08.2 SPECS - Repair RTS - Multiple Bldgs PDPG262040.pdf
PDF 215 KB Posted
- Attached to
- Repair RTS Multiple Buildings
- Solicitation number
- W50S74-26-Q-A022
- Issued by
-
Department of the Army National Guard
About this file
This is a specification document for a federal repair project at March Air Reserve Base in California involving multiple building improvements and door hardware installation.
The project encompasses standing-seam metal roof panels (Section 07 41 13.16), steel doors and frames (Section 08 11 13), and door hardware (Section 08 71 00). For roofing, the specification requires vertical-rib, snap-joint standing-seam metal roof panels with aluminum-zinc alloy-coated steel sheet (ASTM A 792, Class AZ50), 22-gauge nominal thickness, two-coat fluoropolymer finish in acrylic coated galvalum, with continuous rib clips featuring vinyl weatherseal inserts. Panel coverage is 16.5 inches with 1.5-inch height. The roof system must achieve air infiltration of no more than 0.06 cfm/sq. ft., no water penetration at 15 lbf/sq. ft. static pressure, UL 90 wind-uplift rating, and accommodate thermal movement ranges of 120°F ambient and 180°F material surface temperatures. Special warranties include 20 years and 6 months for substrate, 40 years for panel finishes, and 20 years for watertightness, all from date of Substantial Completion.
The steel doors and frames must comply with SDI/DOOR A250.8 Level 4 specifications for maximum duty doors with core insulation (polyurethane foam with R-factor 10.0 or mineral board per ASTM C612). All doors are 1-3/4 inches thick with factory-primed rust-inhibitive coating or hot-dip zinc-coated finishes meeting ASTM A924/A924M Class A40. Door hardware includes Schlage Everest 29 Primus high-security cylinders (Level 9), Ives hinges, LCN surface closers (4040XP model), Von Duprin exit devices, and Zero thresholds and seals. The keying system specifies construction keys with permanent core installation by owner, including 10 construction keys and 2 control keys. Hardware warranties range from one year for hinges to thirty years for closers. The door schedule identifies seven hardware groups applied to doors throughout the Billets, Bathhouse, and Kitchen areas (doors 50-1 through 59-2, 91-1 through 91-5, and 96-1 through 96-3), with specifications for hinges, locks, closers, seals, thresholds, and miscellaneous accessories.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR RTS – MULTIPLE BUILDINGS MARB CA
STANDING-SEAM METAL ROOF PANELS 074113.16 - 1
SECTION 07 41 13.16 - STANDING-SEAM METAL ROOF PANELS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes standing-seam metal roof panels.
B. Related Sections:
1. Section 074293 "Soffit Panels" for metal panels used in horizontal soffit applications.
2. Section 077253 "Snow Guards" for prefabricated devices designed to hold snow on the roof surface, allowing it to melt and drain off slowly.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference .
1. Meet with Owner, Architect, Owner's insurer if applicable, metal panel Installer, metal panel manufacturer's representative, structural-support Installer, and installers whose work interfaces with or affects metal panels, including installers of roof accessories and roof-mounted equipment.
2. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review methods and procedures related to metal panel installation, including manufacturer's written instructions.
4. Examine support conditions for compliance with requirements, including alignment between and attachment to structural members.
5. Review structural loading limitations of deck during and after roofing.
6. Review flashings, special details, drainage, penetrations, equipment curbs, and condition of other construction that affect metal panels.
7. Review governing regulations and requirements for insurance, certificates, and tests and inspections if applicable.
8. Review temporary protection requirements for metal panel systems during and after installation.
9. Review procedures for repair of metal panels damaged after installation.
10. Document proceedings, including corrective measures and actions required, and furnish copy of record to each participant.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 2
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of panel and accessory.
B. Sustainable Design Submittals:
1. Product Test Reports: For roof materials, documentation indicating that roof materials comply with Solar Reflectance Index requirements.
2. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.
C. Shop Drawings:
1. Include fabrication and installation layouts of metal panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories; and special details.
2. Accessories: Include details of the flashing, trim, and anchorage systems, at a scale of not less than 3 inches per 12 inches.
D. Calculations:
1. Include calculations with registered engineer seal, verifying roof panel and attachment method resist wind pressures imposed on it pursuant to applicable building codes.
E. Samples for Initial Selection: For each type of metal panel indicated with factory-applied color finishes.
1. Include similar Samples of trim and accessories involving color selection.
F. Samples for Verification: For each type of exposed finish required, prepared on Samples of size indicated below.
1. Metal Panels: at least 12” long by actual panel width. Include clips, fasteners, closures, and other metal panel accessories.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Manufacturer and Installer.
B. Product Test Reports: For each product, for tests performed by a qualified testing agency.
C. Field quality-control reports.
D. Sample Warranties: For special warranties.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For metal panels to include in maintenance manuals.
1.7 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in architectural sheet metal products.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 3
B. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver components, metal panels, and other manufactured items so as not to be damaged or deformed. Package metal panels for protection during transportation and handling.
B. Unload, store, and erect metal panels in a manner to prevent bending, warping, twisting, and surface damage.
C. Stack metal panels horizontally on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal panels to ensure dryness, with positive slope for drainage of water. Do not store metal panels in contact with other materials that might cause staining, denting, or other surface damage.
D. Retain strippable protective covering on metal panels until installation. Remove as panels are being installed. Verify film is not left on installed panels.
1.9 FIELD CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit assembly of metal panels to be performed according to manufacturers' written instructions and warranty requirements.
1.10 COORDINATION
A. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual equipment provided.
B. Coordinate metal panel installation with rain drainage work, flashing, trim, construction of soffits, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.
1.11 WARRANTY
A. Special Galvalume Substrate Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal panel systems that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including rupturing, or perforating.
b. Deterioration of metals and other materials beyond normal weathering.
2. Warranty Period: 20 years and 6 months from date of Substantial Completion.
B. Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 4
1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D 2244.
b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214.
c. Cracking, chipping, peeling, or failure of paint to adhere to bare metal.
2. Finish Warranty Period: 40 years from date of Substantial Completion.
C. Special Watertightness Warranty: Manufacturer's in which manufacturer agrees to repair or replace standing-seam metal roof panel assemblies that fail to remain watertight, including leaks, within specified warranty period.
1. Warranty Period: 20 years from date of Substantial Completion.
2. Shop drawings must be provided to, reviewed, and approved by panel manufacturer prior to panel system installation.
3. Inspections by panel system manufacturer technical representative are required. Perform first inspection when underlayment and flashing are in place and second inspection when the roof is complete.
D. Special Installer Warranty: Furnish a written warranty signed by the Panel Applicator guaranteeing materials and workmanship for watertightness of the roofing system, flashings, penetrations, and against all leaks.
1. Warranty Period: Two years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Recycled Content: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 29 percent.
B. Solar Reflectance Index (SRI): Three-year-aged SRI not less than [64] [32] or initial SRI not less than [82] [39] when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.
C. Energy Performance: Provide roof panels that are listed on the EPA/DOE's ENERGY STAR "Roof Product List" for steep slope roof products.
D. Energy Performance: Provide roof panels according to one of the following when tested according to CRRC-1:
1. Three-year, aged solar reflectance of not less than [0.55] <Insert value> and emissivity of not less than [0.75] <Insert value>.
2. Three-year, aged Solar Reflectance Index of not less than [64] <Insert value> when calculated according to ASTM E 1980.
E. Structural Performance: Provide metal panel systems capable of withstanding the effects of the following loads, based on testing according to [ASTM E 1592] [UL 580]:
1. Wind Loads: As indicated on Drawings.
2. Other Design Loads: As indicated on Drawings
STANDING-SEAM METAL ROOF PANELS 074113.16 - 5
F. Air Infiltration: Air leakage of not more than 0.06 cfm/sq. ft. when tested according to ASTM E 1680 and ASTM E 283 at the following test-pressure difference:
1. Test-Pressure Difference: 6.24 lbf/sq. ft.
G. Water Penetration under Static Pressure: No water penetration when tested according to ASTM E 1646 and ASTM E 331 at the following test-pressure difference:
1. Test-Pressure Difference: 15 lbf/sq. ft.
H. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.
1. Uplift Rating: UL 90.
I. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change (Range): 120 deg F , ambient; 180 deg F (material surfaces]
2.2 STANDING-SEAM METAL ROOF PANELS
A. General: Provide factory-formed metal roof panels designed to be installed by lapping and interconnecting raised side edges of adjacent panels with joint type indicated and mechanically attaching panels to supports using concealed clips in side laps. Include clips, cleats, pressure plates, and accessories required for weathertight installation.
1. Steel Panel Systems: Unless more stringent requirements are indicated, comply with
ASTM E 1514.
B. Vertical-Rib, Snap-Joint, Standing-Seam Metal Roof Panels: Formed with vertical ribs at panel edges with vinyl gasket, and a flat pan between ribs; designed for sequential installation by engaging opposite edge of adjacent panels, and snapping panels together
1. Metallic-Coated Steel Sheet: Aluminum-zinc alloy-coated steel sheet complying with ASTM A 792/A 792M, Class AZ50 coating designation; structural quality. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Nominal Thickness: 22g
b. Exterior Finish: Two-coat fluoropolymer.
c. Painted materials shall have a removable plastic film to protect the paint during roll forming, shipping and handling.
d. Color: Acrylic Coated Galvalum
2. Clips: Continuous Rib with Vinyl Weatherseal Insert to accommodate thermal movement
3. Material steel clips for metallic-coated steel roof panels and stainless-steel clips for aluminum panels.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 6
4. Panel Coverage: 16.5”.
5. Panel Height: 1.5”
2.3 UNDERLAYMENT MATERIALS
A. Self-Adhering, High-Temperature Underlayment: Provide self-adhering, cold-applied, sheet underlayment, a minimum of 40 mils thick, consisting of slip-resistant, polyethylene-film top surface laminated to a layer of butyl or SBS-modified asphalt adhesive, with release-paper backing. Provide primer when recommended by underlayment manufacturer.
1. Thermal Stability: Stable after testing at 240 deg F; ASTM D 1970.
2. Low-Temperature Flexibility: Passes after testing at minus 20 deg F ; ASTM D 1970.
3. Manufacturers: Subject to compliance with requirements.
2.4 MISCELLANEOUS MATERIALS
A. Miscellaneous Metal Subframing and Furring: ASTM C 645; cold-formed, metallic-coated steel sheet, ASTM A 653/A 653M, G90 (Z275 hot-dip galvanized) coating designation or ASTM A 792/A 792M, Class AZ50 (Class AZM150) coating designation unless otherwise indicated. Provide manufacturer's standard sections as required for support and alignment of metal panel system.
B. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal panels unless otherwise indicated.
1. Closures: Provide closures at eaves and ridges, fabricated of same metal as metal panels.
2. Backing Plates: Provide metal backing plates at panel end splices, fabricated from material recommended by manufacturer.
C. Flashing and Trim: Provide flashing and trim formed from same material as metal panels as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers. Finish flashing and trim with same finish system as adjacent metal panels. If required, insert special requirements for ridge closures, corner units, copings, fasciae.
D. Panel Fasteners: Zinc-coated steel, corrosion resisting steel, zinc cast head, or nylon capped steel, type and size as approved for the applicable loading requirements.
E. Panel Sealants: Provide sealant type recommended by manufacturer that are compatible with panel materials, are nonstaining, and do not damage panel finish.
1. Joint Sealant: Silicone sealant; of type, grade, class, and use classifications required to seal joints in metal panels and remain weathertight; and as recommended in writing by metal panel manufacturer.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 7
2.5 FABRICATION
A. General: Fabricate and finish metal panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.
B. On-Site Fabrication: Subject to compliance with requirements of this Section, metal panels may be fabricated on-site using factory set, non-adjustable, portable roll-forming equipment if panels are of same profile and warranted by manufacturer to be equal to factory-formed panels.
Fabricate according to equipment manufacturer's written instructions and to comply with details shown.
C. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.
D. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's recommendations and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated.
1. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.
2. Sealed Joints: Form non-expansion, but movable, joints in metal to accommodate sealant and to comply with SMACNA standards.
3. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal recommended in writing by metal panel manufacturer.
a. Size: As recommended by SMACNA's "Architectural Sheet Metal Manual" or metal panel manufacturer for application, but not less than thickness of metal being secured.
2.6 FINISHES
A. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in same piece are unacceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
C. Steel Panels and Accessories:
1. Two-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil over 0.2± 0.05 mil primer coat, to provide a total dry film thickness of 0.95± 0.10 mil .Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 8
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal panel supports, and other conditions affecting performance of the Work.
1. Examine primary and secondary roof framing to verify that rafters, purlins, angles, channels, and other structural panel support members and anchorages have been installed within alignment tolerances required by metal roof panel manufacturer.
2. Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking and that installation is within flatness tolerances required by metal roof panel manufacturer.
a. Verify that air- or water-resistive barriers have been installed over sheathing or backing substrate to prevent air infiltration or water penetration.
B. Examine roughing-in for components and systems penetrating metal panels to verify actual locations of penetrations relative to seam locations of metal panels before installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Miscellaneous Supports: Install subframing, furring, and other miscellaneous panel support members and anchorages according to ASTM C 754 and metal panel manufacturer's written recommendations.
3.3 UNDERLAYMENT INSTALLATION
A. Self-Adhering Sheet Underlayment: Apply primer if required by manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation. Apply at locations indicated wrinkle free, in shingle fashion to shed water, and with end laps of not less than 6 inches staggered 24 inches between courses. Overlap side edges not less than 36 inches. Roll laps with roller. Cover underlayment within 14 days or as directed by the underlayment product manufacturer.
1. Apply over the entire roof surface.
3.4 METAL PANEL INSTALLATION
A. General: Install metal panels according to manufacturer's written instructions in orientation, sizes, and locations indicated. Install panels perpendicular to supports unless otherwise indicated.
Anchor metal panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Shim or otherwise plumb substrates receiving metal panels to be level to 1/4 inch in 20 ft..
2. Flash and seal metal panels at perimeter of all openings. Do not begin installation until air-or water-resistive barriers and flashings that will be concealed by metal panels are installed.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 9
3. Locate and space fastenings in uniform vertical and horizontal alignment.
4. Install flashing and trim as metal panel work proceeds.
5. Panels should be continuous without end laps.
6. Align bottoms of metal panels and fasten.
7. Provide weathertight escutcheons for pipe- and conduit-penetrating panels.
B. Fasteners:
1. Steel Panels: Use stainless-steel fasteners for surfaces exposed to the exterior; use galvanized-steel fasteners for surfaces exposed to the interior.
2. Aluminum Panels: Use stainless-steel fasteners for surfaces exposed to the exterior; use stainless-steel fasteners for surfaces exposed to the interior.
C. Anchor Clips: Anchor metal roof panels and other components of the Work securely in place, using manufacturer's approved fasteners according to manufacturers' written instructions.
D. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action as recommended in writing by metal panel manufacturer.
E. Standing-Seam Metal Roof Panel Installation: Fasten metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended in writing by manufacturer.
1. Install clips to supports with self-tapping fasteners.
2. Install pressure plates, if required, at locations indicated in manufacturer's written installation instructions.
3. Snap Joint: Nest standing seams and fasten together by interlocking and completely engaging factory-applied vinyl weatherseal.
F. Accessory Installation: Install accessories with positive anchorage to building and weathertight mounting, and provide for thermal expansion. Coordinate installation with flashings and other components.
1. Install components required for a complete metal panel system including trim, copings, corners, seam covers, flashings, sealants, gaskets, fillers, and similar items. Provide types indicated by metal roof panel manufacturers; or, if not indicated, types recommended by metal roof panel manufacturer.
G. Flashing and Trim: Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.
1. Install exposed flashing and trim that is without buckling and tool marks, and that is true to line and levels indicated, with exposed edges folded back to form hems. Install sheet metal flashing and trim to fit substrates and achieve waterproof and weather-resistant performance.
2. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim.
H. Roof Curbs: Install flashing around bases where they meet metal roof panels.
I. Pipe Flashing: Form flashing around pipe penetration and metal roof panels. Fasten and seal to metal roof panels as recommended by manufacturer.
STANDING-SEAM METAL ROOF PANELS 074113.16 - 10
3.5 ERECTION TOLERANCES
A. Installation Tolerances: Shim and align metal panel units within installed tolerance of 1/4 inch in 20 feet on slope and location lines as indicated and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.
3.6 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect metal roof panel installation, including accessories. Report results in writing.
B. Remove and replace applications of metal roof panels where tests and inspections indicate that they do not comply with specified requirements.
C. Additional tests and inspections, at Contractor's expense, are performed to determine compliance of replaced or additional work with specified requirements.
D. Prepare test and inspection reports.
3.7 CLEANING AND PROTECTION
A. Remove temporary protective coverings and strippable films, if any, as metal panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal panel installation, clean finished surfaces as recommended by metal panel manufacturer.
Maintain in a clean condition during construction.
B. Replace metal panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
END OF SECTION 074113.16
REPAIR RTS - MULTIPLE BUIDINGS MARCH ARB
SECTION 08 11 13
STEEL DOORS AND FRAMES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface
ASTM A924/A924M (2016a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM C578 (2016) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C591 (2016) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation
ASTM D2863 (2013) Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)
ASTM E1300 (2016) Standard Practice for Determining Load Resistance of Glass in Buildings
ASTM F2248 (2012) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass
SECTION 08 11 13 Page 1
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.115 (2016) Hardware Preparation in Steel Doors and Steel Frames
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 105 (2016) Standard for Installation of Smoke Door Assemblies and Other Opening Protectives
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
NFPA 80 (2016) Standard for Fire Doors and Other Opening Protectives
STEEL DOOR INSTITUTE (SDI/DOOR)
SDI/DOOR 113 (2001; R2006) Standard Practice for Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies
SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames
SDI/DOOR A250.4 (2011) Test Procedure and Acceptance Criteria for Physical Endurance for Steel Doors and Hardware Reinforcing
SDI/DOOR A250.6 (2003; R2009) Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames
SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames
UNDERWRITERS LABORATORIES (UL)
UL 10C (2016) UL Standard for Safety Positive Pressure Fire Tests of Door Assemblies
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 81 13 LEED V2009 REQUIREMENTS.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Doors; G
Frames; G
Accessories
SECTION 08 11 13 Page 2
Show elevations, construction details, metal gages, hardware provisions, method of glazing, and installation details.
Schedule of doors; G
Schedule of frames; G
Submit door and frame locations.
SD-03 Product Data
Doors; G
Frames; G
Accessories
Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction. When "custom hollow metal doors" are provided in lieu of "standard steel doors," provide additional details and data sufficient for comparison to SDI/DOOR A250.8 requirements.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Provide temporary steel spreaders securely fastened to the bottom of each welded frame. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.
PART 2 PRODUCTS
2.1 STANDARD STEEL DOORS
SDI/DOOR A250.8 , except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00. Undercut where indicated.
Exterior doors shall have top edge closed flush and sealed to prevent water intrusion. Doors shall be 1-3/4 inch thick, unless otherwise indicated.
Provide exterior glazing in accordance with ASTM F2248 and ASTM E1300.
2.1.1 Classification - Level, Performance, Model
2.1.1.1 Maximum Duty Doors
SDI/DOOR A250.8 , Level 4, physical performance Level A, Model with core construction as required by the manufacturer for interior doors and for indicated exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners shall be filled with mineral board insulation.
2.2 INSULATED STEEL DOOR SYSTEMS
Insulated steel doors shall have a core of polyurethane foam and an R factor of 10.0 or more (based on a k value of 0.16); face sheets, edges, and frames of galvanized steel not lighter than 23 gage, 16 gage, and 16
SECTION 08 11 13 Page 3 gage respectively. Doors and frames shall receive phosphate treatment, rust-inhibitive primer, and baked acrylic enamel finish. Doors shall have been tested in accordance with SDI/DOOR A250.4 and shall have met the requirements for Level C. Prepare doors to receive specified hardware.Doors shall be 1-3/4 inch thick.
2.3 ACCESSORIES
2.3.1 Astragals
For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, as specified in Section 08 71 00 DOOR HARDWARE provide overlapping steel astragals with the doors. For interior pairs of fire rated and smoke control doors, provide stainless steel astragals complying with NFPA 80 for fire rated assemblies and NFPA 105 for smoke control assemblies.
2.3.2 Moldings
Provide moldings around glass of interior and exterior doors. Provide nonremovable moldings on outside of exterior doors and on corridor side of interior doors. Other moldings may be stationary or removable. Secure inside moldings to stationary moldings, or provide snap-on moldings.
Muntins shall interlock at intersections and shall be fitted and welded to stationary moldings.
2.4 INSULATION CORES
Insulated cores shall be of type specified, and provide an apparent U-factor of .48 in accordance with SDI/DOOR 113 and shall conform to:
a. Rigid Cellular Polyisocyanurate Foam: ASTM C591, Type I or II, foamed-in-place or in board form, with oxygen index of not less than 22 percent when tested in accordance with ASTM D2863; or
b. Rigid Polystyrene Foam Board: ASTM C578, Type I or II; or
c. Mineral board: ASTM C612, Type I.
2.5 STANDARD STEEL FRAMES
SDI/DOOR A250.8 , Level 4, except as otherwise specified. Form frames to sizes and shapes indicated, with welded corners. Provide steel frames for doors, transoms, and sidelights, unless otherwise indicated.
2.5.1 Welded Frames
Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.
Weld frames in accordance with the recommended practice of the Structural Welding Code Sections 1 through 6, AWS D1.1/D1.1M and in accordance with the practice specified by the producer of the metal being welded.
2.5.2 Mullions and Transom Bars
Mullions and transom bars shall be closed or tubular construction and be a member with heads and jambs butt-welded thereto. Bottom of door mullions shall have adjustable floor anchors and spreader connections.
SECTION 08 11 13 Page 4
2.5.3 Stops and Beads
Form stops and beads from 20 gage steel. Provide for glazed and other openings in standard steel frames. Secure beads to frames with oval-head, countersunk Phillips self-tapping sheet metal screws or concealed clips and fasteners. Space fasteners approximately 12 to 16 inch on center. Miter molded shapes at corners. Butt or miter square or rectangular beads at corners.
2.5.4 Anchors
Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage.
2.5.4.1 Wall Anchors
Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.
a. Masonry: Provide anchors of corrugated or perforated steel straps or 3/16 inch diameter steel wire, adjustable or T-shaped;
b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding;
2.5.4.2 Floor Anchors
Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member. Where floor fill occurs, terminate bottom of frames at the indicated finished floor levels and support by adjustable extension clips resting on and anchored to the structural slabs.
2.6 FIRE AND SMOKE DOORS AND FRAMES
NFPA 80 and NFPA 105 and this specification. The requirements of NFPA 80 and NFPA 105 shall take precedence over details indicated or specified.
2.6.1 Labels
Fire doors and frames shall bear the label of Underwriters Laboratories (UL), Factory Mutual Engineering and Research (FM), or Warnock Hersey International (WHI) attesting to the rating required. Testing shall be in accordance with NFPA 252 or UL 10C . Labels shall be metal with raised letters, and shall bear the name or file number of the door and frame manufacturer. Labels shall be permanently affixed at the factory to frames and to the hinge edge of the door. Door labels shall not be painted.
2.6.2 Oversized Doors
For fire doors and frames which exceed the size for which testing and labeling are available, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.
SECTION 08 11 13 Page 5
2.6.3 Astragal on Fire and Smoke Doors
On pairs of labeled fire doors, conform to NFPA 80 and UL requirements. On smoke control doors, conform to NFPA 105 .
2.7 WEATHERSTRIPPING
As specified in Section 08 71 00 DOOR HARDWARE.
2.8 HARDWARE PREPARATION
Provide minimum hardware reinforcing gages as specified in SDI/DOOR A250.6 .
Drill and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware in accordance with the applicable requirements of SDI/DOOR A250.8 and SDI/DOOR A250.6 . For additional requirements refer to ANSI/BHMA A156.115 . Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory. Locate hardware in accordance with the requirements of SDI/DOOR A250.8 , as applicable. Punch door frames to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.
2.9 FINISHES
2.9.1 Factory-Primed Finish
All surfaces of doors and frames shall be thoroughly cleaned, chemically treated and factory primed with a rust inhibiting coating as specified in SDI/DOOR A250.8 or paintable A25 galvannealed steel without primer. Where coating is removed by welding, apply touchup of factory primer.
2.9.2 Hot-Dip Zinc-Coated and Factory-Primed Finish
Fabricate scheduled doors and frames from hot dipped zinc coated steel, alloyed type, that complies with ASTM A924/A924M and ASTM A653/A653M . The coating weight shall meet or exceed the minimum requirements for coatings having 0.4 ounces per square foot, total both sides, i.e., A40. Repair damaged zinc-coated surfaces by the application of zinc dust paint.
Thoroughly clean and chemically treat to insure maximum paint adhesion.
Factory prime as specified in SDI/DOOR A250.8 .
2.9.3 Electrolytic Zinc-Coated Anchors and Accessories
Provide electrolytically deposited zinc-coated steel in accordance with ASTM A879/A879M , Commercial Quality, Coating Class A. Phosphate treat and factory prime zinc-coated surfaces as specified in SDI/DOOR A250.8 .
2.10 FABRICATION AND WORKMANSHIP
Finished doors and frames shall be strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Molded members shall be clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints shall be well formed and in true alignment. Conceal fastenings where practicable. Design other frames in exposed masonry walls or partitions to allow sufficient space between the inside back of trim and masonry to receive caulking compound.
SECTION 08 11 13 Page 6
2.10.1 Grouted Frames
For frames to be installed in exterior walls and to be filled with mortar or grout, fill the stops with strips of rigid insulation to keep the grout out of the stops and to facilitate installation of stop-applied head and jamb seals.
2.11 PROVISIONS FOR GLAZING
Materials are specified in Section 08 81 00, GLAZING.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Frames
Set frames in accordance with SDI/DOOR A250.11 . Plumb, align, and brace securely until permanent anchors are set. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners. Build in or secure wall anchors to adjoining construction. Where frames require ceiling struts or overhead bracing, anchor frames to the struts or bracing. Backfill frames with mortar. Coat inside of frames with corrosion-inhibiting bituminous material. For frames in exterior walls, ensure that stops are filled with rigid insulation before grout is placed.
3.1.2 Doors
Hang doors in accordance with clearances specified in SDI/DOOR A250.8 .
After erection and glazing, clean and adjust hardware.
3.1.3 Fire and Smoke Doors and Frames
Install fire doors and frames, including hardware, in accordance with NFPA 80 . Install fire rated smoke doors and frames in accordance with NFPA 80 and NFPA 105 .
3.2 PROTECTION
Protect doors and frames from damage. Repair damaged doors and frames prior to completion and acceptance of the project or replace with new, as directed. Wire brush rusted frames until rust is removed. Clean thoroughly. Apply an all-over coat of rust-inhibitive paint of the same type used for shop coat.
3.3 CLEANING
Upon completion, clean exposed surfaces of doors and frames thoroughly.
Remove mastic smears and other unsightly marks.
-- End of Section --
SECTION 08 11 13 Page 7
DR SIZE MTL HDW
BILLETS
50-1 3'-0" x 7'-0" HM 1 50-2 3'-0" x 7'-0" HM 1 51-1 3'-0" x 7'-0" HM 1 51-2 3'-0" x 7'-0" HM 1 52-1 3'-0" x 7'-0" HM 1 52-2 3'-0" x 7'-0" HM 1 53-1 3'-0" x 7'-0" HM 1 53-2 3'-0" x 7'-0" HM 1 54-1 3'-0" x 7'-0" HM 1 54-2 3'-0" x 7'-0" HM 1 55-1 3'-0" x 7'-0" HM 1 55-2 3'-0" x 7'-0" HM 1 56-1 3'-0" x 7'-0" HM 1 56-2 3'-0" x 7'-0" HM 1 57-1 3'-0" x 7'-0" HM 1 57-2 3'-0" x 7'-0" HM 1 58-1 3'-0" x 7'-0" HM 1 58-2 3'-0" x 7'-0" HM 1 59-1 3'-0" x 7'-0" HM 1 59-2 3'-0" x 7'-0" HM 1
BATHHOUSE
91-1 3'-0" x 7'-0" HM 2 91-2 3'-0" x 7'-0" HM 2 91-3 3'-0" x 7'-0" V HM 3 91-4 3'-0" x 7'-0" V HM 3 91-5 3'-0" x 7'-0" V HM 3
KITCHEN
96-1 3'-0" x 7'-0" HM 1 96-2 3'-0" x 7'-0" PR HM 4 96-3 3'-0" x 7'-0" PR HM 4
LEGEND
HM
PR
V
DOOR SCHEDULE
REPAIR RTS
Multiple Buildings March Air Reserve Base California
HOLLOW METAL
PAIR
1' X 2' LOW VENT
REPAIR RTS – MULTIPLE BUILDING DOOR HARDWARE
Multiple Buildings 08 71 00 -1 March Air Reserve Base California
SECTION 08 71 00
DOOR HARDWARE
PART 1 - GENERAL
1.1 SUMMARY:
A. Section Includes:
1. Door hardware, including electric hardware.
2. Storefront and entrance door hardware.
3. Card Access control system.
4. Power supplies for electric hardware.
5. Door position switches.
6. Cylinders for doors fabricated with locking hardware.
7. Point-to-point wiring diagrams for electric hardware.
B. Related Divisions:
1. Division 06 – door hardware installation
2. Division 07 – sealant at exterior thresholds
3. Division 08 – metal doors and frames, interior aluminum frames, wood doors, integrated security systems, specialty doors, storefront and glazed curtainwall systems.
4. Division 10 – operable partitions
5. Division 21 – fire and life safety systems
6. Division 28 – security access systems
C. Specific Omissions: Hardware for the following is specified or indicated elsewhere.
1. Windows.
2. Cabinets, including open wall shelving and locks.
3. Signs, except where scheduled.
4. Toilet accessories, including grab bars.
5. Installation.
6. Rough hardware.
7. Conduit, junction boxes & wiring.
8. Folding partitions.
9. Sliding aluminum doors.
10. Access doors and panels.
11. Corner Guards.
12. Welded steel gates and supports.
1.2 REFERENCES:
A. Use date of standard in effect as of Bid date.
1. American National Standards Institute
a) ANSI 156.18 – Materials and Finishes.
2. BHMA – Builders Hardware Manufacturers Association
3. 2022 California Building Code
a) Chapter 11B – Accessibility To Public Buildings, Public Accommodations, Commercial Buildings and Public Housing
4. DHI – Door and Hardware Institute
Multiple Buildings 08 71 00 -2 March Air Reserve Base California
5. NFPA – National Fire Protection Association
a) NFPA 80 2016 Edition – Standard for Fire Doors and Other Opening Protectives.
b) NFPA 105 – Smoke and Draft Control Door Assemblies
c) NFPA 252 – Fire Tests of Door Assemblies
6. UL – Underwriters Laboratories
a) UL10C – Positive Pressure Fire Tests of Door Assemblies.
b) UL 305 – Panic Hardware
7. WHI – Warnock Hersey Incorporated State of California Building Code
8. Local applicable codes
9. SDI – Steel Door Institute
10. WI – Woodwork Institute
11. AWI – Architectural Woodwork Institute
12. NAAMM – National Association of Architectural Metal Manufacturers
B. Abbreviations
1. Manufacturers: see table at 2.1.A of this section
2. Finishes: see 2.7 of this section.
1.3 SUBMITTALS & SUBSTITUTIONS:
A. SUBMITTALS: Submit six copies of schedule per D. Only submittals printed one sided will be accepted and reviewed. Organize vertically formatted schedule into “Hardware Sets” with index of doors and headings, indicating complete designations of every item required for each door or opening. Minimum 10pt font size. Include following information:
1. Type, style, function, size, quantity and finish of hardware items.
2. Use BHMA Finish codes per ANSI A156.18.
3. Name, part number and manufacturer of each item.
4. Fastenings and other pertinent information.
5. Location of hardware set coordinated with floor plans and door schedule.
6. Explanation of abbreviations, symbols, and codes contained in schedule.
7. Mounting locations for hardware.
8. Door and frame sizes, materials and degrees of swing.
9. List of manufacturers used and their nearest representative with address and phone number.
10. Catalog cuts.
11. Point-to-point wiring diagrams.
12. Manufacturer’s technical data and installation instructions for electronic hardware.
13. Date of jobsite visit.
B. Bid and submit manufacturer’s updated/improved item if scheduled item is discontinued.
C. Deviations: Highlight, encircle or otherwise identify deviations from “Schedule of Finish Hardware” on submittal with notations clearly designating those portions as deviating from this section.
D. If discrepancy between drawings and scheduled material in this section, bid the more expensive of the two choices, note the discrepancy in the submittal and request direction from Architect for resolution.
E. Substitutions per Division 1. Include product data and indicate benefit to the Project.
Furnish operating samples on request.
Multiple Buildings 08 71 00 -3 March Air Reserve Base California
F. Items listed with no substitute manufacturers have been requested by Owner to meet existing standard.
G. Furnish as-built/as-installed schedule with closeout documents, including keying schedule, riser and point-to-point wiring diagrams, manufacturers’ installation, adjustment and maintenance information, and supplier’s final inspection report.
1.4 QUALITY ASSURANCE:
A. Qualifications:
1. Hardware supplier: direct factory contract supplier who employs a hardware consultant, available at reasonable times during course of work for project hardware consultation to Owner, Architect and Contractor.
a) Responsible for detailing, scheduling and ordering of finish hardware.
Detailing implies that the submitted schedule of hardware is correct and complete for the intended function and performance of the openings.
B. Hardware: Free of defects, blemishes and excessive play. Obtain each kind of hardware (latch and locksets, exit devices, hinges and closers) from one manufacturer.
C. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort.
D. Fire-Rated Openings: NFPA 80 compliant. Hardware UL10C (positive pressure) compliant for given type/size opening and degree of label. Provide proper latching hardware, non-flaming door closers, approved-bearing hinges, and resilient seals.
Coordinate with wood door section for required intumescent seals. Furnish openings complete.
E. Furnish hardware items required to complete the work in accordance with specified performance level and design intent, complying with manufacturers’ instructions and code requirements.
F. Pre-Installation Meetings: Initiate and conduct with supplier, installer and related trades, coordinate materials and techniques, and sequence complex hardware items and systems installation. Include manufacturers' representatives of locks, panic hardware and door closers in the meetings. Convene prior to commencement of related work.
1.5 DELIVERY, STORAGE AND HANDLING:
A. Delivery: coordinate delivery to appropriate locations (shop or field).
1. Permanent keys and cores: secured delivery direct to Owner’s representative.
B. Acceptance at Site: Items individually packaged in manufacturers’ original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate contents, locations in hardware schedule and door numbers.
C. Storage: Provide securely locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, dust, excessive heat and cold, etc.
1.6 PROJECT CONDITIONS AND COORDINATION:
A. Electrified hardware: Electrical drawings and electrical specifications are based on the specific electrified hardware components specified in hardware sets. These electronic hardware components have been specified as an assembly. Changes to these components shall be submitted to the Architect for approval.
Multiple Buildings 08 71 00 -4 March Air Reserve Base California
B. Where exact types of hardware specified are not adaptable to finished shape or size of members requiring hardware, provide suitable types having as nearly as practical the same operation and quality as type specified, subject to Architect’s approval.
C. Coordination: Coordinate hardware with other work. Furnish hardware items of proper design for use on doors and frames of the thickness, profile, swing, security and similar requirements indicated, as necessary for proper installation and function, regardless of omissions or conflicts in the information on the Contract Documents. Furnish related trades with the following information:
1. Location of embedded and attached items to concrete.
2. Location of wall-mounted hardware, including wall stops.
3. Location of finish floor materials and floor-mounted hardware.
4. At masonry construction, coordinate with the anchoring and hollow metal supplier prior to frame installation by placing a strip of insulation, wood, or foam, on the back of the hollow metal frame behind the rabbet section for continuous hinges, as well as at rim panic hardware strike locations, silencers, coordinators, and door closer arm locations. When the frame is grouted in place, the backing will allow drilling and tapping without dulling or breaking the installer’s bits.
5. Locations for conduit and raceways as needed for electrical, electronic and electro-pneumatic hardware items. Fire/life-safety system interfacing. Point-to-point wiring diagrams plus riser diagrams to related trades.
6. Coordinate: low-voltage power supply locations.
7. Coordinate: flush top rails of doors at outswinging exteriors, and throughout where adhesive-mounted seals occur.
8. Manufacturers’ templates to door and frame fabricators.
D. Check Shop Drawings for doors and entrances to confirm that adequate provisions will be made for proper hardware installation.
E. Environmental considerations: segregate unused recyclable paper and paper product packaging, uninstalled metals, and plastics, and have these sent to a recycling center.
F. Prior to submittal, carefully inspect existing conditions to verify finish hardware required to complete Work, including sizes, quantities, existing hardware scheduled for re-use, and sill condition material. If conflict between the specified/scheduled hardware and existing conditions, submit request for direction from Architect. Include date of jobsite visit in the submittal.
1. Submittals prepared without thorough jobsite visit by qualified hardware expert will be rejected as non-compliant.
1.7 WARRANTY:
A. Part of respective manufacturers’ regular terms of sale. Provide manufacturers’ written warranties.
B. Include factory order numbers with close-out documents to validate warranty information, required for Owner in making future warranty claims:
C. Minimum warranties:
Multiple Buildings 08 71 00 -5 March Air Reserve Base California
1. Locksets: Ten years
2. Extra Heavy Duty Cylindrical Lock: Ten Years
Three Years electrical
3. Exit Devices: Ten years mechanical
Three years electrical
4. Closers: Thirty years mechanical
5. Hinges: One year
6. Other Hardware Two years
1.8 COMMISSIONING:
A. Conduct these tests prior to request for certificate of substantial completion:
1. With installer present, test door hardware operation with climate control system and stairwell pressurization system both at rest and while in full operation.
2. With installer, access control contractor and electrical contractor present, test electrical, electronic and electro-pneumatic hardware systems for satisfactory operation.
3. With installer and electrical contractor present, test hardware interfaced with fire/life-safety system for proper operation and release.
Multiple Buildings 08 71 00 -6 March Air Reserve Base…