01_2019 CM Production Lone Pine Pit Closure P1 - Bid Schedule.docx

DOCX document 18 KB Posted

Attached to
2019 CM Production Lone Pine Pit Closure
Solicitation number
IFB1 PHAA 2019000205 5
Issued by
Kit Carson County, Denver City, Colorado

About this file

This is a Bid Schedule document for the CM Production Lone Pine Field Pit Closure Project - Phase 1, issued under IFB PHAA 2019*0205 by a state agency responsible for oil and gas conservation and environmental response. The project involves the closure and remediation of production pits at the Lone Pine location. The work encompasses four primary line items: mobilization and demobilization (1 lump sum), liquids removal and disposal from pits (1,400 barrels), excavation and disposal of heavily contaminated soil exceeding 5,000 mg/kg of Total Petroleum Hydrocarbons (not to exceed 2,000 cubic yards), and excavation and stockpiling of contaminated soil at lower contamination levels. The document indicates that quantities and measurements are approximate and subject to verification by the Project Manager during construction, with actual payment based on verified quantities rather than the bid estimates provided.

The project is funded through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund. Bidders are required to complete the bid schedule with unit costs for each line item and submit it with their proposals. The document specifies that payment will be made only for actual quantities verified in accordance with the Bid Documents, and establishes not-to-exceed quantities for certain items to control project costs. The bid schedule serves as the basis for comparing competing bids and establishing the contract pricing structure for this environmental remediation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

CM Production Lone Pine Field Pit Closure Project - Phase 1

IFB PHAA 2019*0205

The funds to perform the work shown in the Bid Documents are provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund.

Specifications and standards for cost categories shown below are listed in the Bid Documents. The quantities and measurements set forth below are in no case exact and in some instances the exact quantities and measurements are impossible to determine until after conditions have become known during construction. The quantities shown below are for use as a basis for comparing bids only. Payment will be made only for the actual quantities verified by the Project Manager in accordance with the Bid Documents. NTE = Not to Exceed quantities. TPH = Total Petroleum Hydrocarbons.

Item No.
Description
Units
Qty
Unit Cost
Amount
1
Mobilization and Demobilization
1 Mob

1 Demob

2
Liquids Removal and Disposal from Pits
Per Barrel
1,400
3
Excavate, Haul and Dispose Contaminated Soil

(>5000 mg/kg TPH)

Per Cubic Yard
NTE

2,000

4
Excavate and Stockpile Contaminated Soil

(<5000 mg/kg TPH)

Per Cubic Yard
NTE

2,000

5
Backfill Pits with Imported Fill
Per Cubic Yard
NTE

13,000

6
Remediate Contaminated Soils on Location
Per Cubic Yard
NTE

5,400

7
Backfill Pits with Onsite Treated Fill
Per Cubic Yard
NTE

8,800

GRAND TOTAL PRICE =>

DATE

AUTHORIZED SIGNATURE

REPRESENTATIVE NAME (print or type)

COMPANY NAME

TAX ID NUMBER

ADDRESS

TELEPHONE NUMBER

EMAIL ADDRESS

RETURN THIS BID SCHEDULE WITH YOUR BID Page 1 of 2

File details come from the government source that posted it. Updated .