This document is a Plans and Specifications package for road construction on the Los Pinos Integrated Resource Stewardship Contract (IRSC) Fawn Gulch Area Roads in the San Juan National Forest, Pagosa Springs Ranger District, Colorado, prepared by the U.S. Department of Agriculture Forest Service, Rocky Mountain Region.

The project encompasses multiple work items focused on roadbed reconditioning, surfacing, and infrastructure improvements across approximately 3.64 miles of Forest Service System Road 666 and associated segments. Primary deliverables include: roadbed reconditioning and 4-inch aggregate surface course placement on NFSR 666 (3.2 miles with approximately 6,160 tons of ¾" minus aggregate); installation of a heavy-duty double swing-arm Forest Service closure gate at mile post 1.1; roadbed reconditioning on segments 666.E, 666.E1, 666.F, 666.F1, and 666.H with 12-foot-wide crowned surfaces; a new 845-linear-foot road realignment segment (666.F) with 90-degree intersection geometry and 50-foot turning radius; installation of an 18"x20' corrugated metal pipe culvert at mile post 0.19 on NFSR 666.F.1; construction of a Coal Creek Trail Head parking area (approximately 12,000 square feet); and temporary traffic control throughout operations. The specifications reference FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, modified by Forest Service Supplemental Specifications (FSSS), with specific compaction methods (including roller equipment with minimum force requirements or mechanical tampers), surface tolerances, and drainage requirements detailed in accompanying technical drawings. Construction must comply with MUTCD traffic control standards, follow designated clearing and grubbing limits, and maintain all existing drainage features including rolling dips and outlet ditches.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

San Juan National Forest U.S. Department of Agriculture Forest Service

Rocky Mountain Region

Archuleta County Colorado

Appendix D Plans and Specifications for Los Pinos IRSC

Area Roads

Pagosa Springs Ranger District

These plans, specifications and cost estimates meet technical requirements

Date:

Date:

Date:

These plans, comply with technical road requirements and engineering standards.

These plans, specifications comply with land and resource management plans.

Forest Engineer :

Forest Engineer :

District Ranger :

ALLEN MCCAW

ALLEN MCCAW

JOSH PECK

LOS PINOS IRSC – FAWN GULCH AREA ROADS

WORK ITEM DESCRIPTIONS

MARCH 24, 2026

SAN JUAN NATIONAL FOREST – PAGOSA RANGER DISTRICT

COMPILED BY: ER – CODY JONES

LOS PINOS – FAWN GULCH IRSC AREA ROADS –

WORK ITEMS DESCRIPTIONS

Work Item - 666

Conduct roadbed reconditioning and surfacing per FSSS 302 and FP-24 303 on NFSR 666 between mile post 1.0 (FS boundary) and 4.3 (Coal Creek Trailhead) and place a 4-inch compacted lift of ¾” minus aggregate conforming to FP-24 703-01 grading designation G or other gradation approved in writing. The final surface shall be a crowned section constructed at 4-6 percent. Compaction shall be achieved per method FSSS 204.11(d). Water will be required for roadbed reconditioning and surface compaction. There are no water sources available on FS lands. Water will not be paid separately. This

Work Item is estimated to include approximately 3.2 miles of roadbed reconditioning and approximately 6160 tons of in place aggregate.

Install heavy duty double swing arm Forest Service closure gate at approximately mile post 1.1

(location to be staked in the field by FS personnel) per drawings 619-08 and 619-09. The old gate shall be removed and discarded off Forest Service property. Removal will not be paid separately.

Work Item - 666.E

This work item is approximately 1.205 miles of roadbed reconditioning and will be a 12-foot-wide crowned surface constructed per drawing 212-01 compaction method (d). Roadbed reconditioning shall include the maintenance of all drainage features including rolling dips and associated outlet ditches.

Work Item - 666.E1

This work item is approximately 0.26 miles of roadbed reconditioning and will be a 12-foot-wide crowned surface constructed per drawing 212-01 compaction method (d). Roadbed reconditioning

Work Item - 666.F Located at approximately mile post 0.31 of NFSR 666.F, a flag line establishing the new alignment will be located on the left. This location will become an intersection with the private land accessed to the north via the old alignment. The intersection shall meet the old alignment at approximately 90*

(TYPE I) to maximize sight distance and shall have approximately a 50’ turning radius per drawing

212-04. This new alignment segment will be approximately 845 linear feet and will be a 12-foot-wide crowned surface constructed per drawing 212-01, FSSS 201, and 212 compaction method (d). Water will be required for roadbed compaction. There are no water sources available on FS lands. Water will not be paid separately. Clearing and grubbing will not be paid separately. Merchantable materials

ITEM DESCRIPTION UNIT QUANTITY 666 QUANTITY 666.E QUANTITY 666.E1 QUANTITY 666.F QUANTITY 666.F1 QUANTITY 666.H COAL CREEK PARKING TOTAL UNIT PRICE TOTAL 151(03) Mobilization LS 1 1 201(09) Clearing and Grubbing Mile 0.16 0.16

204(17) Excavation and Embankment - Coal Creek Parking Grading LS 1 1

211(07) Roadway Obliteration Mile 0.13 0.13

212(08) Linear Grading - Compaction Method (b)Reroute Mile 0.16 0.16

302(10)A Untreated Aggregate Courses - Surface Course Commercial Source, Compaction Method (b) TON 6160 545 300 7005

303(01) A Road Reconditioning Mile 3.33 0.31 3.64 303(01) B Road Reconditioning Mile 1.205 0.26 1.184 0.863 0.591 4.103 602(10)A Culverts and Drains LF 20 20 619(12) FS Heavy Duty Double Closure Gate LS 1 1 635(27) Temporary Traffic Control LS 1 1

TOTAL

LOS PINOS IRSC - FAWN GULCH AREA ROADS SOI

LOS PINOS – FAWN GULCH IRSC AREA ROADS –

WORK ITEMS DESCRIPTIONS

as determined by Appendix B – Division A-2 will be calculated and available to the purchaser through an add volume agreement.

Approximately 470 feet of the old alignment will be obliterated by scarifying the surface to a 6” depth and slashing the old alignment per Drawing 211-02 FS direction. Obliteration will not be paid separately.

Conduct roadbed reconditioning and surfacing per FSSS 302 and FP-24 303 on NFSR 666.F from mile post 0.0 (intersection with 666) and 0.31 (intersection with the realignment work item). Place a

4-inch compacted lift of ¾” minus aggregate conforming to FP-24 703-01 grading designation G or approved other gradation approved in writing. The final surface shall be a crowned section constructed at 4-6 percent. Compaction shall be achieved per method FSSS 204.11(d).

Work Item - 666.F1

This work item is approximately 0.863 miles of roadbed reconditioning and will be a 12-foot-wide crowned surface constructed per drawing 212-01 compaction method (d). Roadbed reconditioning

Install 18”x 20’ corrugated metal pipe at approximately mile post 0.19 on NFSR 666 F.1(location to be staked in the field by FS personnel) per drawings 602-01, 602-02, and 602-03. Import 20 CY of 3” minus road base for road surface over the pipe ensure minimum 12” cover over pipe.

Work Item - 666.H

This work item is approximately 0.591 miles of roadbed reconditioning and will be a 12-foot-wide crowned surface constructed per drawing 212-01 compaction method (d). Roadbed reconditioning

Work Item - COAL CREEK TRAILHEAD

This work includes Excavation and Embankment per FSSS 204 and Surfacing per FSSS 301 compaction method (b). The area is approximately 12,000 square feet and the existing ground will be modified with a balanced cut and fill to create a parking area with appropriate drainage. This will include a ditch on the north side of the lot from the existing roadside ditch to daylight below the trail.

The parking area shall have a final grade slope of approximately 6% away from the road.

Work Item – TEMPORARY TRAFFIC CONTROL All work within this project requires the use and operation on open Forest Service System Roads.

Temporary Traffic Control will be required at all times during operations per drawings 156-01 and

156-02.

LOS PINOS IRSC- FAWN GULCH AREA ROADS

NEW GATE INSTALLATION

0E ISliIN INSTAl!L!:

NE Sl!JRE

,J

---II

I/

S9 I/

Ii

-II

fl

_ii

II

II

II

j\ N

II�

II

ii

II

t

.o(""'

I/

:?<I "' ,.,_c:::s �

I/

".1' 7

> Microsoft;,¥antor r""

LOS PINOS IRSC - FAWN GULCH AREA ROADS

AGGREGATE SURFACE COURSE

� '\'i

"'- II

/J

� If t

�I

=I/

��1/ w f r

-= ➔ ":'"-.:l II II ,·�

\\ \\ "" - JI

t

I/

I;

1/

LOS PINOS IRSC - FAWN GULCH AREA ROADS

NATIVE SURFACE ROAD RECONDITIONING

II

-✓ '17

I

I\

\I

II

II

II

I;

'It =, � ::::::::.- � � ___.:,,.::...;..,,,'=- = =- 1/ �

// II

'l

JI

,::;- if \I

II

Ii'

II

// I/ II if

}} ""= 'S:- = = 1/ ""' "'=-,f �

)J if

Vantor

LOS PINOS IRSC - FAWN GULCH AREA ROADS

666.F REALIGNMENT

N Microsoft, Vantor

LOS PINOS IRSC - FAWN GULCH AREA ROADS

NEW CULVERT INSTALLATION

ITTP.:l!I.!: l'iJ6-ii l o

'ii I/

'-II

,p

,p ,p

,p

,p il ,p

JI

II

II

_JI

II

II

-fl

II

II

7/ c·o-....J1

-JI

--I!

,1

Microsoft, Vantor

LOS PINOS IRSC- FAWN GULCH AREA ROADS

COAL CREEK TRAIL HEAD

r-

Vantor

CONSTRUCTION SIGNS

CONSTRUCTION SIGNS FOR FOREST SYSTEM ROADS

1. All work shall be done in accordance with the Standard Specifications applicable to the Project and the "Manual on Uniform Traffic Control Devices for all Classes of Streets and Highways" (MUTCD) published by the U.S. Department of Transportation, Federal Highway Administration. Reference manual can be obtained at https://mutcd.fhwa.dot.gov

2. Contractor shall submit a Temporary Traffic Control (TTC) plan for review by the ER. Work on the Project shall not be started until all required signs are in place as agreed upon by the ER and the Contractor.

3. Where traffic is maintained through or over any part of the Project, the Contractor will be required to mark all hazards within the limits of the Project (including connecting roads) with well-maintained signs. Signs shall be moved, added to, changed or removed as required during the progress of construction and removed entirely when the Project is completed.

4. All signs shall be placed for best visibility and legibility, maintained in good condition and kept clean and free of dirt at all times. Contractor's vehicles and equipment must be parked so that signs and barricades are visible to approaching traffic at all times.

5. When it is known that signs will be needed at one location for long periods of time (ie. 3 to 4 weeks), a permanent sign support should be considered. The following factors, in addition to time periods, should be considered in making the decision of a permanent or temporary sign support: amount of logging traffic, vehicle speeds, motorized mixed use, sight distance, road conditions, road width, average daily traffic and local special events that could increase traffic volume.

All sign supports must be crashworthy as outlined in Part 6 of the MUTCD.

6. Information specific to the Sample Temporary Traffic Control Devices shown on Drawing 156-02:

The ROAD WORK, XX FEET, XX MILES, or AHEAD (W20-1) sign, which serves as a general warning of obstructions or restrictions, should be located in advance of the work space or any detour, on the road where the work is taking place. Where traffic can enter a TTC zone from a crossroad or a major (high-volume) driveway, an advance warning sign should be used on the crossroad or major driveway.

The ROAD MACHINERY AHEAD (W21-3) sign may be used to warn of machinery operating in or adjacent to the roadway.

The TRUCK CROSSING (W8-6) sign may be used to alert road users to locations where unexpected travel on the roadway or entries into or departures from the roadway by construction vehicles might occur. These locations might be relatively confined or might occur randomly over a segment of roadway.

The HEAVY TRUCK TRAFFIC (FW8-6a) Sign may be used to alert road users to locations where unexpected heavy truck traffic occurs in or adjacent to the roadway.

The END ROAD WORK Sign (G20-2) should be placed near the downstream end of the termination area, as determined by engineering judgment. The END ROAD WORK sign may be installed on the back of a warning sign facing the opposite direction of road users or on the back of a Type 3 Barricade.

The ROAD CLOSED Sign (R11-2) should be installed where roads have been closed to all traffic (except authorized vehicles). The Road Closed sign shall be designed as horizontal rectangles. These signs shall be preceded by the applicable Advance Road Closed warning sign with the secondary legend AHEAD. ROAD CLOSED, XX FEET, XX MILES, or AHEAD (W20-3), page 590 is an advanced warning sign.

7. Reflective sheeting shall meet the retroreflectivity requirements in Part 2 of the MUTCD.

156-01 58

CONSTRUCTION SIGNS

HINGED

DEMOUNTABLE

RIGID

Type lll Movable Barricades

R11-2

CLOSED

ROAD

G20-2

ROAD WORK

END

WORK

AHEAD

ROAD

W20-1 (36" x 36")

(black on orange) (black on white)

MACHINERY

AHEAD

ROAD

W21-3 (30" x 30")

CROSSING

TRUCK

W8-6 (30" x 30")

TRUCK

TRAFFIC

HEAVY

FW8-6a (30" x 30")

SAMPLE TEMPORARY TRAFFIC CONTROL DEVICES

(black on orange) (black on orange) (black on orange) (black on orange)

Note:

Other Temporary Traffic Control Devices are available as shown in Part 5 and 6 of the MUTCD.

(36" x 18") (48" x 30")

156-02 59

AutoCAD SHX Text As Required

AutoCAD SHX Text Frame

AutoCAD SHX Text 2" X 6"

AutoCAD SHX Text 2" X 8"

AutoCAD SHX Text

CLOSED

AutoCAD SHX Text

ROAD

AutoCAD SHX Text min.

AutoCAD SHX Text 5'

AutoCAD SHX Text 2" X 8"

AutoCAD SHX Text 2" X 6"

AutoCAD SHX Text 5'

AutoCAD SHX Text min.

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

CLOSED

AutoCAD SHX Text

CLOSED

AutoCAD SHX Text

ROAD

AutoCAD SHX Text max.

AutoCAD SHX Text min.

AutoCAD SHX Text added stability

AutoCAD SHX Text Sandbags for

AutoCAD SHX Text 1'-8"

AutoCAD SHX Text 1'-8"

AutoCAD SHX Text 6'-6"

AutoCAD SHX Text 5'

AutoCAD SHX Text and Brace

AutoCAD SHX Text 4" X 4" Posts

AutoCAD SHX Text 2" X 8"

AutoCAD SHX Text 4" X 6" Skids

FO

RE

ST

S

ER

VI

CE

U.

S.

D

EP

AR

TM

EN

T

OF

A

GR

IC

UL

TU

RE

RO

CK

Y M

OU

NT

AI

N

RE

GI

ON

He av y Du ty C lo su re G at e

SA

N

JU

AN

NA

TI

ON

AL

F

OR

ES

T

PA

GO

SA

RA

NG

ER

D

IS

TR

IC

T

9-

ROADSIDE CLEARING/BRUSHING LIMITS 202-01 64

Brushing Limits

AutoCAD SHX Text Height=14'

AutoCAD SHX Text Roadbed

AutoCAD SHX Text Shoulders

AutoCAD SHX Text Fill Slope

AutoCAD SHX Text Backslope

AutoCAD SHX Text Brushing Limits

AutoCAD SHX Text Bottom of ditch

AutoCAD SHX Text 4'

AutoCAD SHX Text 4'

1. Cut all brush and trees (6 inches diameter, or less, at the point of cut) inside the brushing limits and outside the roadbed no higher than 6 inches above ground level (6 inches for machine brushing). If rocks or other obstructions are encountered, cut no higher than 6 inches above the obstruction. Limb live trees with a diameter larger than 6 inches to a height of 14 feet above the road surface.

ROAD OBLITERATION TYPICAL

RECONTOUR

SCARIFY

211-02 64

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text Existing Ground

AutoCAD SHX Text Top of Cut

AutoCAD SHX Text Place Excavated Fill Material

AutoCAD SHX Text Area of Excavated Fill

AutoCAD SHX Text Toe of Fill

AutoCAD SHX Text Depth of

AutoCAD SHX Text Scarification - 6"

AutoCAD SHX Text NOTE: - All Existing Drainages Shall Be Kept Open All Existing Drainages Shall Be Kept Open - Slash Cover Shall Be Minimum of 40% Slash Cover Shall Be Minimum of 40%

AutoCAD SHX Text Existing Ground

AutoCAD SHX Text Slash Obliterated

Road Sureface

SECTION WITH DITCH

LINEAR GRADING TYPICAL SECTIONS

SECTION WITHOUT DITCH

212-01 67

AutoCAD SHX Text Limits

AutoCAD SHX Text Grubbing

AutoCAD SHX Text Limits

AutoCAD SHX Text Grubbing

AutoCAD SHX Text ft.

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text Road Bed

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text 1.

AutoCAD SHX Text : 1:1 backslope

AutoCAD SHX Text Cut slopes

AutoCAD SHX Text : 2:1 Fill slopes

AutoCAD SHX Text Fill slopes

AutoCAD SHX Text descriptions of work.

AutoCAD SHX Text Required widening is included in the design and quantity calculations and is shown on the

AutoCAD SHX Text

2. Road Bed width shown is without necessary widening for fill, sluff, curves, and turnouts.

AutoCAD SHX Text

5. Decking Areas shall be approved by the CO.

AutoCAD SHX Text

4. Oversize rock and unsuitable material shall be disposed of outside the clearing limits.

AutoCAD SHX Text

3. Construction Slash Treatment per FSSS 201.06

AutoCAD SHX Text Road Bed

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text %%U %%U

AutoCAD SHX Text %%U %%U

AutoCAD SHX Text

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3 ft. ± 1 ft.

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text Limits

AutoCAD SHX Text Grubbing

AutoCAD SHX Text

AutoCAD SHX Text

ft. min.

AutoCAD SHX Text Grubbing

AutoCAD SHX Text

AutoCAD SHX Text Limits

*See descriptions of work for widths

TYPE 2

TYPICAL INTERSECTION TYPE I AND II

TYPE I

64212-04

AutoCAD SHX Text

AutoCAD SHX Text ft.

AutoCAD SHX Text ft.

AutoCAD SHX Text

AutoCAD SHX Text ft.

AutoCAD SHX Text

AutoCAD SHX Text ft.

AutoCAD SHX Text Edge of Road Bed

AutoCAD SHX Text Minimum Radius

AutoCAD SHX Text Minimum Radius

AutoCAD SHX Text Minimum Radius

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text Edge of Road Bed

AutoCAD SHX Text 75%%D and less

AutoCAD SHX Text 75%%D - 90%%D

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text Minimum Radius

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text Center of Radius

AutoCAD SHX Text Center of Radius

SURFACING SECTION WITH DITCH

TYPICAL SURFACING SECTIONS 301-01 68302-01

AutoCAD SHX Text

COMPACTION METHOD

AutoCAD SHX Text

COMPACTED DEPTH

AutoCAD SHX Text

GRADING

AutoCAD SHX Text

SOURCE LOCATION:

AutoCAD SHX Text

PIT RUN

AutoCAD SHX Text ft.

AutoCAD SHX Text

SUBBASE COURSE

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text N/A

AutoCAD SHX Text FSSS 204.11 (d)

AutoCAD SHX Text 4"

AutoCAD SHX Text Commercial

AutoCAD SHX Text *Variable, see Descriptions of Work

AutoCAD SHX Text Traveled way width shown is without necessary widening for fill, sluff, curves, intersections and turnouts. Required widening has been included in the design and quantity calculations. Curve widening and turnouts shall be graveled unless otherwise noted in the Description of Work.

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

SURFACE COURSE

AutoCAD SHX Text ER Approved

AutoCAD SHX Text Reconditioned

AutoCAD SHX Text Roadbed

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text N/A

AutoCAD SHX Text

in. Depth

AutoCAD SHX Text 3/4' Minus Surface

AutoCAD SHX Text Compacted Crowned

SECTION WITH DITCH

NATIVE SURFACE ROAD RECONDITIONING

SECTION WITHOUT DITCH

303-01 69

AutoCAD SHX Text Dispose of as approved by the CO.

AutoCAD SHX Text Scatter debris outside of clearing limits.

AutoCAD SHX Text Surface irregularities greater than 4 in.

AutoCAD SHX Text Blade for 50 ft. each direction.

AutoCAD SHX Text Required reconditioning includes necessary widening for fill, sluff, curves and turnouts.

AutoCAD SHX Text Cast over fill slope.

AutoCAD SHX Text Clearing:

AutoCAD SHX Text Excess and Unsuitable Material: . .

AutoCAD SHX Text Intersecting Roads:

AutoCAD SHX Text Scarification:

AutoCAD SHX Text Rock Disposal:

AutoCAD SHX Text 1 ft. min.

AutoCAD SHX Text 3 ft. 1 ft.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Crowned Recondition Surface ft.

AutoCAD SHX Text C

AutoCAD SHX Text Out Slope Recondition Surface ft.

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text 4 ft. min.

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text Variable

AutoCAD SHX Text Variable

AutoCAD SHX Text 4 ft. min.

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text 4 ft. min.

AutoCAD SHX Text L

AutoCAD SHX Text Clearing Limits

AutoCAD SHX Text

AutoCAD SHX Text 4 ft. min.

AutoCAD SHX Text *See descriptions of work for exact widths

AutoCAD SHX Text Crown roads to 5%%% +/-1%%%, outslope or Inslope roads 4%%% +/-1%%% at locations approved by the CO or as shown on the descriptions of work.

602-01

0 Typical Installation in Sidehill Section

Typical Installation in Fill Section

Typical Installation with Outlet Ditch

Typical Installation for Camber For Fills greater than 15 Feet

TYPICAL CULVERT INSTALLATION 64

AutoCAD SHX Text Cut slope as staked

AutoCAD SHX Text Discharge onto

AutoCAD SHX Text natural ground

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text 1 ft. min.

AutoCAD SHX Text

1.5 X dia.

AutoCAD SHX Text Invert

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text Outlet ditch grade

AutoCAD SHX Text Culvert after settlement

AutoCAD SHX Text Culvert after installation

AutoCAD SHX Text Camber

AutoCAD SHX Text culvert length

AutoCAD SHX Text Camber shall be on a curve

AutoCAD SHX Text with no point along the

AutoCAD SHX Text culvert being higher than

AutoCAD SHX Text Install culverts on 2% minimum grade.

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text 2:1

AutoCAD SHX Text 1 ft. min.

AutoCAD SHX Text

1.5 X dia.

AutoCAD SHX Text 1 ft. min.

AutoCAD SHX Text as staked

AutoCAD SHX Text % of

AutoCAD SHX Text

AutoCAD SHX Text Discharge onto

AutoCAD SHX Text natural ground

AutoCAD SHX Text slope

AutoCAD SHX Text 2:1

AutoCAD SHX Text slope

AutoCAD SHX Text natural ground

AutoCAD SHX Text Discharge onto

AutoCAD SHX Text the invert at the inlet.

AutoCAD SHX Text 3' min.

3' min.

Outlet Ditch Detail

Skew Number

TYPICAL CULVERT INSTALLATION

Pipe Skew DiagramTypical Metal End Section

Typical Ditch Block Details

Profile along Ditch Plan

Cross Section

602-02 64

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text along sides of ditch.

AutoCAD SHX Text Excavated material shall be wasted

AutoCAD SHX Text 1 1/2:1 min. slope

AutoCAD SHX Text Centerline

AutoCAD SHX Text 56%%d

AutoCAD SHX Text Shoulder

AutoCAD SHX Text Road Shoulder

AutoCAD SHX Text Ditch Grade

AutoCAD SHX Text 20' min.

AutoCAD SHX Text As Staked or

AutoCAD SHX Text Top

AutoCAD SHX Text Subgrade

AutoCAD SHX Text 2'

AutoCAD SHX Text As Staked or

AutoCAD SHX Text 5' min.

AutoCAD SHX Text Example

AutoCAD SHX Text L

AutoCAD SHX Text Skew is always from right of C

AutoCAD SHX Text Centerline of Road

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text band

AutoCAD SHX Text Standard coupling

AutoCAD SHX Text slope as required

AutoCAD SHX Text Finish earth

AutoCAD SHX Text Toe plate

AutoCAD SHX Text Variable Slope

AutoCAD SHX Text Reinforced Edge

AutoCAD SHX Text Road

AutoCAD SHX Text ditch.

AutoCAD SHX Text bottom of

AutoCAD SHX Text slope or

AutoCAD SHX Text Toe of fill

AutoCAD SHX Text Ditch blocks shall be constructed to divert flow from ditch lines into culverts.

AutoCAD SHX Text Ditch Block

AutoCAD SHX Text Ditch Bottom

AutoCAD SHX Text Normal Ditch Line

AutoCAD SHX Text Ditch Bottom

AutoCAD SHX Text Cut Slope

AutoCAD SHX Text Ditch Block

AutoCAD SHX Text 20' min.

AutoCAD SHX Text Ditch Block

AutoCAD SHX Text Road

AutoCAD SHX Text 2:1 slope

AutoCAD SHX Text 2'

AutoCAD SHX Text Ahead

Station

602-03

Typical Backfill Detail

CULVERT BEDDING DETAILS

Yielding FoundationRock Foundation

Typical Bedding Detail

AutoCAD SHX Text Bedding material

AutoCAD SHX Text 2'

AutoCAD SHX Text 2'

AutoCAD SHX Text 6" (loose depth) compacted layers

AutoCAD SHX Text D

AutoCAD SHX Text Bedding material

AutoCAD SHX Text 12" min.

AutoCAD SHX Text D

AutoCAD SHX Text Soft material

AutoCAD SHX Text 2'

AutoCAD SHX Text D

AutoCAD SHX Text Rock

AutoCAD SHX Text 12" min.

AutoCAD SHX Text 12"

AutoCAD SHX Text 12"

AutoCAD SHX Text D

AutoCAD SHX Text not less than 10%%% of D.

AutoCAD SHX Text Bedding material depth

AutoCAD SHX Text D

AutoCAD SHX Text Ground line

AutoCAD SHX Text Bedding material depth

AutoCAD SHX Text under pipe haunches

AutoCAD SHX Text not less than 10% of D.

AutoCAD SHX Text Bedding material

Excavation and foundation shall be approved by the Engineer prior to pipe installation.

LOS PINOS IRSC – FAWN GULCH AREA ROADS

FP-24 FOREST SERVICE SUPPLEMENTAL

SPECIFICATIONS (FSSS)

FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Project are available athttps://highways.dot.gov/federal-lands/specs/fp-24 https://highways.dot.gov/federal-lands/specs/fp-24

LOS PINOS – FAWN GULCH IRSC AREA ROADS

FP-24 FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

(FSSS)

Contents

PREFACE

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT

Section 103. – SCOPE OF WORK

Section 104. – CONTROL OF WORK

Section 104. – CONTROL OF WORK

Section 104. – CONTROL OF WORK

Section 104. – CONTROL OF WORK

Section 105. – CONTROL OF MATERIAL

Section 106. – ACCEPTANCE OF WORK

Section 106. – ACCEPTANCE OF WORK

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Section 108. - PROSECUTION AND PROGRESS

Section 109. - MEASUREMENT AND PAYMENT

Section 109. - MEASUREMENT AND PAYMENT

Section 109. - MEASUREMENT AND PAYMENT

Section 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS

Section 201. - CLEARING AND GRUBBING

Section 204. – EXCAVATION AND EMBANKMENT

Section 212. – LINEAR AND SITE GRADING

Section 301. — UNTREATED AGGREGATE COURSES

PREFACE

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-24 for construction of

National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in the FP-24. The applicable specifications for the project will be the FP-24 as modified by the FSSS.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

Add the following paragraph to Subsection 101.01 Meaning of Terms:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

Add the following paragraph to Subsection 101.01 Meaning of Terms:

Delete all references to the FAR (Federal Acquisition Regulations) in the specifications when incorporating into 2400-6(T) Timber Sale or 2400-13(T) Stewardship contracts.

Add the following to Subsection 101.03 Abbreviations:

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSSS – Forest Service Supplemental Specifications

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(d) Miscellaneous unit abbreviations.

MP - milepost location ppm - parts per million volume

STA – station location

MFBM - thousand feet board measure volume

Make the following changes to Subsection 101.04 Definitions:

Delete these definitions and replace with the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings —Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work. (Timber Contracts) does not apply, replace NTP with Contract Award.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Forest Service Supplemental Specifications – The Forest Service uses supplemental specifications to modify the FP-24 to meet the agency needs and intents. FSSS revise the FP-24 by adding, deleting, replacing, revising, replacing part of entire sections or subsections or adding new sections to the FP..

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Utilization Standards — The minimum size and percent soundness of trees described in Public

Works contract specifications or Timber Sale and stewardship contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms

Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT

Delete Section 102 Bid, Award, and Execution of Contract in its entirety.

Section 103. – SCOPE OF WORK

Delete all of Section 103 Scope of Work except Subsection 103.01 Intent of Contract.

Section 104. – CONTROL OF WORK

Delete Subsections 104.01 Authority of Contracting Officer, 104.02 Authority of Contracting

Officer’s Representative, 104.03 Authority of Inspectors.

Delete Subsection 104.06 Specifications and Drawings and replace with the following:

Refer to B(T) 5.211 in the 2400-6(T)) or the 2400-13(T) contracts for requirements under this subsection.

Delete Subsection 104.07 Coordination of Contract Documents.

Add the following Subsection 104.12 Use of Roads by Contractor:

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Section 105. – CONTROL OF MATERIAL

Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material

Found in the Work and replace it with the following:

The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.

Section 106. – ACCEPTANCE OF WORK

Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract

Requirements.

Section 106. – ACCEPTANCE OF WORK

Delete Subsection 106.06 Partial and Final Acceptance.

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

Delete Subsection 107.05 Responsibility for Damage Claims.

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

Delete Subsection 107.08 Sanitation, Health, and Safety and replace with the following:

Refer to specific provisions under B(T) 6.0 in the 2400-6(T) or the 2400-13(T) contracts for requirements under this subsection.

Section 108. - PROSECUTION AND PROGRESS

Delete Section 108 Prosecution and Progress in its entirety.

Section 109. - MEASUREMENT AND PAYMENT

Delete Subsections 109.06 Pricing and Adjustments, 109.07 Estimated Work, 109.08 Progress

Payments, and 109.09 Final Payment.

Delete Table 109-1 of Subsection 109.01 Measurement of Work and replace with the following:

Table 109-1

Decimal Accuracy of Quantities for Payment

Pay Item Level of Precision

Acre 0.01

Cubic Foot 1

Cubic Yard 1

Cubic Yard Exception - Structure Excavation;

Sheathing; Materials; Bedding, Bed Course, and

Backfill, Materials; Gabions;

0.1

Cubic Yard Exception – Concrete; Masonry 0.01

Day 1

Each 1

Gallon 1

Hour 0.1

Linear Foot 1

Linear Foot Exception - Timber, Steel, and Concrete

Piles

0.1

M-Gallon 0.1

Mile 0.01

Month 0.1

Pound 1

Square Foot 0.1

Square Yard 0.1

Station 0.1

Thousand Board Feet Measure 0.01

Ton 0.1

Ton Exception - Calcium Chloride; Sodium Chloride;

Hydrated Lime; Bituminous Materials; Pavements; Bed

Course Materials

0.01

Week 0.1

Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:

(c) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.

Section 155. – SCHEDULES FOR CONSTRUCTION CONTRACTS

Delete Section 155 Schedules for Construction Contracts in its entirety.

Section 201. - CLEARING AND GRUBBING

Delete the last sentence in the second paragraph of Subsection 201.03.

201.03 General.

Delete paragraph (c) and (d) of Subsection 201.04 and replace with the following:

201.04 Clearing.

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract; and

(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 14 FEET. If required, remove other branches to present a balanced appearance. Trim according to accepted tree surgery practices.

Delete Subsection 201.06 Disposal and replace with the following:

201.06 Disposal. Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract. Dispose of slash by scattering material, material shall not exceed a depth greater than 6”

Section 204. – EXCAVATION AND EMBANKMENT

Replace the first paragraph of Subsection 204.11 replace with the following.

204.11 Compaction. For Compaction adjust the moisture content of the material to a moisture content suitable for compaction. Compact each lift of material to a firm and stable condition and until there is no visible evidence of further consolidation or deflection. Compact using one of the following as specified:

Add the following to Subsection 204.11 Compaction:

(d) Adjust the moisture content of the material to a moisture content suitable for compaction.

Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Ensure rollers meet the following requirements:

(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.

(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds impact per vibration, specifically designed to compact the material on which it is used.

(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.

(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch of width of roller drum

(e) Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.

(f). Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.

(g) Adjust the moisture content of the material to a moisture content suitable for compaction.

Compact the complete surface with a bucket of an excavator larger than 39,000 pounds Gross

Vehicle Weight using a minimum of three blows. Overlap compaction by ½ width of bucket.

(h) Adjust the moisture content of the material to a moisture content suitable for compaction.

Compact using an approved mechanical tamper for a minimum of three complete passes.

When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes.

Replace the first paragraph of Subsection 204.13 replace with the following.

204.13 Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish to the designated tolerance class as defined in Table 204-2 as follows:

Add the following table to Section 204.

Table 204-2 Construction Tolerances

Dimension Tolerance Class A B C D E F

Roadbed width (ft) +0.5 +1.5 +2.0 +2.0 N/A N/A Subgrade elevation1 (ft) +-0.1 +-1.0 +-3.0 +-5.0 N/A N/A Horizontal alignment (ft) +-0.2 +-1.5 +-5.0 +-10.0 N/A N/A Vertical alignment (%) +-1 +-1 +-2 +-2 N/A N/A Slopes, excavation and embankment (%)

+-3 +-3 +-3 +-3 N/A N/A

1 Subgrade elevation tolerance applies to the cut or fill shown in the staking information unless otherwise agreed to.

Section 212. – LINEAR AND SITE GRADING

Replace Section 212 entirely and replace with the following.

212.01 This work consists of performing linear and site grading at designated locations within specified tolerances.

212.02 Definitions.

(a) Linear grading. Consists of constructing and grading roadways on a designated alignment.

(b) Site grading. Consists of constructing and grading designated areas outside the roadway prism.

Construction Requirements

212.03 Roadway and Site Preparation. Clear the area of vegetation and obstructions according to Sections 201 and 203.

212.04 Excavation and Embankment. Construct the roadbeds and sites according to the applicable requirements of Section 204, except as modified in this Section.

Adjust the moisture content of embankment material to a moisture content suitable for compaction. Place embankment material in 12-inch lifts and compact each lift according to

Subsection 204.11. If compacting with rollers is not practical, use approved mechanical or vibratory compaction equipment.

Construct approach connections to existing roads, parking areas, and trails as directed.

Do not make alignment or profile grade adjustments that adversely affect drainage.

Obtain material from borrow sources and place excess material at sites identified in the plans.

Additional sites may be agreed to.

212.05 Grading Tolerance. Construct roadbeds and sites within the following grading tolerances:

(a) Linear grading.

(1) Alignment (centerline). Alignment may be shifted a maximum of 10 feet left or right of the planned centerline unless otherwise agreed to. Do not construct curves with radii less than 50 feet .

(2) Profile grade. Connect revised forward and back grade tangents with a uniform vertical curve consistent with the existing alignment. Do not construct grades greater than 12%.

(3) Roadbed width. Roadbed width shall not be less than the specified dimensions but may exceed specified dimensions by up to 2 FEET. Add curve widening and slough widening as shown in the plans.

(4) Slopes. Fill slopes and cut slopes shall not deviate from the specified slopes by more than 5%.

(b) Site grading. The footprint may be shifted a maximum of 10 feet in any direction. The profile of the site may be adjusted a maximum of 2 feet from the plan elevation.

212.06 Acceptance. Linear and site grading work will be evaluated under Subsections 106.02 and 106.04.

Clearing will be evaluated under Section 201.

Removal of obstructions will be evaluated under Section 203.

Measurement

212.07 Measure the Section 212 pay items listed in the bid schedule according to Subsection

109.02

Payment

212.08 The accepted quantities will be paid at the contract price per unit of measurement for the

Section 212 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Section 301. — UNTREATED AGGREGATE COURSES

Description

301.01 This work consists of constructing aggregate courses on a prepared surface.Material

301.02 Conform to the following Subsections:Subbase, base, and surface course aggregate

703.05

Water for construction 725.01(c)

Screened aggregate 703.05(d)

Construction Requirements

301.03 General. Prepare the surface according to Section 204 or 303 as applicable.

Written approval of the roadbed is required before placing aggregate.

For pit run material, furnish material smaller than the maximum size identified in the plans, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpile according to

Section 314.

After a representative quantity of aggregate is produced, submit target values within the required gradation range along with a representative 300-pound sample at least 14 days before incorporating the aggregate into the work.

301.04 Mixing and Spreading. Obtain moisture content in accordance with the compaction method specified. If moisture content is not specified by the compaction method adjust the moisture content to a level suitable for compaction. Mix the aggregate and adjust the moisture content to obtain a uniform mixture. Spread and shape the mixture on the prepared surface in a uniform layer.

Do not place the mixture in a layer exceeding 6 inches (150 millimeters) in compacted thickness.

When more than one layer is necessary, compact each layer according to Subsection 301.05 before placing the next layer. Route hauling equipment uniformly over the full width of the surface to minimize rutting or uneven compaction.

301.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(4)(a).

(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in

Subsection 204.11(a)(4)(a).

(d) Compaction D. Compact to a density of at least 95.0 percent of the maximum density, as determined by AASHTO T 99, method C or D.

(e) Compaction E. Compact to a density of at least 95.0 percent of the maximum density, as determined by AASHTO T 180, method C or D.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06 Surface Tolerance. Remove irregularities and shape to a uniform surface. Ensure that the thickness and width of the compacted aggregate conform to the dimensions SHOWN ON

THE DRAWINGS, and that measurements on the compacted aggregate meet the following criteria:

(a) The maximum variation from the specified thickness is 1 inch.

(b) The compacted thickness is not consistently above or below the specified thickness, and the average thickness of measurements for any one mile of road segment is within ±

¼ inch of the specified thickness.

301.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or combination thereof until placement of the next course. Correct defects according to Subsection 301.06.

301.08 Acceptance. See Table 301-1 for sampling, testing, and acceptance requirements.

Screened aggregate will be evaluated Under 106.02 Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.05. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04.

(a) Aggregate gradation. The upper and lower specification limits are equal to the calculated mean of all test results plus or minus the allowable deviations shown in Tables 703-1 and 703-

2, except as follows:

(1) If the calculated mean value for a tested sieve exceeds the maximum gradation range value shown in Table 703-1, then the upper specification is equal to the maximum gradation value in Table 703-1 plus or minus the allowable deviation in Table 703-2.

(2) If the calculated mean value for a tested sieve is less than the minimum gradation range value shown in Table 703-1, then the lower specification is equal to the minimum gradation value in Table 703-1 plus or minus the allowable deviation in Table 703-2.

(b) Plasticity index. The upper and lower specification limits for surface courses are shown in Subsection 703.05(c)(3).

Construction of untreated aggregate courses will be evaluated under Subsections 106.02 and

106.04.

Measurement

301.09 Measure the Section 301 pay items listed in the bid schedule according to

Subsection 109.02 and the following as applicable:

When measuring aggregate by the cubic yard, measure in place.

When measuring aggregate by the square yard, measure the length horizontally along the centerline of the roadway. Measure the width horizontally to include the top of aggregate width, including designed widenings.

Payment

301.10 The accepted quantities will be paid at the contract price per unit of measurement adjusted according to Subsection 106.05 for the Section 301 pay items listed in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See

Subsection 109.05.

Los Pinos_fillable_cover_sheet
Appendix D
LOS PINOS IRSC AREA ROADS_Work Item Descriptions
Project Overview Map
Gate map
Aggreagate Surface Course map
Native Surface Maintenance map
Realignment map
Culvert Installation map
Coal Creek TH map
LosPinos_FawnGulch-156-01
Sheets and Views
LosPinos_FawnGulch-156-01
LosPinos_FawnGulch-156-02
Sheets and Views
LosPinos_FawnGulch-156-02
Heavy Duty Closure Gate long format
202-01
Sheets and Views
MAVREESO_DRAWINGS-202-01
LosPinos_FawnGulch-211-02
Sheets and Views
LosPinos_FawnGulch-212-01
LosPinos_FawnGulch-212-02
Sheets and Views
LosPinos_FawnGulch-212-02
LosPinos_FawnGulch- 212-04
Sheets and Views
LosPinos_FawnGulch-204-04 212-04
LosPinos_FawnGulch-301-01 302-01
Sheets and Views
LosPinos_FawnGulch-301-01 302-01
LosPinos_FawnGulch-303-01
Sheets and Views
LosPinos_FawnGulch-303-01
602-01
Sheets and Views
MAVREESO_DRAWINGS-602-01(1)
602-02
Sheets and Views
MAVREESO_DRAWINGS-602-02
602-03
Sheets and Views
MAVREESO_DRAWINGS-602-03

FSSS Mandatory Timber and LOS PINOS_FAWN GULCH AREA SPEC

sig1:
date1:
sig2:
date2:
sig3:
date3:
2026-07-16T09:19:44-0600
JERRY MCCAW
2026-07-16T09:20:12-0600
JERRY MCCAW
2026-07-16T09:33:03-0600
JOSHUA PECK