This is a Questions and Answers document addressing clarifications regarding the provision of restroom trailers for two separate events involving a naval ship in Norfolk, Virginia and New York.

The Government requires contractor-provided restroom trailers to be positioned onboard the ship for both events. For the Norfolk event, trailers will be delivered to the ship at Naval Station Norfolk. For the New York event, the same trailers will travel with the ship to New York while it is at anchorage, and movement of trailers to the ship will not be possible once the ship is anchored. The Government will provide power and water connections for both events, though contractors should clarify specific power hookup requirements with the ship regarding generator necessity. ADA-compliant restroom trailers are not required but are encouraged for both events. Daily servicing and attendant staffing are not required for either event. Wastewater removal options will be limited due to the ship's position and timing; contractors may need to hold waste until the ship returns to homeport. The contractor must be present upon the ship's return to homeport on July 8, 2026, to retrograde materials and remove waste. For the Norfolk event, drivers require base access, which can be obtained through Department of the Navy credentials or sponsorship paperwork. For the New York event, access control, security clearances, badging, and vehicle clearance requirements should be deferred to the ship for response. The document does not specify pricing terms, response dates, award dates, or federal contract vehicles.

View the file

Other files

File Type Posted
Statement of Work.pdf PDF
Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers

Norfolk, Virginia

- Location of Use: Are the restroom trailers required onboard the ship, pier-side, or both?

Answer: Onboard the ship for both events.

- Utilities: Will the Government provide power, water, and wastewater connections at the site?

Answer: The ship will have power and water for both events.

- Power Supply: Are generators required to be provided by the contractor?

Answer: I would need to know what the power hookups are on the unit to answer whether we can provide.

- Compliance: Are ADA-compliant restroom trailers required for this engagement?

Answer: Not necessary but encourage - same for both events.

- Delivery Details: What is the exact delivery location in New York?

Answer: Delivery of trailers will be conducted in Norfolk and brought up with the ship to NYC. Delivery of trailers for Norfolk event will be to the ship.

- Logistics: Are the same physical trailers expected to move from Norfolk to

New York, or can equivalent trailers be provided locally in New York?

Answer: see answer above. Ship will be at anchorage and movement of trailers to the ship will not be possible.

- Sanitation Services: Who is responsible for wastewater pumping and disposal during the rental period?

Answer: due to the nature of the ship's position and timing, waste water removal options will likely be limited; may require holding of waste until return to homeport.

- Maintenance: Is daily servicing of the units required?

Answer: Servicing should not be required for either event.

- Staffing: Are attendants required to be present during the reception?

Answer: No attendants required for either event.

- Access Control: What specific base access or escort requirements apply at

Naval Station Norfolk?

Answer: Driver will need to have base access. This can be accomplished through the proper DOW credentials or we can fill out the required paperwork to sponsor the driver to get access.

- Security & Clearances: Are there specific insurance, badging, or vehicle clearance requirements we should be aware of?

Answer: Please see above.

- Demobilization: Does the phrase "offloaded upon RTHP on 08 July 2026" mean the contractor must be present at the return to homeport to receive and remove the equipment?

Answer: Yes, as mentioned above, contractor should be prepared to retrograde material and remove waste upon ship's return to homeport. Same for both events.

New York

- Location of Use: Are the restroom trailers required onboard the ship, pier-side, or both?

Answer: Onboard the ship because the ship will be at anchorage.

- Utilities: Will the Government provide power, water, and wastewater connections at the site?

Answer: The ship will have power and water while at anchor

- Power Supply: Are generators required to be provided by the contractor?

Answer: Defer to the ship for response

- Compliance: Are ADA-compliant restroom trailers required for this engagement?

Answer: Not necessary but encourage

- Delivery Details: What is the exact delivery location in New York?

Answer: Delivery of trailers will be conducted in Norfolk and brought up with the ship to NYC.

- Logistics: Are the same physical trailers expected to move from Norfolk to

New York, or can equivalent trailers be provided locally in New York?

Answer: see answer above. Ship will be at anchorage and movement of trailers to the ship will not be possible.

- Sanitation Services: Who is responsible for wastewater pumping and disposal during the rental period?

Answer: due to the nature of the ship's position and timing, waste water removal options will likely be limited; may require holding of waste until return to homeport.

- Maintenance: Is daily servicing of the units required?

Answer: The event is one day should not require service however defer to ships response.

- Staffing: Are attendants required to be present during the reception?

Answer: Ship will be at anchor and will likely be monitored by ship's company.

- Access Control: What specific base access or escort requirements apply at

Naval Station Norfolk?

Answer: Defer to the ship for response.

- Security & Clearances: Are there specific insurance, badging, or vehicle clearance requirements we should be aware of?

Answer: Defer to the ship for response.

- Demobilization: Does the phrase "offloaded upon RTHP on 08 July 2026" mean the contractor must be present at the return to homeport to receive and remove the equipment?

Answer: Yes, as mentioned above, contractor should be prepared to retrograde material and remove waste upon ship's return to homeport. Defer to the ship if the 8th of July is the offload date.