03 - DKFX 1072314 - Total Performance Time.pdf

PDF 153 KB Posted

Attached to
Repair Intersection Runway 03-21 & 15-33
Solicitation number
FA441826R0012
Issued by

About this file

This is a Performance Time Tabulation Form for a federal construction project (DKFX 1072314: Repair Intersection RW 3/21 & 15/33). The form establishes the contract schedule and timeline for a construction repair project with a project award date of August 1, 2026, and an estimated contract completion date of April 28, 2028.

The contract schedule allocates 112 calendar days for mobilization and submittal preparation, with construction activities scheduled to commence on November 21, 2026. The form establishes a total contract duration of 636 calendar days, including 479 calendar days designated for construction activities with inclement weather considerations. Construction is projected to be completed by March 14, 2028, followed by 45 calendar days allocated for closeout submittals in accordance with specification 01 78 00. The form includes a monthly inclement weather budget table spanning from July 2009 through January 2028, though all inclement weather percentages are currently set at 0%. The document references coordination with liquidated damages rates and requires verification of inclement weather days correlating to specification 01 32 00, paragraph 3.3.8.1. The form functions as a template for contractor submission and contracting office coordination of schedule and performance requirements.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Number of Construction

Performance Time Tabulation Form

1 Insert Project Number and Title (data linked to Liquidated Damages tab).

2 Insert current date (data linked to Liquidated Damages tab).

3 Insert estimated NTP.

4 Insert number of Mobilization & Submittal Preparation days you are allowing.

5 Insert number of days for any Special Order Materials Lead Time you are allowing.

6 Insert the Number of Construction Days/Month for each month without consideration of inclement weather days.

7 Insert the % of Month Impacted by Inclement Weather 8 Total number of Contract Days is displayed below.

9 Construction Complete Date is displayed below.

10 Performance Time tab data is linked to the Liquidated Damages tab. Coordinate current LD rates with Contracting.

Insert a safe NTP guesstimate (ToT + 3 months) Insert # days for Pre-Construction Submittals (Division 01) & Mobilization (60 Calendar Days) Insert # days for Special Order Materials (AHUs, Chillers, PEMBs, Equipment, etc.)

Excludes weekends, holidays, etc.

Inclement Weather Budget

Insert # days for Closeout Submittals IAW 01 78 00 (45 Calendar Days)

Days In

Average Inclement Weather

Days/Month (Ref.

Spec 01 32 00, para

% of Days of Month

Possible Inclement Weather Days Per

Non-constructi on days.

(Holidays, weekends, Verify the # Days in Month & # of Inclement Weather Days correctly coorelates to the # of Days per month in 01 32 00, para 3.3.8.1

Month Month 3.3.8.1) Days/Month Construction Month etc.)

July 2009 31 14 0 0% 0

Aug-26 31 9 0 0% 0 Sep-26 30 7 0 0% 0 Oct-26 31 5 0 0% 0 Nov-26 30 4 0 0% 0 Dec-26 31 6 0 0% 0 Jan-27 31 6 0 0% 0 Feb-27 28 5 0 0% 0 Mar-27 31 5 0 0% 0 Apr-27 30 5 0 0% 0 May-27 31 5 0 0% 0 Jun-27 30 8 0 0% 0 Jul-27 31 9 0 0% 0 Aug-27 31 9 0 0% 0 Sep-27 30 7 0 0% 0 Oct-27 31 5 0 0% 0 Nov-27 30 4 0 0% 0 Dec-27 31 6 0 0% 0 Jan-28 31 6 0 0% 0

Total: 0 Total: 0 0

"Construction Time" = 0 Period of Performance (PoP) = 636

Instructions:

Project Award 1-Aug-26 Mobilization & Submittal Preparation: 112

Special Order Materials Lead Time:

Construction Start Date: 21-Nov-26

Number of Construction Days: 0

Number of Inclement Weather Days: 0 DOR Calculated Calendar Days of Construction, Including Inclement Weather 479

Construction Complete 14-Mar-28

Number of Closeout Days: 45 Total Contract Days: 636

Estimated Contract Completion Date: 28-Apr-28

28-Jan-26

DKFX 1072314: REPAIR INTERSECTION RW 3/21 & 15/33

Performance Time Tabulation Form
Days In
Possible Inclement Weather Days Per

File details come from the government source that posted it. Updated .