This document package includes a solicitation for construction services and related documents to renovate space for a PET/CT scanner at a Veterans Affairs medical center. The solicitation requests sealed bids by February 8, 2021 for a construction project valued at approximately $595,000 to renovate areas A, B, and C in three phases. Phase A work must be complete before Phase B can begin. Phase C can be concurrent with Phases A or B. The scope of work includes installing hollow metal frames, interior wood doors, vinyl wall covering, electrical equipment including a 150KW UPS system, and flooring materials. Documents provide specifications for these construction materials and cutsheets for medical equipment. Questions and answers are included to clarify project details such as drawings, access to IT closets, and flooring types. The Department of Veterans Affairs Veterans Health Administration VISN 4 is the awarding agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. 595-19-340 Renovate for PET/CT Scanner Lebanon VAMC
08 11 13 - 1
SECTION 08 11 13
HOLLOW METAL FRAMES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Hollow metal door frames for wood doors at interior locations.
1.2 RELATED WORK
A. Section 08 11 13, INTERIOR WOOD DOORS: Flush Wood Doors.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standard Institute (ANSI):
A250.8-2014.............Standard Steel Doors and Frames
C. ASTM International (ASTM):
A240/A240M-15b..........Chromium and Chromium-Nickel Stainless Steel
Plate, Sheet, and Strip for Pressure Vessels and for General Applications
A653/A653M-15...........Steel Sheet, Zinc-Coated (Galvanized) or
Zinc-Iron Alloy-Coated (Galvannealed) by the
Hot-Dip
A1008/A1008M-15.........Steel, Sheet, Cold-Rolled, Carbon, Structural, High Strength Low Alloy and High Strength Low
Alloy with Improved Formability, Solution
Hardened, and Bake Hardenable
B209-14.................Aluminum and Aluminum-Alloy Sheet and Plate
B209M-14................Aluminum and Aluminum-Alloy Sheet and Plate
(Metric)
B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)
D3656/D3656M-13.........Insect Screening and Louver Cloth Woven from
Vinyl Coated Glass Yarns
E90-09..................Laboratory Measurement of Airborne Sound
Transmission Loss of Building Partitions and
Elements
D. Federal Specifications (Fed. Spec.):
L-S-125B................Screening, Insect, Nonmetallic
E. Master Painters Institute (MPI):
08 11 13 - 2
No. 18..................Primer, Zinc Rich, Organic
F. National Association of Architectural Metal Manufacturers (NAAMM):
AMP 500-06..............Metal Finishes Manual
G. National Fire Protection Association (NFPA):
80-16...................Fire Doors and Other Opening Protectives
H. UL LLC (UL):
10C-09..................Positive Pressure Fire Tests of Door Assemblies
1784-15.................Air Leakage Tests of Door Assemblies and Other
Opening Protectives
I. Department of Veterans Affairs VA Physical Security and Resiliency Design Manual October 1, 2020
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Include schedule showing each door and frame requirements for openings.
3. Installation instructions.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
E. Test reports: Certify products comply with specifications.
1. Sound rated door.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Manufacturer.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Regularly manufactures specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
1.6 DELIVERY
A. Fasten temporary steel spreaders across the bottom of each door frame before shipment.
B. Deliver products in manufacturer's original sealed packaging.
08 11 13 - 3
C. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
D. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight conditioned facility.
B. Protect products from damage during handling and construction operations.
1.8 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 MATERIALS
A. Galvanized Sheet Steel: ASTM A653.
2.2 PRODUCTS - GENERAL
A. Basis of Design: Match existing hollow metal door frames in Nuclear
Medicine Suite.
B. Provide hollow metal doors and frames from one manufacturer.
C. Sustainable Construction Requirements:
1. Steel Recycled Content: 30 percent total recycled content, minimum.
2.3 HOLLOW METAL FRAMES
A. Hollow Metal Frames: ANSI A250.8; face welded. See drawings for sizes and designs.
1. Interior Frames:
a. Wood Doors: 1.3 mm (0.053 inch) thick.
B. Frame Materials:
1. Interior Frames: Sheet steel.
2.4 FABRICATION
A. Hardware Preparation: ANSI A250.8.
B. Hollow Metal Frame Fabrication:
1. Fasten mortar guards to back of hardware reinforcements, except on lead-lined frames.
2. Concealed Closers in Head Frame: Provide 1 mm (0.042 inch) thick steel removable stop sections for access to concealed face plates and control valves, except when cover plates are furnished with closer.
3. Terminated Stops: ANSI A250.8.
4. Two Piece Frames:
08 11 13 - 4
a. One piece unequal leg finished rough buck sub-frames as shown, drilled for anchor bolts.
b. Unequal leg finished frames formed to fit subframes and secured to subframe legs with countersunk, flat head screws, spaced
300 mm (12 inches) on center at head and jambs on both sides.
c. Preassemble at factory for alignment.
5. Frame Anchors:
a. Floor anchors:
1) Provide extension type floor anchors to compensate for depth of floor fills.
2) Provide 1.3 mm (0.053 inch) thick steel clip angles welded to jamb and drilled to receive floor fasteners.
3) Provide 50 mm by 50 mm by 9 mm (2 inch by 2 inch by 3/8 inch) clip angle for lead lined frames, drilled for floor fasteners.
4) Provide mullion 2.3 mm (0.093 inch) thick steel channel anchors, drilled for two floor fasteners and frame anchor screws.
5) Provide continuous 1 mm (0.042 inch) thick steel rough bucks drilled for floor fasteners and frame anchor screws for sill sections.
a) Space floor bolts50 mm (24 inches) on center.
b. Jamb anchors:
1) Place anchors on jambs:
a) Near top and bottom of each frame.
b) At intermediate points at maximum 600 mm (24 inches) spacing.
2) Form jamb anchors from steel minimum 1 mm (0.042 inch) thick.
3) Anchors set in masonry: Provide adjustable anchors designed for friction fit against frame and extended into masonry minimum 250 mm (10 inches). Provide one of following types:
a) Wire Loop Type: 5 mm (3/16 inch) diameter wire.
b) T-Shape type.
c) Strap and stirrup type: Corrugated or perforated sheet steel.
4) Anchors for stud partitions: Provide tabs for securing anchor to sides of studs. Provide one of the following:
a) Welded type.
b) Lock-in snap-in type.
08 11 13 - 5
5) Anchors for frames set in prepared openings:
a) Steel pipe spacers 6 mm (1/4 inch) inside diameter, welded to plate reinforcing at jamb stops, or hat shaped formed strap spacers 50 mm (2 inches) wide, welded to jamb near stop.
b) Drill jamb stop and strap spacers for 6 mm (1/4 inch) flat head bolts to pass through frame and spacers.
c) Two piece frames: Subframe or rough buck drilled for 6 mm (1/4 inch) bolts.
6) Anchors for observation windows and other continuous frames set in stud partitions.
a) Weld clip anchors to sills and heads of continuous frames over 1200 mm (4 feet) long.
b) Space maximum 600 mm (24 inches) on centers.
7) Modify frame anchors to fit special frame and wall construction.
8) Provide special anchors where shown on drawings and where required to suit application.
2.5 FINISHES
A. Steel: ANSI A250.8; shop primed. Field paint to match existing adjacent door frames.
B. Finish exposed surfaces after fabrication.
2.6 ACCESSORIES
A. Primers: ANSI A250.8.
B. Barrier Coating: ASTM D1187/D1187M.
C. Welding Materials: AWS D1.1/D1.1M, type to suit application.
D. Clips Connecting Members and Sleeves: Match door faces.
E. Fasteners: Galvanized steel.
1. Metal Framing: Steel drill screws.
2. Masonry and Concrete: Expansion bolts and power actuated drive pins.
F. Anchors: Galvanized steel.
G. Galvanizing Repair Paint: MPI No. 18.
H. Insulation: Unfaced mineral wool.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
08 11 13 - 6
C. Apply barrier coating to metal surfaces in contact with cementitious materials to minimum 0.7 mm (30 mils) dry film thickness.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 FRAME INSTALLATION
A. Apply barrier coating to concealed surfaces of frames built into masonry.
B. Plumb, align, and brace frames until permanent anchors are set.
1. Use triangular bracing near each corner on both sides of frames with temporary wood spreaders at midpoint.
2. Use wood spreaders at bottom of frame when shipping spreader is removed.
3. Where construction permits concealment, leave shipping spreaders in place after installation, otherwise remove spreaders when frames are set and anchored.
4. Remove wood spreaders and braces when walls are built and jamb anchors are secured.
C. Floor Anchors:
1. Anchor frame jambs to floor with two expansion bolts.
a. Lead Lined Frames: Use 9 mm (3/8 inch) diameter bolts.
b. Other Frames: Use 6 mm (1/4 inch) diameter bolts.
2. Power actuated drive pins are acceptable to secure frame anchors to concrete floors.
D. Jamb Anchors:
1. Masonry Walls:
a. Embed anchors in mortar.
b. Fill space between frame and masonry with grout or mortar as walls are built.
2. Metal Framed Walls: Secure anchors to sides of studs with two fasteners through anchor tabs.
3. Prepared Masonry and Concrete Openings:
a. Direct Securement: 6 mm (1/4 inch) diameter expansion bolts through spacers.
b. Subframe or Rough Buck Securement:
08 11 13 - 7
1) 6 mm (1/4 inch) diameter expansion bolts on 600 mm (24 inch) centers.
2) Power activated drive pins on 600 mm (24 inches) centers.
c. Secure two-piece frames to subframe or rough buck with machine screws on both faces.
E. Touch up damaged factory finishes.
1. Repair galvanized surfaces with galvanized repair paint.
2. Repair painted surfaces with touch up primer.
3.4 DOOR INSTALLATION
A. Install doors plumb and level.
B. Adjust doors for smooth operation.
C. Touch up damaged factory finishes.
1. Repair galvanized surfaces with galvanized repair paint.
2. Repair painted surfaces with touch up primer.
3.5 CLEANING
A. Clean exposed door and frame surfaces. Remove contaminants and stains.
3.6 PROTECTION
A. Protect doors and frames from traffic and construction operations.
B. Remove protective materials immediately before acceptance.
C. Repair damage.
- - - E N D - - -
| SECTION 08 11 13 HOLLOW METAL FRAMES |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY |
| 1.7 STORAGE AND HANDLING |
| PART 2 - PRODUCTS |
| 2.1 MATERIALS |
| 2.2 PRODUCTS - GENERAL |
| 2.4 FABRICATION |
| 2.5 FINISHES |
| 2.6 ACCESSORIES |
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| 3.2 INSTALLATION - GENERAL |
| 3.3 FRAME INSTALLATION |
| 3.4 DOOR INSTALLATION |
| 3.5 CLEANING |
| 3.6 PROTECTION |