03 YTPM 13-0011 Repair Roof Med Fac B2235 Submittal Register.pdf

PDF 3 MB Posted

Attached to
Repair Roof Medical Facility, B2235
Solicitation number
FA660624B0001
Issued by

About this file

This submittal register is for the solicitation FA6606-24-B-0001 to repair the roof of Medical Facility B2235.

The solicitation requires the contractor to provide submittals for a variety of preconstruction, product, design, test, and closeout documents according to the specifications. Preconstruction submittals include lists of contact personnel, the accident prevention plan, the quality control plan, and the submittal register. Product submittals comprise items like insulation and fasteners. Design submittals cover schedules, plans, and analyses. Test submittals include inspection and sampling reports. Closeout submittals such as as-built drawings and warranty documentation are also listed.

The register provides a standardized format for the contractor to receive approval from the government on required submittals at appropriate stages of the project. It will help facilitate communication and documentation between the parties to ensure the work meets specifications.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 17 PAGES

REPAIR ROOF, BUILDING 2235

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1List of Contact Personnel

1.2.1.2 G439 AW Form 20 - Contractor

Information Sheet

SD-06 Test Reports

3.1 GQuarterly Report

01 30 00 SD-01 Preconstruction Submittals

1.4View Location Map

1.5Progress and Completion

Pictures

SD-04 Samples

1.3 GColor Boards

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6.1 GAPP - Construction

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 17 PAGES

01 35 26 1.7Activity Hazard Analysis (AHA)

1.8.1Confined Space Entry Permit

1.8.1Hot Work Permit

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1Traffic Control Plan

2.2.1Haul Road Plan

1.6.1.4Contractor Computer

Cybersecurity Compliance

Statements

1.6.6Contractor Temporary Network

Cybersecurity Compliance

Statements

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1 GRegulatory Notifications

1.5.3 GEmployee Training Records

1.6 GEnvironmental Protection Plan

1.6.8.1 GDirt and Dust Control Plan

1.9 GSolid Waste Management Permit

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 17 PAGES

01 57 19 1.9.1 GMonthly Solid Waste Disposal

Report

SD-07 Certificates

1.5.3 GEmployee Training Records

SD-11 Closeout Submittals

1.5.1 GRegulatory Notifications

1.5.3 GAssembled Employee Training

Records

1.9 GSolid Waste Management Permit

GWaste Determination

Documentation

3.5.1.1 GProject Solid Waste Disposal

Documentation Report

3.5.1.1Contractor Certification

3.5.2.1 GHazardous Waste/Debris

Management

3.5.2.4 GDisposal Documentation for

Hazardous and Regulated Waste

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

1.8.3Annual Report

1.3.4 G439 AW Form 20

1.8.2 GQuarterly Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 17 PAGES

01 74 19 1.8.2 GQuarterly Solid Waste Disposal

Report

SD-11 Closeout Submittals

1.9 GFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.4.4Warranty Tags

1.4.1 GWarranty Management Plan

SD-08 Manufacturer’s Instructions

1.4.1Instructions

SD-10 Operation and Maintenance

Data

3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

1.1.2 GRecord Drawings

1.4.1 GAs-Built Record Of Equipment

And Materials

2.1 GCertification of EPA Designated

Items

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.2.1.4 GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 17 PAGES

02 41 00 1.7 GNotification

02 82 00 SD-03 Product Data

1.2.2Amended Water

1.3.9Safety Data Sheets (SDS) for All

Materials

3.1.1.1Respirators

3.1.7Vacuums

3.1.9Glovebags

SD-06 Test Reports

3.2.10.1 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2Designated Competent Person

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 17 PAGES

02 82 00 1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9Federal, State or Local Citations on Previous Projects

2.1Encapsulates

3.1Equipment Used to Contain

Airborne Asbestos Fibers

3.1.2.3Water Filtration Equipment

3.1.7Vacuums

3.1.7Ventilation Systems

SD-11 Closeout Submittals

1.3.5Permits and Licenses

1.3.5Notifications

1.3.7.1Respirator Program Records

1.5.7Protective Clothing

Decontamination Quality Control

Records

1.5.8Protective Clothing

Decontamination Facility

Notification

1.7.1Rental Equipment

05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.2Previous Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 17 PAGES

05 05 23.16 1.3.3Pre-Qualified Procedures

2.2Welding Electrodes and Rods

1.3.4 GWelder, Welding Operator, And

Tacker Qualification

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.1Certified Brazer Performance

Qualifications (BPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.3.2 GFabrication Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 17 PAGES

05 12 00 2.5.2Shop Primer

2.4.1Welding Electrodes and Rods

2.2.1 GRecycled Content for Structural

Steel

SD-06 Test Reports

2.5.2Class B Coating

2.3Bolts, Nuts, and Washers

3.6.1.2Weld Inspection Reports

3.6.2.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.6.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.3Galvanizing Repair Paint

2.1.3Touch-Up Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 17 PAGES

05 30 00 1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 GRecycled Content of Steel

Products

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.3Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

2.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 GRecycled Content Of Steel

Products

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 17 PAGES

06 10 00 SD-02 Shop Drawings

1.7.2 GModifications of Structural

Members

1.6 GNailers

SD-03 Product Data

2.1.1 GLumber

2.1.2 GPlywood Sheathing

2.2 GFasteners

SD-05 Design Data

1.4.3Preservative-treated

SD-07 Certificates

1.8.1Certificates of Grade

1.6Preservative Treatment

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.3 GFasteners

2.2 GHeat Trace Controller

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 17 PAGES

07 22 00 1.6 GCertificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.3 GFasteners

2.1 GInsulation

07 31 13 SD-03 Product Data

2.1.1Energy Star Label for Asphalt

Shingle

2.1.1 GShingles

SD-04 Samples

2.1.1 GShingles

2.1.1 GColor Charts

SD-08 Manufacturer’s Instructions

3.3 GApplication

SD-11 Closeout Submittals

1.5.1Manufacturer's Warranty

1.5.2Contractor's Warranty

07 42 13 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GWall Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 17 PAGES

07 42 13 2.2.2Factory Color Finish

1.5.5Closure Materials

2.5.4.4Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

1.5.5Accessories

2.5Accessories

SD-04 Samples

2.2.1 GWall Panels

1.5.3.1 GFasteners

2.5.3 GMetal Closure Strips

2.2.2.5 GColor chart

SD-05 Design Data

1.5.1.2Wind load design analysis

SD-06 Test Reports

1.3.2Wind Load Tests

2.2.2.6Coating

2.2.2.6Chalking

SD-07 Certificates

1.5.3.1Coil Stock

1.5.3.1Fasteners

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 17 PAGES

07 42 13 SD-09 Manufacturer’s Field

Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.9 GGutters

3.1.10 GDownspouts

1.4.1 GExpansion Joints

2.2.1 GGravel Stops and fascia

3.1.11 GSplash Pans

3.1.7 GBase Flashing

3.1.7 GCounterflashing

3.1.7 GReglets

3.1.17 GCopings

3.1.8 GDrip Edges

3.1.12 GOpen Valley Flashing

3.1.13 GEave Flashing

2.1 GRecycled Content

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 17 PAGES

07 60 00 1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

09 29 00 SD-03 Product Data

2.1.4Accessories

2.1.1Gypsum Board

2.1.2VOC Content of Joint Compound

SD-07 Certificates

2.1 GAsbestos Free Materials

2.1.1Indoor Air Quality for Gypsum

Board

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SD-07 Certificates

1.5.4.2 GQualification Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 17 PAGES

09 90 00 1.5.3Indoor Air Quality for Paints and

Primers

1.5.3Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

23 05 93 SD-02 Shop Drawings

1.3.2 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

23 34 23.00 40 SD-02 Shop Drawings

2.1.1 GShop Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GFan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 17 PAGES

23 34 23.00 40 2.2.2 GMotor

2.2.3 GRoof Curbs

SD-06 Test Reports

3.2.3 GFinal Test Reports

SD-11 Closeout Submittals

3.3 GRecord Drawings

26 51 00 SD-02 Shop Drawings

1.5.1 GLuminaire Drawings

SD-03 Product Data

2.2 GLuminaires

2.3 GLight Sources

2.4 GLED Drivers

1.6.1 GLuminaire Warranty

31 00 00 SD-03 Product Data

3.8Utilization of Excavated Materials

3.4Opening of any Excavation or

Borrow Pit

SD-06 Test Reports

2.1Borrow Site Testing

SD-07 Certificates

1.2.3Testing

32 92 19 SD-03 Product Data

2.3Fertilizer

SD-06 Test Reports

2.2.3Topsoil Composition Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 17 PAGES

32 92 19 2.1 GSeed

33 40 00 SD-07 Certificates

3.6.4.2Minimum Density

SD-08 Manufacturer’s Instructions

3.3Placing Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

FA664318DD0006 CONTRACT NO:
CONTRACTOR ACTION:
aRow1:
bRow1:
eSD01 Preconstruction Submittals:
fSD01 Preconstruction Submittals:
gSD01 Preconstruction Submittals:
hSD01 Preconstruction Submittals:
iSD01 Preconstruction Submittals:
jSD01 Preconstruction Submittals:
kSD01 Preconstruction Submittals:
lSD01 Preconstruction Submittals:
mSD01 Preconstruction Submittals:
nSD01 Preconstruction Submittals:
oSD01 Preconstruction Submittals:
pSD01 Preconstruction Submittals:
qSD01 Preconstruction Submittals:
rSD01 Preconstruction Submittals:
aRow2:
bRow2:
01 14 00Row1:
f1211:
g1211:
h1211:
i1211:
j1211:
k1211:
l1211:
m1211:
n1211:
o1211:
p1211:
q1211:
r1211:
aRow3:
bRow3:
01 14 00Row2:
gG:
hG:
iG:
jG:
kG:
lG:
mG:
nG:
oG:
pG:
qG:
rG:
aRow4:
bRow4:
01 14 00Row3:
1212Information Sheet:
GInformation Sheet:
gInformation Sheet:
hInformation Sheet:
iInformation Sheet:
jInformation Sheet:
kInformation Sheet:
lInformation Sheet:
mInformation Sheet:
nInformation Sheet:
oInformation Sheet:
pInformation Sheet:
qInformation Sheet:
rInformation Sheet:
aRow5:
bRow5:
01 14 00Row4:
1212SD06 Test Reports:
GSD06 Test Reports:
gSD06 Test Reports:
hSD06 Test Reports:
iSD06 Test Reports:
jSD06 Test Reports:
kSD06 Test Reports:
lSD06 Test Reports:
mSD06 Test Reports:
nSD06 Test Reports:
oSD06 Test Reports:
pSD06 Test Reports:
qSD06 Test Reports:
rSD06 Test Reports:
aRow6:
bRow6:
01 14 00Row5:
Quarterly Report:
gG_2:
hG_2:
iG_2:
jG_2:
kG_2:
lG_2:
mG_2:
nG_2:
oG_2:
pG_2:
qG_2:
rG_2:
aRow7:
bRow7:
31SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals:
gSD01 Preconstruction Submittals_2:
hSD01 Preconstruction Submittals_2:
iSD01 Preconstruction Submittals_2:
jSD01 Preconstruction Submittals_2:
kSD01 Preconstruction Submittals_2:
lSD01 Preconstruction Submittals_2:
mSD01 Preconstruction Submittals_2:
nSD01 Preconstruction Submittals_2:
oSD01 Preconstruction Submittals_2:
pSD01 Preconstruction Submittals_2:
qSD01 Preconstruction Submittals_2:
rSD01 Preconstruction Submittals_2:
aRow8:
bRow8:
01 30 00Row1:
View Location Map:
G14:
g14:
h14:
i14:
j14:
k14:
l14:
m14:
n14:
o14:
p14:
q14:
r14:
aRow9:
bRow9:
01 30 00Row2:
G15:
g15:
h15:
i15:
j15:
k15:
l15:
m15:
n15:
o15:
p15:
q15:
r15:
aRow10:
bRow10:
01 30 00Row3:
15Pictures:
GPictures:
gPictures:
hPictures:
iPictures:
jPictures:
kPictures:
lPictures:
mPictures:
nPictures:
oPictures:
pPictures:
qPictures:
rPictures:
aRow11:
bRow11:
01 30 00Row4:
15SD04 Samples:
GSD04 Samples:
gSD04 Samples:
hSD04 Samples:
iSD04 Samples:
jSD04 Samples:
kSD04 Samples:
lSD04 Samples:
mSD04 Samples:
nSD04 Samples:
oSD04 Samples:
pSD04 Samples:
qSD04 Samples:
rSD04 Samples:
aRow12:
bRow12:
01 30 00Row5:
Color Boards:
gG_3:
hG_3:
iG_3:
jG_3:
kG_3:
lG_3:
mG_3:
nG_3:
oG_3:
pG_3:
qG_3:
rG_3:
aRow13:
bRow13:
13SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_2:
gSD01 Preconstruction Submittals_3:
hSD01 Preconstruction Submittals_3:
iSD01 Preconstruction Submittals_3:
jSD01 Preconstruction Submittals_3:
kSD01 Preconstruction Submittals_3:
lSD01 Preconstruction Submittals_3:
mSD01 Preconstruction Submittals_3:
nSD01 Preconstruction Submittals_3:
oSD01 Preconstruction Submittals_3:
pSD01 Preconstruction Submittals_3:
qSD01 Preconstruction Submittals_3:
rSD01 Preconstruction Submittals_3:
aRow14:
bRow14:
01 32 1600 20Row1:
gG_4:
hG_4:
iG_4:
jG_4:
kG_4:
lG_4:
mG_4:
nG_4:
oG_4:
pG_4:
qG_4:
rG_4:
aRow15:
bRow15:
01 32 1600 20Row2:
12SD07 Certificates:
GSD07 Certificates:
gSD07 Certificates:
hSD07 Certificates:
iSD07 Certificates:
jSD07 Certificates:
kSD07 Certificates:
lSD07 Certificates:
mSD07 Certificates:
nSD07 Certificates:
oSD07 Certificates:
pSD07 Certificates:
qSD07 Certificates:
rSD07 Certificates:
aRow16:
bRow16:
01 32 1600 20Row3:
Monthly Updates:
G14_2:
g14_2:
h14_2:
i14_2:
j14_2:
k14_2:
l14_2:
m14_2:
n14_2:
o14_2:
p14_2:
q14_2:
r14_2:
aRow17:
bRow17:
14SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_3:
gSD01 Preconstruction Submittals_4:
hSD01 Preconstruction Submittals_4:
iSD01 Preconstruction Submittals_4:
jSD01 Preconstruction Submittals_4:
kSD01 Preconstruction Submittals_4:
lSD01 Preconstruction Submittals_4:
mSD01 Preconstruction Submittals_4:
nSD01 Preconstruction Submittals_4:
oSD01 Preconstruction Submittals_4:
pSD01 Preconstruction Submittals_4:
qSD01 Preconstruction Submittals_4:
rSD01 Preconstruction Submittals_4:
aRow18:
bRow18:
01 33 00Row1:
Submittal Register:
gG_5:
hG_5:
iG_5:
jG_5:
kG_5:
lG_5:
mG_5:
nG_5:
oG_5:
pG_5:
qG_5:
rG_5:
aRow19:
bRow19:
17SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_4:
gSD01 Preconstruction Submittals_5:
hSD01 Preconstruction Submittals_5:
iSD01 Preconstruction Submittals_5:
jSD01 Preconstruction Submittals_5:
kSD01 Preconstruction Submittals_5:
lSD01 Preconstruction Submittals_5:
mSD01 Preconstruction Submittals_5:
nSD01 Preconstruction Submittals_5:
oSD01 Preconstruction Submittals_5:
pSD01 Preconstruction Submittals_5:
qSD01 Preconstruction Submittals_5:
rSD01 Preconstruction Submittals_5:
aRow20:
bRow20:
01 35 26Row1:
APP Construction:
161:
gG_6:
hG_6:
iG_6:
jG_6:
kG_6:
lG_6:
mG_6:
nG_6:
oG_6:
pG_6:
qG_6:
rG_6:
aRow21:
bRow21:
01 35 26Row2:
gG_7:
hG_7:
iG_7:
jG_7:
kG_7:
lG_7:
mG_7:
nG_7:
oG_7:
pG_7:
qG_7:
rG_7:
aRow22:
bRow22:
01 35 26Row3:
16SD06 Test Reports:
GSD06 Test Reports_2:
gSD06 Test Reports_2:
hSD06 Test Reports_2:
iSD06 Test Reports_2:
jSD06 Test Reports_2:
kSD06 Test Reports_2:
lSD06 Test Reports_2:
mSD06 Test Reports_2:
nSD06 Test Reports_2:
oSD06 Test Reports_2:
pSD06 Test Reports_2:
qSD06 Test Reports_2:
rSD06 Test Reports_2:
aRow23:
bRow23:
01 35 26Row4:
G111:
g111:
h111:
i111:
j111:
k111:
l111:
m111:
n111:
o111:
p111:
q111:
r111:
aRow24:
bRow24:
01 35 26Row5:
Accident Reports:
gG_8:
hG_8:
iG_8:
jG_8:
kG_8:
lG_8:
mG_8:
nG_8:
oG_8:
pG_8:
qG_8:
rG_8:
aRow25:
bRow25:
01 35 26Row6:
G1113:
g1113:
h1113:
i1113:
j1113:
k1113:
l1113:
m1113:
n1113:
o1113:
p1113:
q1113:
r1113:
aRow26:
bRow26:
01 35 26Row7:
1113SD07 Certificates:
GSD07 Certificates_2:
gSD07 Certificates_2:
hSD07 Certificates_2:
iSD07 Certificates_2:
jSD07 Certificates_2:
kSD07 Certificates_2:
lSD07 Certificates_2:
mSD07 Certificates_2:
nSD07 Certificates_2:
oSD07 Certificates_2:
pSD07 Certificates_2:
qSD07 Certificates_2:
rSD07 Certificates_2:
FA664318DD0006 CONTRACT NO_2:
CONTRACTOR ACTION_2:
aRow1_2:
bRow1_2:
f17:
g17:
h17:
i17:
j17:
k17:
l17:
m17:
n17:
o17:
p17:
q17:
r17:
aRow2_2:
bRow2_2:
01 35 26Row1_2:
f181:
g181:
h181:
i181:
j181:
k181:
l181:
m181:
n181:
o181:
p181:
q181:
r181:
aRow3_2:
bRow3_2:
01 35 26Row2_2:
Hot Work Permit:
f181_2:
g181_2:
h181_2:
i181_2:
j181_2:
k181_2:
l181_2:
m181_2:
n181_2:
o181_2:
p181_2:
q181_2:
r181_2:
aRow4_2:
bRow4_2:
181SD01 Preconstruction Submittals:
fSD01 Preconstruction Submittals_2:
gSD01 Preconstruction Submittals_6:
hSD01 Preconstruction Submittals_6:
iSD01 Preconstruction Submittals_6:
jSD01 Preconstruction Submittals_6:
kSD01 Preconstruction Submittals_6:
lSD01 Preconstruction Submittals_6:
mSD01 Preconstruction Submittals_6:
nSD01 Preconstruction Submittals_6:
oSD01 Preconstruction Submittals_6:
pSD01 Preconstruction Submittals_6:
qSD01 Preconstruction Submittals_6:
rSD01 Preconstruction Submittals_6:
aRow5_2:
bRow5_2:
01 45 0010 20Row1:
QC Plan:
gG_9:
hG_9:
iG_9:
jG_9:
kG_9:
lG_9:
mG_9:
nG_9:
oG_9:
pG_9:
qG_9:
rG_9:
aRow6_2:
bRow6_2:
16SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_5:
gSD01 Preconstruction Submittals_7:
hSD01 Preconstruction Submittals_7:
iSD01 Preconstruction Submittals_7:
jSD01 Preconstruction Submittals_7:
kSD01 Preconstruction Submittals_7:
lSD01 Preconstruction Submittals_7:
mSD01 Preconstruction Submittals_7:
nSD01 Preconstruction Submittals_7:
oSD01 Preconstruction Submittals_7:
pSD01 Preconstruction Submittals_7:
qSD01 Preconstruction Submittals_7:
rSD01 Preconstruction Submittals_7:
aRow7_2:
bRow7_2:
01 50 00Row1:
Construction Site Plan:
13:
gG_10:
hG_10:
iG_10:
jG_10:
kG_10:
lG_10:
mG_10:
nG_10:
oG_10:
pG_10:
qG_10:
rG_10:
aRow8_2:
bRow8_2:
01 50 00Row2:
Traffic Control Plan:
G331:
g331:
h331:
i331:
j331:
k331:
l331:
m331:
n331:
o331:
p331:
q331:
r331:
aRow9_2:
bRow9_2:
01 50 00Row3:
Haul Road Plan:
G221:
g221:
h221:
i221:
j221:
k221:
l221:
m221:
n221:
o221:
p221:
q221:
r221:
aRow10_2:
bRow10_2:
01 50 00Row4:
Contractor Computer:
G1614:
g1614:
h1614:
i1614:
j1614:
k1614:
l1614:
m1614:
n1614:
o1614:
p1614:
q1614:
r1614:
aRow11_2:
bRow11_2:
01 50 00Row5:
1614Cybersecurity Compliance:
GCybersecurity Compliance:
gCybersecurity Compliance:
hCybersecurity Compliance:
iCybersecurity Compliance:
jCybersecurity Compliance:
kCybersecurity Compliance:
lCybersecurity Compliance:
mCybersecurity Compliance:
nCybersecurity Compliance:
oCybersecurity Compliance:
pCybersecurity Compliance:
qCybersecurity Compliance:
rCybersecurity Compliance:
aRow12_2:
bRow12_2:
01 50 00Row6:
1614Statements:
GStatements:
gStatements:
hStatements:
iStatements:
jStatements:
kStatements:
lStatements:
mStatements:
nStatements:
oStatements:
pStatements:
qStatements:
rStatements:
aRow13_2:
bRow13_2:
01 50 00Row7:
G166:
g166:
h166:
i166:
j166:
k166:
l166:
m166:
n166:
o166:
p166:
q166:
r166:
aRow14_2:
bRow14_2:
01 50 00Row8:
166Cybersecurity Compliance:
GCybersecurity Compliance_2:
gCybersecurity Compliance_2:
hCybersecurity Compliance_2:
iCybersecurity Compliance_2:
jCybersecurity Compliance_2:
kCybersecurity Compliance_2:
lCybersecurity Compliance_2:
mCybersecurity Compliance_2:
nCybersecurity Compliance_2:
oCybersecurity Compliance_2:
pCybersecurity Compliance_2:
qCybersecurity Compliance_2:
rCybersecurity Compliance_2:
aRow15_2:
bRow15_2:
01 50 00Row9:
166Statements:
GStatements_2:
gStatements_2:
hStatements_2:
iStatements_2:
jStatements_2:
kStatements_2:
lStatements_2:
mStatements_2:
nStatements_2:
oStatements_2:
pStatements_2:
qStatements_2:
rStatements_2:
aRow16_2:
bRow16_2:
01 50 00Row10:
166SD07 Certificates:
GSD07 Certificates_3:
gSD07 Certificates_3:
hSD07 Certificates_3:
iSD07 Certificates_3:
jSD07 Certificates_3:
kSD07 Certificates_3:
lSD07 Certificates_3:
mSD07 Certificates_3:
nSD07 Certificates_3:
oSD07 Certificates_3:
pSD07 Certificates_3:
qSD07 Certificates_3:
rSD07 Certificates_3:
aRow17_2:
bRow17_2:
01 50 00Row11:
Backflow Tester:
G141:
g141:
h141:
i141:
j141:
k141:
l141:
m141:
n141:
o141:
p141:
q141:
r141:
aRow18_2:
bRow18_2:
01 50 00Row12:
Backflow Preventers:
G14_3:
g14_3:
h14_3:
i14_3:
j14_3:
k14_3:
l14_3:
m14_3:
n14_3:
o14_3:
p14_3:
q14_3:
r14_3:
aRow19_2:
bRow19_2:
14SD01 Preconstruction Submittals_2:
GSD01 Preconstruction Submittals_6:
gSD01 Preconstruction Submittals_8:
hSD01 Preconstruction Submittals_8:
iSD01 Preconstruction Submittals_8:
jSD01 Preconstruction Submittals_8:
kSD01 Preconstruction Submittals_8:
lSD01 Preconstruction Submittals_8:
mSD01 Preconstruction Submittals_8:
nSD01 Preconstruction Submittals_8:
oSD01 Preconstruction Submittals_8:
pSD01 Preconstruction Submittals_8:
qSD01 Preconstruction Submittals_8:
rSD01 Preconstruction Submittals_8:
aRow20_2:
bRow20_2:
01 57 19Row1:
151:
gG_11:
hG_11:
iG_11:
jG_11:
kG_11:
lG_11:
mG_11:
nG_11:
oG_11:
pG_11:
qG_11:
rG_11:
aRow21_2:
bRow21_2:
01 57 19Row2:
153:
gG_12:
hG_12:
iG_12:
jG_12:
kG_12:
lG_12:
mG_12:
nG_12:
oG_12:
pG_12:
qG_12:
rG_12:
aRow22_2:
bRow22_2:
01 57 19Row3:
16:
gG_13:
hG_13:
iG_13:
jG_13:
kG_13:
lG_13:
mG_13:
nG_13:
oG_13:
pG_13:
qG_13:
rG_13:
aRow23_2:
bRow23_2:
01 57 19Row4:
gG_14:
hG_14:
iG_14:
jG_14:
kG_14:
lG_14:
mG_14:
nG_14:
oG_14:
pG_14:
qG_14:
rG_14:
aRow24_2:
bRow24_2:
01 57 19Row5:
gG_15:
hG_15:
iG_15:
jG_15:
kG_15:
lG_15:
mG_15:
nG_15:
oG_15:
pG_15:
qG_15:
rG_15:
aRow25_2:
bRow25_2:
01 57 19Row6:
19SD06 Test Reports:
GSD06 Test Reports_3:
gSD06 Test Reports_3:
hSD06 Test Reports_3:
iSD06 Test Reports_3:
jSD06 Test Reports_3:
kSD06 Test Reports_3:
lSD06 Test Reports_3:
mSD06 Test Reports_3:
nSD06 Test Reports_3:
oSD06 Test Reports_3:
pSD06 Test Reports_3:
qSD06 Test Reports_3:
rSD06 Test Reports_3:
aRow26_2:
bRow26_2:
01 57 19Row7:
SD06 Test ReportsRow1:
19Row2:
GRow2:
gRow26:
hRow26:
iRow26:
jRow26:
kRow26:
lRow26:
mRow26:
nRow26:
oRow26:
pRow26:
qRow26:
rRow26:
FA664318DD0006 CONTRACT NO_3:
CONTRACTOR ACTION_3:
aRow1_3:
bRow1_3:
gG_16:
hG_16:
iG_16:
jG_16:
kG_16:
lG_16:
mG_16:
nG_16:
oG_16:
pG_16:
qG_16:
rG_16:
aRow2_3:
bRow2_3:
01 57 19Row1_2:
191Report:
GReport:
gReport:
hReport:
iReport:
jReport:
kReport:
lReport:
mReport:
nReport:
oReport:
pReport:
qReport:
rReport:
aRow3_3:
bRow3_3:
01 57 19Row2_2:
191SD07 Certificates:
GSD07 Certificates_4:
gSD07 Certificates_4:
hSD07 Certificates_4:
iSD07 Certificates_4:
jSD07 Certificates_4:
kSD07 Certificates_4:
lSD07 Certificates_4:
mSD07 Certificates_4:
nSD07 Certificates_4:
oSD07 Certificates_4:
pSD07 Certificates_4:
qSD07 Certificates_4:
rSD07 Certificates_4:
aRow4_3:
bRow4_3:
01 57 19Row3_2:
gG_17:
hG_17:
iG_17:
jG_17:
kG_17:
lG_17:
mG_17:
nG_17:
oG_17:
pG_17:
qG_17:
rG_17:
aRow5_3:
bRow5_3:
01 57 19Row4_2:
153SD11 Closeout Submittals:
GSD11 Closeout Submittals:
gSD11 Closeout Submittals:
hSD11 Closeout Submittals:
iSD11 Closeout Submittals:
jSD11 Closeout Submittals:
kSD11 Closeout Submittals:
lSD11 Closeout Submittals:
mSD11 Closeout Submittals:
nSD11 Closeout Submittals:
oSD11 Closeout Submittals:
pSD11 Closeout Submittals:
qSD11 Closeout Submittals:
rSD11 Closeout Submittals:
aRow6_3:
bRow6_3:
01 57 19Row5_2:
151_2:
gG_18:
hG_18:
iG_18:
jG_18:
kG_18:
lG_18:
mG_18:
nG_18:
oG_18:
pG_18:
qG_18:
rG_18:
aRow7_3:
bRow7_3:
01 57 19Row6_2:
gG_19:
hG_19:
iG_19:
jG_19:
kG_19:
lG_19:
mG_19:
nG_19:
oG_19:
pG_19:
qG_19:
rG_19:
aRow8_3:
bRow8_3:
01 57 19Row7_2:
153Records:
GRecords:
gRecords:
hRecords:
iRecords:
jRecords:
kRecords:
lRecords:
mRecords:
nRecords:
oRecords:
pRecords:
qRecords:
rRecords:
aRow9_3:
bRow9_3:
01 57 19Row8:
gG_20:
hG_20:
iG_20:
jG_20:
kG_20:
lG_20:
mG_20:
nG_20:
oG_20:
pG_20:
qG_20:
rG_20:
aRow10_3:
bRow10_3:
01 57 19Row9:
19Waste Determination:
gG_21:
hG_21:
iG_21:
jG_21:
kG_21:
lG_21:
mG_21:
nG_21:
oG_21:
pG_21:
qG_21:
rG_21:
aRow11_3:
bRow11_3:
01 57 19Row10:
19Documentation:
GDocumentation:
gDocumentation:
hDocumentation:
iDocumentation:
jDocumentation:
kDocumentation:
lDocumentation:
mDocumentation:
nDocumentation:
oDocumentation:
pDocumentation:
qDocumentation:
rDocumentation:
aRow12_3:
bRow12_3:
01 57 19Row11:
gG_22:
hG_22:
iG_22:
jG_22:
kG_22:
lG_22:
mG_22:
nG_22:
oG_22:
pG_22:
qG_22:
rG_22:
aRow13_3:
bRow13_3:
01 57 19Row12:
3511Documentation Report:
GDocumentation Report:
gDocumentation Report:
hDocumentation Report:
iDocumentation Report:
jDocumentation Report:
kDocumentation Report:
lDocumentation Report:
mDocumentation Report:
nDocumentation Report:
oDocumentation Report:
pDocumentation Report:
qDocumentation Report:
rDocumentation Report:
aRow14_3:
bRow14_3:
01 57 19Row13:
G3511:
g3511:
h3511:
i3511:
j3511:
k3511:
l3511:
m3511:
n3511:
o3511:
p3511:
q3511:
r3511:
aRow15_3:
bRow15_3:
01 57 19Row14:
gG_23:
hG_23:
iG_23:
jG_23:
kG_23:
lG_23:
mG_23:
nG_23:
oG_23:
pG_23:
qG_23:
rG_23:
aRow16_3:
bRow16_3:
01 57 19Row15:
3521Management:
GManagement:
gManagement:
hManagement:
iManagement:
jManagement:
kManagement:
lManagement:
mManagement:
nManagement:
oManagement:
pManagement:
qManagement:
rManagement:
aRow17_3:
bRow17_3:
01 57 19Row16:
gG_24:
hG_24:
iG_24:
jG_24:
kG_24:
lG_24:
mG_24:
nG_24:
oG_24:
pG_24:
qG_24:
rG_24:
aRow18_3:
bRow18_3:
01 57 19Row17:
3524:
G:
g:
h:
i:
j:
k:
l:
m:
n:
o:
p:
q:
r:
aRow19_3:
bRow19_3:
3524SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_7:
gSD01 Preconstruction Submittals_9:
hSD01 Preconstruction Submittals_9:
iSD01 Preconstruction Submittals_9:
jSD01 Preconstruction Submittals_9:
kSD01 Preconstruction Submittals_9:
lSD01 Preconstruction Submittals_9:
mSD01 Preconstruction Submittals_9:
nSD01 Preconstruction Submittals_9:
oSD01 Preconstruction Submittals_9:
pSD01 Preconstruction Submittals_9:
qSD01 Preconstruction Submittals_9:
rSD01 Preconstruction Submittals_9:
aRow20_3:
bRow20_3:
01 74 19Row1:
gG_25:
hG_25:
iG_25:
jG_25:
kG_25:
lG_25:
mG_25:
nG_25:
oG_25:
pG_25:
qG_25:
rG_25:
aRow21_3:
bRow21_3:
01 74 19Row2:
16Plan:
GPlan:
gPlan:
hPlan:
iPlan:
jPlan:
kPlan:
lPlan:
mPlan:
nPlan:
oPlan:
pPlan:
qPlan:
rPlan:
aRow22_3:
bRow22_3:
01 74 19Row3:
16SD06 Test Reports_2:
GSD06 Test Reports_4:
gSD06 Test Reports_4:
hSD06 Test Reports_4:
iSD06 Test Reports_4:
jSD06 Test Reports_4:
kSD06 Test Reports_4:
lSD06 Test Reports_4:
mSD06 Test Reports_4:
nSD06 Test Reports_4:
oSD06 Test Reports_4:
pSD06 Test Reports_4:
qSD06 Test Reports_4:
rSD06 Test Reports_4:
aRow23_3:
bRow23_3:
01 74 19Row4:
Annual Report:
G183:
g183:
h183:
i183:
j183:
k183:
l183:
m183:
n183:
o183:
p183:
q183:
r183:
aRow24_3:
bRow24_3:
01 74 19Row5:
439 AW Form 20:
134:
gG_26:
hG_26:
iG_26:
jG_26:
kG_26:
lG_26:
mG_26:
nG_26:
oG_26:
pG_26:
qG_26:
rG_26:
aRow25_3:
bRow25_3:
01 74 19Row6:
gG_27:
hG_27:
iG_27:
jG_27:
kG_27:
lG_27:
mG_27:
nG_27:
oG_27:
pG_27:
qG_27:
rG_27:
aRow26_3:
bRow26_3:
01 74 19Row7:
Quarterly ReportsRow1:
182Row1:
GRow1:
gRow26_2:
hRow26_2:
iRow26_2:
jRow26_2:
kRow26_2:
lRow26_2:
mRow26_2:
nRow26_2:
oRow26_2:
pRow26_2:
qRow26_2:
rRow26_2:
FA664318DD0006 CONTRACT NO_4:
CONTRACTOR ACTION_4:
aRow1_4:
bRow1_4:
gG_28:
hG_28:
iG_28:
jG_28:
kG_28:
lG_28:
mG_28:
nG_28:
oG_28:
pG_28:
qG_28:
rG_28:
aRow2_4:
bRow2_4:
01 74 19Row1_2:
182Report:
GReport_2:
gReport_2:
hReport_2:
iReport_2:
jReport_2:
kReport_2:
lReport_2:
mReport_2:
nReport_2:
oReport_2:
pReport_2:
qReport_2:
rReport_2:
aRow3_4:
bRow3_4:
01 74 19Row2_2:
182SD11 Closeout Submittals:
GSD11 Closeout Submittals_2:
gSD11 Closeout Submittals_2:
hSD11 Closeout Submittals_2:
iSD11 Closeout Submittals_2:
jSD11 Closeout Submittals_2:
kSD11 Closeout Submittals_2:
lSD11 Closeout Submittals_2:
mSD11 Closeout Submittals_2:
nSD11 Closeout Submittals_2:
oSD11 Closeout Submittals_2:
pSD11 Closeout Submittals_2:
qSD11 Closeout Submittals_2:
rSD11 Closeout Submittals_2:
aRow4_4:
bRow4_4:
01 74 19Row3_2:
gG_29:
hG_29:
iG_29:
jG_29:
kG_29:
lG_29:
mG_29:
nG_29:
oG_29:
pG_29:
qG_29:
rG_29:
aRow5_4:
bRow5_4:
01 74 19Row4_2:
19Diversion Report:
GDiversion Report:
gDiversion Report:
hDiversion Report:
iDiversion Report:
jDiversion Report:
kDiversion Report:
lDiversion Report:
mDiversion Report:
nDiversion Report:
oDiversion Report:
pDiversion Report:
qDiversion Report:
rDiversion Report:
aRow6_4:
bRow6_4:
19SD03 Product Data:
GSD03 Product Data:
gSD03 Product Data:
hSD03 Product Data:
iSD03 Product Data:
jSD03 Product Data:
kSD03 Product Data:
lSD03 Product Data:
mSD03 Product Data:
nSD03 Product Data:
oSD03 Product Data:
pSD03 Product Data:
qSD03 Product Data:
rSD03 Product Data:
aRow7_4:
bRow7_4:
01 78 00Row1:
Warranty Tags:
G144:
g144:
h144:
i144:
j144:
k144:
l144:
m144:
n144:
o144:
p144:
q144:
r144:
aRow8_4:
bRow8_4:
01 78 00Row2:
gG_30:
hG_30:
iG_30:
jG_30:
kG_30:
lG_30:
mG_30:
nG_30:
oG_30:
pG_30:
qG_30:
rG_30:
aRow9_4:
bRow9_4:
01 78 00Row3:
141SD08 Manufacturers Instructions:
GSD08 Manufacturers Instructions:
gSD08 Manufacturers Instructions:
hSD08 Manufacturers Instructions:
iSD08 Manufacturers Instructions:
jSD08 Manufacturers Instructions:
kSD08 Manufacturers Instructions:
lSD08 Manufacturers Instructions:
mSD08 Manufacturers Instructions:
nSD08 Manufacturers Instructions:
oSD08 Manufacturers Instructions:
pSD08 Manufacturers Instructions:
qSD08 Manufacturers Instructions:
rSD08 Manufacturers Instructions:
aRow10_4:
bRow10_4:
01 78 00Row4:
Instructions:
G141_2:
g141_2:
h141_2:
i141_2:
j141_2:
k141_2:
l141_2:
m141_2:
n141_2:
o141_2:
p141_2:
q141_2:
r141_2:
aRow11_4:
bRow11_4:
01 78 00Row5:
141SD10 Operation and Maintenance:
GSD10 Operation and Maintenance:
gSD10 Operation and Maintenance:
hSD10 Operation and Maintenance:
iSD10 Operation and Maintenance:
jSD10 Operation and Maintenance:
kSD10 Operation and Maintenance:
lSD10 Operation and Maintenance:
mSD10 Operation and Maintenance:
nSD10 Operation and Maintenance:
oSD10 Operation and Maintenance:
pSD10 Operation and Maintenance:
qSD10 Operation and Maintenance:
rSD10 Operation and Maintenance:
aRow12_4:
bRow12_4:
01 78 00Row6:
141Data:
GData:
gData:
hData:
iData:
jData:
kData:
lData:
mData:
nData:
oData:
pData:
qData:
rData:
aRow13_4:
bRow13_4:
01 78 00Row7:
gG_31:
hG_31:
iG_31:
jG_31:
kG_31:
lG_31:
mG_31:
nG_31:
oG_31:
pG_31:
qG_31:
rG_31:
aRow14_4:
bRow14_4:
01 78 00Row8:
32Manuals:
GManuals:
gManuals:
hManuals:
iManuals:
jManuals:
kManuals:
lManuals:
mManuals:
nManuals:
oManuals:
pManuals:
qManuals:
rManuals:
aRow15_4:
bRow15_4:
01 78 00Row9:
32SD11 Closeout Submittals:
GSD11 Closeout Submittals_3:
gSD11 Closeout Submittals_3:
hSD11 Closeout Submittals_3:
iSD11 Closeout Submittals_3:
jSD11 Closeout Submittals_3:
kSD11 Closeout Submittals_3:
lSD11 Closeout Submittals_3:
mSD11 Closeout Submittals_3:
nSD11 Closeout Submittals_3:
oSD11 Closeout Submittals_3:
pSD11 Closeout Submittals_3:
qSD11 Closeout Submittals_3:
rSD11 Closeout Submittals_3:
aRow16_4:
bRow16_4:
01 78 00Row10:
AsBuilt Drawings:
31:
gG_32:
hG_32:
iG_32:
jG_32:
kG_32:
lG_32:
mG_32:
nG_32:
oG_32:
pG_32:
qG_32:
rG_32:
aRow17_4:
bRow17_4:
01 78 00Row11:
Record Drawings:
112:
gG_33:
hG_33:
iG_33:
jG_33:
kG_33:
lG_33:
mG_33:
nG_33:
oG_33:
pG_33:
qG_33:
rG_33:
aRow18_4:
bRow18_4:
01 78 00Row12:
gG_34:
hG_34:
iG_34:
jG_34:
kG_34:
lG_34:
mG_34:
nG_34:
oG_34:
pG_34:
qG_34:
rG_34:
aRow19_4:
bRow19_4:
01 78 00Row13:
141And Materials:
GAnd Materials:
gAnd Materials:
hAnd Materials:
iAnd Materials:
jAnd Materials:
kAnd Materials:
lAnd Materials:
mAnd Materials:
nAnd Materials:
oAnd Materials:
pAnd Materials:
qAnd Materials:
rAnd Materials:
aRow20_4:
bRow20_4:
01 78 00Row14:
gG_35:
hG_35:
iG_35:
jG_35:
kG_35:
lG_35:
mG_35:
nG_35:
oG_35:
pG_35:
qG_35:
rG_35:
aRow21_4:
bRow21_4:
01 78 00Row15:
21Items:
GItems:
gItems:
hItems:
iItems:
jItems:
kItems:
lItems:
mItems:
nItems:
oItems:
pItems:
qItems:
rItems:
aRow22_4:
bRow22_4:
21SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_8:
gSD01 Preconstruction Submittals_10:
hSD01 Preconstruction Submittals_10:
iSD01 Preconstruction Submittals_10:
jSD01 Preconstruction Submittals_10:
kSD01 Preconstruction Submittals_10:
lSD01 Preconstruction Submittals_10:
mSD01 Preconstruction Submittals_10:
nSD01 Preconstruction Submittals_10:
oSD01 Preconstruction Submittals_10:
pSD01 Preconstruction Submittals_10:
qSD01 Preconstruction Submittals_10:
rSD01 Preconstruction Submittals_10:
aRow23_4:
bRow23_4:
02 41 00Row1:
Demolition Plan:
122:
gG_36:
hG_36:
iG_36:
jG_36:
kG_36:
lG_36:
mG_36:
nG_36:
oG_36:
pG_36:
qG_36:
rG_36:
aRow24_4:
bRow24_4:
02 41 00Row2:
Deconstruction Plan:
gG_37:
hG_37:
iG_37:
jG_37:
kG_37:
lG_37:
mG_37:
nG_37:
oG_37:
pG_37:
qG_37:
rG_37:
aRow25_4:
bRow25_4:
02 41 00Row3:
Existing Conditions:
G110:
g110:
h110:
i110:
j110:
k110:
l110:
m110:
n110:
o110:
p110:
q110:
r110:
aRow26_4:
bRow26_4:
02 41 00Row4:
110SD07 Certificates:
GSD07 Certificates_5:
gSD07 Certificates_5:
hSD07 Certificates_5:
iSD07 Certificates_5:
jSD07 Certificates_5:
kSD07 Certificates_5:
lSD07 Certificates_5:
mSD07 Certificates_5:
nSD07 Certificates_5:
oSD07 Certificates_5:
pSD07 Certificates_5:
qSD07 Certificates_5:
rSD07 Certificates_5:
FA664318DD0006 CONTRACT NO_5:
CONTRACTOR ACTION_5:
aRow1_5:
bRow1_5:
02 41 00:
Notification:
gG_38:
hG_38:
iG_38:
jG_38:
kG_38:
lG_38:
mG_38:
nG_38:
oG_38:
pG_38:
qG_38:
rG_38:
aRow2_5:
bRow2_5:
17SD03 Product Data:
GSD03 Product Data_2:
gSD03 Product Data_2:
hSD03 Product Data_2:
iSD03 Product Data_2:
jSD03 Product Data_2:
kSD03 Product Data_2:
lSD03 Product Data_2:
mSD03 Product Data_2:
nSD03 Product Data_2:
oSD03 Product Data_2:
pSD03 Product Data_2:
qSD03 Product Data_2:
rSD03 Product Data_2:
aRow3_5:
bRow3_5:
02 82 00Row1:
Amended Water:
G122:
g122:
h122:
i122:
j122:
k122:
l122:
m122:
n122:
o122:
p122:
q122:
r122:
aRow4_5:
bRow4_5:
02 82 00Row2:
G_2:
g_2:
h_2:
i_2:
j_2:
k_2:
l_2:
m_2:
n_2:
o_2:
p_2:
q_2:
r_2:
aRow5_5:
bRow5_5:
02 82 00Row3:
Materials:
GMaterials:
gMaterials:
hMaterials:
iMaterials:
jMaterials:
kMaterials:
lMaterials:
mMaterials:
nMaterials:
oMaterials:
pMaterials:
qMaterials:
rMaterials:
aRow6_5:
bRow6_5:
02 82 00Row4:
Respirators:
G3111:
g3111:
h3111:
i3111:
j3111:
k3111:
l3111:
m3111:
n3111:
o3111:
p3111:
q3111:
r3111:
aRow7_5:
bRow7_5:
02 82 00Row5:
Vacuums:
G317:
g317:
h317:
i317:
j317:
k317:
l317:
m317:
n317:
o317:
p317:
q317:
r317:
aRow8_5:
bRow8_5:
02 82 00Row6:
Glovebags:
G319:
g319:
h319:
i319:
j319:
k319:
l319:
m319:
n319:
o319:
p319:
q319:
r319:
aRow9_5:
bRow9_5:
02 82 00Row7:
319SD06 Test Reports:
GSD06 Test Reports_5:
gSD06 Test Reports_5:
hSD06 Test Reports_5:
iSD06 Test Reports_5:
jSD06 Test Reports_5:
kSD06 Test Reports_5:
lSD06 Test Reports_5:
mSD06 Test Reports_5:
nSD06 Test Reports_5:
oSD06 Test Reports_5:
pSD06 Test Reports_5:
qSD06 Test Reports_5:
rSD06 Test Reports_5:
aRow10_5:
bRow10_5:
02 82 00Row8:
Clearance Sampling:
gG_39:
hG_39:
iG_39:
jG_39:
kG_39:
lG_39:
mG_39:
nG_39:
oG_39:
pG_39:
qG_39:
rG_39:
aRow11_5:
bRow11_5:
02 82 00Row9:
gG_40:
hG_40:
iG_40:
jG_40:
kG_40:
lG_40:
mG_40:
nG_40:
oG_40:
pG_40:
qG_40:
rG_40:
aRow12_5:
bRow12_5:
02 82 00Row10:
3332Report:
GReport_3:
gReport_3:
hReport_3:
iReport_3:
jReport_3:
kReport_3:
lReport_3:
mReport_3:
nReport_3:
oReport_3:
pReport_3:
qReport_3:
rReport_3:
aRow13_5:
bRow13_5:
02 82 00Row11:
3332SD07 Certificates:
GSD07 Certificates_6:
gSD07 Certificates_6:
hSD07 Certificates_6:
iSD07 Certificates_6:
jSD07 Certificates_6:
kSD07 Certificates_6:
lSD07 Certificates_6:
mSD07 Certificates_6:
nSD07 Certificates_6:
oSD07 Certificates_6:
pSD07 Certificates_6:
qSD07 Certificates_6:
rSD07 Certificates_6:
aRow14_5:
bRow14_5:
02 82 00Row12:
Employee Training:
134_2:
gG_41:
hG_41:
iG_41:
jG_41:
kG_41:
lG_41:
mG_41:
nG_41:
oG_41:
pG_41:
qG_41:
rG_41:
aRow15_5:
bRow15_5:
02 82 00Row13:
Notifications:
135:
gG_42:
hG_42:
iG_42:
jG_42:
kG_42:
lG_42:
mG_42:
nG_42:
oG_42:
pG_42:
qG_42:
rG_42:
aRow16_5:
bRow16_5:
02 82 00Row14:
137:
gG_43:
hG_43:
iG_43:
jG_43:
kG_43:
lG_43:
mG_43:
nG_43:
oG_43:
pG_43:
qG_43:
rG_43:
aRow17_5:
bRow17_5:
02 82 00Row15:
gG_44:
hG_44:
iG_44:
jG_44:
kG_44:
lG_44:
mG_44:
nG_44:
oG_44:
pG_44:
qG_44:
rG_44:
aRow18_5:
bRow18_5:
02 82 00Row16:
Testing Laboratory:
gG_45:
hG_45:
iG_45:
jG_45:
kG_45:
lG_45:
mG_45:
nG_45:
oG_45:
pG_45:
qG_45:
rG_45:
aRow19_5:
bRow19_5:
02 82 00Row17:
Landfill Approval:
gG_46:
hG_46:
iG_46:
jG_46:
kG_46:
lG_46:
mG_46:
nG_46:
oG_46:
pG_46:
qG_46:
rG_46:
aRow20_5:
bRow20_5:
02 82 00Row18:
Delivery Tickets:
gG_47:
hG_47:
iG_47:
jG_47:
kG_47:
lG_47:
mG_47:
nG_47:
oG_47:
pG_47:
qG_47:
rG_47:
aRow21_5:
bRow21_5:
02 82 00Row19:
gG_48:
hG_48:
iG_48:
jG_48:
kG_48:
lG_48:
mG_48:
nG_48:
oG_48:
pG_48:
qG_48:
rG_48:
aRow22_5:
bRow22_5:
02 82 00Row20:
gG_49:
hG_49:
iG_49:
jG_49:
kG_49:
lG_49:
mG_49:
nG_49:
oG_49:
pG_49:
qG_49:
rG_49:
aRow23_5:
bRow23_5:
02 82 00Row21:
Medical Certification:
gG_50:
hG_50:
iG_50:
jG_50:
kG_50:
lG_50:
mG_50:
nG_50:
oG_50:
pG_50:
qG_50:
rG_50:
aRow24_5:
bRow24_5:
02 82 00Row22:
gG_51:
hG_51:
iG_51:
jG_51:
kG_51:
lG_51:
mG_51:
nG_51:
oG_51:
pG_51:
qG_51:
rG_51:
aRow25_5:
bRow25_5:
02 82 00Row23:
151Documentation:
GDocumentation_2:
gDocumentation_2:
hDocumentation_2:
iDocumentation_2:
jDocumentation_2:
kDocumentation_2:
lDocumentation_2:
mDocumentation_2:
nDocumentation_2:
oDocumentation_2:
pDocumentation_2:
qDocumentation_2:
rDocumentation_2:
aRow26_5:
bRow26_5:
02 82 00Row24:
G152:
g152:
h152:
i152:
j152:
k152:
l152:
m152:
n152:
o152:
p152:
q152:
r152:
FA664318DD0006 CONTRACT NO_6:
CONTRACTOR ACTION_6:
aRow1_6:
bRow1_6:
Workers License:
153_2:
gG_52:
hG_52:
iG_52:
jG_52:
kG_52:
lG_52:
mG_52:
nG_52:
oG_52:
pG_52:
qG_52:
rG_52:
aRow2_6:
bRow2_6:
02 82 00Row1_2:
Contractors License:
154:
gG_53:
hG_53:
iG_53:
jG_53:
kG_53:
lG_53:
mG_53:
nG_53:
oG_53:
pG_53:
qG_53:
rG_53:
aRow3_6:
bRow3_6:
02 82 00Row2_2:
G159:
g159:
h159:
i159:
j159:
k159:
l159:
m159:
n159:
o159:
p159:
q159:
r159:
aRow4_6:
bRow4_6:
02 82 00Row3_2:
159on Previous Projects:
Gon Previous Projects:
gon Previous Projects:
hon Previous Projects:
ion Previous Projects:
jon Previous Projects:
kon Previous Projects:
lon Previous Projects:
mon Previous Projects:
non Previous Projects:
oon Previous Projects:
pon Previous Projects:
qon Previous Projects:
ron Previous Projects:
aRow5_6:
bRow5_6:
02 82 00Row4_2:
Encapsulates:
G21:
g21:
h21:
i21:
j21:
k21:
l21:
m21:
n21:
o21:
p21:
q21:
r21:
aRow6_6:
bRow6_6:
02 82 00Row5_2:
G31:
g31:
h31:
i31:
j31:
k31:
l31:
m31:
n31:
o31:
p31:
q31:
r31:
aRow7_6:
bRow7_6:
02 82 00Row6_2:
31Airborne Asbestos Fibers:
GAirborne Asbestos Fibers:
gAirborne Asbestos Fibers:
hAirborne Asbestos Fibers:
iAirborne Asbestos Fibers:
jAirborne Asbestos Fibers:
kAirborne Asbestos Fibers:
lAirborne Asbestos Fibers:
mAirborne Asbestos Fibers:
nAirborne Asbestos Fibers:
oAirborne Asbestos Fibers:
pAirborne Asbestos Fibers:
qAirborne Asbestos Fibers:
rAirborne Asbestos Fibers:
aRow8_6:
bRow8_6:
02 82 00Row7_2:
G3123:
g3123:
h3123:
i3123:
j3123:
k3123:
l3123:
m3123:
n3123:
o3123:
p3123:
q3123:
r3123:
aRow9_6:
bRow9_6:
02 82 00Row8_2:
Vacuums_2:
G317_2:
g317_2:
h317_2:
i317_2:
j317_2:
k317_2:
l317_2:
m317_2:
n317_2:
o317_2:
p317_2:
q317_2:
r317_2:
aRow10_6:
bRow10_6:
02 82 00Row9_2:
Ventilation Systems:
G317_3:
g317_3:
h317_3:
i317_3:
j317_3:
k317_3:
l317_3:
m317_3:
n317_3:
o317_3:
p317_3:
q317_3:
r317_3:
aRow11_6:
bRow11_6:
02 82 00Row10_2:
317SD11 Closeout Submittals:
GSD11 Closeout Submittals_4:
gSD11 Closeout Submittals_4:
hSD11 Closeout Submittals_4:
iSD11 Closeout Submittals_4:
jSD11 Closeout Submittals_4:
kSD11 Closeout Submittals_4:
lSD11 Closeout Submittals_4:
mSD11 Closeout Submittals_4:
nSD11 Closeout Submittals_4:
oSD11 Closeout Submittals_4:
pSD11 Closeout Submittals_4:
qSD11 Closeout Submittals_4:
rSD11 Closeout Submittals_4:
aRow12_6:
bRow12_6:
02 82 00Row11_2:
Permits and Licenses:
G135:
g135:
h135:
i135:
j135:
k135:
l135:
m135:
n135:
o135:
p135:
q135:
r135:
aRow13_6:
bRow13_6:
02 82 00Row12_2:
Notifications_2:
G135_2:
g135_2:
h135_2:
i135_2:
j135_2:
k135_2:
l135_2:
m135_2:
n135_2:
o135_2:
p135_2:
q135_2:
r135_2:
aRow14_6:
bRow14_6:
02 82 00Row13_2:
G1371:
g1371:
h1371:
i1371:
j1371:
k1371:
l1371:
m1371:
n1371:
o1371:
p1371:
q1371:
r1371:
aRow15_6:
bRow15_6:
02 82 00Row14_2:
Protective Clothing:
G157:
g157:
h157:
i157:
j157:
k157:
l157:
m157:
n157:
o157:
p157:
q157:
r157:
aRow16_6:
bRow16_6:
02 82 00Row15_2:
157Decontamination Quality Control:
GDecontamination Quality Control:
gDecontamination Quality Control:
hDecontamination Quality Control:
iDecontamination Quality Control:
jDecontamination Quality Control:
kDecontamination Quality Control:
lDecontamination Quality Control:
mDecontamination Quality Control:
nDecontamination Quality Control:
oDecontamination Quality Control:
pDecontamination Quality Control:
qDecontamination Quality Control:
rDecontamination Quality Control:
aRow17_6:
bRow17_6:
02 82 00Row16_2:
157Records:
GRecords_2:
gRecords_2:
hRecords_2:
iRecords_2:
jRecords_2:
kRecords_2:
lRecords_2:
mRecords_2:
nRecords_2:
oRecords_2:
pRecords_2:
qRecords_2:
rRecords_2:
aRow18_6:
bRow18_6:
02 82 00Row17_2:
Protective Clothing_2:
G158:
g158:
h158:
i158:
j158:
k158:
l158:
m158:
n158:
o158:
p158:
q158:
r158:
aRow19_6:
bRow19_6:
02 82 00Row18_2:
158Decontamination Facility:
GDecontamination Facility:
gDecontamination Facility:
hDecontamination Facility:
iDecontamination Facility:
jDecontamination Facility:
kDecontamination Facility:
lDecontamination Facility:
mDecontamination Facility:
nDecontamination Facility:
oDecontamination Facility:
pDecontamination Facility:
qDecontamination Facility:
rDecontamination Facility:
aRow20_6:
bRow20_6:
02 82 00Row19_2:
158Notification:
GNotification:
gNotification:
hNotification:
iNotification:
jNotification:
kNotification:
lNotification:
mNotification:
nNotification:
oNotification:
pNotification:
qNotification:
rNotification:
aRow21_6:
bRow21_6:
02 82 00Row20_2:
Rental Equipment:
G171:
g171:
h171:
i171:
j171:
k171:
l171:
m171:
n171:
o171:
p171:
q171:
r171:
aRow22_6:
bRow22_6:
171SD01 Preconstruction Submittals:
GSD01 Preconstruction Submittals_9:
gSD01 Preconstruction Submittals_11:
hSD01 Preconstruction Submittals_11:
iSD01 Preconstruction Submittals_11:
jSD01 Preconstruction Submittals_11:
kSD01 Preconstruction Submittals_11:
lSD01 Preconstruction Submittals_11:
mSD01 Preconstruction Submittals_11:
nSD01 Preconstruction Submittals_11:
oSD01 Preconstruction Submittals_11:
pSD01 Preconstruction Submittals_11:
qSD01 Preconstruction Submittals_11:
rSD01 Preconstruction Submittals_11:
aRow23_6:
bRow23_6:
05 05 2316Row1:
G32:
g32:
h32:
i32:
j32:
k32:
l32:
m32:
n32:
o32:
p32:
q32:
r32:
aRow24_6:
bRow24_6:
05 05 2316Row2:
32SD03 Product Data:
GSD03 Product Data_3:
gSD03 Product Data_3:
hSD03 Product Data_3:
iSD03 Product Data_3:
jSD03 Product Data_3:
kSD03 Product Data_3:
lSD03 Product Data_3:
mSD03 Product Data_3:
nSD03 Product Data_3:
oSD03 Product Data_3:
pSD03 Product Data_3:
qSD03 Product Data_3:
rSD03 Product Data_3:
aRow25_6:
bRow25_6:
05 05 2316Row3:
13_2:
gG_54:
hG_54:
iG_54:
jG_54:
kG_54:
lG_54:
mG_54:
nG_54:
oG_54:
pG_54:
qG_54:
rG_54:
aRow26_6:
bRow26_6:
05 05 2316Row4:
G132:
g132:
h132:
i132:
j132:
k132:
l132:
m132:
n132:
o132:
p132:
q132:
r132:
FA664318DD0006 CONTRACT NO_7:
CONTRACTOR ACTION_7:
aRow1_7:
bRow1_7:
f133:
g133:
h133:
i133:
j133:
k133:
l133:
m133:
n133:
o133:
p133:
q133:
r133:
aRow2_7:
bRow2_7:
05 05 2316Row1_2:
f22:
g22:
h22:
i22:
j22:
k22:
l22:
m22:
n22:
o22:
p22:
q22:
r22:
aRow3_7:
bRow3_7:
05 05 2316Row2_2:
gG_55:
hG_55:
iG_55:
jG_55:
kG_55:
lG_55:
mG_55:
nG_55:
oG_55:
pG_55:
qG_55:
rG_55:
aRow4_7:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .