05A_McCain Access Road_Final Const Drawings_2024-03-08_Addendum 2.pdf
PDF 39 MB Posted
- Attached to
- McCain Access Road State and local contract opportunity
- Solicitation number
- 03-03-302-003
- Issued by
- Teller County, Colorado
About this file
The document is a comprehensive set of civil engineering and construction drawings for the McCain Access Road project in the Town of Breckenridge, Summit County, Colorado, prepared by Ware Malcomb. The project involves constructing a new access road approximately 0.75 miles long, including roadway infrastructure, utilities, storm drainage systems, water lines, and two infiltration ponds. The design includes a 34-foot wide roadway with 11-foot lanes, 5-foot bike shoulders, curb and gutter, and a right-of-way varying between 70 and 75 feet. The project will incorporate multiple utility installations, including water lines, storm sewers, fire hydrants, and electrical infrastructure, with construction details and cross-sections meticulously documented across multiple technical drawing sheets.
The project appears to be funded through municipal infrastructure development, with specific engineering considerations for the high-altitude mountain environment of Breckenridge. The drawings indicate careful attention to drainage management, with two infiltration ponds (Pond A at 30.04 acres and Pond B at 14.75 acres) designed to manage stormwater runoff. The design includes specific elevation considerations, with road elevations ranging from approximately 9280 to 9350 feet above sea level, and incorporates erosion control measures, native landscaping, and compliance with local municipal standards. The project includes multiple utility crossings, fire hydrant placements, and is designed with considerations for existing solar field infrastructure and potential future development in the area.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 00_Addendum 1_Bid Date Changes.pdf | ||
| 04_McCain Access Road_Ware Malcomb Specs_02-22-24.pdf | ||
| 01A_McCain Access Road_Contract _ Bid Documents_Addendum 2.pdf | ||
| 08_Bid Questions _ Answers_03-11-24_Addendum 2.pdf | ||
| 02_C700 General Conditions_2023.pdf | ||
| 07_Water Construction Standards.pdf | ||
| 00_Addendum 2_Bid Items _ Plans.pdf | ||
| 03_C800 Supplementary Conditions_2023.pdf | ||
| 05_McCain Access Road_Final Construction Drawings.pdf | ||
| 06_Appendix G - Town Standard Details.pdf | ||
| 01_McCain Access Road_Contract _ Bid Documents.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST
AN
M
ILL
ER
DR
IVE
H W
Y
MARKS LN
SIL
VER
CIR
SIL
VE
R C
IR.
SH
EK
EL
LN
FA
IR
VI
EW
B
LV
D.
HIGHLANDS DR.
FAIRWAYS DR.
TIGER RD.
BRADDOCK DR.
DELAWARE DR.
VICINITY MAP
N.T.S.
MCCAIN ACCESS ROAD
A PORTION OF THE SOUTHWEST QUARTER OF SECTION 18,
TOWNSHIP 6 SOUTH, RANGE 77 WEST, SIXTH PRINCIPAL MERIDIAN,
TOWN OF BRECKENRIDGE, COUNTY OF SUMMIT, STATE OF COLORADO
BASIS OF BEARINGS:
BEARINGS ARE BASED ON THE NORTHWESTERLY LINE OF TRACT C McCAIN SUBDIVISION, WITH AN ASSUMED BEARING OF SOUTH 31°54'49" WEST WITH ALL BEARINGS SHOWN HEREON RELATIVE THERETO, AND IS MONUMENTED AS SHOWN HEREON.
PROJECT BENCHMARK:
NGS BENCHMARK J 299, BEING A FOUND 3.75" BRASS CAP STAMPED "NGS 299 1951" LOCATION: 2.9 MILES NORTH ALONG STATE HIGHWAY 9 FROM THE COUNTY COURTHOUSE AT BRECKENRIDGE, 114 FEET EAST OF THE CENTER LINE OF THE HIGHWAY, 85 FEET SOUTHEAST OF A TELEPHONE POLE, 1.3 FEET WEST OF A WITNESS POST, SET IN THE TOP OF A CONCRETE POST WHICH PROJECTS 0.2 FOOT ABOVE THE GROUND. ELEVATION
IS 9301.74 FEET, (NAVD 88 DATUM).
SITE BENCHMARK:
FOUND 2" ALUMINUM CAP STAMPED "CP BEAR 1511365 KING SURVEYORS". LOCATION: LOCATED SOUTH OF STAN MILLER DRIVE, AT THE END OF THE CONCRETE MEDIAN COMING FROM COLORADO STATE HIGHWAY NO. 9. ELEVATION IS 9280.98 FEET, (NAVD 88 DATUM). AS SHOWN HEREON.
WATER NOTES:
1. CONTRACTOR SHALL VERIFY THE ELEVATION OF ALL EXISTING UTILITIES WHERE NEW GRADING OR UTILITY WORK WILL OCCUR AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS.
ENGINEER WILL NOT BE LIABLE FOR ANY COSTS ASSOCIATED WITH CHANGES TO THE DESIGN
WITHOUT PROPER NOTIFICATION.
2. PROPOSED DRY UTILITIES ARE SHOWN FOR REFERENCE ONLY. REFER TO PLANS BY UTILITY
PROVIDERS AND/OR MEP.
3. WATER MAIN CROSSING WILL REQUIRE A 20' SECTION OF C-900 OR ENCASEMENT.
4. CURRENT CROSSINGS ARE SHOWN PER A SUE LEVEL B SURVEY. POTHOLING SHALL BE
COMPLETED BEFORE UTILITY INSTALLATION AS REQUIRED BY TOB INSPECTOR.
5. WATER MAIN CROSSING WILL REQUIRE A 20' SECTION OF C-900
OR ENCASEMENT. C-900 SHALL BE CENTERED ON CROSSING.
6. MIN BURY DEPTH FOR WATER LINES IS 9'. MIN BURY DEPTH FOR DREDGE ROCK IS 11'.
7. MIN BURY DEPTH FOR HYDRANTS IS 9.5' AND 11.5' IN DREDGE ROCK.
8. WATERLINES SHALL BE 10' MIN FROM STORM AND SANITARY SEWER.
9. SEE DETAILS FOR WATER/SEWER CROSSING.
10. BOARD INSULATION REQUIRED AT WATER/STORM SEWER CROSSINGS. INSULATION SHALL BE 60
PSI (FOR AREAS BENEATH TRAFFIC LOADS). SEE SHEET C8.0 FOR LOCATIONS.
CONSTRUCTION NOTES:
1. GENERAL. ALL CONSTRUCTION AND/OR RESTORATIONS MADE IN A PUBLIC WAY SHALL BE MADE AT THE DIRECTION OF THE TOWN ENGINEER OR HIS DESIGNATED AGENT AND HE SHALL HAVE THE AUTHORITY TO PRESCRIBE THE CONSTRUCTION METHODS AND TO ATTACH SUCH OTHER CONDITIONS AS MAY BE REASONABLY NECESSARY TO PREVENT DAMAGE TO PUBLIC OR PRIVATE PROPERTY, TO MINIMIZE THE INTERFERENCE WITH VEHICULAR OR PEDESTRIAN TRAFFIC AND TO PREVENT THE CONSTRUCTION FROM BEING CONDUCTED
IN A MANNER LIKELY TO CREATE A NUISANCE.
2. UTILITIES. CONTRACTOR SHALL CALL FOR ALL APPROPRIATE UTILITY LOCATIONS PRIOR TO START OF CONSTRUCTION AND PROTECT THOSE UTILITIES WITH THE SAME CARE AS GIVEN TO PROTECTION OF ALL ADJACENT PROPERTIES. ALL UTILITY FACILITIES SHALL BE EXPOSED SUFFICIENTLY AHEAD OF TRENCH EXCAVATION WORK TO AVOID DAMAGE TO THOSE FACILITIES AND TO PERMIT THEIR
RELOCATION, IF NECESSARY.
3. S.U.E. LEVEL A LOCATES ARE NOT REQUIRED DUE TO CONSTRUCTION BEING IN AN AREA THAT IS ALREADY WELL-MAPPED FOR
UNDERGROUND UTILITIES.
4. SURVEY MARKERS AND MONUMENTS. MONUMENTS OF CONCRETE, IRON OR OTHER LASTING MATERIAL SET FOR THE PURPOSE OF LOCATING OR PRESERVING THE LINES OF ANY STREET OR PROPERTY SUBDIVISION, OR A PRECISE SURVEY REFERENCE POINT, OR A PERMANENT SURVEY BENCH MARK WITHIN THE TOWN SHALL NOT BE REMOVED OR DISTURBED OR CAUSED TO BE REMOVED OR DISTURBED UNLESS PERMISSION TO DO SO IS FIRST OBTAINED IN WRITING FROM THE TOWN ENGINEER. PERMISSION SHALL BE GRANTED ONLY UPON THE CONDITION THAT THE CONTRACTOR SHALL PAY ALL EXPENSES INCIDENT TO THE PROPER REPLACEMENT OF THE MONUMENT BY A REGISTERED LAND SURVEYOR. MARKERS OR MONUMENTS REPLACED BY A REGISTERED LAND SURVEYOR AT
CONTRACTOR’S SOLE COST AND EXPENSE.
5. DRAINAGE. UNDER NO CIRCUMSTANCES SHALL ANY CONTRACTOR ENCROACH UPON, FILL, RECHANNEL OR CONTAMINATE ANY NATURAL DRAINAGE COURSES AS A RESULT OF CONSTRUCTION. IF WORK PERFORMED BY THE CONTRACTOR INTERFERES WITH THE ESTABLISHED DRAINAGE SYSTEM OF ANY STREET, PROVISION SHALL BE MADE BY THE CONTRACTOR TO PROVIDE PROPER DRAINAGE TO THE SATISFACTION OF THE TOWN ENGINEER. EXCAVATED MATERIALS. CONTRACTOR SHALL STRIP AND STORE ALL TOP SOIL, FROZEN ORGANIC MATERIALS OR ANY OTHER MATERIALS DESIGNATED AS UNSATISFACTORY FOR STRUCTURAL BACKFILL BY THE TOWN ENGINEER.
CONTRACTOR SHALL REMOVE ASPHALT PAVEMENT BEFOREHAND IN THOSE AREAS WHERE IT IS MOST LIKELY TO BE MIXED WITH EXCAVATED MATERIAL. PAVEMENT MAY ONLY BE USED FOR BACKFILL IF BROKEN INTO PIECES THAT DO NOT EXCEED 6 INCHES. OTHER
ASPHALT PIECES LARGER THAN 6 INCHES SHALL BE REMOVED AND DISPOSED OF PROPERLY.
6. BEDDING. NATIVE EXCAVATION SHALL BE PLACED IN LIFTS NOT TO EXCEED 18 INCHES. FILL SHALL BE PLACED TO A UNIFORM DEPTH AND COMPACTED TO 95% STANDARD PROCTOR RELATIVE DENSITY USING MECHANICAL COMPACTION METHODS TO ENSURE SATISFACTORY RESULTS. THE TOWN MAY WAIVE ANY REQUIRED TESTING IF IT DEEMS THE COMPACTIVE EFFORT AND QUALITY TO BE SATISFACTORY.
NATIVE MATERIAL FOR BACKFILL SHALL BE REASONABLY DRY; HOWEVER, IF DEEMED NECESSARY, CONTRACTOR MAY BE REQUIRED TO INTRODUCE ADDITIONAL MOISTURE TO ENSURE REASONABLE COMPACTION. NO ROCK LARGER THAN 8 NICHES IN DIAMETER SHALL BE
ACCEPTABLE FOR BACKFILL. LIFTS WITHIN ROW SHALL NOT EXCEED 8”
7. TOPPING COURSE. IN TRAVELED ROADWAYS, THE FINAL 12 INCH LIFT OF BACKFILL BELOW ABC SHALL CONSIST OF WELL COMPACTED BACKFILL; MOISTURE CONDITIONED AS NEEDED. BACKFILL PLACED AND COMPACTED WITHIN 2 INCHES BELOW FINISHED ABC SUBGRADE TO FACILITATE PAVING. CLASS 6 ABC TO BE WELL GRADED AND COMPACTED IN FINAL 6" LIFT. IN GRAVELED ROADS, FINAL LIFT OF CLASS 6
MATERIAL SHALL BE PLACED AND COMPACTED TO FINAL ROADWAY ELEVATION.
8. HOT BITUMINOUS PAVEMENT. PATCHING AND PLACEMENT OF TO BITUMINOUS PAVEMENT WILL BE MADE ONLY AFTER ALL EDGES AND CORNERS OF AFFECTED AREAS ARE HAMMERED OR CUT SQUARE AND AN APPLICATION OF TACK OIL IS MADE TO PROVIDE A QUALITY PATCH. HOT BITUMINOUS PAVEMENT SHALL BE GRADING E TO BE PLACED A MINIMUM OF 3 INCHES THICK, STRUCK OFF AND SURFACE IRREGULARITIES ADJUSTED. SURFACE SHALL BE ROLLED TO COLORADO DEPARTMENT OF HIGHWAY SPECIFICATIONS FOR DENSITY TO A SURFACE FREE OF UNDUE CRACKING, DISPLACEMENT OR DISTORTIONS. AN INSPECTION MUST BE CALLED FOR THIS OPERATION. DURING CERTAIN TIMES OF THE YEAR WHEN HOT PLANT MIXED ASPHALTIC IS UNAVAILABLE, COLD PLANT MIXED ASPHALTIC CONCRETE SHALL BE PLACED; HOWEVER, THIS SHALL NOT BE CONSIDERED A PERMANENT PATCH, AND THE CONTRACTOR SHALL MAINTAIN THIS TEMPORARY PATCH AS REQUIRED TO ENSURE PROPER AND SAFE MOVEMENT OF TRAFFIC UNTIL SUCH TIME AS A PERMANENT PATCH OF HIT BITUMINOUS ASPHALT WITHIN 15 DAYS FOLLOWING THE AVAILABILITY OF THE PROPER MATERIAL. THE TOWN ENGINEER MAY, UNDER CERTAIN CIRCUMSTANCES, ALLOW LATE SEASON PATCHES TO BE HOT PATCHED THE FOLLOWING SPRING.
9. RESTORATION. IN ALL AREAS BEYOND THE LIMITS OF ASPHALT AND/OR GRAVELED SHOULDER, CONTRACTOR SHALL PLACE TOPSOIL NATIVE TO AN AVERAGE DEPTH OF 6 INCHES. SEEDING AND MULCHING WILL BE REQUIRED IN THOSE AREAS DEEMED NECESSARY.
CONTRACTOR SHALL PROVIDE TOWN WITH A GRASS SEED MIX SPECIFICATION SUITABLE TO THE TOWN PRIOR TO ANY RESEEDING.
10. IF ANY SETTLEMENT IN A CONSTRUCTION AREA OCCURS WITHIN A PERIOD OF 2 YEARS FROM THE DATE OF COMPLETION OF THE PERMANENT RESTORATION, ANY EXPENSE INCURRED BY THE TOWN IN CORRECTING THE SETTLEMENT SHALL BE PAID BY THE CONTRACTOR UNLESS PROOF IS SUBMITTED BY THE CONTRACTOR, SATISFACTORY TO THE TOWN ENGINEER, THAT THE SETTLEMENT IS NOT DUE TO DEFECTIVE BACKFILLING. ANY WORK IN ROW SHALL BE WARRANTED FOR 2 YEARS.
11. FINAL CLEAN UP. UPON COMPLETION OF ALL RESTORATION OF PAVING OPERATIONS, CONTRACTOR MUST WITHIN A REASONABLE TIME REMOVE ALL SURPLUS MATERIALS OR DEBRIS AND RETURN THE PUBLIC WAY TO A CONDITION EQUAL TO OR BETTER THAN THE ORIGINAL STATE. UPON SATISFACTORY COMPLETION OF ALL WORK INCLUDING REPLACEMENT OF PAVED SECTIONS, SIDEWALKS, GRAVEL, SHOULDER, ETC. A FINAL INSPECTION SHALL BE MADE BY THE TOWN ENGINEER.
12. TOWN ENGINEERING REPRESENTATIVE SHALL BE CONTACTED PRIOR TO INSTALLATION OF WORK WITHIN TOWN ROW + PROPERTY. TOWN
REP TO APPROVE WORK PRIOR TO CONSTRUCTION COMMENCING.
SITE
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
V I L
E
N G
I N
E E
R I N
G
S U
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O A
D
B R
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
1.
0_
C ov er S he et a nd
N ot es .d w g
/1 0/
:3
M
J C
A R
A
O
:1
C O
V E
R S
H E
E T
A N
D N
O
TE
S
C1.0
SHEET INDEX
C1.0 COVER SHEET AND NOTES
C2.0 INITIAL EROSION CONTROL PLAN
C2.1 INITIAL EROSION CONTROL PLAN
C2.2 INTERIM EROSION CONTROL PLAN
C2.3 INTERIM EROSION CONTROL PLAN
C2.4 FINAL EROSION CONTROL PLAN
C2.5 FINAL EROSION CONTROL PLAN
C3.0 HORIZONTAL CONTROL PLAN
C3.1 HORIZONTAL CONTROL PLAN
C4.0 OVERALL GRADING PLAN
C5.0 ROADWAY PLAN AND PROFILE
C5.1 ROADWAY PLAN AND PROFILE
C5.2 ROADWAY PLAN AND PROFILE
C5.3 ROADWAY PLAN AND PROFILE
C6.0 ROADWAY CROSS SECTIONS
C6.1 ROADWAY CROSS SECTIONS
C6.2 ROADWAY CROSS SECTIONS
C8.0 OVERALL UTILITY PLAN
C9.0 STORM PLAN AND PROFILE
C9.1 STORM PLAN AND PROFILE
C11.0 WATER PLAN AND PROFILE
C11.1 WATER PLAN AND PROFILE
C11.2 WATER PLAN AND PROFILE
C11.3 WATER PLAN AND PROFILE
C12.0 POND A PLAN
C12.1 POND B PLAN
C13.0 CONSTRUCTION DETAILS
C13.1 CONSTRUCTION DETAILS
C13.2 CONSTRUCTION DETAILS
C13.3 CONSTRUCTION DETAILS
C13.4 CONSTRUCTION DETAILS
C13.5 CONSTRUCTION DETAILS
C13.6 CONSTRUCTION DETAILS
C13.7 CONSTRUCTION DETAILS
C13.8 CONSTRUCTION DETAILS
C13.9 CONSTRUCTION DETAILS
DRN1 DRAINAGE MAP
COYNE VALLEY RD.
C5.4 ROADWAY PLAN AND PROFILE
C6.3 ROADWAY CROSS SECTIONS
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
VTC
SF
SF
SF
SF
SF
SF
SF
SF
SF
CF
CF
CF
SF
SF
SSA
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING STORM INLET
ST EXISTING STORM MANHOLE
PROPERTY LINE
EXISTING STORM LINE
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
EXISTING FLOW ARROW
WM NOTES: EROSION CONTROL
1. CONTRACTOR TO INSPECT AND MAINTAIN EROSION CONTROL
MEASURES THROUGHOUT THE COURSE OF CONSTRUCTION, INCLUDING
INSTALLING, REPAIRING, REPLACING, RELOCATING, AND MODIFYING AS
NECESSARY FOR CONSTRUCTION AND TO ENSURE THE SITE IS IN
COMPLIANCE WITH STATE AND LOCAL REQUIREMENTS.
2. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN
MAY BE NECESSARY TO PREVENT EROSION AND SEDIMENTATION.
3. AREAS THAT ARE TO REMAIN IN A DISTURBED CONDITION FOR AN
EXTENDED PERIOD SHALL BE TEMPORARILY SEEDED IN ACCORDANCE
WITH STATE AND LOCAL CRITERIA.
4. REFER TO THE APPROVED LANDSCAPE PLAN FOR FINAL STABILIZATION
INFORMATION. AREAS NOT STABILIZED BY PAVEMENT, BUILDING
FOOTPRINT, PERMANENT LANDSCAPING, OR OTHER PERMANENT
STABILIZATION SHALL BE PERMANENTLY SEEDED PER STATE AND
LOCAL REQUIREMENTS.
5. ANY SEDIMENT TRUCKED ONTO STAN MILLER DRIVE SHALL BE REMOVED
+ SWEPT DAILY.
6. NO SEDIMENT SHALL BE TRUCKED ONTO SH 9. ANY SEDIMENT SHALL BE
REMOVED DAILY.
7. APPLICANT TO SUBMIT SWMP + CDPHE PERMIT TO TOWN. APPLICANT
TO SEND ANY UPDATES OR MODIFICATIONS TO SWMP TO TOWN
EMERGENCY FLOW PATH
S E
E S
H E
E T
C 2.
M
A
TC
H
LI
N E
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
0-
C 2.
X _I ni tia l E ro si on
C on tro l.d
/3 /2
9:
H O
O G
E N
B O
IN
IT
IA
L
E R
O S
IO
N
C O
N
TR
O L
P
LA
C2.0
E
E
E
E
E
E
E
E
E
E
E
E E
E E E
E E
E E
E E
E E
E E
EV
EV
E
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
SB
SB
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
CF
SF
SF
SF
CF
CF
CF
CF
CF
CF
SP
SSA
CWA
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING STORM INLET
ST EXISTING STORM MANHOLE
PROPERTY LINE
EXISTING STORM LINE
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
EXISTING FLOW ARROW
WM NOTES: EROSION CONTROL
1. CONTRACTOR TO INSPECT AND MAINTAIN EROSION CONTROL MEASURES THROUGHOUT THE COURSE OF CONSTRUCTION, INCLUDING INSTALLING, REPAIRING, REPLACING, RELOCATING, AND MODIFYING AS NECESSARY FOR CONSTRUCTION AND TO ENSURE THE SITE IS
IN COMPLIANCE WITH STATE AND LOCAL REQUIREMENTS.
2. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN MAY BE NECESSARY TO PREVENT EROSION AND
SEDIMENTATION.
3. AREAS THAT ARE TO REMAIN IN A DISTURBED CONDITION FOR AN EXTENDED PERIOD SHALL BE TEMPORARILY SEEDED IN
ACCORDANCE WITH STATE AND LOCAL CRITERIA.
4. REFER TO THE APPROVED LANDSCAPE PLAN FOR FINAL STABILIZATION INFORMATION. AREAS NOT STABILIZED BY PAVEMENT, BUILDING FOOTPRINT, PERMANENT LANDSCAPING, OR OTHER PERMANENT STABILIZATION SHALL BE PERMANENTLY SEEDED PER
STATE AND LOCAL REQUIREMENTS.
5. ANY SEDIMENT TRUCKED ONTO STAN MILLER DRIVE SHALL BE REMOVED + SWEPT DAILY.
6. NO SEDIMENT SHALL BE TRUCKED ONTO SH 9. ANY SEDIMENT SHALL BE REMOVED DAILY.
7. APPLICANT TO SUBMIT SWMP + CDPHE PERMIT TO TOWN. APPLICANT TO SEND ANY UPDATES OR MODIFICATIONS TO SWMP TO TOWN EMERGENCY FLOW PATH
S E
E S
H E
E T
C 2.
M
A
TC
H
LI
N E
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
0-
C 2.
X _I ni tia l E ro si on
C on tro l.d
/2
9:
O
O G
E N
B O
IN
IT
IA
L
E R
O S
IO
N
C O
N
TR
O L
P
LA
C2.1
HW
Y
XIN
G
STO
P
SLO
W
93119312
931293139314
932493269327
933893
93139314
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
VTC
SSA
SF
SF
SF
SF
SF
SF
SF
SF
SF
CF
CF
SF
SF
OP
OP
IP
OP
CF
IP
PROPOSED 100-YEAR
FLOODPLAIN
EXISTING 100-YEAR
FLOODPLAIN
ROUGH EXTENTS OF
EXISTING 3,000 CY
ROCK PILE (1.5" ROCK)
S D
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
KEY MAP
N.T.S.
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING STORM INLET
ST EXISTING STORM MANHOLE
PROPERTY LINE
EXISTING STORM LINE
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
(5720)
(5721)
EXISTING FLOW ARROW
WM NOTES: EROSION CONTROL
1. CONTRACTOR TO INSPECT AND MAINTAIN EROSION CONTROL
MEASURES THROUGHOUT THE COURSE OF CONSTRUCTION, INCLUDING
INSTALLING, REPAIRING, REPLACING, RELOCATING, AND MODIFYING AS
NECESSARY FOR CONSTRUCTION AND TO ENSURE THE SITE IS IN
COMPLIANCE WITH STATE AND LOCAL REQUIREMENTS.
2. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN
MAY BE NECESSARY TO PREVENT EROSION AND SEDIMENTATION.
3. AREAS THAT ARE TO REMAIN IN A DISTURBED CONDITION FOR AN
EXTENDED PERIOD SHALL BE TEMPORARILY SEEDED IN ACCORDANCE
WITH STATE AND LOCAL CRITERIA.
4. REFER TO THE APPROVED LANDSCAPE PLAN FOR FINAL STABILIZATION
INFORMATION. AREAS NOT STABILIZED BY PAVEMENT, BUILDING
FOOTPRINT, PERMANENT LANDSCAPING, OR OTHER PERMANENT
STABILIZATION SHALL BE PERMANENTLY SEEDED PER STATE AND
LOCAL REQUIREMENTS.
5. ANY SEDIMENT TRUCKED ONTO STAN MILLER DRIVE SHALL BE REMOVED
+ SWEPT DAILY.
6. NO SEDIMENT SHALL BE TRUCKED ONTO SH 9. ANY SEDIMENT SHALL BE
REMOVED DAILY.
7. APPLICANT TO SUBMIT SWMP + CDPHE PERMIT TO TOWN. APPLICANT
TO SEND ANY UPDATES OR MODIFICATIONS TO SWMP TO TOWN
EMERGENCY FLOW PATH
EROSION CONTROL BMP LEGEND
LIMITS OF
CONSTRUCTION
CONSTRUCTION FENCE
CONCRETE WASHOUT
AREA
DRAINAGE SWALE
EROSION CONTROL
BLANKET
INLET PROTECTION
MULCHING &
TEMPORARY SEEDING
OUTLET PROTECTION
PERMANENT SEEDING /
LANDSCAPE (PER
LANDSCAPE PLAN)
ROCK/CURB SOCK
STRAW BALE BARRIER
SILT FENCE
STOCKPILE
MANAGEMENT
STABILIZED STAGING
AREA
VEHICLE TRACKING
CONTROL
LOC
CF
CWA
DS
ECB
IP
TS
MU
OP
PS
RS
SBB
SF
SP
SSA
VTC
S E
E S
H E
E T
C 2.
M
A
TC
H
LI
N E
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
2-
C 2.
X _I nt er im E ro si on C on tro l.d
/2
:3
I
R
A W
FO
IN
TE
R
IM
E R
O S
IO
N
C O
N
TR
O L
P
LA
C2.2
SS
E
E
E
E
E
E
E
E
E
E
E
E E
E E E
E E
E E
E E
E E
E E
EV
EV
E
S D
SD
049306
069307
93079308930993119312
9287928892
93069307
92809285
PROPOSED 100-YEAR
FLOODPLAIN
EXISTING 100-YEAR
FLOODPLAIN
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
SSA
CWA
SP
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
CF
CF
CF
CF
CF
CF
CF
IP
IP
IP
IP
IP
IP
OP
OP
OP
OP
SD
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
KEY MAP
N.T.S.
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING STORM INLET
ST EXISTING STORM MANHOLE
PROPERTY LINE
EXISTING STORM LINE
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
(5720)
(5721)
EXISTING FLOW ARROW
WM NOTES: EROSION CONTROL
1. CONTRACTOR TO INSPECT AND MAINTAIN EROSION CONTROL MEASURES THROUGHOUT THE COURSE OF CONSTRUCTION, INCLUDING INSTALLING, REPAIRING, REPLACING, RELOCATING, AND MODIFYING AS NECESSARY FOR CONSTRUCTION AND TO ENSURE THE SITE IS IN
COMPLIANCE WITH STATE AND LOCAL REQUIREMENTS.
2. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN MAY BE NECESSARY TO PREVENT EROSION AND SEDIMENTATION.
3. AREAS THAT ARE TO REMAIN IN A DISTURBED CONDITION FOR AN EXTENDED PERIOD SHALL BE TEMPORARILY SEEDED IN ACCORDANCE WITH
STATE AND LOCAL CRITERIA.
4. REFER TO THE APPROVED LANDSCAPE PLAN FOR FINAL STABILIZATION INFORMATION. AREAS NOT STABILIZED BY PAVEMENT, BUILDING
FOOTPRINT, PERMANENT LANDSCAPING, OR OTHER PERMANENT STABILIZATION SHALL BE PERMANENTLY SEEDED PER STATE AND LOCAL
REQUIREMENTS.
5. ANY SEDIMENT TRUCKED ONTO STAN MILLER DRIVE SHALL BE REMOVED + SWEPT DAILY.
6. NO SEDIMENT SHALL BE TRUCKED ONTO SH 9. ANY SEDIMENT SHALL BE REMOVED DAILY.
7. APPLICANT TO SUBMIT SWMP + CDPHE PERMIT TO TOWN. APPLICANT TO SEND ANY UPDATES OR MODIFICATIONS TO SWMP TO TOWN
EMERGENCY FLOW PATH
EROSION CONTROL BMP LEGEND
LIMITS OF
CONSTRUCTION
CONSTRUCTION FENCE
CONCRETE WASHOUT
AREA
DRAINAGE SWALE
EROSION CONTROL
BLANKET
INLET PROTECTION
MULCHING &
TEMPORARY SEEDING
OUTLET PROTECTION
PERMANENT SEEDING /
LANDSCAPE (PER
LANDSCAPE PLAN)
ROCK/CURB SOCK
STRAW BALE BARRIER
SILT FENCE
STOCKPILE
MANAGEMENT
STABILIZED STAGING
AREA
VEHICLE TRACKING
CONTROL
LOC
CF
CWA
DS
ECB
IP
TS
MU
OP
PS
RS
SBB
SF
SP
SSA
VTC
S E
E S
H E
E T
C 2.
M
A
TC
H
LI
N E
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
2-
C 2.
X _I nt er im E ro si on C on tro l.d
/2
:3
R
A W
FO
IN
TE
R
IM
E R
O S
IO
N
C O
N
TR
O L
P
LA
C2.3
XIN
G
STO
P
SLO
W
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
PROPOSED 100-YEAR
FLOODPLAIN
EXISTING 100-YEAR
FLOODPLAIN
50:1
93159320
149316
93189319 932193229323
93389339
93129313
ECB
ECB
ECB
ECB
MU
TS
MU
TS MU
TS
MU
TS
MU
TS
S D
LOC
LOC
ECB
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
KEY MAP
N.T.S.
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING STORM INLET
ST EXISTING STORM MANHOLE
PROPERTY LINE
EXISTING STORM LINE
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
(5720)
(5721)
EXISTING FLOW ARROW
WM NOTES: EROSION CONTROL
1. CONTRACTOR TO INSPECT AND MAINTAIN EROSION CONTROL
MEASURES THROUGHOUT THE COURSE OF CONSTRUCTION, INCLUDING
INSTALLING, REPAIRING, REPLACING, RELOCATING, AND MODIFYING AS
NECESSARY FOR CONSTRUCTION AND TO ENSURE THE SITE IS IN
COMPLIANCE WITH STATE AND LOCAL REQUIREMENTS.
2. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN
MAY BE NECESSARY TO PREVENT EROSION AND SEDIMENTATION.
3. AREAS THAT ARE TO REMAIN IN A DISTURBED CONDITION FOR AN
EXTENDED PERIOD SHALL BE TEMPORARILY SEEDED IN ACCORDANCE
WITH STATE AND LOCAL CRITERIA.
4. REFER TO THE APPROVED LANDSCAPE PLAN FOR FINAL STABILIZATION
INFORMATION. AREAS NOT STABILIZED BY PAVEMENT, BUILDING
FOOTPRINT, PERMANENT LANDSCAPING, OR OTHER PERMANENT
STABILIZATION SHALL BE PERMANENTLY SEEDED PER STATE AND
LOCAL REQUIREMENTS.
5. ANY SEDIMENT TRUCKED ONTO STAN MILLER DRIVE SHALL BE REMOVED
+ SWEPT DAILY.
6. NO SEDIMENT SHALL BE TRUCKED ONTO SH 9. ANY SEDIMENT SHALL BE
REMOVED DAILY.
7. APPLICANT TO SUBMIT SWMP + CDPHE PERMIT TO TOWN. APPLICANT
TO SEND ANY UPDATES OR MODIFICATIONS TO SWMP TO TOWN
EMERGENCY FLOW PATH
EROSION CONTROL BMP LEGEND
LIMITS OF
CONSTRUCTION
CONSTRUCTION FENCE
CONCRETE WASHOUT
AREA
DRAINAGE SWALE
EROSION CONTROL
BLANKET
INLET PROTECTION
MULCHING &
TEMPORARY SEEDING
OUTLET PROTECTION
PERMANENT SEEDING /
LANDSCAPE (PER
LANDSCAPE PLAN)
ROCK/CURB SOCK
STRAW BALE BARRIER
SILT FENCE
STOCKPILE
MANAGEMENT
STABILIZED STAGING
AREA
VEHICLE TRACKING
CONTROL
LOC
CF
CWA
DS
ECB
IP
TS
MU
OP
PS
RS
SBB
SF
SP
SSA
VTC
S E
E S
H E
E T
C 2.
M
A
TC
H
LI
N E
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
4-
C 2.
X _F in al
E ro si on
C on tro l.d
/2
:0
R A
W
FO
FI
N
A L
E R
O S
IO
N
C O
N
TR
O L
P
LA
C2.4
E
E
E
E
E
E
E
E
E
E
E
E E
E E E
E E
E E
E E
E E
E E
EV
EV
E
SS
S D
SD
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
PROPOSED 100-YEAR
FLOODPLAIN
EXISTING 100-YEAR
FLOODPLAIN
05 93019301
93069307
93009305
928992
930293039304
ECB
ECB
ECB
ECB
ECBECB
ECB
MU
TS
MU
TS
MU
TS
MU
TS
TS
MU
TS
MU
TS
MU
TS
MU
TSMU
TS
(9310)
(9310)
(9310)
(9305) (9
0) (9
0)
93089308
SD
MU
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
KEY MAP
N.T.S.
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
EXISTING STORM INLET
ST EXISTING STORM MANHOLE
PROPERTY LINE
EXISTING STORM LINE
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
(5720)
(5721)
EXISTING FLOW ARROW
WM NOTES: EROSION CONTROL
1. CONTRACTOR TO INSPECT AND MAINTAIN EROSION CONTROL MEASURES THROUGHOUT THE COURSE OF CONSTRUCTION, INCLUDING INSTALLING, REPAIRING, REPLACING, RELOCATING, AND MODIFYING AS NECESSARY FOR CONSTRUCTION AND TO ENSURE THE SITE IS
IN COMPLIANCE WITH STATE AND LOCAL REQUIREMENTS.
2. ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THIS PLAN MAY BE NECESSARY TO PREVENT EROSION AND
SEDIMENTATION.
3. AREAS THAT ARE TO REMAIN IN A DISTURBED CONDITION FOR AN EXTENDED PERIOD SHALL BE TEMPORARILY SEEDED IN ACCORDANCE
WITH STATE AND LOCAL CRITERIA.
4. REFER TO THE APPROVED LANDSCAPE PLAN FOR FINAL STABILIZATION INFORMATION. AREAS NOT STABILIZED BY PAVEMENT, BUILDING FOOTPRINT, PERMANENT LANDSCAPING, OR OTHER PERMANENT STABILIZATION SHALL BE PERMANENTLY SEEDED PER STATE AND
LOCAL REQUIREMENTS.
5. ANY SEDIMENT TRUCKED ONTO STAN MILLER DRIVE SHALL BE REMOVED + SWEPT DAILY.
6. NO SEDIMENT SHALL BE TRUCKED ONTO SH 9. ANY SEDIMENT SHALL BE REMOVED DAILY.
7. APPLICANT TO SUBMIT SWMP + CDPHE PERMIT TO TOWN. APPLICANT TO SEND ANY UPDATES OR MODIFICATIONS TO SWMP TO TOWN EMERGENCY FLOW PATH
EROSION CONTROL BMP LEGEND
LIMITS OF
CONSTRUCTION
CONSTRUCTION FENCE
CONCRETE WASHOUT
AREA
DRAINAGE SWALE
EROSION CONTROL
BLANKET
INLET PROTECTION
MULCHING &
TEMPORARY SEEDING
OUTLET PROTECTION
PERMANENT SEEDING /
LANDSCAPE (PER
LANDSCAPE PLAN)
ROCK/CURB SOCK
STRAW BALE BARRIER
SILT FENCE
STOCKPILE
MANAGEMENT
STABILIZED STAGING
AREA
VEHICLE TRACKING
CONTROL
LOC
CF
CWA
DS
ECB
IP
TS
MU
OP
PS
RS
SBB
SF
SP
SSA
VTC
S E
E S
H E
E T
C 2.
M
A
TC
H
LI
N E
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
4-
C 2.
X _F in al
E ro si on
C on tro l.d
/2
:0
R A
W
FO
FI
N
A L
E R
O S
IO
N
C O
N
TR
O L
P
LA
C2.5
XIN
G
STO
P
SLO
W
C O
YN
E
VA
LL
EY
R
O A
D
McCAIN ACCESS ROAD
STREET LIGHT
(RE: OVERALL UTILITY PLAN C9.0)
70.00' R.O.W.
SWALE
STOP SIGN
(MUTCD R1-1)
START OF ROADWAY ALIGNMENT
N: 1,613,268.09 E: 2,844,920.93
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
4" SOLID DOUBLE
YELLOW LINE
11.00' LANE
(TYP.)
11.00' LANE
(TYP.)
N00°19'37"W 88.60'
∆=52°29'38" R=193.00' L=176.83'
CHB=N25°55'12"E
CHD=170.71'
N52°10'01"E 47.73'
N09°41'45"E 583.02'
∆=56°42'34" R=204.00' L=201.91'
CHB=N17°47'29"W
CHD=193.77'
N46 °0
8'1 8"W
.88
∆=49°39'26" R=196.00' L=169.87'
CHB=N21°18'35"W
CHD=164.60'
100.00'
(TYP.)
FIRE
HYDRANT
∆=42°28'16" R=354.00' L=262.41'
CHB=N30°55'53"E
CHD=256.44'
FIRE
HYDRANT
FIRE
HYDRANT
FIRE
HYDRANT
MATCH EXISTING EOA
N: 1,613,268.54 E: 2,844,956.89
MATCH EXISTING EOA
N: 1,613,268.25 E: 2,844,884.89
2' X 8' THERMOPLASTIC
CROSSWALK STRIPING
PEDESTRIAN CROSSING
SIGN (MUTCD W11-2)
PEDESTRIAN CROSSING
SIGN (MUTCD W11-2)
MOUNTED TO LIGHT POLE
EXISTING BIKE
TRAIL TO REMAIN
4" SOLID WHITE LINE
R18.00'
PROPOSED
CONCRETE RAMP
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
S E
E S
H E
E T
C 3.
M
A
TC
H
LI
N E
KEY MAP
N.T.S.
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
WM NOTES: SITE
1. CONTRACTOR TO FIELD-VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION
AND SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES. ENGINEER WILL NOT BE
LIABLE FOR ANY COSTS ASSOCIATED WITH CHANGES TO THE DESIGN WITHOUT
PROPER NOTIFICATION.
2. DIMENSIONS ARE TO FLOWLINE/BOTTOM OF CURB AND BUILDING FACE UNLESS
OTHERWISE NOTED.
3. ACCESSIBLE CURB RAMPS SHALL BE CONSTRUCTED WITH DETECTIBLE WARNING
PADS. REFERENCE DETAIL.
4. CONTRACTOR SHALL REMOVE AND REPLACE CURB, GUTTER, PAVING, LANDSCAPE,
AND ANY OTHER ITEMS DAMAGED DURING CONSTRUCTION.
5. SHARED USE PATH, SIDEWALK, STREET LIGHTS, AND SEWER TO BE FROZEN ON
FINAL DRAWINGS (THEY ARE NOT BEING CONSTRUCTED IN THIS PHASE). KEEP
LINEWORK IN CAD AND PRINT A NOT FOR CONSTRUCTION PDF SET SHOWING
THESE IMPROVEMENTS. FOR CONSTRUCTION SET, KEEP GRADING UNCHANGED
FOR SHARED USE PATH/REC PATH (BENCH FOR FUTURE ADDITION). ADD SPARE
CONDUITS AND VAULTS AT DRIVEWAY CROSSINGS.
LEGEND:
PROPERTY LINE
EXISTING CURB & GUTTER
PROPOSED CATCH CURB & GUTTER
PROPOSED ADA ROUTE
PROPOSED SIGN
EXISTING LIGHT POLE
EXISTING FIRE HYDRANT
PROPOSED FIRE HYDRANT
PROPOSED SPILL CURB & GUTTER
PROPOSED CONCRETE WALK
PROPOSED STRIPING
PROPOSED TURN ARROW
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
3.
0-
C 3.
X _H or iz on ta l C on tro l P la n.
dw
7/
2:
P
ZA
C E
V
IC
H O
R
IZ
O N
TA
L
C O
N
TR
O L
P
LA
N
C3.0
PROPOSED HEAVY-DUTY ASPHALT
34.00' 18.00'
VARIABLE R.O.W.
CLROW ROW
TYPICAL ROADWAY
CROSS-SECTION
McCAIN ACCESS ROAD N.T.S.
2.00' CURB
AND GUTTER 2.0%2.0%
4:1 4:12.0%
3.00' ROAD
BASE SHOULDER
14.00'
REREATION
PATH
3.00' ROAD
BASE SHOULDER
16.00' ROADSIDE
DITCH
PAVEMENT THICKNESS
LOCATION ASPHALT AND AGGREGATE BASE
COURSE HMA + CLASS 6 ABC
MCCAIN ROAD 6 INCHES + 6 INCHES
SS
McCAIN ACCESS ROAD
M cC
A
IN
R O
A D
PH
A
SE
M cC
A
IN
R O
A D
PH
A
SE
(S
EE
A
LT
A
VE
R D
E W
O R
KF
O
R C
E
PL
AN
S)
REMOVE TYPE III BARRICADE
PRIOR TO CONSTRUCTION
R.O.W.
VARIES
TRACT B
THE MCCAIN SUBDIVISION
REC. NO. 1200093
TOWN OF BRECKENRIDGE
SOLAR GARDEN
REC. 1035199
TRACT B
THE MCCAIN SUBDIVISION
REC. NO. 1200093
STREET LIGHT
(RE: OVERALL UTILITY PLAN C9.0)
SWALE
THERMOPLASTIC
LEFT TURN ARROW
THERMOPLASTIC
STRAIGHT ARROW
BUS STOP
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
N: 1,616,375.86 E: 2,845,471.51
N: 1,616,384.67
E: 2,845,429.42SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
SPEED LIMIT
SIGN 25 MPH
(MUTCD R2-1)
150.00' SETBACK
FROM HIGHWAY 9
11.00' LANE
(TYP.)
11.00' LANE
(TYP.)
4" SOLID DOUBLE
YELLOW LINE
∆=49°39'26" R=196.00' L=169.87'
CHB=N21°18'35"W
CHD=164.60'
N03°31'08"E 231.49'
∆=81°20'22" R=106.00' L=150.48'
CHB=N44°11'19"E
CHD=138.16'
N84°51'30"E 42.29'
∆=115°09'29" R=114.00' L=229.13'
CHB=N27°16'45"E
CHD=192.46'
N30°18'00"W 126.73'
∆=30°52'17" R=106.00'
L=57.11'
CHB=N14°51'51"W
CHD=56.42'
N00°34'17"E 283.92'
∆=19°47'06" R=766.00' L=264.51'
CHB=N10°27'50"E
CHD=263.20'
N20°21'23"E 103.48'
∆=8°31'24" R=774.00' L=115.14'
CHB=N16°05'41"E
CHD=115.03'
N11°49'59"E 220.14'
100.00
(TYP.)
N: 1,615,087.74 E: 2,845,088.06
N: 1,615,094.80 E: 2,845,227.89
28.00'
L1 C1 L2 C2
L3
C3 L4
C4
LINE TABLE
LINE #
L1
L2
L3
L4
BEARING
N11°49'59"E
N02°22'00"W
N11°49'59"E
N21°37'49"E
DISTANCE
13.19'
26.27'
50.00'
47.26'
CURVE TABLE
CURVE #
C1
C2
C3
C4
DELTA
14°11'59"
14°11'59"
9°47'50"
9°47'50"
RADIUS
50.00'
50.00'
50.00'
50.00'
LENGTH
12.39'
12.39'
8.55'
8.55'
CHORD DIRECTION
N04°44'00"E
S04°44'00"W
S16°43'54"W
N16°43'54"E
CHORD LENGTH
12.36'
12.36'
8.54'
8.54'
N: 1,616,202.28 E: 2,845,389.16
FIRE
HYDRANT
FIRE
HYDRANT
FIRE
HYDRANT
FIRE
HYDRANT
SWALE
75.00' R.O.W.
70.00' R.O.W.
R.O.W.
VARIES
EXACT LOCATION OF
DRIVE CUT TO BE COORDINATED
WITH TOWN OF BRECKENRIDGE
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
S E
E S
H E
E T
C 3.
M
A
TC
H
LI
N E
KEY MAP
N.T.S.
SCALE: 1" =
30 60 120
60' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
WM NOTES: SITE
1. CONTRACTOR TO FIELD-VERIFY EXISTING
CONDITIONS PRIOR TO CONSTRUCTION AND SHALL
NOTIFY ENGINEER OF ANY DISCREPANCIES.
ENGINEER WILL NOT BE LIABLE FOR ANY COSTS
ASSOCIATED WITH CHANGES TO THE DESIGN
WITHOUT PROPER NOTIFICATION.
2. DIMENSIONS ARE TO FLOWLINE/BOTTOM OF CURB
AND BUILDING FACE UNLESS OTHERWISE NOTED.
3. ACCESSIBLE CURB RAMPS SHALL BE CONSTRUCTED
WITH DETECTIBLE WARNING PADS. REFERENCE
DETAIL.
4. CONTRACTOR SHALL REMOVE AND REPLACE CURB,
GUTTER, PAVING, LANDSCAPE, AND ANY OTHER
ITEMS DAMAGED DURING CONSTRUCTION.
5. SHARED USE PATH, SIDEWALK, STREET LIGHTS, AND
SEWER TO BE FROZEN ON FINAL DRAWINGS (THEY
ARE NOT BEING CONSTRUCTED IN THIS PHASE).
KEEP LINEWORK IN CAD AND PRINT A NOT FOR
CONSTRUCTION PDF SET SHOWING THESE
IMPROVEMENTS. FOR CONSTRUCTION SET, KEEP
GRADING UNCHANGED FOR SHARED USE PATH/REC
PATH (BENCH FOR FUTURE ADDITION). ADD SPARE
CONDUITS AND VAULTS AT DRIVEWAY CROSSINGS.
LEGEND:
PROPERTY LINE
EXISTING CURB & GUTTER
PROPOSED CATCH CURB & GUTTER
PROPOSED ADA ROUTE
PROPOSED SIGN
EXISTING LIGHT POLE
EXISTING FIRE HYDRANT
PROPOSED FIRE HYDRANT
PROPOSED SPILL CURB & GUTTER
PROPOSED CONCRETE WALK
PROPOSED STRIPING
PROPOSED TURN ARROW
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
3.
0-
C 3.
X _H or iz on ta l C on tro l P la n.
7/
2:
ZA
C E
V
IC
H O
R
IZ
O N
TA
L
C O
N
TR
O L
P
LA
N
C3.1
PROPOSED HEAVY-DUTY ASPHALT
34.00' 18.00'
VARIABLE R.O.W.
CLROW ROW
TYPICAL ROADWAY
CROSS-SECTION
McCAIN ACCESS ROAD N.T.S.
2.00' CURB
AND GUTTER 2.0%2.0%
4:1 4:12.0%
3.00' ROAD
BASE SHOULDER
14.00'
REREATION
PATH
3.00' ROAD
BASE SHOULDER
16.00' ROADSIDE
DITCH4.00 BIKE
SHOULDER
5.00 BIKE
SHOULDER
PROPOSED LIGHT-DUTY ASPHALT
PAVEMENT THICKNESS
LOCATION ASPHALT AND AGGREGATE BASE
COURSE HMA + CLASS 6 ABC
MCCAIN ROAD 6 INCHES + 6 INCHES
SLOW
HWY
STOP
HW
Y
XIN
G
STO
P
SLO
W
WM
WM
M
A
WM
W M
WMWM
W M
W M
W
WM
WM
WM
WM
WM
N G
AS
FO
E
T T
T
T
T
14" G G
S
S S
S S
SS
SS
SS
S S
SS
S
S
SS
S
S D
S
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
E
E
E
E
E E
E E
E E
E E
E
E
E
E
EV
EV
EV
EV
McCAIN ROAD
PA
D
D
LE
R O
A D
DRIFT ROAD
RAPID DRIVE93059310
93409345 93
928192
92909295
92839283
92709270
92759280
(9
5)
(9
0)
(9320) (9320)
(9325)
(9
0)
(9
5)
(9305)
(9300)
(9295)
(9295)(9295)
(9275)(9280)
(9280)
(9280)(9
0) (9
0)
(9280)
(9280)
(9
0)(9280)
(9280)(9
0) (9
0)
(9
0)
(9280) (9280)(9285)(9285)
(9285) (9285)
(9285)(92
(9
5)
(9320)
(93
(9330)(9335)(9
0)(9340)(9
0)
(9320)
(9325) (9325)
(9325)
(9330)(9
5)
(9340) (9
0)
(9340) (9340)
(9290) (9290)
(9
0)
(9290)(9
0) (9
0)
(9
0) (9
0)
(9
0)
(9
0)
(9
0)
(9295)(92
)(9295)(9
5)
(9
5) (9
5)
(9
5)(9295)
(9
5)
(9295)
(9
5)(9295)(9295)
(9295)
(9295)
C O
YN
E
VA
LL
EY
R
O A
D
HIGHWAY 9 M
cC
A
IN
R O
A D
PH
A
SE
M cC
A
IN
R O
A D
PH
A
SE
(S
EE
A
LT
A
VE
R D
E W
O R
KF
O
R C
E
PL
AN
S)
(9
0)(9280) (9
0)
(9280) (9280)
(9280)(9280)(9280)(9280) (9280)
(9280)
M cC
A
IN
R O
A D
PH
A
SE
M cC
A
IN
R O
A D
PH
A
SE
(S
EE
A
LT
A
VE
R D
E W
O R
KF
O
R C
E
PL
AN
S)
STAN MILLER
DRIVE
(9295)
(9
0)
(9
5)
(9305)
(9
5)(9305)
(9305)
(9
5)
(9305)(9310)
(9
5)(9320)
(9325)
(9330)
(9
0)
(92
(9295)
(9
5)
(93
(9300)(9300)
(9305)
(9
5)
(9305)
(9280)
(9280)
(9280)
(9280)
(9285)
(9
5) (92
)(9285) (9285)(9285)
(9285)
(9285)
(9
5)
(9285) (9285)
(92
(9285)(9285) (9
5)
(92
(92
(9
5)
(9290)(9290)(9290)
(9
0) (9290)(9290) (9290) (92
(9290)
(9290)
(9275)
(9275)
(9285)
SD
S
SD
S D
SD
S
SD
S D
SD
INFILTRATION
POND B
INFILTRATION
POND A
SWALE
STABILIZED PUBLIC WORKS
AREA (1.5" ROCK) FROM LARGE
EXISTING ROCK PILE TO SOUTH
NEAR COYNE VALLEY ROAD
SD
McCAIN ROAD
SWALE
150.00'
SETBACK
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
2.
0_
O ve ra ll
G ra di ng
P la n.
/2
8/
:4
A
R A
O V
E R
A
LL
G R
A D
IN
G
P
LA
N
C4.0
SCALE: 1" =
75 150 300
150' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
LEGEND:
EXISTING RIGHT-OF-WAY
PROPOSED EASEMENT
EXISTING STORM INLET
EXISTING EASEMENT
PROPOSED STORM LINE
ST EXISTING STORM MANHOLE
PROPOSED STORM INLET
PROPERTY LINE
EXISTING STORM LINE
PROPOSED 5' CONTOUR
PROPOSED 1' CONTOUR
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
PROPOSED FLOW ARROW
PROPOSED SWALE
5031.62
(5031.62) 1.1%
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED FLOW ARROW
PROPOSED SPILLCURB
PROPOSED SIDEWALK
SD PROPOSED STORM MANHOLE
WM NOTES: GRADING
1. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY
DISCREPANCIES WITH THE ELEVATIONS SHOWN ON
THE PLANS. ENGINEER WILL NOT BE LIABLE FOR
ANY COSTS ASSOCIATED WITH CHANGES TO THE
DESIGN WITHOUT PROPER NOTIFICATION.
2. SEE COVER SHEET FOR BENCHMARK, BASIS OF
BEARINGS, AND SURVEY INFORMATION.
3. ELEVATIONS ARE AT FINISHED SURFACE UNLESS
OTHERWISE NOTED.
4. CURB ELEVATIONS ARE AT FLOWLINE/BOTTOM OF
CURB UNLESS OTHERWISE NOTED.
5. SIDEWALKS AND LANDINGS SHALL BE 2% MAX
CROSS-SLOPE TOWARD ROADS, DRIVE LANES, AND
PARKING AREAS UNLESS OTHERWISE NOTED.
6. REFER TO THE GEOTECH REPORT FOR
GROUNDWATER ELEVATIONS.
STABILIZED PUBLIC WORKS AREA
TYPICAL SECTION
STABILIZED PUBLIC WORKSAREA
N.T.S.
1.5" ROCK FROM
EXISTING ROCK PILE
(RE:2.2)
6" MIN.
RE-VEGETATED SOIL
shannons Line shannons Line shannons Text Box Seeded native fill shannons Line
XIN
G
STO
P
93409340
9342 9342
9344 93
9+80 10+00 11+00 12+00
13+00
14+00
15+00
16+00
17+00
18+00
N52°10'01"E 47.73'
N09°41'45"E 583.02'
C O
YN
E
VA
LL
EY
R
O A
D
McCAIN ROAD
934693479348
93299329
93289329
(9325)
(9
6)
(9327)
(9335)
(9
0)
(9334)
(9
4)(9334)
(9336)(9337)
(9
8)
(9
9)
(9
1) (9
2)
(9
3)
(9
4)
(9331) (9332)
(9
0)(9330) (9330)
(9328)(9
8)
(9328)
(9328)(9328)
(9329)
(9329)
(9
9)
(9329)
(9329)
(9
1)
(9332)(9
2)(9332)
(9333)
(9
4)
(9334)
(9340)
(9340)
(9340)
(9340)
(9345)
(9339)
(9341)
(9342)(9343)(9344)
(9346)
(9347)
150.00' SETBACK
FROM HIGHWAY 9
B
B
STREET LIGHT
(RE: OVERALL UTILITY PLAN C8.0)EX. 20.00' WESTERN SLOPE
GAS ESMT.
REC. NO. 437669
WST COMMUNICATIONS
REC. NO. 437672 U.S.
STA: 13+65.71
EL: 9334.85
START OF
CONSTRUCTION
A
A
SWALE TO TRANSITION
TO ROADSIDE DITCH
9331.00
9333.32
N: 1,613,437.15 E: 2,845,009.77
N: 1,613,666.92 E: 2,845,130.70
9351.16±
(ME)
.6
.9
4' PAN
(RE: DETAIL C13.0)
9351.33±
(ME)
9351.33±
(ME)
9349.81±
(ME)
9349.92
9345.26
.8
.2
.7
9336.16
9336.00
9334.53
9329.22
9329.05
9334.37
STA: 13+17.98
EL: 9336.48
STA: 11+41.15
EL: 9345.06
STA: 16+28.11
EL: 9329.54
9332.89
.7
.4
.2
.1
.9
.4
.2
9333.10
9351.33±
(ME)
9351.02
6.00' TRANSITION
FROM 6" TO 0" CURB
9345.38 9344.81
9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
-4.90%
-2.00%
-2.30%
PVI STA: 10+48.82
PVI EL: 9349.58
A.D: -2.60% K: 34.67
LVC: 90.00
P V
C : 1
0+
.8
E L:
0.
P V
T:
0+
.8
E L:
7.
PVI STA: 13+40.82
PVI EL: 9335.29
A.D: 2.90% K: 31.08
LVC: 90.00
P V
C : 1
2+
.8
E L:
7.
P V
T:
3+
.8
E L:
4.
PROPOSED GRADE
AT CENTERLINE
EXISTING GRADE
AT CENTERLINE
SCALE
HORIZ: 1"=30'
VERT: 1"=5'
McCAIN ACCESS ROAD
S
TA
R T
O F
C O
N S
TR
U
C
TI
O N
-2.00%
S
TA
: 1 0+
.0
E
L:
0.
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
SCALE: 1" =
15 30 60
30' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
WM NOTES: ROADWAY
1. ALL WALKWAYS TO BE SLOPED 2.0% TOWARDS
ROADWAY UNLESS OTHERWISE NOTED.
2. SEE GEOTECH REPORT FOR PAVEMENT SECTION.
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF
ANY DISCREPANCIES WITH THE PROPOSED ELEVATIONS
SHOWN ON THE GRADING PLAN. THE ENGINEER WILL
NOT BE LIABLE FOR ANY COSTS ASSOCIATED WITH
CHANGES TO THE DESIGN WITHOUT PROPER
NOTIFICATION.
LEGEND:
EXISTING RIGHT-OF-WAY
PROPOSED SAWCUT LINE
EXISTING STORM INLET
EXISTING EASEMENT
PROPOSED STORM LINE
PROPOSED STORM INLET
PROPERTY LINE
EXISTING STORM LINE
PROPOSED 5' CONTOUR
PROPOSED 1' CONTOUR
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
SD PROPOSED STORM MANHOLE
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
3.
0-
4_ R oa dw ay P la n an d
P ro fil es
.d
9/
:1
R
A W
FO
RO
AD
W
AY
P
LA
N
AN
D
PR
OF
IL
E
C5.0
KEY MAP
N.T.S.
McCAIN ACCESS ROAD
ROAD A
ROAD B
RO
AD
C
PROPOSED SWALE
5031.62
(5031.62) 1.1%
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED FLOW ARROW
PROPOSED SIDEWALK
MATCH EXISTINGME
LOW POINTLP
HIGH POINTHP
PROPOSED STREET LIGHT
34.00' 18.00'
75.00' R.O.W.
CLROW ROW
SECTION B-B
STATION 12+87.67 - 27+95.73
McCAIN ACCESS ROAD N.T.S.
2.00' CURB
AND GUTTER 2.0%2.0%
3:1 3:1
34.00' 18.00'
75.00' R.O.W.
CLROW ROW
2.00' CURB
AND GUTTER
2.0%2.0%
10.5' WIDE DITCH
W/ 1' FLAT BOTTOM
(18" DEEP)
S E
E S
H E
E T
C 5.
M
A
TC
H
LI
N E
M A
TC
H
LI
N
E
SE
E
SH
EE
T
C 5.
5.00' BIKE
SHOULDER
5.00' BIKE
SHOULDER
5.00' BIKE
SHOULDER
5.00' BIKE
SHOULDER
100YR DEPTH = 1.40'
Q100 = 25.26 CFS
LANE
EDGE
STRIPING
LANE
EDGE
STRIPING
LANE
EDGE
STRIPING
LANE
EDGE
STRIPING
6" HMA
6" ABC
6" HMA
6" ABC
SECTION A-A
STATION 10+00 - 12+87.67
McCAIN ACCESS ROAD
N.T.S.
STRUCTURAL FILL
WHERE APPLICABLE
(VARIABLE DEPTH)
STRUCTURAL FILL
WHERE APPLICABLE
(VARIABLE DEPTH)
19+00
20+00
21+00
22+00 23+00
+00
25+00
26+00 27+00
N09°41'45"E 583.02'
N46 °0
8'1 8"W
.88
McCAIN ROAD
93239324
189319
93059306
93079308
(9307)
(9310)
(9315)
(9
0)
(9
9)
(9311)(9312)(9313)(9314)
(9316)
(9317)(9317)
(9317)
(9
8)
(9319)(9
1)
(9
2)
(9323)
(9324)
(9
8)
(9310)
(9311)
(9320)
(9325)
(9325)
(9325)
(9321)
(9322)(9322)(9322)
(9323)
(9323)
(9323)
(9324)
(9
5) (9
6)
(9317)
(9318)
B
B
STREET LIGHT
(RE: OVERALL UTILITY PLAN C8.0)
STA: 22+11.14
EL: 9317.64
9317.16
9317.32
9310.76
9310.59
STA: 24+13.05
EL: 9311.08
STA: 24+46.93
EL: 9310.17
STA: 26+16.80
EL: 9307.09
9309.92
9309.85
9306.87
9306.77
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 26+50
-3.38%
PVI STA: 22+00.00
PVI EL: 9318.10
A.D: -1.38% K: 65.38
LVC: 90.00
P V
C : 2
1+
.0
E L:
9.
P V
T:
2+
.0
E L:
6.
PVI STA: 25+00.00
PVI EL: 9307.97
A.D: 2.58% K: 116.30
LVC: 300.00
P V
C : 2
3+
.0
E L:
3.
P V
T:
6+
.0
E L:
6.
M A
TC
H
LI
N
E S
E E
S H
E E
T C
5.
M A
TC
H
LI
N
E S
E E
S H
E E
T C
5.
PROPOSED GRADE
AT CENTERLINE
EXISTING GRADE
AT CENTERLINE
SCALE
HORIZ: 1"=30'
VERT: 1"=5'
McCAIN ACCESS ROAD
CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
TH
ES
E
DR
AW
IN
GS
A
ND
S
PE
CI
FIC
AT
IO
NS
A
RE
TH
E
PR
OP
ER
TY
A
ND
C
OP
YR
IG
HT
O
F W
AR
E
MA
LC
OM
B A
ND
S
HA
LL
N
OT
B E
US
ED
O N
AN
Y
OT
HE
R W
OR
K
EX
CE
PT
B
Y
AG
RE
EM
EN
T W
ITH
W
AR
E
MA
LC
OM
B.
W
RI
TT
EN
D
IM
EN
SI
ON
S
SH
AL
L T
AK
E
PR
EC
ED
EN
CE
O
VE
R
SC
AL
ED
D
IM
EN
SI
ON
S
AN
D
SH
AL
L B E
VE
RI
FIE
D
ON
TH
E
JO
B
SI
TE
. A
NY
D
IS
CR
EP
AN
CY
S
HA
LL
B E
BR
OU
GH
T T
O
TH
E
NO
TIC
E
OF
W
AR
E
MA
LC
OM
B
PR
IO
R
TO
TH
E
CO
MM
EN
CE
ME
NT
O F A
NY
W
OR
K.
FOR AND ON BEHALF
OF WARE MALCOMB
SHEET
PA / PM:
JOB NO.:
DESIGNED:
R E
M A
R K
S D
A
TE
N O
DATE:
PLOT DATE:
su ite so ut h br oa dw ay de nv er , c o p
3.
1.
w ar em al co m b.
co m
C I
G
I N
E E
R
R V
E Y
I N
G
03/08/24
M cC
A
IN
A C
E S
S R
O
E C
K E
N R
ID
G
E , C
O
DCS21-4113
D.ALLEN
I.CRAWFORD
6/22/2023
/1 8/
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
2/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
4/
/2
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
6/
/2
IN
FR
A
S
TR
U C
TU
R
E P
E R
M
IT
2/
/2
FI
N
A L
IN
FR
A S
TR
U
C
TU
R E
P E
R M
IT
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
SCALE: 1" =
15 30 60
30' WARE MALCOMB assumes no responsibility for utility locations.
The utilities shown on this drawing have been plotted from the best available information. It is, however, the contractors responsibility to field verify the location of all utilities prior to the commencement of any construction.
M A
TC
H
LI
N
E
SE
E
SH
EE
T
C 5.
WM NOTES: ROADWAY
1. ALL WALKWAYS TO BE SLOPED 2.0% TOWARDS
ROADWAY UNLESS OTHERWISE NOTED.
2. SEE GEOTECH REPORT FOR PAVEMENT SECTION.
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF
ANY DISCREPANCIES WITH THE PROPOSED ELEVATIONS
SHOWN ON THE GRADING PLAN. THE ENGINEER WILL
NOT BE LIABLE FOR ANY COSTS ASSOCIATED WITH
CHANGES TO THE DESIGN WITHOUT PROPER
NOTIFICATION.
LEGEND:
EXISTING RIGHT-OF-WAY
PROPOSED SAWCUT LINE
EXISTING STORM INLET
EXISTING EASEMENT
PROPOSED STORM LINE
PROPOSED STORM INLET
PROPERTY LINE
EXISTING STORM LINE
PROPOSED 5' CONTOUR
PROPOSED 1' CONTOUR
EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
SD PROPOSED STORM MANHOLE
M A
TC
H
LI
N
E S
E E
S H
E E
T C
5.
W :\D
C S
\2 1\
\0 0\
C iv il\ C
A D
\S he et s\
C D
\D C
S
-4
3_ C
3.
0-
4_ R oa dw ay P la n an d
P ro fil es
.d
9/
:1
R
A W
FO
RO
AD
W
AY
P
LA
N
AN
D
PR
OF
IL
E
C5.1
KEY MAP
N.T.S.
McCAIN ACCESS ROAD
ROAD A
ROAD B
RO
AD
C
PROPOSED SWALE
5031.62
(5031.62) 1.1%
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED FLOW ARROW
PROPOSED SIDEWALK
MATCH EXISTINGME
LOW POINTLP
HIGH POINTHP
PROPOSED STREET LIGHT
34.00'
18.00'
75.00' R.O.W.
CLROW ROW
SECTION B-B
STATION 12+87.67 - 27+95.73
McCAIN ACCESS ROAD N.T.S.
2.00' CURB
AND GUTTER 2.0%2.0%
5.00' BIKE
SHOULDER
5.00' BIKE
SHOULDER
3:1 3:1
10.5' WIDE DITCH
W/ 1' FLAT BOTTOM
(18" DEEP)
100YR DEPTH = 1.40'
Q100 = 25.26 CFS
6" HMA
6" ABC
LANE
EDGE
STRIPING
LANE
EDGE
STRIPING
STRUCTURAL FILL
27+00 28+00
29+00
30+00
31+00
32+00
33+00
34+00
35+00
N03°31'08"E 231.49'
N
°5 1'
"E
2.
N30°18'00"W 126.73'
150.00' SETBACK
FROM HIGHWAY 9
McCAIN ROAD
9306 93
00 92
92979297
(9298) (9298)
(9
9)
(9299)(9299)
(9305)
(9305)
(93
(9
5)
(9305) (9305)
(9
5)
(9301)
(9301)
(9302)(93
(93
) (9303)(9303)
(9
3)
(9
4) (9
4)
(9
4)(9304)
(9304)
(9304)
(9304)
(9304)(9
4)
(9304)(9
4)
(9304)
(9
4)
(9306)(9306)
(9306)
(9306)
(9306)
(9
6)
(9306)
(9307)
(9307)
(9307)(9307)
(9
7)
(93
(9307) (9307)
(9307)(9307)
(9
7)
(9
0)(9310)
(9310)(9310)
(9
0)
(93
)(9
0)
(93
)(9308)
(93
(93
(9
9)
(9
9) (93
(9311)(9
1) (9
1)(9311) (9
1)
(9
1)
(9300)
(9301) (9301) (9301)
(9301)
(9301)
(9301)
(9310)
(9310)(9310)
(9309)
(9310)
(9306)(9307)
(9308)
(9
9) (9
9)
(9
9)(9309)(9
9)
(9309)
(9309) (9
9)
(9309)(9309)
(9309)
(9311) (9311)
(9
1)
(9311)(9312)(9
2)(9312)
(9
3)
(9311)
(9
2)(9312)(9312)(9312) (9312)(9312)(9312)
(9313)
(9314)
TRACT B
THE MCCAIN SUBDIVISION
REC. NO. 1200093
A
A
B
B
STREET LIGHT
(RE: OVERALL UTILITY PLAN C8.0)
STA: 30+41.06
EL: 9303.66
STA: 28+48.29
EL: 9305.20
18" HDPE CULVERT
9304.88
9304.71
STA: 29+98.77
EL: 9304.00
STA: 32+70.19
EL: 9301.83
STA: 33+96.92
EL: 9300.72
STA: 34+54.03
EL: 9299.88
.5
.3
.2
.4
.5
9301.35
9303.34
.1
.8
9303.68
9305.24 9305.44
26+50 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00
-0.80%
PVI STA: 35+00.00
PVI EL: 9300.00
A.D: -2.70% K: 111.00
LVC: 300.00
P V
C : 3
3+
.0
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .