This document contains a bid schedule for a roof repair project at Westover Air Reserve Base Building 2235. The scope of work includes replacing an existing 3-tab asphalt shingle roofing system, modifying existing flashing and drainage conditions to current code requirements, correcting drainage issues at the main entrance, closing in an existing skylight, and replacing roof curbs. Bids are solicited for a lump sum price for all work specified and shown on the contract drawings. The award will be made to the single low responsible and responsive bidder for the aggregate total bid amount. Bidders must bid on all items in the schedule.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR ROOF, BUILDING 2235 WESTOVER ARB

CHICOPEE, MA

SECTION 00 00 10

CONTRACT LINE ITEM SCHEDULE

01/23

PART 1 CONTRACT LINE ITEM SCHEDULE - BID SCHEDULE

Offeror’s Name: ________________________________________

ITEM# DESCRIPTION TOTAL

0001 Per Drawings, Specifications and as described here:

Westover Air Reserve Base Building 2235 is an existing 1-story building consisting of an exterior brick cavity wall with CMU back up, steel structure and asphalt shingle roof. The facility currently serves as a medical training facility. This project primarily consists of the replacement of an existing 3-tab asphalt shingle roofing system and modifications to the existing conditions to update flashing and roof drainage conditions to current code requirements. Other scope includes correcting drainage issues at the main entrance, closing in of an existing skylight, and replacement of roof curbs.

Lot $______________

TOTAL BTotal $_______________

AWARD: Only one award will be made as result of this solicitation and such award will be made in the aggregate to the low responsible and responsive bidder. Bidder must bid on all items. Failure to do so shall be cause for rejection of the bid.

NOTE: Although not specifically identified in item 0001 above, all items specified in Technical Provisions and shown on the Contract Drawings are incorporated in this schedule.