This document contains a schedule of material submittals and federal contract opportunity for repair and replacement of domestic water pumps and piping at Building 420 on a military base. The schedule outlines fifteen required submittals from the contractor by various dates prior to and after notice to proceed, including project schedules, health and safety plans, shop drawings for pumps, variable frequency drives, piping, cables, switches, panels, and controls systems. The federal contract opportunity involves replacing the two existing large domestic pumps with a combination of smaller and medium pumps operating on variable frequency drives to cover a wider flow range from 100 to 600 gallons per minute. It also requires replacing all steel water piping infrastructure to resize pipes for new pump flows and equip with new valves and fittings. The agency is the Department of the Air Force Space Command.

View the file

Other files

File Type Posted
09 Wage Determination.pdf PDF
07 SAFB Environmental Supplement.docx DOCX document
05 Existing Conditions Drawing - GLEN12-1027.pdf PDF
01 SOW GLEN 12-1027.docx DOCX document
03 Requirements - 01 55 04 - SAFB Security Requirements.doc DOC document
04 Design Drawings - GLEN12-1027.pdf PDF
Synopsis GLEN 12-1027.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal 1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT NAMESOLICITATION /CONTRACT NUMBER
GLEN12-1027Repair by Replacing Domestic Water Pumps
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERCERTIFICATE OF COMPLIANCESHOP DRAWINGSCOLOR SELECTIONMANUFATURUR'S RECOMMENDATIONCATALOG DATAO&M RECOMMENDATIONSCALCULATIONSWARRANTYDRAWINGSREPORTTEST RESULTSREQUIRED SUBMISSION DATEDATE TO CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSAPPROVEDDISAPPROVEDCONTRACTOR SUBMITTALFINAL APPROVALREMARKS
GENERAL
1Project Specific MSDS SheetsxNTP + 7 Days
2Form-3064 Contract Progress SchedulexNTP + 7 Days
1Form-3065 Contract Progress ReportxNTP + 7 Days
2Health, Safety, and Environment Plan(s)xNTP + 7 Days
3Contractor's QA/QC PlanxNTP + 7 Days
MECHANICAL
4PumpsxxxxBefore ordering
5VFDsxxxxBefore ordering
6PipingxxxxBefore ordering
ELECTRICAL
7CablesxxxBefore ordering
8SwitchesxxxBefore ordering
9PanelsxxxBefore ordering
10BreakersxxxBefore ordering
11ConduitsxxxBefore ordering
12Controls systemxxxBefore ordering
ARCHITECTURAL
13PaintxxxxBefore ordering
CLOSEOUT
13O&M Maintainance data, manuals and Manufacturer's WarrantiesBefore project close out
14Factory and Field Test Certificates, Logs and Test ResultsBefore project close out
15As Built SubmittalBefore project close out

&L&9Project Submittal Form AF-66