This document appears to be a specification for a gas-fired micro-turbine generation system for the Department of Military and Veterans Affairs at the Grayling Army Airfield in Grayling, Michigan. The project involves the installation of a new 400kW natural gas turbine generator, a 400kW natural gas generator, and associated switchgear, transformers, and control equipment. The work is to be completed by September 27, 2023, with an addendum issued on December 15, 2023. The contract opportunity is designated as 511/21310. CAK; GAAF - Gas Fired Micro Turbine Generator, and is open to bidders in Crawford County, Michigan.

The specification provides detailed technical requirements for the electrical infrastructure, including conduit, wiring, and surge protection. It also outlines the system's operation, including the automated start-up and synchronization of the generators upon loss of utility power, and the remote monitoring and control capabilities. Pricing and funding details are not included in this document, but the contract opportunity is being managed through the SIGMA VSS system, with questions directed to the specified points of contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSUMERS ENERGY

PROVIDED UNDERGROUND

NEW NEMA 3R UTILITY

PRIMARY SWITCHGEAR

8.32KV-3PH, 3W, 50,000 AIC

BY EC

100E 600A/3P

100E 600A/3P

G

CABINET STRIP

HEATER

G

CABINET STRIP

HEATER

2 2

SECONDARY:

277Y480V 3PH 4W

NEW NEMA 3R

1500 KVA TRANSFORMER

DELTA-DELTA CONNECTED

BLOCK HEATER,

BATTERY CHARGER

AND REMOTE

ANNUNCIATOR

800A/3PBY EC

800A/3P

#6

800A/3P

BLOCK HEATER,

BATTERY CHARGER

AND REMOTE

ANNUNCIATOR

800A/3P

NEW 400KW NATURAL GAS

TURBINE

NEW 400KW NATURAL GAS

GENERATOR

NEW NEMA 3R GENERATOR

PARALLELING/ CONTROL PANEL

480/277V-3PH, 2000A

BY EC

NEW

AUTOMATED SWITCH

(OUTDOOR METAL-

ENCLOSED SWITCHGEAR)

600A 8.32KV 50,000AIC

PLC-L

SEC351

100E 600A/3P

M

UTILITY CO.

METERUTILITY

CT

UTILITY

PT

TO GENERATOR

CONTROL PANEL

A E F

F

1 1

GENERATOR AREA

A

100E 600A/3P

GENERATOR AREA

A

C

D

60A/3P

SPD

I

A

A

4E 600A/3P

PANEL

NEW

LV-GEN

120/208V

3PH, 4W

125A MCB

H

A

J

(1) SPARE 4" CND(3) #2 15KV CABLES

(4) 500 KCMIL #1/04"

4" #4

THHN/THWN75

MV-105105

TAG KCMIL

AWG °C TEMP.

SIZE

CONDUIT GND

RATED TYPE REMARKS

A

B

C -

(4) #8 AWG #81-1/2" THHN/THWN75D -

(3) 600 KCMIL 4" #1/0 75E

F

(4) 500 KCMIL #2/03-1/2"" THHN/THWN75 2 SETS PARALLEL

5 SETS PARALLELTHHN/THWN

(4) 500 KCMIL 4" #1/0 75 THHN/THWN

-G - (1) 1" - - -

ELECTRICAL ONE-LINE FEEDER SIZE SCHEDULE NOTES:

1. UNDERGROUND 600V AND BELOW DIRECT BURY FEEDERS SHALL BE RMC ABOVE GRADE.

2. UNDERGROUND FEEDERS THAT CROSS ROADWAYS SHALL BE RUN IN SCHEDULE 80 PVC RACEWAY.

3. DISTRIBUTION PANEL OR PANELBOARD FEEDERS THAT WILL NOT FIT THE PANEL'S MAIN BREAKER LUGS

SHALL BE REDUCED IN SIZE UTILIZING UL APPROVED INSULATED CONNECTOR BLOCK SUCH AS NSi IT SERIES POLARIS CONNECTORS (www.NSi-sales.com) TO REDUCE THE LARGE CONDUCTOR (SIZE SELECTED FOR VOLTAGE DROP CONSIDERATIONS) TO A CONDUCTOR SIZE THAT MATCHES THE UPSTREAM CIRCUIT

4. COORDINATE THE CONNECTION OF THE NEW SERVICE CONDUCTORS TO NEW PRIMARY SWITCHGEAR WITH

CONSUMERS ENERGY

2 SETS PARALLEL

-H (4) #1/0 (1) 2" #6 75 THHN/THWN

WIRE PER MANUF. REC.I - (1) 1" - - -

FOR UTILITY COMPANY J - (2) 5" - - -

1. ALL EQUIPMENT EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

2. ALL NEW CONDUIT AND WIRE SHALL BE INSTALLED UNDERGROUND.

3. PROVIDE PROGRAMMING AND GRAPHIC CONFIGURATION OF THE

SCADA UTILIZING WEST MICHIGAN INSTRUMENTATION SERVICES TO

ALLOW THE SYSTEM TO VIEW INFORMATION ON THE TURBINE

GENERATOR CONTROLS. THIS PROGRAMMING TO BE SETUP FOR VIEW

ONLY, ONE-WAY. THE SCADA OPERATOR WILL BE ABLE TO VIEW THE

GENERATOR AND SWITCH STATUS BUT NOT CONTROL IT. THE

TURBINE/SWITCH OPERATOR WILL HAVE NO VIEW OR CONTROL

ACCESS TO THE SCADA.

4. CONTRACTOR SHALL PROVIDE A COMPLETE WORKING SYSTEM TO

COMMUNICATE WITH THE SCADA SYSTEM INCLUDING ALL HARDWARE

AND LABOR.

CONTRACTOR PROVIDED EQUIPMENT. CONTRACTOR SHALL PROVIDE

BREAKER(S) INSIDE FACILITY FOR BATTERY CHARGER AND BLOCK HEATER.

CONTRACTOR SHALL PROVIDE CONDUIT AND WIRE FOR GENERATOR

ANNUNCIATOR, GENERATOR START SIGNAL TO AUTOMATED SWITCH,

BATTERY CHARGER, BLOCK HEATER AND E-STOP.

CONTRACTOR SHALL PROVIDE POWER FOR STRIP HEATER.

CONTRACTOR SHALL PROVIDE AND INSTALL NEW CONTROL WIRING

UNDERGROUND IN CONDUIT BETWEEN TWO NEW GENERATORS.

CONTRACTOR SHALL PROVIDE AND INSTALL RAYCAP RSE-2 SURGE

PROTECTION DEVICE.

CONTRACTOR SHALL PROVIDE AND INSTALL PROVIDE RACK-MOUNTABLE,

UNINTERRUPTIBLE POWER SUPPLY (UPS). UPS SHALL BE 5KVA RATED, HIGH

EFFICIENCY, DOUBLE CONVERSION, CONTINUOUS DUTY, ON-LINE TYPE.

INPUT VOLTAGE OF 120VAC, 60HZ, 1-PHASE, 3-WIRE PLUS GROUND. OUTPUT

VOLTAGE OF 120VAC, 60HZ, 1-PHASE, 3-WIRE PLUS GROUND. INTEGRATED

MAINTENANCE BYPASS SWITCH, BACKLIT LCD CONTROL PANEL. INCLUDE

WEB CARD AND ALARM RELAY BOARD FOR REMOTE MONITORING, NEMA 3R

ENCLOSURE. ENERGY SEALED CELL BATTERIES. 90-MINUTE RUN TIME.

SELF DIAGNOSTICS. HARD-WIRED TERMINALS FOR CONNECTION TO

EXTERNAL 120VAC, 1PH POWER PANEL. VERTIV LIEBERT

GXT5-5000LVRT2UXL. INSTALLER PROVIDED INPUT AND OUTPUT CABLING

SHALL BE FLEXIBLE CONDUIT TO ALLOW UPS POD BYPASS MODULE

WITHOUT POWERING DOWN THE LOAD. INCLUDE SYSTEM START-UP

SERVICES, USER TRAINING AND TWO-YEAR, ON-SITE WARRANTY SERVICE

FOR PARTS & LABOR.

NORMAL OPERATION (UTILITY POWER IS AVAILABLE):

· GENERATORS 1 AND 2 ON STANDBY.

·· 52L CLOSED (THIS IS THE ISOLATION SWITCH THAT IS LOCATED

AT/ADJACENT TO THE TURBINE GENERATOR).

·· GENERATOR BREAKERS OPEN (THESE ARE THE AUTOMATED

BREAKERS LOCATED INSIDE EACH GENERATOR).

·· GENERATOR CONTROL PANEL MONITORS POWER FLOW AT UTILITY

INTERFACE.

LOSS OF UTILITY POWER (NORMAL POWER IS LOST FROM UTILITY PROVIDER):

· GENERATOR CONTROL PANEL DETECTS LOSS OF POWER AT UTILITY

METERING CABINET.

·· OPEN 52L RELAY. SIGNALING GENERATOR CONTROL PANEL TO

BEGIN GENERATOR START-UP. DISCONNECTS CAMP ISOLATE AWAY

FROM UTILITY.

·· THE GENERATOR CONTROL PANEL SENDS START SIGNAL TO

NATURAL GAS TURBINE GENERATOR.

·· NATURAL GAS TURBINE GENERATOR BEGINS STARTUP.

·· THE GENERATOR CONTROL PANEL SENDS START SIGNAL TO

NATURAL GAS GENERATOR.

·· THE GENERATOR CONTROL PANEL MONITORS NATURAL GAS

TURBINE GENERATOR AND NATURAL GAS GENERATOR FOR

PROPER POWER OUTPUT.

·· GENERATORS ARE INDEPENDENTLY SYNCHRONIZE WITH

GENERATOR PANEL PP-GEN. ONCE ONE GENERATOR IS FEEDING

PANEL PP-GEN, GENERATOR CONTROL NOTIFIES PLC. PLC DIRECTS

52L TO CLOSE, PROVIDING EMERGENCY POWER TO BASE.

·· ONCE NATURAL GAS GENERATOR IS UP TO SPEED. NATURAL GAS

TURBINE GENERATOR TO BEGIN SHUTDOWN CYCLE.

·· GENERATOR CONTROL PANEL CONTINUES TO MONITOR POWER

OUTPUT OF GENERATOR THAT IS OPERATING.

THIS IS THE STANDARD OPERATION UNTIL UTILITY POWER IS RESTORED.

ST

AT

E O

F M

IC

H

IG

AN

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

G

AS

F

IR

ED

M

IC

R

O -T

U R

BI

N

E G

EN

ER

AT

IO

N S

YS

TE

M (E

R C

IP

1G

R

D

EP

AR

TM

EN

T

O F

M

IL

IT

AR

Y

AN

D V

ET

ER

AN

S

AF

FA

IR

S

G R

AY

LI

N G

A R

M Y

AI

R

FI

EL

D

G R

AY

LI

N G

, M

IC

H

IG

AN

R

EV

IE

W

/0

1/

M A

T R

I X

FO

R

B

ID

S

/2 7/

0.

AD

D

EN

D

U M

/1 5/

E-

File details come from the government source that posted it. Updated .