06_Bid_Schedule_21-030_26Oct21.pdf

PDF 67 KB Posted

Attached to
ND - Arrowwood Coulee Levee Repair
Solicitation number
140F0122R0007
Issued by

About this file

This document contains a bidding schedule for a federal contract opportunity to repair a coulee levee and lake road trail at Arrowwood National Wildlife Refuge in North Dakota. The bidding schedule outlines line items for mobilization, demolition, excavation, culvert installation, embankment repair, erosion protection, and general conditions. Pricing is requested for a base bid to repair the west Arrowwood coulee levee and an optional line item to repair the west Arrowwood lake road trail. Bidders are instructed to include overhead and profit in the line item prices. The related federal contract opportunity posted by the U.S. Fish and Wildlife Service seeks these coulee levee repair and trail rehabilitation services at the Arrowwood National Wildlife Refuge in Stutsman County, North Dakota, as detailed in the specifications, drawings, and attachments.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING SCHEDULE

COULEE LEVEE AND LAKE ROAD TRAIL REPAIR 21-030

ARROWWOOD NATIONAL WILDLIFE REFUGE

PINGREE, NORTH DAKOTA

PROJECT DESCRIPTION:

LINE ITEM 10 - WEST ARROWWOOD COULE LEVEE

DIVISION 1 GENERAL CONDITIONS: $

Mobilization, Demobilization, Bond, General Requirements, Profit and Overhead

DIVISION 2 EXISTING CONDITIONS $

DIVISION 3 CONCRETE $

DIVISION 31 EARTHWORK $

DIVISION 33 UTILITIES $

TOTAL LINE ITEM 10 - BASE BID $

OPTION 1: LINE ITEM 20 - WEST ARROWWOOD LAKE ROAD TRAIL

A. DIV 1 GENERAL CONDITIONS:

Mobilization, Demobilization, Bond, General Requirements, Profit and Overhead

Division 1 Total $

B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

DIVISION 2 EXISTING CONDITIONS $

DIVISION 31 EARTHWORK $

TOTAL OPTION 1 - LINE ITEM 20 $

TOTAL ALL LINE ITEMS $

Furnish all labor, materials, and equipment to replace levee structure and culverts, provide erosion control upstream and downstream, replace road surface along top of levee. Complete all work in accordance with the attached drawings and specifications.

NOTE: Prices inserted into lines on this sheet are to include Overhead and Profit.

File details come from the government source that posted it. Updated .