03b. CHPP Roof As-builts, various dates.pdf
PDF 3 MB Posted
- Attached to
- FTQW 251102 - Repair Roof B6203 (CHPP)
- Solicitation number
- 25_1102
About this file
This file contains as-built roofing drawings and technical specifications, primarily showing Firestone EPDM roofing system details and installation requirements. The drawings include detailed dimensions and specifications for roof membrane installation, including quickseam splice tape requirements, bonding adhesive details, and fastening specifications for wall/curb attachments. The document includes multiple roof plans for different buildings including East and West Filtration Buildings, Switchgear Building, Thaw Shed, and CAT Shed, along with EPDM installation details across multiple drawing sheets (EPDM-1 through EPDM-10).
The technical drawings show specific measurements like 1/8" to 1/2" tolerances for installations, 12" maximum spacing for fasteners, and 1" minimum overlap requirements for splice tape. Contact information for A&A Roofing Co. Inc. in Fairbanks, AK is prominently displayed throughout the drawings. These as-builts appear to be reference documents supporting the pre-solicitation for roof repairs at Building 6203 (CHPP) at Eielson AFB, Alaska.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 03. FTQW251102, DSN Rpr Roof B6203, SOW, 26 Nov 24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRESTONE INSULATION
NOTES:
1.
END LAPS OF QUICKSEAM SPLICE TAPE MUST2.
OVERLAP A MINIMUM OF 1" (25.4 mm).
QUICKPRIME PLUS
.090" PLATINUM EPDM MEMBRANE
3" QUICKSEAM SPLICE TAPE
.090" PLATINUM EPDM MEMBRANE
SUBSTRATE
(SEE NOTES)
FIRESTONE BONDING ADHESIVE
REFER TO FIRESTONE WEBSITE FOR MOST
CURRENT INFORMATION.
1/8" (3.2 mm) TO 1/2" (12.7 mm)
A
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
bi z
A
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
RPF STRIP ATTACHED
W
AL
L / C
UR
B
TO WALL/CURB
WALL / CURB
4.8 mm ) O
.C . M
AX
1-1/2" (38mm)
6" (152.4 mm) MAX.
1" (25.4 mm) MAX. & 1/8" (3 mm) MIN.
FIRESTONE QUICKSEAM
RPF STRIP (TYPICAL)
FIRESTONE FASTENER AND 2" METAL
PLATE AT 12" (304.8 mm) O.C. MAX.
(SEE NOTES)
WALL / CURB
W
AL
L / C
UR
B
12" (304.8mm) O.C. MAX.6" (152.4mm) 1-1/2" (38mm)
1" (25.4 mm) MAX. & 1/8" (3 mm) MIN.
1/2" (12.7 mm) 1-1/2" (38 mm)
FIRESTONE FASTENER AND 2"
METAL PLATE AT 12" (304.8 mm)
O.C. MAX. (SEE NOTES)
RPF STRIPW
AL
L / C
UR
B
ATTACHED
6" (152.4 mm) 1-1/2" (38.1 mm)
TO WALL/CURB
A
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
A R oo fin g C o.
, I nc
PO
B ox
Fa irb an ks
, A K
(9
) 4
-3 f (
7)
-2
A
A R oo fin g@ aa ro of in g.
| 2 - ROOF PLAN - SOUTH AND NORTH ELEVATIONS |
| EAST FILTRATION BUILDING GROUND - EQUIPMENT LEVEL AND ROOF PLANS |
| EAST FILTRATION BUILDING ROOF AND PLUMBING PLAN |
| Filtration BLDG ROOF PLAN |
| FILTRATION BUILDINGS ROOF FRAMING PLANS |
| SWITCHGEAR BLDG ROOF FRAMING PLANS |
| Thaw Shed Roofing Plan |
| EPDM-1 Roof Plan |
| EPDM-2 Roof Plan |
| EPDM-3 Roof Plan |
| EPDM-4 Securement Plan |
| EPDM-5 EPDM Details |
| EPDM-6 EPDM Details |
| EPDM-7 EPDM Details |
| EPDM-8 EPDM Details |
| EPDM-9 EPDM Details |
| EPDM-10 CAT Shed Roof Plan |
| WEST FILTRATION BUILDING GROUND - EQUIPMENT LEVEL AND ROOF PLANS |
| WEST FILTRATION BUILDING ROOF AND PLUMBING PLAN |
File details come from the government source that posted it. Updated .