This document contains a price proposal form for construction manager as constructor services for seismic upgrades, backfill tenant space, and building renovations at the Frank E. Moss Courthouse in Salt Lake City, Utah. The General Services Administration is soliciting proposals for CMc services including design phase services on a firm-fixed-price basis and optional construction phase services on a guaranteed maximum price basis. Proposed pricing should be provided using the template for 17 contract line item numbers including design services, basic construction, and optional upgrades such as HVAC and elevator replacements. Proposals are due in January 2021 and contract award is scheduled for May 2021. The work is to be completed in accordance with the project schedule with design phase services concluding in February 2022 and construction beginning in March 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Construction Manager as Constructor (CMc) Services - Frank E. Moss Courthouse Seismic Updgrades, Backfill, & Building Renovation, newest first.
File Type Posted
Amendment 0001 - SF 30 - Questions and Answers.pdf PDF
01 - The Solicitation - Amendment 0001.pdf PDF
01 - The Solicitation .pdf PDF
03 - Attachment 5 - SBU Information Request Form.doc DOC document
03 - Attachment 2 - KEY PERSONNEL PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
03 - Attachment 4 - Model Subcontracting Plan.docx DOCX document
04 - Standard Form 1442 - Solicitation Offer and Award.pdf PDF
06 - General Decision Number UT20200085 Dated 10.30.2020.pdf PDF
03 - Attachment 1 - OFFEROR PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
05 - The Agreement - Solicitation 47PJ0020R0183.pdf PDF
02 - Offeror Representations and Certifications Form.pdf PDF
03 - Attachment 6 - Authorized Negotiators.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Summary

OFFERORS SHOULD NOT ENTER INFORMATION ON THIS SHEET - TOTALS ARE CALCULATED FROM EACH CLIN TAB
TOTAL EVALUATED PRICE - SUMMARY OF CLINs
DESCRIPTIONTOTALS
CLIN 0001 Base Services - Moss Design Phase Services$ - 0
CLIN 0002 - Reserved$ - 0
CLIN 0003 GMP Optional Item 1 - Moss Construction Services$ - 0
CLIN 0004 GMP Optional Item 2 - Replace existing HVAC with new central system with five AHUs$ - 0
CLIN 0005 GMP Optional Item 3 - Replace existing HVAC with new central system with five EDEC AHUs$ - 0
CLIN 0006 GMP Optional Item 4 - Three new high efficiency boilers$ - 0
CLIN 0007 GMP Optional Item 5 - Heat recovery on air handlers$ - 0
CLIN 0008 GMP Optional Item 6 - New 5,000-pound capacity service elevator$ - 0
CLIN 0009 GMP Optional Item 7 - New 2,500-pount judge's elevator$ - 0
CLIN 0010 GMP Optional Item 8 - Upgrade interior car finishes in NE elevator #1 and SE elevator #2 and #3$ - 0
CLIN 0011 GMP Optional Item 9 - South lightwell: replace existing skylight with new single skylight$ - 0
CLIN 0012 GMP Optional Item 10 - South lightwell: replace existing skylight with four new 12'x12' modular skylights$ - 0
CLIN 0013 GMP Optional Item 11 - North lightwell: add new single skylight$ - 0
CLIN 0014 GMP Optional Item 12 - North lightwell: add six new 12'x12' modular skylights$ - 0
CLIN 0015 GMP Optional Item 13 - New single bay dock on west side of Moss$ - 0
CLIN 0016 GMP Optional Item 14 - Wood frames remain with custom wood sash replacement$ - 0
CLIN 0017 GMP Optional Item 15 - Full custom wood frames and custom sash replacement$ - 0
TOTAL EVALUATED PRICE$ - 0

CLIN 0001

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0001 - Base Service - Frank E. Moss Design Phase Services (Firm-Fixed Price)
DescriptionHoursHourly RateTOTALS
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
<insert description>$ - 0$ - 0
CLIN 0001 Summary of Design Phase Services$ - 0
Overhead (enter number as percent)$ - 0
CLIN 0001 Summary (Design Phase Services + OH)$ - 0
Profit (enter number as percent)$ - 0
CLIN 0001 Base Service Total Frank E. Moss Design Phase Services (Firm-Fixed Price)$ - 0

CLIN 0002 - Reserved

CLIN 0003

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0003 - GMP Optional Item 1 - Frank E. Moss Basic Construction Services
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0003 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0003 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0004

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0004 - GMP Optional Item 2 - Replace existing HVAC with new central system with five AHUs
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0004 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0004 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0005

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0005 - GMP Optional Item 3 - Replace existing HVAC with new central system with five IDEC AHUs
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0005 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0005 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0006

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0006 - GMP Optional Item 4 - Three new high efficiency boilers
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0006 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0006 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0007

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0007 - GMP Optional Item 5 - Heat recovery on air handlers
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0007 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0007 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0008

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0008 - GMP Optional Item 6 - New 5,000-pound capacity service elevator
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0008 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0008 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0009

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0009 - GMP Optional Item 7 - New 2,500-pound judge's elevator
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0009 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0009 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0010

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0010 - GMP Optional Item 8 - Upgrade interior car finishes in NE elevator #1 and SE elevators #2 and #3
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0010 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0010 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0011

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0011 - GMP Optional Item 9 - South lightwell: replace existing skylight with new single skylight
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0011 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0011 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0012

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0012 - GMP Optional Item 10 - South lightwell: replace existing skylight with four new 12'x12' modular skylights
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0012 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0012 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0013

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0013 - GMP Optional Item 11 - North lightwell: add new single skylight
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0013 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0013 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0014

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0014 - GMP Optional Item 12 - North lightwell: add six new 12'x12' modular skylights
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0014 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0014 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0015

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0015 - GMP Optional Item 13 - New single bay dock on west side of Moss
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0015 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0015 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0016

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0016 - GMP Optional Item 14 - Wood frames remain with custom wood sash replacement
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0016 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0016 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.

CLIN 0017

Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0017 - GMP Optional Item 15 - Full custom wood frames and custom sash replacements
DescriptionCOSTSTOTALS
Foundations$ - 0$ - 0
Basement Construction$ - 0$ - 0
Superstructure$ - 0$ - 0
Exterior Closure$ - 0$ - 0
Roofing$ - 0$ - 0
Interior Construction$ - 0$ - 0
Stairs$ - 0$ - 0
Interior Finishes$ - 0$ - 0
Conveyance Systems$ - 0$ - 0
Plumbing$ - 0$ - 0
HVAC$ - 0$ - 0
Fire Protection$ - 0$ - 0
Electrical$ - 0$ - 0
Equipment$ - 0$ - 0
Furnishings$ - 0$ - 0
Special Construction$ - 0$ - 0
Selective Building Demolition$ - 0$ - 0
Sitework - Building Related$ - 0$ - 0
Sitework - Non-Building Related$ - 0$ - 0
CLIN 0017 Target Estimated Cost of Work (ECW)$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)$ - 0
Fee for the Construction Work (enter number as percent)$ - 0
CLIN 0017 Guaranteed Maximum Price for Construction Services$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.