This document contains a price proposal form for construction manager as constructor services for seismic upgrades, backfill tenant space, and building renovations at the Frank E. Moss Courthouse in Salt Lake City, Utah. The General Services Administration is soliciting proposals for CMc services including design phase services on a firm-fixed-price basis and optional construction phase services on a guaranteed maximum price basis. Proposed pricing should be provided using the template for 17 contract line item numbers including design services, basic construction, and optional upgrades such as HVAC and elevator replacements. Proposals are due in January 2021 and contract award is scheduled for May 2021. The work is to be completed in accordance with the project schedule with design phase services concluding in February 2022 and construction beginning in March 2022.
View the file
Other files for this federal contract opportunity
Other files attached to Construction Manager as Constructor (CMc) Services - Frank E. Moss Courthouse Seismic Updgrades, Backfill, & Building Renovation, newest first.
CLIN 0017 GMP Optional Item 15 - Full custom wood frames and custom sash replacement
$ - 0
TOTAL EVALUATED PRICE
$ - 0
CLIN 0001
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0001 - Base Service - Frank E. Moss Design Phase Services (Firm-Fixed Price)
Description
Hours
Hourly Rate
TOTALS
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
<insert description>
$ - 0
$ - 0
CLIN 0001 Summary of Design Phase Services
$ - 0
Overhead (enter number as percent)
$ - 0
CLIN 0001 Summary (Design Phase Services + OH)
$ - 0
Profit (enter number as percent)
$ - 0
CLIN 0001 Base Service Total Frank E. Moss Design Phase Services (Firm-Fixed Price)
$ - 0
CLIN 0002 - Reserved
CLIN 0003
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0003 - GMP Optional Item 1 - Frank E. Moss Basic Construction Services
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0003 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0003 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0004
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0004 - GMP Optional Item 2 - Replace existing HVAC with new central system with five AHUs
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0004 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0004 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0005
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0005 - GMP Optional Item 3 - Replace existing HVAC with new central system with five IDEC AHUs
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0005 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0005 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0006
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0006 - GMP Optional Item 4 - Three new high efficiency boilers
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0006 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0006 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0007
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0007 - GMP Optional Item 5 - Heat recovery on air handlers
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0007 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0007 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0008
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0008 - GMP Optional Item 6 - New 5,000-pound capacity service elevator
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0008 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0008 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0009
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0009 - GMP Optional Item 7 - New 2,500-pound judge's elevator
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0009 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0009 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0010
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0010 - GMP Optional Item 8 - Upgrade interior car finishes in NE elevator #1 and SE elevators #2 and #3
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0010 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0010 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0011
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0011 - GMP Optional Item 9 - South lightwell: replace existing skylight with new single skylight
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0011 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0011 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0012
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0012 - GMP Optional Item 10 - South lightwell: replace existing skylight with four new 12'x12' modular skylights
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0012 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0012 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0013
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0013 - GMP Optional Item 11 - North lightwell: add new single skylight
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0013 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0013 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0014
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0014 - GMP Optional Item 12 - North lightwell: add six new 12'x12' modular skylights
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0014 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0014 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0015
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0015 - GMP Optional Item 13 - New single bay dock on west side of Moss
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0015 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0015 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0016
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0016 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
CLIN 0017
Offerors shall complete yellow cells only - gray cells will automatically calculate, please do not change formulas
CLIN 0017 - GMP Optional Item 15 - Full custom wood frames and custom sash replacements
Description
COSTS
TOTALS
Foundations
$ - 0
$ - 0
Basement Construction
$ - 0
$ - 0
Superstructure
$ - 0
$ - 0
Exterior Closure
$ - 0
$ - 0
Roofing
$ - 0
$ - 0
Interior Construction
$ - 0
$ - 0
Stairs
$ - 0
$ - 0
Interior Finishes
$ - 0
$ - 0
Conveyance Systems
$ - 0
$ - 0
Plumbing
$ - 0
$ - 0
HVAC
$ - 0
$ - 0
Fire Protection
$ - 0
$ - 0
Electrical
$ - 0
$ - 0
Equipment
$ - 0
$ - 0
Furnishings
$ - 0
$ - 0
Special Construction
$ - 0
$ - 0
Selective Building Demolition
$ - 0
$ - 0
Sitework - Building Related
$ - 0
$ - 0
Sitework - Non-Building Related
$ - 0
$ - 0
CLIN 0017 Target Estimated Cost of Work (ECW)
$ - 0
CMc Contingency Allowance (CCA) (enter number as percent)
$ - 0
Fee for the Construction Work (enter number as percent)
$ - 0
CLIN 0017 Guaranteed Maximum Price for Construction Services
$ - 0
Estimated Cost of Work (ECW) means the estimated cost of the construction work, not including home office overhead
CMc Contingency Allowance (CCA) means an allowance for the exclusive use of the contruction contractor to cover reimbursable costs during construction that are not the basis of a change order.
Fee for the Construction Work (Percentage): percentage established for the contractor's profit and home office overhead costs.
File details come from the government source that posted it.
Updated .