This is a Questions and Answers document for federal contract solicitation 030ADV27R0008 issued by the National Library Service (NLS), a component of the Library of Congress.

The solicitation, issued as a FAR Part 12 commercial product acquisition on SF 1449, concerns development and production of a USB breath switch device for Digital Talking Book Machines (DTBMs). Key technical requirements include ISO 9001 certification of the contractor's quality-control processes by an accredited third-party registrar (required prior to contract performance), injection-molded enclosure and mouth tube components, submission of a Technical Data Package (TDP) derived from or updated based on a prior ATmega32U4/MPXV7002GP design, and delivery of firmware source code and hex files. The device must support 20-command DTBM control, user calibration, data retrieval, LED feedback, incorporate tubing/filters, and carry a 24-month warranty. External dimensions should be nominally 1.0 inch × 1.0 inch × 1.5 inch (width × length × height), though actual proposals should remain close to these nominal values. The contractor must deliver Technical Data Package materials including STEP files (OnShape or Solidworks acceptable), mechanical and electronics designs, source code, PCB Gerbers, and injection-mold tooling, with all intellectual property retained by NLS. The Library will furnish six Digital Talking Book Machines (two DS-1 Digital Standard Players, two DA-1 Digital Advanced Players, and two DA-2 Digital Advanced Players) as government-furnished equipment within 30 calendar days of contract start. The solicitation permits $0.00 pricing for NRE (non-recurring engineering) line items and allows subcontracting of injection molding and PCB assembly provided subcontractors are named in proposals. 3D-printed components are explicitly not acceptable; all parts must be injection-molded. The contract is firm-fixed-price across a five-year schedule with annual sample quantities of 20 units priced under the base year. Questions should be directed to jacmiller@loc.gov.

View the file

Other files

File Type Posted
Attachment J2 - Past Performance Questionnaire Revised.docx DOCX document
030ADV27R0008 0001.pdf PDF
Attachment J2 - Past Performance Questionnaire.docx DOCX document
Attachment J4 - Technical Data Package (TDP).zip ZIP file
Attachment J1 - Price Schedule.xlsx XLSX spreadsheet
030ADV27R0008.pdf PDF
Attachment J3 - Breath Switch Requirements.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-5 – Questions and Answers – 030ADV27R0008

1. C.3.4 ISO 9001: We have performed DLA prime contracts carrying higher-level quality requirements under its ISO 9001-aligned quality management system, which DLA audited and accepted. Will that audited system satisfy C.3.4 for this solicitation? If third-party certification is still required, is an offeror with a registrar audit scheduled at submission and the certificate in hand before the QA Plan is due acceptable? If not, is manufacturing at an ISO 9001-certified subcontractor acceptable?

Section C.3.4 requires the contractor’s quality-control processes to be certified to the applicable ISO 9001 standard by an accredited third-party registrar. Although a quality management system previously audited and accepted by the Defense Logistics Agency (DLA) demonstrates relevant quality management experience, it does not replace the third-party certification requirement.

An offeror is not required to possess ISO 9001 certification at the time of proposal submission. However, the successful offeror must obtain the required certification prior to the commencement of contract performance and maintain certification throughout the life of the contract. Offerors currently undergoing the certification process should provide information regarding their scheduled registrar audit, anticipated certification date, and approach to meeting this requirement as part of their technical proposal.

Manufacturing at an ISO 9001-certified subcontractor's facility is permissible. However, the subcontractor’s certification alone does not satisfy the prime contractor’s certification requirement under Section C.3.4. The prime contractor remains responsible for ensuring that all manufacturing, quality assurance, inspection, testing, and corrective-action processes comply with the requirements of the contract.

2. May the prime perform engineering, TDP, final test and release, with injection molding and PCB assembly subcontracted? Must those subcontractors be named in the proposal?

Yes, that would be acceptable. The subcontractor needs to be named in the proposal.

3. C.3.4 independent QC organization: Does a designated Quality Manager, separate from production, with documented hold and stop-ship authority satisfy this for a small business?

Yes. A designated Quality Manager who operates independently of production and has documented authority to stop production, place products on hold, prevent shipment, and require corrective actions and process or product changes is acceptable.

NLS does not require a separate quality-control department or a minimum number of quality-control personnel. The intent of this requirement is to ensure that quality-control decisions are made independently of production and that the designated personnel have sufficient authority to ensure compliance with all contract specifications.

The contractor shall document the Quality Manager’s roles, responsibilities, reporting structure, authority, and quality-control procedures in its Quality-Assurance Plan submitted to NLS for approval.

4. Attachment J-3 §3.1 “Target cost” is in the table of contents but has no text. Please provide it.

This has been removed from the attachment. It is up to the offeror to propose their price.

5. May the new TDP be derived from the prior TDP (ATmega32U4 / MPXV7002GP design), updated and re-documented, or is an independent design required?

Yes, it needs to be derived/updated from the prior TDP. However, a new design within the constraints of the prior TDP will be acceptable as well.

6. No firmware is included in the prior TDP. Is the contractor expected to develop the firmware from Appendix A? Is any existing firmware or reference unit available?

Yes, the firmware hex file and the corresponding source code is available.

7. What DTBM units (DS-1, DA-1, DA-2) and quantities will be Government-furnished, and when?

NLS will provide the successful contractor with the following Digital Talking Book Machines (DTBMs) as Government-Furnished Equipment to support engineering, development, verification, compatibility, and factory acceptance testing of the USB breath switch: Two (2) DS-1 Digital Standard Players, Two (2) DA-1 Digital Advanced Players and Two (2) DA-2 Digital Advanced Players. A total of six (6) DTBMs will be provided within 30 calendar days of the start of the contract's period of performance.

The contractor shall coordinate with the Contracting Officer's Representative (COR) if additional units are required to support production and testing activities. All Government-furnished DTBMs shall remain the property of NLS. The contractor shall be responsible for the maintenance, accountability, and safeguarding of the equipment throughout the contract's period of performance and shall return the equipment to NLS upon completion or termination of the contract.

8. Are native OnShape files required, or are STEP files plus native files from another CAD system acceptable?

STEP files will be acceptable. We currently have licenses for OnShape and Solidworks.

9. Are the 20 first-article samples priced under the Base Year “Annual Samples” line, not

NRE?

Yes, the 20 first-article samples are to be priced for the annual samples line item.

10. Could this device be 3Dprinted if we use medical grade filament? This would greatly reduce cost as there would not need to be tooling. Tooling used injection molding and can be quite costly.

3D printed parts would be inferior to an injection molded part and as such would not be acceptable.

11. The external dimensions of the enclosure shall be within 1.0 inch x 1.0 inch x 1.5 inch (WxLxH) Is this requirement set in stone? I do not believe that readily available sip and puff switches will fit inside of these dimensions. As there is nothing on the market close to this, it would have to be designed from scratch, which will not fit into your time frame.

The dimensions are nominal value and closely resemble the actual dimensions in the TDP. The Library would like to adhere to this dimension or very close to it. The Library provided a NRE timeframe for development of product design.

12. (References: Sections B.1, C.3.1.1, C.3.1.2, C.6, and Attachment J-1)

Solicitation 030ADV27R0008 is issued on SF 1449 as a FAR Part 12 Commercial Product acquisition. Where an offeror proposes an adapted, U.S.-manufactured commercial device developed at private expense (meeting all functional, 20-command DTBM control, user calibration, data retrieval, LED feedback, tubing/filter, and 24-month warranty requirements of Attachment J-3) at $0.00 NRE (CLIN 0001) across the five-year Firm-Fixed-Price schedule:

• 12a. Will the Library accept Form, Fit, and Function documentation and verification test reports in lieu of proprietary source code, PCB Gerbers, and mold transfer, allowing the contractor to retain ownership of its background IP and commercial injection-mold tooling?

No, the Library requires ownership of mechanical and electronics designs, source code, PCB Gerbers, tooling etc.

• 12b. Please confirm that entering \$0.00 for CLIN 0001 NRE line items in Attachment J-1 is acceptable and will not be deemed incomplete.

This is acceptable. Pricing is up to the offeror, but will not be subject to later changes once the contract is awarded.

• 12c. If a Technical Data Package (TDP) under Section C.3.1.1 remains required, please confirm that pre-existing tooling and background IP developed at private expense remain the sole property of the Contractor and may continue to be used and sold commercially.

This will be developed as part of the NRE process and the Library will retain ownership of all developed IP and design artifacts.

13. (References: Section C.3.1.1, Attachment J-3 pp. 3–4, and Attachment J-4)

Attachment J-3 and Attachment J-4 differ on several housing details (for example, 1.0" × 1.0" × 1.5" snap-fit in Attachment J-3 vs. 1.543" × 0.983" × 0.915" screw-fastened in Attachment J-4).

• 13a. Please confirm whether the housing dimensions and label recess callouts in Attachment J-3 are nominal reference values, and whether an injection-molded enclosure within 2.25" × 1.0" × 1.0" (< 1.0 oz)—incorporating an integrated USB-A plug, recessed custom NLS Breath Switch label, dual red/green LED window, Luer-lock fitting, clear food-safe tubing, garment clip, and inline filtered mouthpiece—is acceptable.

The snap fit references the assembly of the unit not the enclosure itself. The dimensions as found in the TDP are the actual dimensions of the current breath switch.

The J-3 dimension requirements are nominal but the actual dimension for the proposals needs to be close to it.

• 13b. Where 3D CAD models are required, are neutral STEP files acceptable in lieu of OnShape?

Yes.

14. (References: Attachment J-3 pp. 2, 4; Attachment J-4 Drawing A-0914-201-200)

Attachment J-3 (p. 2) specifies injection molding only for the enclosure and mouth tube.

Given the estimated annual volume (~450 units/year), is production-grade 3D printing permitted for the plastic lapel/garment clip component instead of custom injection molding, provided it meets all Attachment J-3 retention, adjustability, flammability, and drop-test requirements?

No. 3D printed parts are inferior to injection molded ones and would not be accepted.

15. (Reference: Section C.3.4, p. 10)

Is Section C.3.4 satisfied when production assembly is performed by an offeror’s ISO 9001-certified Contract Manufacturer (certified by an accredited third-party registrar), operating under the Prime Contractor’s quality plan, 100% Factory Acceptance Testing, and ANSI/ASQ Z1.4 (AQL 0.40) lot sampling?

No, not solely on the basis of the Contract Manufacturer’s ISO 9001 certification. As currently written, Section C.3.4 requires the Prime Contractor’s quality-control processes to be certified to the applicable ISO 9001 standard by an accredited third-party registrar.

The use of an ISO 9001-certified Contract Manufacturer is permissible; however, the Contract Manufacturer’s certification does not independently satisfy the Prime Contractor’s certification requirement. While the proposed quality-assurance plan, 100% Factory Acceptance Testing, and ANSI/ASQ Z1.4 lot sampling at an AQL of 0.40 are consistent with the solicitation’s quality-assurance and inspection requirements, these measures do not replace the ISO 9001 certification requirement. The Prime Contractor shall remain responsible for ensuring that all manufacturing, quality-control, inspection, testing, and corrective-action activities performed by its Contract Manufacturer comply with all contractual requirements.

16. (References: Attachment J-3, pp. 2, 4)

Attachment J-3 references ANSI/UL 60065 (since superseded by UL 62368-1) and ASTM E595-07. Do manufacturer material certifications (such as UL 94 plastic flammability ratings and food-safe/biocompatible tubing certifications) together with contractor drop testing satisfy these requirements without third-party laboratory or vacuum-chamber testing?

Yes, that would be acceptable.

17. (References: Sections C.3.1.1 and L.1.3, p. 55)

Section L.1.3 references manufacturing in accordance with Attachment J-4, while Section C.3.1.1 provides for an updated design. Please confirm that proposing modernized electronics and firmware (replacing aging components in Attachment J-4 while meeting all Attachment J-3 functional requirements) complies with Section L.1.3.

Yes, the manufacturing will be based on the updated design as developed per C.3.1.1

18. (References: Sections G.1 & L.1.1; Attachment J-2)

Section G.1 and Attachment J-2 list jacmiller@loc.gov, whereas Sections L.1.1 and L.1.2 list acmiller@loc.gov. Please confirm jacmiller@loc.gov is the correct address for questions, Past Performance Questionnaires, and proposals.

The correct email is jacmiller@loc.gov.

mailto:jacmiller@loc.gov