08 Appendices.pdf
PDF 127 KB Posted
- Solicitation number
- 147423
- Issued by
- Riverside County, California
About this file
This appendices document supports the City of Beaumont's Invitation for Bid (IFB) 26-22 for Citywide Sidewalk Improvements under Capital Improvement Project (CIP) R25-02 in California. The appendices provide supplementary information essential to the bid process, including detailed work descriptions organized by specific project addresses and prevailing wage determinations required for the project execution. The document serves as a reference guide for bidders to understand the scope of sidewalk improvement work distributed across multiple locations throughout Beaumont and the labor cost requirements that must be incorporated into bid proposals.
The prevailing wage determination outlined in Appendix B establishes the mandatory labor rates that contractors must comply with when executing work on this public works project, ensuring that workers receive wages consistent with prevailing standards for the region. The work descriptions provided in Appendix A enable bidders to assess project requirements systematically by location, facilitating accurate cost estimation and project planning. These appendices are integral to the IFB process and must be reviewed in conjunction with the primary bid documents to develop compliant and competitive proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 08 Appendix B - Prevailing Wage Determination.pdf | ||
| 06 Contract Drawings.pdf | ||
| 07 Public Works Agreement.pdf | ||
| 08 Appendix A - Work Descriptions by Address.pdf | ||
| 04 Special Conditions.pdf | ||
| 05 Technical Specs.pdf | ||
| 09 Bid Plans - Elm Street.pdf | ||
| 02 General Conditions.pdf | ||
| 001 IFB.docx | DOCX document | |
| 03 Special Federal Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Beaumont Appendices
Citywide Sidewalk Improvements
CIP R25-02
APPENDICES
TABLE OF CONTENTS
APPENDIX A – WORK DESCRIPTIONS BY ADDRESS
APPENDIX B – PREVAILING WAGE DETERMINATION
APPENDIX A – WORK DESCRIPTIONS BY ADDRESS
APPENDIX B – PREVAILING WAGE DETERMINATION
File details come from the government source that posted it. Updated .