This is a Section 011000 (Furnished Equipment) specification document for the Jersey City Main Office Backflow Preventer Upgrade Project (NYS046/B64929) issued by the United States Postal Service on October 29, 2024.
The contractor must provide all materials, labor, tools, equipment, transportation, and services necessary to complete a code-compliant new sprinkler system installation at the postal facility. The work is designed per NFPA 13 (2019), NFPA 14 (2013), and USPS HANDBOOK AS-503 (2010), covering Ordinary Hazard Groups 1 and 2. Specific coverage requirements include 130 square feet maximum per sprinkler in mechanical, workroom, platform, lobby, support, office, and administration areas; 120 square feet maximum for areas above ceilings; and VK636 extended coverage concealed sprinklers at 20'x20' spacing for courtroom areas. Sprinkler pipe 1" shall be schedule 40 black cast iron with threaded fittings; 1-1/4" and larger shall be schedule 10 black with grooved fittings. All materials must be UL-listed. The contractor must internally inspect the first floor loading dock dry system and either replace or pressure test it to 200 PSI if adequate. Existing sprinkler and standpipe systems are to be removed under separate contract. Hydrostatic testing at system static pressure must be conducted for 2 hours with no leaks. All new piping must be concealed above existing ceilings where applicable, and fire-rated assembly penetrations must be sealed with UL-certified systems. The contractor must provide separate line items for utility connection fees, permits, and inspections, with contract price adjustments based on actual costs incurred.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 089495-26-A-0054 F07 SOW 2 - Attachment 14.pdf | ||
| Coupa Supplier Registration Form.docx | DOCX document | |
| Event management for suppliers - Coupa.pdf | ||
| COUPA Supplier Registration Quick Reference Guide.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jersey City Main Office � Backflow Preventer Upgrade Project No. NYS046 (B64929)
011000 � Page 1
POSTAL SERVICE
USPS Date: 10/29/2024 FURNISHED EQUIPMENT
SECTION 011000
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SCOPE
A. The Contractor must provide all material, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the construction of a postal facility for the Postal Service, including all incidental work described in the contract documents.
B. The scope of work shall be to provide code compliant new sprinkler system layouts for use by Owner (see floor plans).
1. The areas as per the contract are designed as per NFPA 13, 2019 and NFPA 14, 2013 in conjunction with USPS STANDARD DESIGN CRITERIA fire protection system requirements (HANDBOOK AS-503, 2010), The local fire department, and any authority having jurisdiction.
2. Coverage: Ordinary Hazard Groups 1 & 2
Max. Coverage per sprinkler in mechanical, workroom & platform areas shall be 130 SQ.FT. (Ord Hazard Group 2) or as specified with extended coverage ordinary hazard sprinklers.
Max. coverage per sprinkler in lobbies and support areas shall be 130 SQ.FT.
(Ord Hazard Group 2) max. Coverage per sprinkler in office and administration areas shall be 130 SQ.FT. (Ord Hazard Group 1) or as specified with extended coverage sprinklers.
Max. coverage per sprinklers above ceilings (combustible & concealed) shall be 120 SQ.FT (Ord Hazard Group 2).
Courtroom areas shall be as specified herein: VK636 extended coverage concealed sprinklers covering at 20�X20� maximum spacing, with an end head pressure per sprinkler specification of 12.8 PSI, over an area of 1500 SQ.FT.
3. New upright sprinkler heads shall be installed to clear existing structural beams and MEP obstructions. Position sprinkler deflector a minimum of 1" and a maximum of 12" from deck per NFPA 13, 2019. New upright/pendent sprinkler heads shall be installed to clear existing structural beams and MEP obstructions.
4. All existing sprinkler and standpipe systems to be removed under separate contract except for the 1st floor loading dock dry system, which shall be internally inspected to determine condition of piping. if not adequate, demolish and replace entire system. if adequate, pressure test to 200 PSI.
5. Arm-overs greater than 2' shall require a hanger.
6. All hangers shall be spaced in accordance with NFPA 13, 2019.
7. New sprinkler pipe 1" to be schedule 40 black cast iron joined with threaded fittings. 1-1/4� and up pipe shall be sch. 10 blk. Joined with grooved fittings unless otherwise noted.
011000 � Page 2
POSTAL SERVICE
USPS Date: 10/29/2024 FURNISHED EQUIPMENT
8. All material used shall be U.L. listed.
9. All vertical and horizontal pipe through fire rated assembly shall be sealed to achieve the original fire rating.
10. All sprinklers in the A.C.T. areas shall be center of tile.
11. Hydraulic calculations are provided on fire protection floor plans.
12. Existing standpipe and sprinkler systems shall be removed under separate contract. New installation shall begin at sprinkler room as indicated on basement plans.
13. All new piping to be concealed above the existing ceilings where applicable.
14. All new piping in areas with non-acoustical ceilings shall be installed exposed, or ceiling trenching may be required.
a. All ceiling trenching to be coordinated with the Owner.
15. New gang drain in stairwells shall be piped to a drain or to daylight.
16. Auxiliary drains are not shown on these drawings. Locations of auxiliary drains shall be determined by Contractor; where a change in piping direction prevents drainage of the system piping through the main drain valve. Signs shall be provided to indicate auxiliary drain locations.
17. Contractor shall coordinate painting of pipe per code compliance and building standards.
18. Hydrostatic testing shall be conducted at system static pressure for 2 hours to ensure no leaks.
19. Seismic protection is not required at this site.
20. Penetration of fire-rated assemblies shall be sealed by the Contractor with a U.L. certified through penetration system appropriate for the rating of the wall.
21. All fire wall penetrations shall be sealed in accordance with manufacturer's specifications.
22. All dimensions shall be center to center unless noted otherwise.
23. Sprinkler pipe loops and feed mains shall be pitched to drain back at floor control valve in stairwells.
24. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.
C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply.
1.3 MISCELLANEOUS CONTRACT EXPENSES
011000 � Page 3
POSTAL SERVICE
USPS Date: 10/29/2024 FURNISHED EQUIPMENT
A. In accordance with the terms and conditions of the contract provisions and clauses, including those concerning Permits and Responsibilities and, Building Codes, Fees and Charges, the Contractor must include in its price proposal a separate line item for the cost each of the of the following fees or charges payable to State, local, or special community development agencies:
Water service connection and meter fee
Electrical company required fees
Telephone company required fees
Off-site inspection fees
Sanitary sewer connection fee
Environmental Permits/Registrations
Other permits or fees
B. If the actual cost of any item identified above is more or less than the amount listed, the contract price will be adjusted accordingly by a contract modification. The adjustment will not include overhead and profit. The Contractor must, within 30 days after incurring the expenses, inform the Contracting Officer that the payment has been made. Evidence of the actual amount paid must be provided. The contract amount will be adjusted upward or downward as necessary to accommodate actual charges from the utilities. The Contractor must provide all coordination with the utilities in accomplishing their work and must make all payments to the utilities for their work.
C. The Contractor must include all additional fees, as required, in the price proposal.
PART 2 � PRODUCTS
NOT USED
PART 3 � EXECUTION
NOT USED
END OF SECTION
USPS Specification Last Revised: 10/1/2022
File details come from the government source that posted it. Updated .