03b. CHPP Roof As-builts, various dates.pdf

PDF 3 MB Posted

Attached to
FTQW 251102 - Repair Roof B6203 (CHPP)
Solicitation number
25_1102
Issued by

About this file

This file contains as-built roofing drawings and technical specifications, primarily showing Firestone EPDM roofing system details and installation requirements. The drawings include detailed dimensions and specifications for roof membrane installation, including quickseam splice tape requirements, bonding adhesive details, and fastening specifications for wall/curb attachments. The document includes multiple roof plans for different buildings including East and West Filtration Buildings, Switchgear Building, Thaw Shed, and CAT Shed, along with EPDM installation details across multiple drawing sheets (EPDM-1 through EPDM-10).

The technical drawings show specific measurements like 1/8" to 1/2" tolerances for installations, 12" maximum spacing for fasteners, and 1" minimum overlap requirements for splice tape. Contact information for A&A Roofing Co. Inc. in Fairbanks, AK is prominently displayed throughout the drawings. These as-builts appear to be reference documents supporting the pre-solicitation for roof repairs at Building 6203 (CHPP) at Eielson AFB, Alaska.

View the file

Other files

File Type Posted
03. FTQW251102, DSN Rpr Roof B6203, SOW, 26 Nov 24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRESTONE INSULATION

NOTES:

1.

END LAPS OF QUICKSEAM SPLICE TAPE MUST2.

OVERLAP A MINIMUM OF 1" (25.4 mm).

QUICKPRIME PLUS

.090" PLATINUM EPDM MEMBRANE

3" QUICKSEAM SPLICE TAPE

.090" PLATINUM EPDM MEMBRANE

SUBSTRATE

(SEE NOTES)

FIRESTONE BONDING ADHESIVE

REFER TO FIRESTONE WEBSITE FOR MOST

CURRENT INFORMATION.

1/8" (3.2 mm) TO 1/2" (12.7 mm)

A

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

bi z

A

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

RPF STRIP ATTACHED

W

AL

L / C

UR

B

TO WALL/CURB

WALL / CURB

4.8 mm ) O

.C . M

AX

1-1/2" (38mm)

6" (152.4 mm) MAX.

1" (25.4 mm) MAX. & 1/8" (3 mm) MIN.

FIRESTONE QUICKSEAM

RPF STRIP (TYPICAL)

FIRESTONE FASTENER AND 2" METAL

PLATE AT 12" (304.8 mm) O.C. MAX.

(SEE NOTES)

WALL / CURB

W

AL

L / C

UR

B

12" (304.8mm) O.C. MAX.6" (152.4mm) 1-1/2" (38mm)

1" (25.4 mm) MAX. & 1/8" (3 mm) MIN.

1/2" (12.7 mm) 1-1/2" (38 mm)

FIRESTONE FASTENER AND 2"

METAL PLATE AT 12" (304.8 mm)

O.C. MAX. (SEE NOTES)

RPF STRIPW

AL

L / C

UR

B

ATTACHED

6" (152.4 mm) 1-1/2" (38.1 mm)

TO WALL/CURB

A

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

A R oo fin g C o.

, I nc

PO

B ox

Fa irb an ks

, A K

(9

) 4

-3 f (

7)

-2

A

A R oo fin g@ aa ro of in g.

2 - ROOF PLAN - SOUTH AND NORTH ELEVATIONS
EAST FILTRATION BUILDING GROUND - EQUIPMENT LEVEL AND ROOF PLANS
EAST FILTRATION BUILDING ROOF AND PLUMBING PLAN
Filtration BLDG ROOF PLAN
FILTRATION BUILDINGS ROOF FRAMING PLANS
SWITCHGEAR BLDG ROOF FRAMING PLANS
Thaw Shed Roofing Plan
EPDM-1 Roof Plan
EPDM-2 Roof Plan
EPDM-3 Roof Plan
EPDM-4 Securement Plan
EPDM-5 EPDM Details
EPDM-6 EPDM Details
EPDM-7 EPDM Details
EPDM-8 EPDM Details
EPDM-9 EPDM Details
EPDM-10 CAT Shed Roof Plan
WEST FILTRATION BUILDING GROUND - EQUIPMENT LEVEL AND ROOF PLANS
WEST FILTRATION BUILDING ROOF AND PLUMBING PLAN

File details come from the government source that posted it. Updated .