08 Planning - Project AF 66 Form - GLEN12-1027.xls
XLS spreadsheet 121 KB Posted
- Solicitation number
- FA2550-20-R-0002
About this file
This document contains a schedule of material submittals and federal contract opportunity for repair and replacement of domestic water pumps and piping at Building 420 on a military base. The schedule outlines fifteen required submittals from the contractor by various dates prior to and after notice to proceed, including project schedules, health and safety plans, shop drawings for pumps, variable frequency drives, piping, cables, switches, panels, and controls systems. The federal contract opportunity involves replacing the two existing large domestic pumps with a combination of smaller and medium pumps operating on variable frequency drives to cover a wider flow range from 100 to 600 gallons per minute. It also requires replacing all steel water piping infrastructure to resize pipes for new pump flows and equip with new valves and fittings. The agency is the Department of the Air Force Space Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09 Wage Determination.pdf | ||
| 07 SAFB Environmental Supplement.docx | DOCX document | |
| 05 Existing Conditions Drawing - GLEN12-1027.pdf | ||
| 01 SOW GLEN 12-1027.docx | DOCX document | |
| 03 Requirements - 01 55 04 - SAFB Security Requirements.doc | DOC document | |
| 04 Design Drawings - GLEN12-1027.pdf | ||
| Synopsis GLEN 12-1027.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||
| GLEN12-1027 | Repair by Replacing Domestic Water Pumps | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| LINE NUMBER | CERTIFICATE OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS | |
| GENERAL | ||||||||||||||||||||||
| 1 | Project Specific MSDS Sheets | x | NTP + 7 Days | |||||||||||||||||||
| 2 | Form-3064 Contract Progress Schedule | x | NTP + 7 Days | |||||||||||||||||||
| 1 | Form-3065 Contract Progress Report | x | NTP + 7 Days | |||||||||||||||||||
| 2 | Health, Safety, and Environment Plan(s) | x | NTP + 7 Days | |||||||||||||||||||
| 3 | Contractor's QA/QC Plan | x | NTP + 7 Days | |||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| 4 | Pumps | x | x | x | x | Before ordering | ||||||||||||||||
| 5 | VFDs | x | x | x | x | Before ordering | ||||||||||||||||
| 6 | Piping | x | x | x | x | Before ordering | ||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 7 | Cables | x | x | x | Before ordering | |||||||||||||||||
| 8 | Switches | x | x | x | Before ordering | |||||||||||||||||
| 9 | Panels | x | x | x | Before ordering | |||||||||||||||||
| 10 | Breakers | x | x | x | Before ordering | |||||||||||||||||
| 11 | Conduits | x | x | x | Before ordering | |||||||||||||||||
| 12 | Controls system | x | x | x | Before ordering | |||||||||||||||||
| ARCHITECTURAL | ||||||||||||||||||||||
| 13 | Paint | x | x | x | x | Before ordering | ||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| 13 | O&M Maintainance data, manuals and Manufacturer's Warranties | Before project close out | ||||||||||||||||||||
| 14 | Factory and Field Test Certificates, Logs and Test Results | Before project close out | ||||||||||||||||||||
| 15 | As Built Submittal | Before project close out |
&L&9Project Submittal Form AF-66