01_2019 CM Production Lone Pine Pit Closure P1 - Bid Schedule.docx
DOCX document 18 KB Posted
- Attached to
- 2019 CM Production Lone Pine Pit Closure
- Solicitation number
- IFB1 PHAA 2019000205 5
- Issued by
- Kit Carson County, Denver City, Colorado
About this file
This is a Bid Schedule document for the CM Production Lone Pine Field Pit Closure Project - Phase 1, issued under IFB PHAA 2019*0205 by a state agency responsible for oil and gas conservation and environmental response. The project involves the closure and remediation of production pits at the Lone Pine location. The work encompasses four primary line items: mobilization and demobilization (1 lump sum), liquids removal and disposal from pits (1,400 barrels), excavation and disposal of heavily contaminated soil exceeding 5,000 mg/kg of Total Petroleum Hydrocarbons (not to exceed 2,000 cubic yards), and excavation and stockpiling of contaminated soil at lower contamination levels. The document indicates that quantities and measurements are approximate and subject to verification by the Project Manager during construction, with actual payment based on verified quantities rather than the bid estimates provided.
The project is funded through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund. Bidders are required to complete the bid schedule with unit costs for each line item and submit it with their proposals. The document specifies that payment will be made only for actual quantities verified in accordance with the Bid Documents, and establishes not-to-exceed quantities for certain items to control project costs. The bid schedule serves as the basis for comparing competing bids and establishing the contract pricing structure for this environmental remediation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
CM Production Lone Pine Field Pit Closure Project - Phase 1
IFB PHAA 2019*0205
The funds to perform the work shown in the Bid Documents are provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund.
Specifications and standards for cost categories shown below are listed in the Bid Documents. The quantities and measurements set forth below are in no case exact and in some instances the exact quantities and measurements are impossible to determine until after conditions have become known during construction. The quantities shown below are for use as a basis for comparing bids only. Payment will be made only for the actual quantities verified by the Project Manager in accordance with the Bid Documents. NTE = Not to Exceed quantities. TPH = Total Petroleum Hydrocarbons.
| Item No. |
| Description |
| Units |
| Qty |
| Unit Cost |
| Amount |
| 1 |
| Mobilization and Demobilization |
| 1 Mob |
1 Demob
| 2 |
| Liquids Removal and Disposal from Pits |
| Per Barrel |
| 1,400 |
| 3 |
| Excavate, Haul and Dispose Contaminated Soil |
(>5000 mg/kg TPH)
| Per Cubic Yard |
| NTE |
2,000
| 4 |
| Excavate and Stockpile Contaminated Soil |
(<5000 mg/kg TPH)
| Per Cubic Yard |
| NTE |
2,000
| 5 |
| Backfill Pits with Imported Fill |
| Per Cubic Yard |
| NTE |
13,000
| 6 |
| Remediate Contaminated Soils on Location |
| Per Cubic Yard |
| NTE |
5,400
| 7 |
| Backfill Pits with Onsite Treated Fill |
| Per Cubic Yard |
| NTE |
8,800
GRAND TOTAL PRICE =>
DATE
AUTHORIZED SIGNATURE
REPRESENTATIVE NAME (print or type)
COMPANY NAME
TAX ID NUMBER
ADDRESS
TELEPHONE NUMBER
EMAIL ADDRESS
RETURN THIS BID SCHEDULE WITH YOUR BID Page 1 of 2