th , 2
D C
C A ut h
K ey
: F
FF
6Z
LX
V
File details come from the government source that posted it. Updated .