Statement of Work.pdf

PDF 116 KB Posted

Attached to
Porta Potties
Solicitation number
06162026
Issued by

About this file

This is a Statement of Work for equipment rental services to support the SAIL 250 Reception aboard USS IWO JIMA (LHD 7) and a separate event in New York.

The contractor shall provide one 2-stall restroom trailer and two 4-stall restroom trailers for a 400-guest reception. The primary delivery is scheduled for 16 JUN 2026 to Naval Station Norfolk, Pier 14, with the reception held the same day and equipment returned on 17 JUN 2026. Identical equipment is required for a New York event with delivery by 25 JUN 2026 (prior to ship's departure) and the reception held on 04 JUL 2026, with offloading upon Return to Home Port (RTHP) on 08 JUL 2026. All electrical equipment must meet NAVSEA and fire performance standards for shipboard use. The contractor is responsible for removal and disposal of any hazardous materials brought onboard, with no hazardous materials to be left unattended. Permitted working hours for delivery are 0700-2200, Monday through Sunday. Proper personal protective equipment use is highly encouraged during loading and setup operations.

View the file

Other files

File Type Posted
Question and Answers.pdf PDF
Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

1. Purpose:

USS IWO JIMA (LHD 7) requests consideration of contracting services for the rental of equipment to support the SAIL 250 Reception being held on board. The same supplies are needed for an event in New York.

2. 2. Period of Performance:

The required delivery date for all items is 16 JUN 2026. The reception will be held on 16 JUN 2026. Rented items will be returned the following day, 17 JUN 2026. Same items are needed for a separate event in New York 25 JUN 2026 prior to ship’s departure. The reception will be held on 04 JUL 2026. Rented items will be offloaded upon RTHP on 08

JUL 2026.

3. 3. Breakdown of Requirements:

The contractor shall provide the following rental items for a 400-guest reception.

The Contractor is to provide

Other Expenses Quantity

2 Stall Restroom Trailer 1

4 Stall Restroom Trailer 2

Delivery Address: Naval Station Norfolk, Pier 14

4. General Requirements:

a. All electrical equipment, including but not limited to tents, lighting, and portable AC units, must be safe for shipboard use and meet all applicable NAVSEA and fire performance standards.

b. The use of proper personal protective equipment is highly encouraged during loading and setup.

c. It is the responsibility of the contractor to remove and dispose of any hazardous material they bring onboard. No hazardous materials are to be left unattended at any time.

5. Permitted Working Hours for Delivery:

0700-2200, Monday – Sunday.

File details come from the government source that posted it. Updated .