06 - 573-20-604 RCAR_ALT BID PROPOSAL.docx
DOCX document 14 KB Posted
- Attached to
- Y1DA--BB - Renovate Common Area Restrooms Federal contract opportunity
- Solicitation number
- Not on record
About this file
This document is a Bid Proposal for the renovation of common area restrooms at the Malcom Randall VA Medical Center (Contract 573-20-604). The base bid and three alternates are detailed, with each option presenting variations in project scope and complexity. The base bid involves general construction, alterations, and removal of existing structures, with an estimated completion time of 730 calendar days.
The alternates progressively reduce scope by deducting specific restrooms (D304-1 and D304A-1 on the first floor of building 1) and introducing additional cost-saving measures. Alternate No. 2 and No. 3 include provisions for unit costs related to asbestos removal, lead removal, site preparation, and PCB caulk removal, referencing survey reports dated May 2022. Alternate No. 3 further reduces costs by proposing reuse of existing lockers instead of installing new ones. Each alternate maintains a reduced estimated completion time of 700 calendar days, offering the government flexible bidding options with potential cost efficiencies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24825R0119 0003 RFI Responses.pdf | ||
| S05 - RFIs 573-20-604 BB Renovate Common Area Restrooms.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PROPOSAL
573-20-604 | Renovate Common Area Restrooms
BASE BID ITEM: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.
Estimated completion time 730 Calendar days.
ALTERNATE NO.1: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items. EXCEPT DEDUCT restrooms D304-1 and D304A-1. On first floor of building 1.
Estimated completion time 700 Calendar days.
ALTERNATE NO.2: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items. EXCEPT DEDUCT restrooms D304-1 and D304A-1. On first floor of building 1. AND DEDUCT Provide unit costs for each asbestos removal items type, lead removal items and site preparation, and PCB caulk removal items as listed and directed in 028211 and in the “Asbestos and Lead Containing Paint Survey Report”, “Limited Mold Assessment Report” and “Limited PCBs in Caulk Survey Report”, all dated May 2022 and prepared by GLE.
Estimated completion time 700 Calendar days.
ALTERNATE NO.3: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items. EXCEPT DEDUCT restrooms D304-1 and D304A-1. On first floor of building 1. AND DEDUCT Provide unit costs for each asbestos removal items type, lead removal items and site preparation, and PCB caulk removal items as listed and directed in 028211 and in the “Asbestos and Lead Containing Paint Survey Report”, “Limited Mold Assessment Report” and “Limited PCBs in Caulk Survey Report”, all dated May 2022 and prepared by GLE. AND DEDUCT new lockers and reuse the existing lockers with the base and bulkhead shown in the drawings at the locker rooms.
Estimated completion time 700 Calendar days.