05-Bid Package - Bid Form Independence Plaza Water Damage Repairs at 703 and 711 Atlantic Ave Fillable.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- 2026-ITB-Water Damage IP-AHA-HD-009
- Issued by
- Alameda County, California
About this file
This is a bid form for water damage repairs at Independence Plaza, a property managed by the Housing Authority of the City of Alameda (AHA) located at 703 and 711 Atlantic Avenue, Alameda, California. The project scope encompasses restoration of two buildings damaged by fire sprinkler water, including replacement of drywall, cabinets, flooring, and other interior building components. Work is required across multiple residential units in Building 711 (Units 156-161 and 256-261), common areas in Building 703 (Units 105, 106, and 108), and shared spaces including first floor corridor, second floor corridor, and stairwell. A mandatory pre-bid conference is scheduled for Thursday, July 23, 2026, at 1:00 p.m. at 703 Atlantic Avenue. Sealed bids must be submitted by Wednesday, August 5, 2026, no later than 4:00 p.m. to the AHA offices at 701 Atlantic Avenue, with bid opening occurring on Thursday, August 6, 2026, at 1:00 p.m. in the Independence Plaza Community Room.
The bid form requires contractors to provide total construction costs including general conditions, contractor fees, insurance, local tax, and bond fees, with an owner's discretionary contingency of 15% for unforeseen conditions added to the base bid. Contractors must also provide unit pricing for potential additional work including drywall, tape and texture; paint; bedroom carpet; bathroom flooring; and unit flooring, as well as hourly rates for applicable trades including insulators, drywall installers, finishers, painters, plumbers, carpenters, flooring installers, and general contractor personnel. The invitation encourages minority-owned, women-owned, and emerging small businesses to apply. Qualified licensed contractors are eligible to submit bids for this construction project.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID FORM - WATER DAMAGE REPAIRS AT 703 AND 711 ATLANTIC AVE. | ||
| ITEM # | DESCRIPTION OF WORK | COST |
| BUILDING 703 | ||
| Corridor | Supply and Install flooring and baseboard | |
| Unit # 105 | Supply and Install new cove base | |
| Unit # 106 | Supply and Install new cove base | |
| Unit # 108 | Supply and Install new cove base |
| BUILDING 711 | |
| Unit # 156 | |
| Unit #156 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 157 | |
| Unit #157 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 158 | |
| Unit #158 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 159 | |
| Unit #159 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 160 | |
| Unit #160 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 161 | |
| Unit #161 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 256 | |
| Unit #256 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 257 | |
| Unit #257 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 258 | |
| Unit #258 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 259 | |
| Unit #259 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 260 | |
| Unit #260 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| Unit # 261 | |
| Unit #261 | Insulation |
| Drywall, tape, and texture | |
| Paint | |
| Walk in shower | |
| Cabinets and Countertops | |
| Sinks, faucets, and toilets | |
| New flooring and base | |
| Finish electrical | |
| Appliances | |
| 1st Floor Corridor | |
| 1st Floor Corridor | Insulation, drywall, tape, and texture |
| Paint | |
| New flooring and base | |
| 2nd Floor Corridor | |
| 2nd Floor Corridor | Insulation, drywall, tape, and texture |
| Paint | |
| New flooring and base | |
| Stairwell | |
| Stairwell | Insulation, drywall, tape, and texture |
| Paint | |
| New flooring and base | |
| Total- |
| General Conditions | ||
| Contractor Fees | ||
| Insurance | ||
| Local Tax | ||
| Bond Fees | ||
| Total Construction- | ||
| REQUIRED: Owner's Discretionary Contingency for unforeseen conditions at 15% (unit and labor costs below) | (Add 15%) | |
| TOTAL BID |
| Please provide additional unit costs for the following line items in the event that additional work would be required. | SF/LF Cost |
| Drywall, tape, and texture (SF) | |
| Paint (SF) | |
| Bedroom Carpet (SF) | |
| Bathroom Flooring (SF) | |
| Unit Flooring (SF) |
| Hourly rate for each applicable trade | ||
| Trade | Hourly Rate | Overtime Rate |
| Insulation Installer | ||
| Drywall Installer | ||
| Drywall Finisher | ||
| Painter | ||
| Plumber | ||
| Rough Carpenter | ||
| Finish Carpenter | ||
| Flooring-Carpet Installer | ||
| Flooring-LVP Installer | ||
| GC Foreman | ||
| GC Superintendant | ||
| GC Project Manager | ||
| FIRM: | ||
| NAME: | ||
| TITLE: | ||
| DATE: |
SIGNATURE:
File details come from the government source that posted it. Updated .