This is a specification document detailing requirements for maintenance and renovation work in family housing quarters at US Army Garrison Bavaria's Grafenwoehr Military Community - Rose Barracks in Germany. The work includes cleaning, repair and interior painting, repair and replacement of floors, and mold removal in government-owned family quarters, Bachelor Officers Quarters (BOQ), and Senior Enlisted Bachelor Officers Quarters (SEBOQ) in Rose Barracks (Vilseck) and Fitzthum Village, as well as leased quarters within a 40km radius.
The specifications outline detailed requirements for cleaning services (including floors, walls, appliances, fixtures, and outdoor areas), painting preparation and application, floor maintenance (hardwood, PVC, carpet), and mold remediation. The document includes bilingual English-German text and emphasizes compliance with both US and German regulations, particularly regarding worker safety, hazardous waste disposal, and security requirements. Contractors must obtain proper work permits and authorization to access US military installations. The work requires specialized certification for mold removal services and adherence to specific quality control and documentation requirements. The document serves as Attachment I to a larger contract package dated March 1, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 05 Attachment II Price Schedule.xlsx | XLSX spreadsheet | |
| 01 Cover letter.pdf | ||
| 02 Bid Label.pdf | ||
| Notice to 52.229-11+52.229-12+W-14.pdf | ||
| 06 Attachment III Totals.xlsx | XLSX spreadsheet | |
| W-14 Form-SAMPLE with fill-ins.pdf | ||
| W-14 Form.pdf | ||
| 03 Solicitation W912PB25B8001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 216 Pages Seite 1 von 216 Seiten
- 1 -
ATTACHMENT # I
DEPARTMENT OF THE ARMY
UNITED STATES ARMY GARRISON BAVARIA
DIRECTORATE OF PUBLIC WORKS
UNIT 28130
APO AE 09114-8130
1 March 2024
S P E C I F I C A T I O N
Maintenance of Family Housing Quarters, USAG Bavaria, Grafenwoehr Military Community - Rose Barracks
L E I S T U N G S B E S C H R E I B U N G
Renovierungen von Familienwohnungen, USAG Bavaria, Grafenwoehr Military Community - Rose Barracks
In the event of a disagreement between the English text and the courtesy translation of this specification the English text shall govern.
Im Falle einer Unstimmigkeit zwischen dem englischen Text der Leistungsbeschreibung und der Gefälligkeitsübersetzung ist der englische Text maßgebend.
Internal code: I24FH_V.docx, 29 May 2024, Morgeneier, last saved 29 May 2024 09:28:00, Morgeneier, Wolfgang Mr CIV DE USA IMCOM
- 2 -
TABLE OF CONTENTS
INHALTSANGABE
SUBJECT PAGE
TITEL SEITE
Cover Sheet Deckblatt 1
Table of Contents Inhaltsangabe 2
General Description Allgemeine Beschreibung 3
General Preamble Allgemeine Vorbemerkungen 4 - 28
Description of Specification Items Beschreibung der Positionen 29 - 216
This specification includes the following work:
Dieses Leistungsverzeichnis enthält folgende Arbeiten:
001 Cleaning Work Reinigungsarbeiten 29 - 72
002 Repair and Painting Work Reparatur und Anstricharbeiten 73 - 106
003 Repair and Replace Floors Reparieren und ersetzen von Bodenbelägen 107 - 164
004 Remove Mold and other Repair Work Entfernen von Schimmel und andere Reparaturarbeiten 165 - 216
- 3 -
GENERAL DESCRIPTION
Perform renovation work in Government owned family quarters, "Bachelor Officers Quarters (BOQ)" and "Senior Enlisted Bachelor Officers Quarters (SEBOQ)" in Rose Barracks (Vilseck) and Fitzthum Village (Vilseck), as well as in leased quarters in Amberg, Edelsfeld, Freihung, Hahnbach, Kaltenbrunn, Schlicht, Sorghof, Vilseck and others within a radius of 40 kilometers from Rose Barracks.
Among others perform the following work:
- Cleaning work
- Repair and interior painting
- Repair, sanding and sealing of hardwood floors, replace damaged hardwood floors by new PVC floors, replace PVC floors and carpet floors
- Remove mold, replace molded or damaged furnishings, replace damaged doors, blinds and gates, as well as repair concrete pavement at terraces.
ALLGEMEINE BESCHREIBUNG
In US-eigenen Familienwohnungen und Ledigenunterkünften "Bachelor Officers Quarters (BOQ)" und "Senior Enlisted Bachelor Officers Quarters (SEBOQ)" in Rose Barracks (Vilseck) und Fitzthum Village (Vilseck), sowie in den angemieteten Wohnungen in Amberg, Edelsfeld, Freihung, Hahnbach, Kaltenbrunn, Schlicht, Sorghof, Vilseck und anderen Orten innerhalb eines Radius von 40 km um die Rose Barracks werden Renovierungsarbeiten durchgeführt.
Unter anderem handelt es sich um folgende Arbeiten:
- Reinigungsarbeiten
- Reparatur und Innenanstrich
- Reparieren, abschleifen und versiegeln von Hartholzfußböden, austauschen von schadhaften Hartholzfußböden durch PVC Bodenbeläge, ersetzen von PVC Bodenbelägen und von Teppichbelägen
- Beseitigen von Schimmel, ersetzen von verschimmelten oder beschädigten Einrichtungsgegenständen, austauschen von beschädigten Türen, Jalousien und Toren, sowie reparieren von Betonpflaster auf Terrassen.
- 4 -
General Preamble Allgemeine Vorbemerkungen
1. Regulations
The work to be accomplished and material to be furnished shall be in accordance with the following standards and regulations:
a. DIN standards (German Industry Standards) of German Construction Contract Procedures (VOB), Part C, identified below are governing:
DIN 18 299 General Regulations for all kinds of Construction Work DIN 18 300 Earth Work DIN 18 318 Traffic Routes Construction Work, Unconnected Stone Pavings and
Tile Coverings, Borderings DIN 18 334 Carpentry and Constructional Timber Work DIN 18 340 Dry Wall Construction DIN 18 350 Plaster and Stucco Work DIN 18 352 Tile and Slab Work DIN 18 353 Floor Finishing Work DIN 18 354 Mastic Asphalt Work DIN 18 355 Joinery Work DIN 18 356 Parquetry Work DIN 18 363 Painting and Enameling Work, Surface Coatings DIN 18 365 Floor Covering Work DIN 18 366 Wall Papering Work DIN 18 381 Gas, Water and Sewer Systems within Buildings DIN 18 382 Low and Medium Voltage Systems with Nominal Voltage up to 36 kV DIN 18 451 Scaffolding Work
b. Other regulations:
VDE Regulation No. 0100 Erection of power installations, with rated voltages up to 1000 V
Pertinent accident prevention regulations of the employer's liability insurance association.
DIN 4 108 Thermal Insulation in Building Construction DIN 4 109 Sound Insulation in Building Construction DIN 18 202 Variation in Dimensions for the Evenness of Floor Coverings, Ceilings, Floor Finishing TT-E-489 H TypeI Enamel, alkyd, gloss for interior and exterior surfaces TT-E-505 B Enamel, alkyd, odorless, interior, high gloss TT-E-509 C Enamel, alkyd, semi-gloss, interior odorless, heat resistant up to 120°C = 248°F TT-E-545 C Enamel, alkyd, odorless, undercoat, interior TT-P-19-D Paint Latex, acrylic emulsion, exterior TT-P-29 J (2) Type I Paint, latex based, interior painting TT-P-25 E (2) Enamel, undercoat, exterior TT-S-179 B Sealer, surface, pigmented oil, plaster and wallboard TT-V-121 H Varnish, spar, water resistant TT-P-664 A Primer paint
- 5 -
1. Vorschriften
Die auszuführenden Arbeiten und zu liefernden Materialien müssen den folgenden Bestimmungen und Vorschriften entsprechen:
a. DIN Bestimmungen der VOB, Teil C, wie nachfolgend aufgeführt, sind gültig:
DIN 18 299 Allgemeine Regelungen für Bauarbeiten jeder Art DIN 18 300 Erdarbeiten DIN 18 318 Verkehrswegebauarbeiten, Pflasterdecken und Plattenbeläge in ungebundener Ausführung, Einfassungen DIN 18 334 Zimmer- und Holzbauarbeiten DIN 18 340 Trockenbauarbeiten DIN 18 350 Putz- und Stuckarbeiten DIN 18 352 Fliesen- und Plattenarbeiten DIN 18 353 Estricharbeiten DIN 18 354 Gussasphaltarbeiten DIN 18 355 Tischlerarbeiten DIN 18 356 Parkettarbeiten DIN 18 363 Maler- und Lackierarbeiten - Beschichtungen DIN 18 365 Bodenbelagarbeiten DIN 18 366 Tapezierarbeiten DIN 18 381 Gas-, Wasser- und Entwässerungsanlagen innerhalb von Gebäuden DIN 18 382 Nieder- und Mittelspannungsanlagen mit Nennspannungen bis 36 kV DIN 18 451 Gerüstarbeiten
b. Sonstige Bestimmungen:
VDE Bestimmung Nr. 0100 Bestimmungen für das Errichten von Starkstromanlagen mit Nennspannungen bis 1000 V
Einschlägige Unfallverhütungvorschriften der Berufsgenossenschaft
DIN 4 108 Wärmeschutz im Hochbau DIN 4 109 Schallschutz im Hochbau DIN 18 202 Maßtoleranzen für die Ebenheit der Oberflächen von Rohdecken, Estrichen und Bodenbelägen TT-E-489 H Type I Lackfarbe, Alkyd, glänzend für innen und außen TT-E-505 B Lackfarbe, Alkyd, geruchslos, innen, hochglänzend TT-E-509 C Lackfarbe, Alkyd mattglänzend, geruchslos, innen, hitzebeständig bis zu 120°C = 248°F TT-E-545 C Lackfarbe, Alkyd, geruchslos, Grundierung innen TT-P-19-D Farbe Latex, acrylic emulsion, außen TT-P-29 J (2) Type I Farbe, Latex basierend, für innen TT-P-25 E (2) Lackfarbe, Grundierung außen TT-S-179 B Grundierung für Oberflächen, pigmentiert, Putz und Sperrholz TT-V-121 H Klarlack, wasserabweisend TT-P-664 A Grundierfarbe
- 6 -
2. Authorization to Perform Work in Germany
a. Contractors performing work in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the contractor also shall determine what documents or authorization its employees and any subcontractor employees shall possess to work in Germany. The contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.
b. Contractor employees who:
(1) are not nationals of Germany or other European Union countries, and
(2) are not members of the force, the civilian component or their dependents, and
(3) do not have assimilated status under Articles 71, 72, or 73 of the
Supplementary Agreement to the NATO SOFA shall possess work and residence permits.
c. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations applicable to the performance of the work.
d. By acceptance of and performance under this contract and any task orders or delivery orders issued hereunder, the contractor affirms that it has complied with the requirements above. Compliance with this clause and German law is a material contract requirement. Noncompliance by the contractor or subcontractor at any tier shall be grounds for issuing a negative performance evaluation and terminating this contract, task order, or delivery order for default.
2. Befugnis in Deutschland zu arbeiten
a. Auftragnehmer, die in der Bundesrepublik Deutschland (BRD) Arbeitsleistungen erbringen, müssen deutsches Recht befolgen. Der Auftragnehmer muss ermitteln, ob die Ausführung der Arbeiten die Registrierung bei deutschen Behörden erfordert oder ob eine Genehmigung, Geschäfte zu tätigen, eingeholt werden muss, und - wenn dies der Fall ist - allen Anforderungen entsprechen. Gleichgültig, ob eine Registrierung oder die Genehmigung, Geschäfte zu tätigen, erforderlich ist, oder nicht, muss der Auftragnehmer ermitteln, welche Dokumente oder Autorisierungen seine eigenen Arbeitnehmer sowie sämtliche Arbeitnehmer von Subunternehmern besitzen müssen, um in Deutschland arbeiten zu dürfen. Der Auftragnehmer muss unbedingt sicherstellen, dass seine eigenen Arbeitnehmer und die Arbeitnehmer der Subunternehmer derartige Dokumente oder Autorisierungen besitzen.
b. Arbeitnehmer von Auftragnehmern, die:
(1) keine deutschen Staatsbürger oder keine Staatsbürger anderer Staaten der Europäischen Union sind, und
(2) keine Mitglieder der Streitkräfte, Zivilisten oder deren Familienangehörige sind, und
(3) über keinen gleichgestellten Rechtsstatus gemäß Artikel 71, 72, oder 73 der Zusatzvereinbarung zum NATO Truppenstatut verfügen (SOFA = Status of Forces Agreement), müssen Arbeits- und Aufenthaltsgenehmigungen besitzen.
- 7 -
c. Der Auftragnehmer ist, ohne dass zusätzliche Kosten für den Auftraggeber entstehen, dafür verantwortlich, jegliche Erlaubnis einzuholen und sämtliche notwendige Genehmigungen zu besorgen, und sich an sämtliche, für die Arbeitsdurchführung maßgeblichen Gesetze, Vorschriften und Bestimmungen zu halten.
d. Mit der Zustimmung zu diesem Vertrag und der Ausführung von Leistungen im
Rahmen dieses Vertrages und sämtlicher hierunter erteilten Arbeits- oder Lieferaufträge, versichert der Auftragnehmer die Erfüllung der obigen Anforderungen. Die Einhaltung dieser Klausel und des deutschen Rechts ist eine wesentliche Vertragsbedingung. Eine Zuwiderhandlung seitens des Auftragnehmers oder Subunternehmers, gleich auf welcher Ebene, hat die Erteilung einer negativen Arbeitsbeurteilung und die Beendigung dieses Vertrages, Arbeitsauftrages oder Lieferauftrages wegen Nichterfüllung zur Folge.
3. German Accident Prevention Laws and Regulations
The contractor shall comply with FAR 52.236-13, Accident Prevention, the references contained therein (e.g. EM 385-1-1), and applicable Host Nation Safety Laws and Regulations. The requirements under FAR 52.236-13 and specifically of the EM 385- 1-1 include, but are not limited to the following:
a. Before initiation of work at the job site, an accident prevention plan, written by the contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1, will be approved by designated Government personnel. Specific requirements for development of the accident prevention plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1- 1 is available online at www.usace.army.mil.
b. Before beginning any work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, an activity hazard analysis (AHA) shall be prepared by the contractor (see paragraph 01.a.09 of EM 385-1-1).
c. The contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.
d. The contractor shall discuss the plans in conferences convened by the contracting officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than 15 calendar days prior to initiation of work on each major phase.
e. In all areas where construction, demolition, alteration, building, or similar related activities take place, the contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(1) Short sleeve shirt.
(2) Long trousers.
(3) Steel-toed safety boots.
(4) Hard hat.
- 8 -
f. In addition to other requirements for accident prevention specified in this contract, the contractor is responsible for compliance with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction Sites, Baustellenverordnung (BaustellV), dated 10 June 1998, the contractor is responsible for coordination of all work at the site, including development of plans and providing advance notices. The contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the contractor shall assure that it complies with the non-exclusive list of duties described in this clause. If the contractor determines that additional activities are required to fully comply, the contractor shall assure that compliance with the laws is complete. The duties include:
(1) Conditions of construction and operational activities to be considered include but are not limited construction activities meeting the following criteria:
(a) The work is scheduled to last longer than 30 working days and on which more than 20 workers are occupied simultaneously, or
(b) The volume of work is scheduled to exceed 500 person days, or the work presents particularly hazardous tasks (e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater)).
(2) If the contractor determines that the BaustellV, dated 10 June 1998, applies, the contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator shall meet minimum training and experience requirements required under Host Nation laws.
(a) The SIGE shall be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:
(i) Maintenance of tools and equipment.
(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.
(iii) Modifying performance periods for such work, taking into consideration the site conditions.
(iv) Organizing cooperation between different employers and contractors without employees.
(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.
- 9 -
(b) The contractor is responsible for completing and providing any safety notifications required by host nation authorities and shall provide proof to the contracting officer that such notifications were made.
3. Deutsche Unfallverhütungsgesetze und -vorschriften
Der Auftragnehmer muss die FAR 52.236-13, Federal Acquisition Regulation, (Beschaffungsverordnung der US-Bundesbehörden) zur Unfallverhütung befolgen, sowie die darin enthaltenen Dienstvorschriften (zum Beispiel EM 385-1-1, Engineers Manual = Ingenieursdienstvorschrift) und die maßgeblichen Sicherheitsgesetze und Vorschriften des Gastgeberstaates. FAR 52.236-13 und besonders die Dienstvorschrift EM 385-1-1 umfassen unter anderem die nachfolgenden Anforderungen:
a. Noch vor Arbeitsbeginn auf der Baustelle, wird ein vom Auftragnehmer verfasster Unfallverhütungsplan für die spezielle Arbeit und die Gefahren des Vertrages, unter genauer Einhaltung der einschlägigen Anforderungen der Dienstvorschrift EM 385-1-1, von designiertem Regierungspersonal genehmigt. Die genauen Anforderungen für die Entwicklung des Unfallverhütungsplanes sind im Abschnitt 01.A und Anhang A der Dienstvorschrift EM 385-1-1 zu finden. Die Dienstvorschrift EM 385-1-1 ist online unter dem Link: www.usace.army.mil.
verfügbar.
b. Noch vor Beginn jeglicher Arbeiten, die Gefahren darstellen, welche in vorherigen Projektabläufen noch nicht vorkamen oder bei der ein neues Team oder Subunternehmer Arbeiten durchführen müssen, hat der mit der Tätigkeit betraute Auftragnehmer eine Tätigkeits-Gefahrenanalyse (AHA - activity hazard analysis) zu erstellen. (Siehe Paragraph 01.a.09 der EM 385-1-1)
c. Der Auftragnehmer hat seine Subunternehmer zu verpflichten, eine
Arbeitsablaufsplanung vorzulegen, die die beabsichtigten Maßnahmen für die Durchführung wichtiger Arbeitsphasen aufzeigt.
d. Noch bevor mit den Arbeiten für jede größere Arbeitsphase begonnen wird, muss der Auftragnehmer in vom Contracting Officer einberufenen Konferenzen seine Pläne besprechen. Die Pläne müssen alle relevanten Informationen enthalten, wie zum Beispiel Lagepläne für Transportstraßen, Zugangsstraßen, Ablagerungsflächen, elektrische Verteilungsleitungen, die Maßnahmen, die eine Gefährdung durch Überkopf-Lasten auf ein Minimum beschränken und die Art und Weise, wie die Arbeitsstätten erreicht werden können. Der Plan zur Verwirklichung der Arbeiten in der Anfangsphase muss innerhalb von 15 Kalendertagen nach Auftragsvergabe vorliegen. Pläne für größere, darauffolgende Arbeitsphasen müssen spätestens 15 Kalendertage vor dem Arbeitsbeginn jeder größeren Phase vorliegen.
e. In allen Bereichen, in denen Bau-, Abbruch- und Änderungsarbeiten durchgeführt, Bauwerke erstellt oder ähnliche, damit in Verbindung stehende Aktivitäten stattfinden, muss der Auftragnehmer als Mindesterfordernis für jeden Arbeiter oder Besucher die im Folgenden beschriebene, persönliche Schutzkleidung und Ausrüstungsteile zur Verfügung stellen:
(1) Kurzärmeliges Hemd
(2) Lange Hose
(3) Sicherheitsschuhe mit Stahlkappen
(4) Schutzhelm http://www.usace.army.mil/
- 10 -
f. Zusätzlich zu weiteren Anforderungen an die in diesem Vertrag aufgeführten Unfallverhütungsmaßnahmen, ist der Auftragnehmer für die Einhaltung aller Bundes-und Staatsvorgaben, die für den Sicherheits- und Gesundheitsschutz auf Baustellen maßgeblich sind, sowie anderer zutreffender berufsbezogener Sicherheitsvorschriften, verantwortlich. Im Besonderen innerhalb der Anforderungen der deutschen Verordnung über Sicherheit und Gesundheitsschutz auf Baustellen (Baustellenverordnung - BaustellV), vom 10 Juni 1998, ist der Auftragnehmer für die Koordination aller Arbeiten auf der Baustelle, sowie für die Planentwicklung und die Erbringung von Vorabmitteilungen verantwortlich. Der Auftragnehmer muss seinen Plan zur Einhaltung anzeigen unter Berücksichtigung der Arbeiten, welche im Design und im technischen Angebot beschrieben sind, der operativen Aufgaben der Regierung oder anderer im Arbeitsbereich, die Bestimmung des Koordinators und die Anwendung aller Unfallverhütungsmaßnahmen dieses Vertrages. Zur Einhaltung der Gesetze und Vorschriften des Gastgeberstaates stellt der Auftragnehmer sicher, dass er die nicht-exklusive Liste der in dieser Klausel beschriebenen Verpflichtungen befolgt.
Wenn der Auftragnehmer feststellt, dass zusätzliche Maßnahmen zur vollständigen Einhaltung notwendig sind, muss er sicherstellen, dass die Gesetze eingehalten werden. Die Verpflichtungen beinhalten:
(1) Die einzuhaltenden Konditionen für bauliche und betriebliche
Tätigkeiten beinhalten - unter anderem - Baumaßnahmen, die folgende Kriterien erfüllen:
(a) Die voraussichtliche Dauer der Arbeiten beträgt mehr als 30
Arbeitstage und es werden mehr als 20 Arbeiter gleichzeitig beschäftigt, oder
(b) Der Umfang der Arbeiten übersteigt 500 Personentage, oder die
Arbeit beinhaltet besonders gefährliche Tätigkeiten (z.B. Erdaushub in einer Tiefe von mehr als 5 Metern, Arbeiten in einer Höhe von über 7 Meter, Umgang mit gefährlichen chemischen oder biologischen Substanzen, Arbeiten in einem Abstand von weniger als 5 Meter von Hochspannungsleitungen, Tiefbau- oder Tunnelarbeiten, Gefahr zu ertrinken, Arbeiten mit Tauchgeräten, Arbeiten mit Druckluft, Arbeiten mit ionisierender Strahlung, Sprengstoff oder Arbeiten die den Aufbau bzw. Abbau von schweren Fertigbauteilen beinhalten (10 Tonnen oder mehr)).
(2) Stellt der Auftragnehmer fest, dass die BaustellV vom 10 June 1998, zutreffend ist, muss er gemäß dieser Verordnung einen Sicherheits- und Gesundheitsschutzplan (SIGE) erstellen. Der „SIGE“ muss zwei Wochen vor der Baustelleneinrichtung eingereicht werden. Außerdem muss der Auftragnehmer einen qualifizierten Sicherheitsbeauftragten bestimmen, der sicherstellt, dass alle Sicherheitsmaßnahmen während der Baumaßnahme umgesetzt werden. In Übereinstimmung mit der Rechtsordnung des Gastgeberstaates muss der Sicherheitsbeauftragte ein Mindestmaß an Training und die notwendigen Erfahrungen aufweisen.
(a) SIGE wird in umfassender Form geschrieben und in einer von den
Arbeitern verständlichen Sprache erklärt und soll mindestens folgende Informationen enthalten:
(i) Instandhaltung der Arbeitsmittel.
(ii) Vorkehrungen zur Lagerung und Entsorgung der Arbeitsstoffe und Abfälle, insbesondere umweltgefährdende Materialien und Gefahrstoffe.
(iii)Anpassen der Ausführungszeiten für die Arbeiten unter Berücksichtigung der Gegebenheiten auf der Baustelle.
(iv) Zusammenarbeit zwischen verschiedenen Arbeitgebern und Auftragnehmern ohne Beschäftigte.
- 11 -
(v) Wechselwirkungen zwischen den Arbeiten auf der Baustelle und anderen betrieblichen Tätigkeiten auf dem Gelände, auf dem oder in dessen Umgebung die erstgenannten Arbeiten ausgeführt werden.
Dabei sind die Anweisungen und Empfehlungen des Koordinators sowie der Sicherheits- und Gesundheitsschutzplan zu berücksichtigen.
(b) Der Auftragnehmer ist verantwortlich für die Erstellung und
Bereitstellung jeglicher, von der zuständigen Behörde des Gastgeberlandes geforderten, Sicherheitsbekanntmachungen und muss dem Contracting Officer einen Nachweis darüber liefern.
4. Instructions for Contractor's Quality Control Plan
a. The contractor shall coordinate with the COR (or receiving activity, if no COR has been appointed) to establish a contractor's Quality Control Plan (CQCP).
b. The contractor shall provide a copy of the CQCP annotated with the contract number to the COR at least one week after contract start date. The COR shall submit an approved copy to the contracting officer at the below listed address not later than three weeks after contract start date:
Regional Contracting Office Bavaria Building 542, Lager 92655 Grafenwöhr
c. In addition to any requirements in the specification or statement of work, the contractor's quality control plan shall have as a minimum:
(1) Identification and clearly defined authority of key personnel under the contractor's organization.
(2) A quality inspection system covering all general and specific tasks included in the contract scope of work. It should specify tasks or areas to be inspected on either a scheduled or unscheduled basis, and the manner in which inspections are to be conducted.
(3) The names of firms or individuals tasked to perform inspections and the extent of their authority. This may be in the form of an organization chart or other form approved by the contracting officer's representative (COR).
(4) Proposed test methods, including names of technicians or qualified testing laboratories to be used, if applicable. Tests shall be specified.
(5) A method of identifying deficiencies in the quality of services or construction performed before the level of performance becomes unacceptable.
(6) A method of documenting and enforcing quality control operations of both prime and subcontractor work, including inspection and testing.
(7) Key control, internal control or security procedures, if applicable.
(8) Any winterization plans and procedures for outdoor and exposed contractor and Government furnished equipment, if applicable.
(9) A method of identifying deficiencies in the quality of manufacturing, services, or construction performed before the level of performance becomes unacceptable.
(10) Detailed information specifying the types of action the contractor shall take to correct deficiencies and prevent their recurrence.
(11) Detailed information on the inspection methods used and proposed test methods, including names of technicians or qualified testing laboratories to be used, if applicable. Tests shall be specified.
- 12 -
4. Qualitätskontrollplan des Auftragnehmers
a. Der Auftragnehmer muss in Abstimmung mit dem COR (oder, falls kein COR ernannt wurde, mit dem Leistungsempfänger) einen annehmbaren Fertigungs- /Gütekontrollplan (CQCP) erstellen.
b. Eine Kopie des genehmigten Fertigungs-/Gütekontrollplans, unter Angabe der Vertragsnummer, muss spätestens eine Woche nach Vertragsbeginn beim Vertreter des Contracting Officers (COR) vorliegen. Der Vertreter des Contracting Officers hat den genehmigten Fertigungs-/Gütekontrollplans dem Contracting Officer spätestens drei Wochen nach Vertragsbeginn unter folgender Adresse einzureichen.
Regional Contracting Office Bavaria Building 542, Lager 92655 Grafenwöhr
c. Außer den Anforderungen des Leistungsverzeichnisses bzw. der Arbeitsbeschreibung, muss der Fertigungs-/Gütekontrollplan mindestens folgendes beinhalten:
(1) Benennung des verantwortlichen Schlüsselpersonals (Bauleiter etc.) und dessen Befugnisse innerhalb der Organisation des Vertragsnehmers.
(2) Alle speziellen Erfordernisse, die den Umfang der Arbeit ausmachen, müssen durch das Fertigungs-/Gütekontrollsystem abgedeckt sein. Die Art der Kontrolle/Inspektion, planmäßig oder außerplanmäßig, sowie die Arbeit/Arbeitsbereiche selber müssen genau dargelegt werden.
(3) Die Namen der Firmen oder Einzelpersonen, die damit beauftragt wurden, die Fertigungs-/Gütekontrollen durchzuführen und deren klare Befugnisse. Dies kann in der Form einer Organisationsübersicht oder eines anderen, vom Vertreter des Contracting Officers (COR) genehmigten Vorschlages erfolgen.
(4) Die beabsichtigten Prüfungsmethoden, unter Angabe der Namen der Techniker bzw. der Testlaboratorien, die dafür vorgesehen sind (falls zutreffend). Die Tests müssen ausführlich beschrieben werden.
(5) Eine Methode zur Feststellung von Mängeln im Arbeits-/ Leistungsablauf, die eine Nichtabnahme/-annahme seitens des Auftraggebers vorbeugend verhindert.
(6) Ein Nachweis- bzw. Ausführungsverfahren der Fertigungs-/ Gütekontrollmethoden von Leistungen des Hauptunternehmers als auch aller Subunternehmer, einschließlich der vorgesehenen Inspektionen und Tests.
(7) Alle wesentlichen und innerbetrieblichen Kontrollen sowie alle Sicherheitsmaßnahmen (falls zutreffend).
(8) Alle Pläne und Verfahren zur Winterfestmachung von ungeschützten Ausrüstungsgegenständen des Vertragsnehmers oder -gebers.
(9) Eine Methode zur Feststellung von Qualitätsmängeln in der Produktion, im Dienstleistungsbetrieb oder bei den Bauarbeiten, die eine Nichtabnahme/-annahme seitens des Auftraggebers vorbeugend verhindert.
(10) Ausführliche Informationen welche Maßnahmen der Auftragnehmer ergreifen wird um Mängel zu korrigieren und ihre Wiederholung zu verhindern.
(11) Ausführliche Informationen über die angewandten Inspektionsmethoden und die beabsichtigten Testmethoden, unter Angabe der Namen der Techniker bzw. der Testlaboratorien, die dafür vorgesehen sind (falls zutreffend). Die Tests müssen ausführlich beschrieben werden.
- 13 -
5. Disposal of Debris
a. The Sanitary Landfill Grafenwöhr will not accept material, such as asphalt, concrete, wood, construction debris, metal, branches, rootstocks, cardboard, hazardous waste (cleaning agents, paints etc.), dismantled material (cables, pipes, installation material etc.) or soil excavation. This material becomes property of the contractor and shall be disposed of in accordance with German laws and regulations (for example Closed Cycle and Waste Management Act, Ordinance of Waste Wood Management, Guideline 3.4/1 of the Bavarian Water Board for tar debris, etc.).
If applicable, the contractor shall commission a certified laboratory to analyze representative samples for classification. Sampling and chemical analysis of the excavated soil shall be executed according to LAGA PN 98 (German Interstate Working Party on Waste Processing - Ordinance for the procedure for physical, chemical and biological analyses in connection with recycling/removal of waste). If the sample analysis shows contamination classifications not included in any of the specification items, an appropriate contract modification will be issued.
b. Waste wood resulting from demolition work shall be disassembled individually and stored separate from other debris. The disposal shall be in compliance with the German Ordinance on the Management of Waste wood ("Altholzverordnung"). Waste wood shall be categorized and disposed of based on the Ordinance on the Management of Waste wood.
c. A copy of the waste consignment document shall be provided to the COR within four (4) weeks after the disposal.
d. The dismantled material shall be stored in water-tight covered containers until removal and shall be disposed of at least once a week.
e. Within USAG Bavaria, Grafenwöhr Military Community there is a separate sewer system for rain water and waste water. Therefore, accumulated waste water shall be disposed of via waste water duct in coordination with the COR.
5. Bauschuttabfuhr
a. Material, wie Teeraufbruch, Beton, Holz, Bauschutt, Metall, Äste, Wurzelstöcke, Kartonagen, Sondermüll (Reiniger, Farben, etc.), ausgebaute Materialien (Kabel, Rohre, Installationsmaterialien, etc.) oder Erdaushub werden nicht an der Mülldeponie im Lager Grafenwöhr angenommen. Diese Materialien werden Eigentum des Auftragnehmers und sind gemäß deutschen Gesetzen und Vorschriften (zum Beispiel Kreislaufwirtschaftsgesetz, Altholzverordnung, Merkblatt 3.4/1 des Bayerischen Landesamt für Wasserwirtschaft für Teeraufbruch, etc.) zu entsorgen.
Gegebenenfalls muss der Auftragnehmer ein zertifiziertes Labor beauftragen, repräsentative Proben zu untersuchen und entsprechend einzustufen. Die Probenahme und Analytik des Bodenaushubs muss nach der Richtlinie LAGA PN 98 (Länderarbeitsgemeinschaft Abfall - Richtlinie für das Vorgehen bei physikalischen, chemischen und biologischen Untersuchungen im Zusammenhang mit der Verwertung / Beseitigung von Abfällen) erfolgen. Falls die Probeuntersuchung eine Einstufung der Kontamination aufweist, die nicht in irgendeiner Position der Leistungsbeschreibung beinhaltet ist, wird eine entsprechende Vertragsmodifikation erstellt.
b. Fallen im Zuge der Abbrucharbeiten Holzabfälle an, sind diese separat zurück zu bauen und von den übrigen Abfällen getrennt zur Entsorgung bereit zu stellen.
Die Entsorgung ist in der Altholzverordnung geregelt. Der anfallende Holzabfall ist gemäß den Kategorien der Altholzverordung einzuteilen und zu entsorgen.
- 14 -
c. Eine Kopie des jeweiligen Entsorgungsnachweises muss dem COR innerhalb vier
(4) Wochen nach der Entsorgung ausgehändigt werden.
d. Bauabfälle sind bis zur Abfuhr in wasserdicht abgedeckten Containern zu lagern und mindestens einmal pro Woche abzufahren.
e. Im Bereich der USAG Bavaria, Grafenwöhr Military Community besteht ein Trennsystem für Regenwasser und Schmutzwasser. Anfallendes Schmutzwasser muss deshalb nach Angabe des COR über den Schmutzwasserkanal entsorgt werden.
6. Hazardous Waste
a. Hazardous waste (for example cleaning agents, paints, glue, containers of chemical products and materials) shall be disposed of at the appropriate waste disposal site in accordance with German law and regulation by the contractor.
Hazardous waste shall not be stored or dumped on U.S. Army controlled property.
Costs for hazardous waste disposal shall not be separately priced, unless specifically stated otherwise. A copy of the waste consignment document, accompanying papers and weight certificate shall be provided to the COR within four
(4) weeks after disposal.
b. Costs for the documentation of the disposal (such as waste consignment documents, accompanying and transfer papers, review by the Bavarian State Office for Environmental Protection (LFU)if the hazardous waste is not disposed of within Bavaria) shall be paid by the contractor.
6. Sondermüll
a. Sondermüll (zum Beispiel Reiniger, Farben, Kleber, Behälter von chemischen Produkten und Materialien) muss vom Auftragnehmer auf einem geeigneten Entsorgungsplatz nach deutschen Gesetzen und Vorschriften deponiert werden. Der Sondermüll darf nicht auf dem Territorium der U.S. Armee deponiert werden. Die Kosten für die Sondermüllabfuhr sind nicht gesondert aufzuführen, außer wenn dies ausdrücklich verlangt wird. Eine Kopie des Entsorgungsnachweises, Begleitschein und Wiegeschein muss dem COR innerhalb vier (4) Wochen nach der Entsorgung ausgehändigt werden.
b. Kosten für die Dokumentation der Entsorgung (z.B. Entsorgungsnachweise, Begleit- und Übernahmescheine, Überprüfung durch das bayerische Landesamt für Umweltschutz falls die Sonderabfälle nicht innerhalb Bayerns entsorgt werden) müssen vom Auftragnehmer übernommen werden.
- 15 -
7. Job Site Equipment and Storage
The contractor shall be responsible for the safe storage of materials and equipment. Upon approval from the COR and at their own risk the contractor may be authorized to erect containers for personnel and construction equipment/materials according to current German workplace ordinance. These containers shall be a minimum of 25 meters away from any building occupied by 10 or more personnel.
Construction materials and other equipment shall not be stored in U.S. buildings.
Upon completion of work the contractor shall clean up the storage area and return it to its original condition.
7. Baustelleneinrichtung und Materiallagerung
Der Auftragnehmer ist für eine sichere Lagerung der Materialien und Geräte selbst verantwortlich. Er darf mit Genehmigung des COR und auf eigene Gefahr Container für Personal und Baugeräte/Material gemäß der Arbeitstättenverordnung aufstellen.
Diese Container müssen mindestens 25 m von allen Gebäuden entfernt sein, in denen sich zehn oder mehr Personen aufhalten. Baumaterial und sonstige Gegenstände dürfen nicht in U.S. Gebäuden gelagert werden. Nach Beendigung der Arbeiten ist der Lagerplatz zu reinigen und wieder in den ursprünglichen Zustand zu versetzen.
8. Paints
All paints, oil, lubricating products and containers of chemical products and materials shall be disposed of at an appropriate waste disposal site according to German laws and regulations. They shall not be dumped on U. S. Army controlled property.
8. Farben
Alle Farben, Öle, Schmierprodukte und Behälter von chemischen Produkten und Materialien müssen auf einem geeigneten Entsorgungsplatz nach deutschen Gesetzen und Vorschriften deponiert werden. Sie dürfen nicht auf Eigentum der U. S. Armee deponiert werden.
9. German Paint Products
German paint products may be used. However, these products shall be in accordance with American specifications.
9. Deutsche Farbprodukte
Es können auch deutsche Farbprodukte verwendet werden. Diese müssen jedoch den amerikanischen Spezifikationen entsprechen.
- 16 -
10. Electromagnetic Compatibility Directive (Germany)
The contractor certifies that all electrical and electronic equipment and appliances furnished are in compliance with the Electromagnetic Compatibility Directive 2014/30/EU. For radio transmitting and telecommunication devices furnished in the Federal Republic of Germany, the contractor certifies that all such items have been approved by the Bundesamt für Zulassungen. Any penalties for noncompliance imposed by the Government of the European country where the equipment or appliances are delivered or product liability claims caused by interference generated by furnished appliances or equipment are solely the responsibility of the contractor.
10. Elektromagnetische Verträglichkeit (Deutschland)
Der Auftragnehmer bescheinigt, dass alle gelieferten elektrischen und elektronischen Betriebsmittel und Geräte mit der Richtlinie über die elektromagnetische Verträglichkeit 2014/30/EU übereinstimmen. Für Funkgeräte und Fernmeldeeinrichtungen, die in der Bundesrepublik Deutschland verwendet werden, bescheinigt der Auftragnehmer, dass diese vom Bundesamt für Zulassungen genehmigt wurden. Alle Strafen für die Nichteinhaltung dieser Bestimmungen, welche von Behörden des europäischen Landes erlassen werden, in die die Betriebsmittel oder Geräte geliefert wurden oder Produkthaftungsansprüche wegen Störungen, die durch die gelieferten Geräte oder Betriebsmittel verursacht wurden, gehen allein zu Lasten des Auftragnehmers.
11. Spill reporting procedures for contractors working within the Training Area/Tower Barracks and Rose Barracks
a. Applicability: In accordance with USAG Bavaria’s Environmental Management System (EMS) the following procedures shall be followed in the event of a spill of hazardous substances caused by vehicles or equipment of contractors working within the Training Area/Tower Barracks or Rose Barracks
b. Hazards for humans and environment:
- Release of hazardous substances during accidents (mainly Petroleum, Oil and
Lubricant (POL)products);
- Release of hazardous substances caused by equipment failure (mainly POL products)
- Release of hazardous substances during transportation of hazardous materials/waste (excluding Class 1, explosives).
c. Protective Measures and Procedures: The following requirements shall be met when operating a vehicle within the Training Area/Tower Barracks or Rose Barracks.
- Valid driving license appropriate for the vehicle;
- Valid hazardous cargo driver’s license for the transportation of hazardous material/hazardous waste;
- Follow the Road Traffic Regulation:
- Road Traffic Law (Straßenverkehrsgesetz - StVG);
- Road Traffic Regulation (Straßenverkehrsordnung - StVO)Federal Motor Vehicle
Safety Standards (Straßenverkehrs-Zulassungs-Ordnung - StVZO);
- 17 -
- European Agreement concerning the international carriage of dangerous goods by road (Accord europeen relatif au transport international des marchandises Dangereuses par Route - ADR);
- Load safety according to VDI 2700 and ADR
- Spill equipment shall be kept on hand (e.g. absorbent, absorbent pads etc.).
d. The following procedures shall be followed should hazardous situations arise:
- Within one (1) business day notify the COR and the local US Fire Department under the following number: 09641 – 83 8303 if hazardous substances (diesel, hydraulic fluid etc.), including hazardous waste, are released due to failure of vehicles or construction equipment;
- The contractor shall take immediate protective measures to prevent spilled material from spreading;
- The necessary spill clean-up shall be performed by the contractor or their subcontractors.
e. Emergency Procedures – First Aid:
- Secure scene of the accident;
- Inform the COR and the local U.S. Fire Department at 09641-83-8303 (emergency number: 09641-83-112);
- Provide first aid to injured individuals
f. Refueling, Maintenance, Disposal:
- To avoid impacting the environment, appropriate precautionary measures shall be taken during refueling of construction vehicles / equipment;
- Maintenance of vehicles and equipment shall only be conducted on paved surfaces connected to an oil/water separator (such as maintenance hardstands/refueling pads);
- The contractor is responsible for the disposal of hazardous substances and contaminated soil caused by accidents or failure of vehicles/equipment. Proof of proper disposal shall be provided to the COR within 14 days after receipt of the documentation (Entsorgungsnachweis).
11. Verhaltensregeln für Auftragnehmer bei Freisetzung von Gefahrstoffen auf dem Truppenübungsplatz/Tower Barracks (Grafenwöhr) bzw. Rose Barracks (Vilseck)
a. Geltungsbereich: Gemäß dem Umweltmanagementsystem (Environmental Management System – EMS) von USAG Bavaria, wird im Folgenden das Verhalten bei Freisetzung von Gefahrstoffen während des Betriebs von Baufahrzeugen von auf dem Truppenübungsplatz/Tower Barracks bzw. in der Rose Barracks tätigen Auftragnehmern beschrieben.
b. Gefahren für Mensch und Umwelt:
- Freisetzen von Gefahrstoffen bei Unfällen(in der Regel Mineralöle).
- Freisetzen von Gefahrstoffen durch defekte Maschinen (in der Regel Mineralöle).
- Freisetzen von Gefahrstoffen bei Gefahrstofftransporten/Sondermülltransporten
(ausgenommen Klasse 1, Sprengstoffe)
- 18 -
c. Schutzmaßnahmen und Verhaltensregeln: Voraussetzung für das Führen eines Fahrzeuges auf dem Truppenübungsplatz/Tower Barracks bzw. in der Rose Barracks:
- Gültige Fahrerlaubnis für das entsprechende Fahrzeug.
- Gültiger Gefahrgutführerschein beim Transport von Gefahrgut/Sondermüll.
- Einhalten der Vorschriften des Straßenverkehrsrechts:
- Straßenverkehrsgesetz (StVG)
- Straßenverkehrsverordnung (StVO)
- Straßenverkehrs-Zulassungs-Ordnung (StVZO)
- Europäisches Abkommen zum internationalen Transport von Gefahrgütern auf
Straßen (Accord europeen relatif au transport international des marchandises Dangereuses par Route - ADR).
- Ladungssicherung entsprechend VDI 2700 und ADR
- Ausrüstung zur Bekämpfung von Ölunfällen ist für den Notfall bereitzuhalten
(z.B. Bindemittel, Ölbindematten etc.).
d. Verhalten bei Störungen und im Gefahrfall:
- Bei Freisetzen von Gefahrstoffen (auch Sondermüll) oder Betriebsmitteln
(Hydrauliköl, Diesel usw.) durch Defekte an Fahrzeugen bzw. Baumaschinen sind innerhalb eines (1) Arbeitstages der COR und die Standortfeuerwehr unter der Telefonnummer 09641-83-8303 zu verständigen.
- Der Auftragnehmer hat dafür zu sorgen, dass geeignete Sofortmaßnahmen getroffen werden um ein Ausbreiten zu verhindern.
- Die anfallenden Reinigungsarbeiten sind vom Auftragnehmer bzw. Subunternehmer durchzuführen.
e. Verhalten bei Unfällen - Erste Hilfe:
- Unfallstelle sichern.
- COR und Standortfeuerwehr unter 09641-83-8303 (Notruf: 09641-83-112) verständigen.
- Verletzte versorgen.
f. Betanken, Instandhaltung, Entsorgung:
- Beim Betanken von Baustellenfahrzeugen / Baumaschinen sind geeignete
Vorsichtsmaßnahmen zu treffen, um Umweltschäden zu vermeiden.
- Instandhaltungsarbeiten an Fahrzeugen und Baumaschinen sind grundsätzlich nur auf befestigtem Untergrund mit Anschluss an einen Ölabscheider durchzuführen (z.B. Wartungs- und Betankungsflächen).
- Die Entsorgung von ausgelaufenen Substanzen oder von verunreinigtem Boden als Folge von Unfällen oder durch defekte Fahrzeuge/Baumaschinen ist vom Auftragnehmer selbst durchzuführen. Ein Nachweis über die ordnungsgemäße Entsorgung ist dem COR innerhalb von 14 Tagen nach Erhalt der Dokumentation (Entsorgungsnachweis) vorzulegen.
12. Security Checks
The contractor shall consider delays caused by checks when entering and leaving the construction sites on US installations, as this will not be separately reimbursed.
- 19 -
12. Sicherheitskontrollen
Verzögerungen bedingt durch Zugangskontrollen beim Betreten und Verlassen der Baustellen innerhalb von Liegenschaften der US-Armee sind vom Auftragnehmer zu berücksichtigen, da diese nicht extra bezahlt werden.
13. Anti-Terrorism/Operations Security (AT/OPSEC) Requirements
Contractors and subcontractors shall comply with the following marked AT/OPSEC requirements:
☒ a. Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation provost marshal office, director of emergency services, or security office. Contractor workforce must comply with all personal identification verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
☒ b. For contractors that do not require CACs, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB)(Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative), or at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
☒ c. iWATCH/iSALUTE Training. The contractor and all associated subcontractors shall brief all employees on the local iWATCH/iSALUTE program (training standards provided by the requiring activity AT officer). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.
☒ d. Antiterrorism Level 1 Training. The contractor and all associated subcontractors shall brief all employees on the local AT Level 1 program (training standards provided by the requiring activity AT officer). This locally developed training may change based on local threat at which time the AT officer will provide updated materials for the briefing. This training shall be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.
- 20 -
☒ e. OPSEC Training. The contractor and all associated subcontractors shall brief all employees on the local OPSEC program (training standards provided by the requiring activity AT officer) annually. This locally developed training may change based on local threat at which time the AT officer will provide updated materials for the briefing. This training shall be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.
13. Vorschriften zur Sicherheit und Anti-Terrormaßnahmen (AT/OPSEC)
Auftragnehmer und Subunternehmer sollen die folgenden markierten AT/OPSEC Vorschriften erfüllen:
☒ a. Vorschriften und Regelungen für den Zutritt zum Gelände und allgemeine Schutzmaßnahmen. Der Auftragnehmer und alle Subunternehmer müssen alle Unterlagen zur Durchführung einer Sicherheitsüberprüfung vorlegen, damit die Zutrittsvoraussetzungen der örtlichen Militärpolizei, der Abteilung für Katastrophenschutz sowie des Büros für Sicherheit erfüllt werden. Die Mitarbeiter der Vertragsfirma sind ausweispflichtig (FAR Klausel 52.204-9, Personal Identify Verification of Contractor Personnel) gemäß den Bestimmungen des U.S.
Verteidigungsministeriums, des Hauptquartiers der U.S. Armee, und den Bestimmungen vor Ort. Zusätzlich zu Änderungen aufgrund der Änderungsklausel zu diesem Vertrag, kann die Regierung die Sicherheitsmaßnahmen oder -vorschriften ändern, wenn sich die Sicherheitseinstufung (FPCON) eines Gebäudes oder Standorts ändert.
☒ b. Vertragsnehmer, für die keine CAC (allgemeine Zugangskontrollkarte) erforderlich ist, die jedoch Zugang zu Einrichtungen oder Liegenschaften des U.S.
Verteidigungsministeriums benötigen:
Vertragsnehmer und dazugehörige Subunternehmer müssen allen Anforderungen und Verfahren richterlicher Urteile unter Anwendung des "National Crime Information Center Interstate Identification Index (NCIC-III)" [Zwischenstaatliches Vorstrafenregister des Nationalen Auskunftszentrums für Kriminalität] sowie der Screening-Datenbank für Terroristen (Armee-Richtlinie 2014-05/Armee- Dienstvorschrift 190-13), und maßgeblicher Sicherheitsrichtlinien und Anweisungen (von einem Regierungsvertreter zur Verfügung gestellt), welche den Zutritt zu Liegenschaften und Einrichtungen betreffen, sowie die des örtlichen Kommandeurs und…