08. PF-16 Adequate Accounting System TM LH May 2019.pdf
PDF 129 KB Posted
- Attached to
- Employment-Related Legal Services
- Solicitation number
- 359724-JR
About this file
The document is a Preaward Survey of Prospective Subcontractor Accounting System form for Time & Material or Labor Hour Subcontracts, dated May 2019. The form is designed to evaluate a prospective subcontractor's accounting system capabilities across six key criteria, including compliance with Generally Accepted Accounting Principles (GAAP), timekeeping system accuracy, labor distribution and charging processes, and alignment with specific contract definitions. The survey covers detailed aspects such as identifying employee labor by subcontract, charging direct and indirect labor costs correctly, ensuring employees charge only qualified labor categories, and verifying materials are charged without profit/fee. The form provides comprehensive definitions for terms like "direct materials," "hourly rate," and "material handling costs" to ensure precise accounting practices. The document is valid for one year from the date of signature and requires completion by the prospective subcontractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Yes No NA Explanation 1 Is the accounting system in accord with the Generally Accepted Accounting
Principles (GAAP) applicable to the circumstances?
2 Does the timekeeping system identify employee labor by subcontract?
3 Does the labor distribution system charge direct and indirect labor cost to the subcontract?
4 Does the labor charging system provide for employees charging only labor categories they are qualified for?
5 Are Materials charged without profit/fee?
6 Does the accounting system align with these definitions?
1. “Direct materials” means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.
2. “Hourly rate” means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualification of a labor category specified in the contract that are—
a. Performed by the contractor;
b. Performed by the subcontractors; or
c. Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
3. “Materials” means—
a. Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;
b. Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;
c. Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.); and
d. Applicable indirect costs.
4. Material handling costs. When included as part of material costs, material handling costs shall include only costs clearly excluded from the labor-hour rate. Material handling costs may include all appropriate indirect costs allocated to direct materials in accordance with the contractor’s usual accounting procedures
Valid for one year from the date of signature PF-16 May 2019
Signature Date
Completed by Name Title
Preaward Survey of Prospective Subcontractor Accounting System for Time & Material or Labor Hour Subcontracts
Prospective Subcontractor
If No or NA, please explain
Table 1
| Prospective Subcontractor: |
| Explanation: |
| Explanation_2: |
| Explanation_3: |
| Explanation_4: |
| Explanation_5: |
| Explanation_6: |
| Name: |
| Title: |
| Date2_af_date: |
| Check Box4: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
File details come from the government source that posted it. Updated .