This Statement of Work (SOW) details the Naval Surface Warfare Center, Dahlgren Division's (NSWCDD) requirement for acoustic panels and their installation. The contractor must provide and install acoustic panels with specific technical requirements, including a minimum two-inch thickness, maximum weight of 1.25 pounds per square foot, gray fabric wrapping, and meeting sound absorption specifications across multiple frequency ranges. Installation will cover walls and ceiling areas, with the contractor responsible for providing all materials, tools, personnel, transportation, and a boom lift with a certified operator.
Key contract details include: four personnel traveling to Dahlgren, Virginia for two days, work to be performed during normal business hours (0800-1700, Monday-Friday), and the project is unclassified. The procurement is a small business set-aside using Simplified Acquisition Procedures with a Lowest Price Technically Acceptable evaluation method. The solicitation (N0017825Q6854) is due on 14 August 2025 by 12:00 p.m. EST, with an anticipated award date of 15 September 2025. Offerors must be registered in the System for Award Management (SAM) and provide OEM documentation verifying authorized reseller/distributor status.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1449 - N0017825Q6854.pdf | ||
| Solicitation Amendment N0017825Q68540001 SF 30.pdf | ||
| 0618-09 - Acoustic Panels Reqts List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACOUSTIC PANELS
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
The Naval Surface Warfare Center, Dahlgren Division (NSWCDD), requires acoustic panels with installation for .
2.0 APPLICABLE DOCUMENTS
2.1 Occupational Safety and Health Administration (OSHA) Regulations;
2.2 Center for Disease Control (CDC) Guidelines;
2.3 Original Equipment Manufacturer (OEM) Specification;
2.5 Requirements List (attached)
3.0 REQUIREMENTS
3.1 The Contractor shall provide all necessary materials for acoustic panel installation, adhering, and fabric wrapping of all panels.
3.1.1 The Contractor shall account for additional material due to field cutting to suit around obstructions.
3.2 The Contractor shall provide all necessary tooling, personnel, and material transportation to accomplish this installation
3.3 The Contractor shall provide fully compatible materials as listed in the Requirements List to meet all form, fit, and function requirements when integrating with the pre-existing cubical workstations.
3.4 The Contractor shall supply panels with a minimum of two (2) inch thickness while weighing no more than 1.25 pounds (Lbs.) per square foot after gray color fabric wrapping and necessary solutions to adhere the panels.
3.5 The Contractor shall provide a boom lift and certified operator to accomplish installation requirements.
3.6 The Contractor shall install panels on all walls and ceiling areas as outlined in the requirement list while meeting minimum sound absorption requirements of 125 (Hertz) Hz @ .4 / 250 Hz @ .74 / 500 Hz @ 1.24 / 1000 Hz @ 1.25 / 2000 Hz @ 1.22 /4000 Hz @ 1.14.
3.7 The Contractor personnel shall wear personal protective equipment IAW OSHA regulations and CDC guidelines throughout the project when applicable.
3.8 The Contractor shall protect Government property from damage or disfigurement.
3.9 The Contractor shall keep all supplies, equipment, and tools out of traffic lanes or other areas where they might create a hazard.
3.10 At the end of each work period, the Contractor shall secure all supplies, equipment, and tools.
3.11 The Contractor shall wipe down any areas from debris, sweep debris caused by installation and remove any materials resulting as waste from the installation activity.
3.12 The Contractor shall perform all work during normal working hours, Monday through Friday, 0800 – 1700.
3.13 The Contractor shall coordinate with the technical point of contact (TPOC) identified below to schedule all required work and perform a final work-through to ensure installation is fully complete meeting the government’s requirements.
4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION
(GFP/GFM/GFI)
4.1 The Government will provide access to the base and building for work completion.
5.0 SECURITY
The work performed under this contract is unclassified.
6.0 TRAVEL
The Contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be in accordance with Federal Travel Regulations (FTR). The following travel is anticipated: Four
(4) personnel for two (2) days to Dahlgren, Virginia
7.0 TECHNICAL POINT OF CONTACT