About this file

This is a project documentation file related to remediation activities at the Margaret Spaulding Location in Jackson County, presented by CM Production LLC and the Colorado Oil and Gas Conservation Commission (COGCC). The document provides a visual and narrative overview of CM Production LLC's remediation progress spanning from 2013 to the present, with specific focus on closure activities at the Lone Pine Pit. The file includes site inspection photographs and project location drawings dated from May 2013 through March 2016, documenting various remediation components including Pit 5, a treater pit, soil stockpile, land application site, and injection wells (Margaret Spaulding 4-B and Entrada 1-28). The presentation was delivered by Alex Fischer, COGCC Western Environmental Supervisor, on September 30, 2015, utilizing exhibits from multiple site visits and inspections conducted between May 2013 and March 2016.

The project location operates under significant environmental constraints that directly impact the remediation timeline and execution strategy. The site sits at ground elevation of approximately 8,230 feet and experiences extended winter conditions, including five months of annual snow cover (December through April) and below-freezing temperatures for seven months per year. Consequently, the remediation work must be concentrated within the five-month field season from May through November to achieve effectiveness. The Margaret Spaulding Location is classified as a sensitive area due to its proximity to surface water, which necessitates careful environmental management and compliance with applicable water protection standards throughout all remediation activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CM Production LLC’s Remediation Progress from 2013 to Present at the Margaret Spaulding Location

Presented by Alex Fischer, COGCC Western Environmental Supervisor

Ex. 60, Sept. 30, 2015 Inspection Pit 5

March 7-8, 2016

Margaret Spaulding Location (Jackson County)

Ex. 11, May 8, 2013 Site Visit Overlook of the Location

Treater Pit

Soil Stockpile

Land Application Site

Margaret Spaulding 4-B Injection Well Entrada 1-28 Injection Well

May June July August September October November

Short Field Season

• Ground elevation is ~8230’

• Five (5) months of snow cover per year, Dec. - April

• Below-freezing temperatures seven (7) months per year

Therefore the months of May – Nov. must be utilized effectively

Margaret Spaulding Location is in a Sensitive Area

• Proximity to surface water (<500’ to Spring Gulch)

• Shallow groundwater (11 to 32 feet)

• Hydraulic conductivity of underlying clayey sand and gravel

• Concentrations* of total petroleum hydrocarbons (TPH) in Pits, Stockpile, and Landfarm

- Free-phase hydrocarbons observed inside of pits

*Table 910-1 maximum allowable TPH Concentration: 500 mg/kg

Sources: Exs. 28 & 59, Groundwater Sampling Reports submitted by CM

Stockpile and Pits on May 8, 2013 (immediately after the approval of the 2013 Orders)

Stockpiled Soil, visible hydrocarbons Pit 3, in use. Note: soil stockpile in background.

Ex. 11 Ex. 11

Active vs. Passive Remediation

May 13, 2015 (Ex. 39)

June 2, 2015 (Ex. 48)

November 7, 2014 Inspection - Pits 4 and 5

Pit 4

Pit 5

No active remediation has been performed

Residual fluids – hydrocarbons and water

Source: Ex. 30, November 7, 2014 Inspection

Pit 3

November 7, 2014 Inspection Pits 1-3 and Overflow Treater Pit also show no progress

Overflow Treater Pit Pit 1

Pit 2

Source: Ex. 30, November 7, 2014 Inspection

Pit 1 – Throughout the 2015 Field Season

Sept. 30, 2015 (Ex. 60)

Pit 2 – Throughout the 2015 Field Season

Pit 3 – Throughout the 2015 Field Season

Pit 4 – Throughout the 2015 Field Season

Pit 5 – Throughout the 2015 Field Season

Overflow Treater Pit – Throughout the 2015 Field Season

May 13, 2015 (Ex. 39)

June 2, 2015 – Inspection (Landfarm Construction)

June 2, 2015 (Ex. 48) June 2, 2015 (Ex. 48)

June 2, 2015 (Ex. 48)

July 2014 November 2014 September 2015 Pit closure deadline, pursuant to 2013 Orders (Exs. 7 & 8)

Pit closure deadline after first extension request (Ex. 20)

Ex. 30, Nov. 7, 2014 Inspection

Ex. 60, Sept. 30, 2015 Inspection Pit 5

July 2014 November 2014 September 2015 Pit closure deadline, pursuant to 2013 Orders (Exs. 7 & 8)

Pit closure deadline after first extension request (Ex. 20)

Pit depicted above, Field Inspection (Ex. 60)

CM Production LLC’s� Remediation Progress from 2013 to Present�at the Margaret Spaulding Location
Slide Number 2
Slide Number 3
Slide Number 4
Short Field Season
Margaret Spaulding Location is in a Sensitive Area
Stockpile and Pits on May 8, 2013 �(immediately after the approval of the 2013 Orders)
Active vs. Passive Remediation
November 7, 2014 Inspection - Pits 4 and 5
November 7, 2014 Inspection�Pits 1-3 and Overflow Treater Pit also show no progress
May 13, 2015 (Ex. 39)
May 13, 2015 (Ex. 39)
May 13, 2015 (Ex. 39)
Slide Number 21
Slide Number 22
Slide Number 23
June 2, 2015 – Inspection (Landfarm Construction)
Pit 5
Pit 5